Professional Documents
Culture Documents
磁粉式煞車器
磁粉式煞車器
Special Features
500
50
400
40
300
20
ZKB010AA
100
W
L4
L3
L1
Shaft dimensions
D2
D3
ZKB2S5AA
ZKB1S2AA
1000
200
500
1000
1500
Rated torque
1.2 (12)
2.5 (25)
5 (50)
10(100)
20 (200)
40 (400)
Current
0.94
1.24
2.15
2.4
2.7
3.5
Power
22.5
30
51.5
57.6
64.8
84
Capacity
ZK
B0
20
20
ZK
10
ZK
B1
S2
B0
ZK
ZK
B0
B2
AA
AA
10
S5
05
AA
2
1
AA
AA
0.5
0.3
0.2
0.1
0.05
10
50
100
1000
2000
ZKB040AA
0.5
2000
ZKB020AA
30
ZKB1S2AA
100
ZKB010AA
ZKB2S5AA
ZKB005AA
ZKB-5KG
ZKB2S5AA
50
(kgf-m)
500
ZKB1S2AA
10
AA
ZKB010AA
MODEL
100
40
(N-m)
ZKB020AA
DC24V
(75C)
(A)
(W)
(S)
Air pressure
(m3/min)
(kg)
Weight
D1
D2
D3 (g7)
Examples of installation
Spring coupling
installation board
1.
2.
3.
1.Insert tray assembly into the installation board to hold it in place.
2.The spring coupling must be used to main contact between the
clutch shaft and the load shaft. In addition, the alignment and
angles between shafts mush be maintained with the allowable
range for spring coupling.
3.Stay within permitted load ranges when installing a belt pan
ZKB
21
[kgm](Nm)
20
300
* S:
Lead wires
500
ZKB040AA
B0
(W)
D4
ZK
1200
10
ZKB005A
A
50
L5 *S
30
ZKB020AA
200
L2
D1
Torque (N-m)
ZKB040AA
Torque (kgf-cm)
600
60
Exterior
dimensions
D4
L
L1
L2
L3
L4
L5
d (h7)
H
W
V
R
S
0.1
0.37
0.25
0.13
0.12
0.4
-2
2.4*10
3*10 4
3.8*10
5*10 4
9.5*10
3.5*10
0.2
0.4
0.6
1.1
1.6
2.0
250
380
700
1100
1900
2800
1.34*10
-3
-3
5.2
20
14.5
33
60
182
159.5
55
78
155
43
108
17
15
17
20
22
26
15
M4*0.7P*8L
M5*0.8P*10L
6-M6*1P*10L
1/8
6*10
1*105
152
126
42
64
131.8
29.5
98.1
15
25.5
14.6
-3
1800
M6*1P*12L
1/4
22
34
140
276
260.5
100
140
235
64.8
163.5
28
219
195
74
100
192.4
55
131.3
30
28
17.3
25
28
-2
9.15*10
5*10 4
2*10 5
53
100
225
370
325
301
110
150
274.45
69
195.85
30
-1
395
360
130
200
336.7
92
232
35
66.5
56
31.85
42.5
45
35
48.5
38.5
12
10
M10*1.5P*20L
8-M12*P1.75*20L
6-M10*1.5P*15L
46
21.5
30
33
3/8
Series
Magnetic Particle Brake
Special Features
500
50
400
40
300
20
ZKB010AA
100
W
L4
L3
L1
Shaft dimensions
D2
D3
ZKB2S5AA
ZKB1S2AA
1000
200
500
1000
1500
Rated torque
1.2 (12)
2.5 (25)
5 (50)
10(100)
20 (200)
40 (400)
Current
0.94
1.24
2.15
2.4
2.7
3.5
Power
22.5
30
51.5
57.6
64.8
84
Capacity
ZK
B0
20
20
ZK
10
ZK
B1
S2
B0
ZK
ZK
B0
B2
AA
AA
10
S5
05
AA
2
1
AA
AA
0.5
0.3
0.2
0.1
0.05
10
50
100
1000
2000
ZKB040AA
0.5
2000
ZKB020AA
30
ZKB1S2AA
100
ZKB010AA
ZKB2S5AA
ZKB005AA
ZKB-5KG
ZKB2S5AA
50
(kgf-m)
500
ZKB1S2AA
10
AA
ZKB010AA
MODEL
100
40
(N-m)
ZKB020AA
DC24V
(75C)
(A)
(W)
(S)
Air pressure
(m3/min)
(kg)
Weight
D1
D2
D3 (g7)
Examples of installation
Spring coupling
installation board
1.
2.
3.
1.Insert tray assembly into the installation board to hold it in place.
2.The spring coupling must be used to main contact between the
clutch shaft and the load shaft. In addition, the alignment and
angles between shafts mush be maintained with the allowable
range for spring coupling.
3.Stay within permitted load ranges when installing a belt pan
ZKB
21
[kgm](Nm)
20
300
* S:
Lead wires
500
ZKB040AA
B0
(W)
D4
ZK
1200
10
ZKB005A
A
50
L5 *S
30
ZKB020AA
200
L2
D1
Torque (N-m)
ZKB040AA
Torque (kgf-cm)
600
60
Exterior
dimensions
D4
L
L1
L2
L3
L4
L5
d (h7)
H
W
V
R
S
0.1
0.37
0.25
0.13
0.12
0.4
-2
2.4*10
3*10 4
3.8*10
5*10 4
9.5*10
3.5*10
0.2
0.4
0.6
1.1
1.6
2.0
250
380
700
1100
1900
2800
1.34*10
-3
-3
5.2
20
14.5
33
60
182
159.5
55
78
155
43
108
17
15
17
20
22
26
15
M4*0.7P*8L
M5*0.8P*10L
6-M6*1P*10L
1/8
6*10
1*105
152
126
42
64
131.8
29.5
98.1
15
25.5
14.6
-3
1800
M6*1P*12L
1/4
22
34
140
276
260.5
100
140
235
64.8
163.5
28
219
195
74
100
192.4
55
131.3
30
28
17.3
25
28
-2
9.15*10
5*10 4
2*10 5
53
100
225
370
325
301
110
150
274.45
69
195.85
30
-1
395
360
130
200
336.7
92
232
35
66.5
56
31.85
42.5
45
35
48.5
38.5
12
10
M10*1.5P*20L
8-M12*P1.75*20L
6-M10*1.5P*15L
46
21.5
30
33
3/8