Section - 1 Installation of Equipments.: S.No - Description Unit Qty Rate
Section - 1 Installation of Equipments.: S.No - Description Unit Qty Rate
NO
.
DESCRIPTION
UNIT QTY
RATE
SECTION-1INSTALLATIONOFEQUIPMENTS.
Installation , testing and commissioning of VRV/VRF air conditioning units of different capacities (as
per
mentioned in schedule) complete in all respects, ready to operate including installation of supports,
brackets, branch distributor rubber isolator, flashing, gas charging, flexible duct connector, control
wiring & power wiring (connection) in G.I. for external / PVC for internal from outdoor unit to indoor
unit complete in all respects ready to operate.(EXCLUDING LIFTING/TRANSPORTATION OF OUTDOOR
UNITS) PART OF A/C SUPPLIER
CU-02 ( 32 HP = 16 HP + 16 HP Outdoor Units )
Set
2
No.
No.
No.
11
No.
SUB TOTAL:
SECTION-2PIPING
7
Lot
SUB TOTAL:
SECTION-4ELECTRICAL
1
Lot
Lot
AMOUNT
(Rs.)
installation of supports,
duct connector, control
m outdoor unit to indoor
ORTATION OF OUTDOOR