Professional Documents
Culture Documents
Ieema PV Cable
Ieema PV Cable
Due
28580127730
Phone : 011-73310001
Fax
: 011-23313707.
From
Chief General Manager (P&MM),
APCPDCL, 4th floor, Corporate Office,
Mint Compound, Hyderabad 500 004.
To
M/s. Hindustan Vidyuth Products Ltd.,
Kanchenjunga, (7th floor) 18,
Barakhamba Road,
New Delhi-110001
PRICES :
The prices noted below are Variable in rupees, Free at destination stores,
inclusive of Freight & Insurance, Excise duty @ 10%, Education Cess @ 3% on ED
and
CST @ 2% against C form.
The prices are subject to adjustment due to variation in the following factors.
The prices are variable with 50% ceiling on Ex-works price on positive side and no
ceiling on negative side as per Clause 14.8 of General Terms and Conditions of
specification with base date as 01-08-2011 as per IEEMA Circular with the following
price variation formula.
P = Po + AlF(AL-Alo) + CCFAI(CC-Cco) + FeF (Fe - Feo)
For any price variation up or down in the prices of raw materials as defined
above of Rupee one in price per MT of EC Grade Aluminium Rods (Al), PVC
Compound (CC) Grade CW 22 and Steel for Armouring (Fe) of Flat 4 mm x 0.8 mm,
the corresponding increase or decrease in price per KM of finished Cable allowable
shall be as given below.
Sl.N
o.
1.
2.
3.
Description
Variation factor
AIF
CCFAI
FeF
1.605
2.406
1.113
date of delivery) or the contracted delivery date including any agreed extension
thereto whichever shall be the earlier.
:: 2 ::
If the date of delivery as defined in the P.V. formula is beyond the contracted
delivery date, the scheduled delivery date or inspection offer date or the actual
delivery date which ever is advantageous to the purchaser will form the basis for
calculation of price variation.
As far as practicable, prices will be revised (upward or downward) abinitio, to
take care of any variation in prices of raw materials as defined above but if for any
reason it is not found to practicable shall be effected at the contracted price and
price variation claimed subsequently through a supplementary bill which will be
paid as per the documentary evidence, proof or certificate in regard to the price
variation bill is required by this office, the supplier shall have to furnish the same.
If there is downward revision in the prices of raw materials at the time of
supply, the suppliers shall invariably claim the invoices at reduced rates on account
of such downward revision.
3.
SCHEDULE OF MATERIALS :
Sl.
No
.
Particulars
1.
Size in
sq.mm
Qty.
in
(KM
)
11 KV
3Cx185
Sq.mm
50
6,16,500.00
Ex-works
5,28,703.50
E.D. & Cess
@ 10.3%
CST @ 2%
F&I
Amount
Rs.
3,08,25,000
0
:
: 54,456.46
: 11,663.20
: 21,676.84
------------------
Total :
6,16,500.00
------------------
Total:
3,08,25,00
00
(Rupees Three Crores Eight Lakhs and Twenty Five Thousand Only)
4.
DELIVERY : The supply of material shall be commenced in one month from
the date of receipt of technically, commercially clear purchase order and shall be
complete the supplies as detailed below.
By 30-04-2012
By 31-05-2012
By 30-06-2012
15 KM
15 KM
20 KM
:: 3 ::
5.
PERFORMANCE GUARANTEE : You are requested to furnish Performance
Guarantee in the form of DD / Bank Guarantee in the prescribed proforma within
15 days of receipt of purchase order to the extent of 10% value of the purchase
order valid upto 2 months over and above the guarantee period to draw 100%
payment. The Bank Guarantee shall be furnished only from the Nationalized Bank.
6.
TERMS OF PAYMENT :
100% payment will be arranged on or after 30 days reckoned from the date of
certified receipt of material / equipment in good condition at the destination / stores
duly transferring the said amount to the bank account of the supplier by the
purchaser bank. The supplier will have to predefine the Bank details while entering
into contract.
The 100% payment mentioned above is subject to on submission of
performance security to the extent of 10% of the value of the contract by the
supplier.
