S.

NO
.

DESCRIPTION

UNIT QTY

RATE

SECTION-1INSTALLATIONOFEQUIPMENTS.

Installation , testing and commissioning of VRV/VRF air conditioning units of different capacities (as
per
mentioned in schedule) complete in all respects, ready to operate including installation of supports,
brackets, branch distributor rubber isolator, flashing, gas charging, flexible duct connector, control
wiring & power wiring (connection) in G.I. for external / PVC for internal from outdoor unit to indoor
unit complete in all respects ready to operate.(EXCLUDING LIFTING/TRANSPORTATION OF OUTDOOR
UNITS) PART OF A/C SUPPLIER
CU-02 ( 32 HP = 16 HP + 16 HP Outdoor Units )
Set
2

(Wall Mounted indoor units 1 HP)

No.

(Wall Mounted indoor units 1.25 HP)

No.

(Wall Mounted indoor units 2 HP)

No.

11

(Wall Mounted indoor units 2.5 HP)

No.

SUB TOTAL:
SECTION-2PIPING
7

Installation, testing and commissioning of refrigerant


pipes (liquid + gas) with insulation, PVC tape wrapping
Lot
+ control wiring from indoor to outdoor for Split type
units complete in all respects ready to operate.

Lot

SUB TOTAL:

SECTION-4ELECTRICAL
1

Supply and installation of electrical wiring from owner


Lot
supplied
SUB and
TOTAL:
electrical panel to all VRF indoor units
outdoor units
SECTION-4DRAINPIPING
Supply and installation of Upvc cable tray for refrigerant
pipes and
control wiring inside the building complete in all respects Lot
including hangers, supports brackets as per instruction of
Consultant.
SUB TOTAL:
Grand Total PKR

Lot

Lot

AMOUNT
(Rs.)

different capacities (as

installation of supports,
duct connector, control
m outdoor unit to indoor
ORTATION OF OUTDOOR