Item RM: COEB442 Engineering Economics Semester 1 2016/2017 Assignment 1
Item RM: COEB442 Engineering Economics Semester 1 2016/2017 Assignment 1
Assignment 1
RM
1,000,000
740,000
30,000
1,200,000
40,000
100,000
150,000
10,000
30,000
80,000
100,000
600,000
800,000
20,000
ii.
iii.
calculated in (i).
If the average current ratio for industry is 9, what can u say about
the performance of the company?
iv. Prepare the Profit & Loss and Balance Sheet for Alladins Sdn Bhd.