The supplier should invariably submit test certificates and other documents
before despatch of the material to the destination stores so that they can be
checked and approved well in advance.
The performance guarantee to be executed in accordance with this
specification will be furnished on a stamp paper of value Rs.100/-. The Bank
Guarantee will be extended if required suitably.
If the supplier has received any over payments by mistake or if any amounts
are due to the APCPDCL due to any other reason, when it is not possible to recover
such amounts under the contract resulting out of this specification, the APCPDCL
reserves the right to collect the same from any other amount and / or Bank
Guarantees given by the company due to or with the APCPDCL.
When the supplier does not at any time, fulfill his obligations in replacing /
rectifying etc. of the damaged/defective materials in part or whole promptly to the
satisfaction of the APCPDCL Officers, the APCPDCL reserves the right not to accept
the bills against subsequent dispatches made by the supplier and only the supplier
will be responsible for any demurrages, wharfages or damage occurring to the
consignments so dispatched.
7.
8.
DESPATCH :
(A)
(B)
ACKNOWLEDGEMENT :
The Lorry receipt should be sent to the persons noted against each circle and
should be accompanied by two copies of the invoice/challan, one of which will be
returned to you direct in token of acknowledgement of receipt of the goods. A copy
of the invoice shall be sent to this office as soon as despatch is made.
9.
LOSS OR DAMAGE :
External damages or shortages that are prima facie the result or rough
handling in transit or due to defective packing will be intimated within a fortnight of
receipt of materials. Internal defects damages or shortages or any internal parts
which cannot ordinarily be detected on superficial examination though due to bad
handling in transit or defective packing would be intimated within 2 months from
the date of receipt of the materials. In either case the damaged or defective
materials should be replaced by you free of cost.
:: 4 ::
Where any materials supplied by you are found defective in whole or in part
WITHIN THE GUARANTEE PERIOD, you will be intimated of the same. You should
take immediate steps to rectify the defects or to replace the defective materials free
of cost. If no steps are taken within 15 days of receipt of intimation of defects or
such other reasonable time as the APCPDCL may deem to afford the APCPDCL may
without prejudice to its rights and remedies, cause to replace the same and recover
the expenditure incurred therefore from the deposits such as EARNEST MONEY
SECURITY DEPOSIT AND PERFORMANCE or other monies available with APCPDCL or
by resorting to legal action and also decline to accept further deliveries of materials.
The defective portions or whole of the materials so replaced should give
satisfactory performance till the expiry of six months from the date of such
replacement or until the end of guarantee period whichever may be later.
For the purpose of any legal construction, the materials should be deemed to
pass into APCPDCLs ownership only at the destination stores where they are
delivered and accepted.
The APCPDCL reserves the right apart from the above said provisions, not to
accept further despatches of materials and the connected bills etc., under
conditions of your continued negligence to replace any materials supplied earlier
and received in damaged condition or failed within the guarantee period, or not
conforming to the purchase order specification.
10.
GUARANTEE :
DEFECTIVE SUPPLIES :
If, during the guaranteed period, the cables are found to be defective in
materials or workmanship it shall be replaced by you free of cost.
12.
:: 5 ::
Any variation up or down in Excise Duty, or Sales Tax or other statutory
levies, or new levies introduced after placing of the order, under this specification,
shall be to the APCPDCLs account, provided that, the delivery schedules are
adhered to by the supplier. In case, if there are increases in excise duty or sales tax
or other statutory levies or new levies after the agreed delivery dates, the supplier
shall bear the impact of these levies and if there is downward variation/revision
APCPDCL shall be given credit to that extent.
In case you do not adhere to the delivery schedule the APCPDCL reserves the
right to purchase the balance quantity from the open market and recover
expenditure incurred from you.
This is in addition to the right of the APCPDCL
mentioned in first para of this clause and under law.
13.
