Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

S.

No

Description

Unit

Rate

Amount

S.No

Description

Quantification
Unit

Earth work in Excavation in Foundation.

2000.00

0.45

Back filling.

2000.00

0.45

WBM. 150mm

M2

2000.00

0.45

Asplating. 50mm

2000.00

0.45

Seal Coat

2000.00

0.45

Quantification
D

Quantity

S.No

1.20

1080.00

Earth work in Excavation in Foundation.

1.00

900.00

Back filling.

0.00

900.00

135

WBM. 100-75 chiping

0.00

900.00

45

0.00

900.00

4950

4764.15
1588.05
1016.352
317.61

5193
25.965

Description

3A

WBM. 50-65 chiping

4
4A
5
6
7

Asplating. (50mm) 25-32mm Agg


15-20mm Agg
Seal Coat 6mm chips
Asphalt 80 No (200 kg Barrel)
WBM

Quantification
Unit
Quantity

Rate

Amount

Cft

38113.20

12.00

457358.40

Cft

31761.00

6.00

190566.00

Cft

4765.00

25.00

119125.00

Cft

1588.00

25.00

39700.00

Cft
Cft
Cft
Barrel
sqm

1016.00
635.00
320.00
26.00
900.00

27.00
27.00
23.00
6000.00
150.00

Machinary @ 20%

27432.00
17145.00
7360.00
156000.00
135000.00
1149686.40
229937.28
1379623.68