Fixingof Geotextile, Water Proof Membrane & Water Stopper

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

AFCONS INFRASTRUCTURE LTD

CONSTRUCTION OF TUNNEL T74-RB SOUTH PORTAL (2624)


IPWT- SUBCONTRACTOR - DAILY PROGRESS REPORT

Fixingof Geotextile, Water Proof Membrane & Water stopper


Chainage
Sl. No.

Block No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
80
81
82
83
84
85
79

From

To

125708.00
125720.50
125733.00
125745.20
125757.60
125770.00
125782.30
125794.60
125806.90
125819.20
125831.50
125843.80
125856.10
125868.40
125880.70
125893.00
125905.30
125917.60
125929.90
125942.20
125954.50
125966.80

125720.50
125733.00
125745.20
125757.60
125770.00
125782.30
125794.60
125806.90
125819.20
125831.50
125843.80
125856.10
125868.40
125880.70
125893.00
125905.30
125917.60
125929.90
125942.20
125954.50
125966.80
125979.10

Length. (M).

Cumalative
Length. (M).

12.50
12.50
12.20
12.40
12.40
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30

25.00
12.50
37.20
49.60
62.00
74.30
86.60
98.90
111.20
123.50
135.80
148.10
160.40
172.70
185.00
197.30
209.60
221.90
234.20
246.50
258.80
271.10

Geo-textile
Area

WPM
Date

Area

Water stopper
Date

RM

TEST
Date

Date

Result

Remarks

Kerb to be casted
Kerb to be casted
Kerb to be casted
Kerb to be casted
Kerb to be casted
Kerb to be casted
126052.90
126065.20
126077.50
126089.80
126102.10
126114.40
126126.70
126139.00
126151.30
126163.60
126175.90
126188.20
126200.50
126212.80
126225.10
126237.40
126249.70
126274.30
126286.60
126298.90
126311.20
126323.50
126335.80
126262.00

126065.20
126077.50
126089.80
126102.10
126114.40
126126.70
126139.00
126151.30
126163.60
126175.90
126188.20
126200.50
126212.80
126225.10
126237.40
126249.70
126262.00
126286.60
126298.90
126311.20
126323.50
126335.80
126348.10
126274.30

12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30

283.40
295.70
308.00
320.30
332.60
344.90
357.20
369.50
381.80
394.10
406.40
418.70
431.00
443.30
455.60
467.90
480.20
492.50
504.80
517.10
529.40
541.70
554.00
566.30

AFCONS INFRASTRUCTURE LTD


CONSTRUCTION OF TUNNEL T74-RB SOUTH PORTAL (2624)
IPWT- SUBCONTRACTOR - DAILY LABOR REPORT

S.NO
Main tunnel
1
2
3
4
5
6
7
8
9
10
Total
Escape Tunnel
1
2
3
4
5
6
7
8
9
10

Total

NAME

DESIGNATION

AFCONS INFRASTRUCTURE LTD


CONSTRUCTION OF TUNNEL T74-RB SOUTH PORTAL (2624)
IPWT- SUBCONTRACTOR - LIABILITY AMOUNT
MATERIAL SUPPLY INVOICES
DESPATCH QUANTITY
S.NO

DATE

GEOTEXTILE

WATER PROOF MEMBRANE

642
DESPATCH QUANTITY
HYDROPHYLIC

AFCONS INFRASTRUCTURE LTD


CONSTRUCTION OF TUNNEL T74-RB SOUTH PORTAL (2624)
IPWT- SUBCONTRACTOR - LIABILITY AMOUNT

S.NO

DESCRIPTION

Providing , laying & fixing protective felt (geo textile) with a minimum
weight of 500 g/m2
Inside tunnel
Outside tunnel

78301
82

Providing , placing , welding of 2 mm thick PVC membrane


Inside tunnel
Outside tunnel

SCOPE

Providing and placing hydrophilic type seals (bentonite water stops)

Toatl Supply
Total Apply

78301
82

100110

TOTAL RATE
UNIT

TOTAL AMOUNT

Material

Labour

Total

Material

Labour

Total

Sqm
Sqm

119
119

33
33

152
152

9317819
9758

2583933
2706

11901752
12464

Sqm
Sqm

598
598

38.5
38.5

636.5
636.5

46823998
49036

3014588.5
3157

246.5

10

256.5

24677115

1001100

RMT

80877726

6605484.5

RA BILL-1
Supply

49838586.5
52193

25678215

87483210.5

8.75

64372817

74%
6.437

RA BILL-1
Apply

Material received