INSPECTION :
14.
a)
The drum along with the UG Cable shall be weighed 4 or 5 empty reels
normally used for winding the UG Cable shall also be weighed. Net
weight of the UG Cable shall be calculated by subtracting average
weight of the empty reel from the gross weight of the drum containing
UG Cable. Having known the weight of the UG Cable and other
parameters of the conductor its length can be computed.
b)
ALTERNATIVELY :
Transfer the UG Cable from one reel to the other
while at the same time measuring the length of the UG Cable so
transferred by means of meter.
To ensure that the equipment are in accordance with the specifications, the
supplier shall adopt suitable quality assurance programme to control such activities
at all points, as necessary. The QA programme shall be generally in line with the
ISO-9000/IS-14000.
:: 6 ::
The supplier shall be required to submit two sets of the following Quality
Assurance documents within three weeks of receipt of order (preferably through
compact discs).
15.
(i)
(ii)
(iii)
The technical particulars as per the ISI shall be guaranteed by you for the
supplies against this order. Also refer to the Annexure-I.
16.
FORCE MAJEURE:
You shall not be liable for any liquidated damages for delay or for failure to
perform the contract, for reasons for force majeure such as Acts of God, Acts of
Public Enemy, Acts of Government, Fires, Epidemics, Quarantine restrictions, strikes,
Riots, Freight Embargoes and provided that you shall within ten days from the
beginning of such delay, notify the APCPDCL in writing the cause of delay, the
APCPDCL shall verify the facts and grant such extension as facts justify.
17.
EXTENSION OF TIME :
TEST CERTIFICATES :
The latest certificates containing the results of the tests as per ISS (of latest
issue) must be submitted to Chief General Manager/P&MM, 4 th floor, Corporate
Office,
Mint Compound Hyderabad and got approved by him before sending
bills for payment.
19.
DESPATCH INSTRUCTIONS:
To be sent to the
APCPDCLs Stores at
Anantapur
Kurnool
Nalgonda
Mahabubnagar
Sangareddy
Hyderabad
R.R. Dist.
Materials to be
consigned and
despatched to
ADE/Stores/APCPDCL.
Anantapur
Kurnool
Nalgonda
Mahabubnagar
Sangareddy, Medak
City Stores Erragadda.
R.R.- South
Note : Detailed despatch instructions will be issued as and when the material is
offered
for inspection and cleared for despatch.
:: 7 ::
20.
PACKING :
The cable shall be wound on a drum of suitable size and duly packed. You
should ensure that the packing is such that the cable reaches the departmental
stores without damage after transport by Rail and Road.
a)
b)
c)
The cable shall also be marked with the ISI certification mark.
d)
e)
1.
2.
3.
4.
5.
6.
f)
21.
GENERAL :
(M. VENKATESULU)
CHIEF GENERAL MANAGER (P&MM)
Acting for and on behalf of APCPDCL
We accept all the terms and conditions of the
Purchase order and specification.
SIGNATURE OF THE SUPPLIER.
Copy to :
The Chief General Manager/Finance/APCPDCL/Hyderabad 04.
The Accountant General/Andhra Pradesh/Hyderabad.
The Pay Officer/APCPDCL/Hyderabad-04
The General Manager/SP & P&A/CPDCL/Hyderabad 04.
The Superintending Engineer/Operation/Anantapur, Kurnool, Mahaboobnagar,
Nalgonda, Medak, Hyd-North, Hyd-South, Hyd-Central,
Ranga Reddy-North, Ranga Reddy-South.
The Accounts Officer/Expr. O/o. SE/Opn./Anantapur, Kurnool, Mahaboobnagar,
Nalgonda, Medak, Hyd-North, Hyd-South, Hyd-Central,
Ranga Reddy-North, Ranga Reddy-South
The Asst. Divisional Engineer/Stores/ Gunthakal, Kurnool, Mahaboobnagar,
Nalgonda, Medak, City-Hyd, Ranga Reddy.
The Chief General Manager/P&MM/APEPCDL/APSPDCL/APNPDCL.
The General Manager/IT/APCPDCL/Hyd : Place the scan copy of purchase order in
CPDCL website.
