Professional Documents
Culture Documents
Fixingof Geotextile, Water Proof Membrane & Water Stopper
Fixingof Geotextile, Water Proof Membrane & Water Stopper
Fixingof Geotextile, Water Proof Membrane & Water Stopper
Block No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
80
81
82
83
84
85
79
From
To
125708.00
125720.50
125733.00
125745.20
125757.60
125770.00
125782.30
125794.60
125806.90
125819.20
125831.50
125843.80
125856.10
125868.40
125880.70
125893.00
125905.30
125917.60
125929.90
125942.20
125954.50
125966.80
125720.50
125733.00
125745.20
125757.60
125770.00
125782.30
125794.60
125806.90
125819.20
125831.50
125843.80
125856.10
125868.40
125880.70
125893.00
125905.30
125917.60
125929.90
125942.20
125954.50
125966.80
125979.10
Length. (M).
Cumalative
Length. (M).
12.50
12.50
12.20
12.40
12.40
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
25.00
12.50
37.20
49.60
62.00
74.30
86.60
98.90
111.20
123.50
135.80
148.10
160.40
172.70
185.00
197.30
209.60
221.90
234.20
246.50
258.80
271.10
Geo-textile
Area
WPM
Date
Area
Water stopper
Date
RM
TEST
Date
Date
Result
Remarks
Kerb to be casted
Kerb to be casted
Kerb to be casted
Kerb to be casted
Kerb to be casted
Kerb to be casted
126052.90
126065.20
126077.50
126089.80
126102.10
126114.40
126126.70
126139.00
126151.30
126163.60
126175.90
126188.20
126200.50
126212.80
126225.10
126237.40
126249.70
126274.30
126286.60
126298.90
126311.20
126323.50
126335.80
126262.00
126065.20
126077.50
126089.80
126102.10
126114.40
126126.70
126139.00
126151.30
126163.60
126175.90
126188.20
126200.50
126212.80
126225.10
126237.40
126249.70
126262.00
126286.60
126298.90
126311.20
126323.50
126335.80
126348.10
126274.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
12.30
283.40
295.70
308.00
320.30
332.60
344.90
357.20
369.50
381.80
394.10
406.40
418.70
431.00
443.30
455.60
467.90
480.20
492.50
504.80
517.10
529.40
541.70
554.00
566.30
S.NO
Main tunnel
1
2
3
4
5
6
7
8
9
10
Total
Escape Tunnel
1
2
3
4
5
6
7
8
9
10
Total
NAME
DESIGNATION
DATE
GEOTEXTILE
642
DESPATCH QUANTITY
HYDROPHYLIC
S.NO
DESCRIPTION
Providing , laying & fixing protective felt (geo textile) with a minimum
weight of 500 g/m2
Inside tunnel
Outside tunnel
78301
82
SCOPE
Toatl Supply
Total Apply
78301
82
100110
TOTAL RATE
UNIT
TOTAL AMOUNT
Material
Labour
Total
Material
Labour
Total
Sqm
Sqm
119
119
33
33
152
152
9317819
9758
2583933
2706
11901752
12464
Sqm
Sqm
598
598
38.5
38.5
636.5
636.5
46823998
49036
3014588.5
3157
246.5
10
256.5
24677115
1001100
RMT
80877726
6605484.5
RA BILL-1
Supply
49838586.5
52193
25678215
87483210.5
8.75
64372817
74%
6.437
RA BILL-1
Apply
Material received