Professional Documents
Culture Documents
Key Plan: URBANE-The Design Workshop
Key Plan: URBANE-The Design Workshop
STRUCTURAL CONSULTANT:
ELECTRICAL CONSULTANT:
PLUMBING CONSULTANT:
HVAC CONSULTANT:
NOTES:
1.
3600
470
470
470
0.00.
2. DRAWING TO BE READ IN CONJUNCTION WITH
RELEVANT CONSULTANTS' DRAWINGS.
3. ANY DISCREPANCIES TO BE BROUGHT TO THE
NOTICE OF THE ARCHITECT.
4. DRAWING TO BE READ AND NOT SCALED.
5. ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED.
6. ALL DIMENSIONS TO BE VERIFIED ON THE SITE BY THE
SITE ENGINEER.
7. ALL LEVELS ARE FINISHED LEVELS.
8. THE DRAWING IS THE COPYRIGHT OF THE
ARCHITECT AND SHOULD NOT BE USED FOR ANY
OTHER PURPOSE.
KEY PLAN
8880
LEVEL
GYPSUM BOARD
2400 MM
2700 MM
MR BOARD CEILING
2400 MM
PREPARED BY:
CHECKED BY:
470
600
APPROVED BY:
600
01
NORTH
CLIENT:
SUN PHARMACEUTICAL INDUSTRIES LTD
PROJECT:
R&D CENTER BLOCK-II
AT VILLAGE SARHAUL- GURGAON
PROJECT TITLE :
PROJECT NUMBER :
DATE :
DRAWN BY :
CHECKED BY :
DRAWING NUMBER:
SCALE :
103 - SPG
24.08.2015
KP
DK
SP-FC-01
--