/var/www/apps/conversion/tmp/scratch_5/330441786.doc
:: 9 ::
General
Name and country of the manufacturer
Cables
Cable Description
2.2
2.3
2.4
2.5
2.6
Cable code
Voltage Grade (KV)
Whether suitable for effectively earthed
system
Whether conductor screen, insulation and
insulation screen are simultaneously extruded
by way of triple extrusion process.
Permissible frequency variation and voltage
variation for satisfactory operation.
Design ambient temperature (Degree C)
Recommended minimum bending radius
(mm)
Safe pulling force with pulling eye (kg)
2.7
2.8
2.9
2.1
0
2.1
1
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4.0
4.1
4.2
4.3
4.4
4.5
5.0
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
Conductor
Material and grade
Flexibility class
Number of conductors
Nominal area of cross-section of each
conductor-phase (Sq.mm)
Minimum number of wire/strand per
conductor-phase
Diameter of wire/strand (mm)
Diameter of conductor-phase (mm)
Shape of conductor
Whether compacted
CONDUCTOR SCREEN
Material
Type
Thickness of screen (mm)
Continuous working temperature (Degree C)
Maximum allowable temperature at the
termination of the short circuit (Degree C)
INSULATION
Material
(a) Thickness of insulation between Cores
(mm)
(b) Nom. Thickness of Insulation
Thickness of insulation between Cores and
inner sheath (mm)
Tolerance of thickness of insulation
Diameter of core over insulation
Specific insulation resistance at 90 Degrees C
(Ohm-cm)
Whether XLPE insulation dry cured or not
Whether XLPE insulation filled or unfilled
Whether XLPE comply in all respects to the IS
specified.
:: 10 ::
6.0
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
7.0
INSULATION SCREEN
Material
Type
Thickness of Semi-conducting Part (mm)
(Min)
Thickness of (Copper-Tape) metallic part
(mm)
Size of Copper tape (mm)
(Nom)
Whether overlapping provided
Diameter of cable over screen (mm)
(Approx)
Whether insulation screen is removable
without application of heat
(i) Current carrying capacity continuously
(Amps.)
(ii) for a short duration of 1 sec. (kAmps)
INNER SHEATH
7.1
7.2
7.3
7.4
7.5
7.6
8.0
9.0
9.1
9.2
9.3
9.4
9.5
9.6
10.
0
10.
1
10.
2
10.
3
10.
4
10.
5
10.
6
10.
7
Whether extruded
Yes
11.
1
11.
2
11.
0
2.36
Tolerance on thickness
Overall diameter of cable (mm)
(Approx)
0.164
0.211
11.
3
11.
4
0.0969
0.38
:: 11 ::
11.
5
11.
6
11.
7
11.
8
Loss tangent
12.
1
12
.
12.
2
12.
3
Dielectric constant
Maximum cable charging current at normal operating voltage
(amps/km)
OTHER PARAMETERS
12.
4
Not specified IS :
7098 (PT-2)
However volume
resistivity shall
be measured and
shall be 1x1014
Ohm cm at 27
Deg. C
0.004 at Uo
(Max.)
2.3
0.76
17.4
One
90
250
Yes
330
273
233
294
294
273
233
261
As per enclosed
annexure
As per enclosed
annexure
Suitable rating
factor should be
applied if
installation
conditions are
other than IS.
Not applicable
Yes guaranteed
to perform
satisfactory
Not applicable for
multicore cable
Not applicable for
multicore cable
:: 12 ::
12.
5
13.
0
13.
1
13.
2
13.
3
14.
0
Yes
Copy of type test report enclosed
As per type test report enclosed
FACTORY TESTS
14.
1
15.
0
PHYSICAL DETAILS
15.
1
15.
2
15.
3
15.
4
15.
5
16.
0
17.
0
18.
0
/var/www/apps/conversion/tmp/scratch_5/330441786.doc
4530
250
+ 5%
1133
350
1483
By applying coloured strips Red,
Yellow & Blue colour on cores.
Manufacturer Name / Trade Mark,
6.35/ 11 KV, Year of Manufacture,
APCPDCL
5% of the ordered qty, no length less
than 100 m
+ 5%