Analysis
Comments of WKV
1.
2.
3.
- The condition of the turbine is ready for operation, gate valve remain
installed and will be closed by means of plate between flanges
- After flushing from the dam to the headpond, then open the gate of
flushing inlet penstock. If the condition of the turbine is ok, flushing will
be discharged through the bypass and closed at the end of the bifurcation.
- Arkora Hydro will send letter to WKV for the consideration of test
pressure of the headpond or of AB 7
Kind regards
WKV
WASSERKRAFT VOLK AG
Bernhard Wernet
Head of Installation
Commissioning and Service