Download as pdf
Download as pdf
You are on page 1of 15
2s D/tew flger 2016/0. ¢-2006 UTTAR HARYANA BIJLI VITRAN NIGAM Sales Circular No. U- 34/2016 From The Chief General Manager/Commercial, UHBVN, Panchkula To All CEs/ (OP)/SEs (OP) Xens/SDOsiop, JEs-, Incharge in UHBVN Memo No.Ch- 19/TR-S0/Draft Reg, 2016/HERC/CGM/C-| Dated: 29.08.2016 Subject: Schedule of General & Miscellaneous Charges. Please refer to S.C. No. U-27/2011 dated 01.09.2011 issued in compliance to Hon'ble Commission order dated 17" Aug, 2011 circulated vide memo no Now, the revised General & Miscellaneous Charges as per HERC Notification No. HERC/34/2016 dated 11" July, 2016 on Duty to supply electricity on request, Power to "eeover expenditure incurred in providing supply and Power to require security Regulations, 2016. As such, the charges are as under:- A-Schedule of General Charges 1 [ Application Processing charges Connected load | Application processing fee [Deez KW | Rs.50r- ia ei Above 2 kW Loe Rs.25 per kW or p Rs.20,000/- 2(a) | Meter installation charges: The licensee shall recover meter installation charges as per | Part thereof subject to the Tmax of] consumer or the licensee, | Three phase meter | Rs.200 per meter eal Single phase meter Rs.100 per meter ] { — i Three phase meter (with CTs and | 3% of the cost of the meter! metering equipment PTs) | Subject to a minimum of Rs.500/- 2(b) | Meter Inspection & Testing Charges: If the Correctness of a meter is chall langed by the) | consumer: i (i) Single Phase ~ | Rs. 507 Per met (ii) 3-phase whole current i.e., | Rs. 100/- Per meter without C. | LT. CT meter | Rs. 500/- Per meter — 246 (WHT. & EHT metering | Rs. 1000/- Per meter equipment. | (@WLTCTsony TRs SO0iset (Wi AT CTs (T7KV) only Rs. 1000/set °F (vil) HT PTs (17 KV) only Rs. 1000/- Note: Ifthe challenged meter is found to be incorrect the inspection and testing charges will be refunded to the consumer, otherwise these will be forfeited [Q(e) Changing the Meter or its position in the same premises at the request of the consumer when no additional material is required. No charges shall be levied if the meter is re-located by the licensee:- (i) Single phase |Rs. 100/- Per meter (ij S-phase whole current ie. without | Rs. 200/- Per meter ci Gi) LT. meter with CTs Rs, 800/- Per meter (WHT. & EHF metering equipment. | Rs. 1600/- Per meter 2(@) | Re-sealing charges where seals are found broken. (Meter cupboard [ Rs.30/- | (Where cut-out is independently | Rs.25/- sealed (Meter cover or Meter Terminal | Rs.100/- cover (Single Phase) ivJMeter cover or Meter Terminal | Rs.250/- cover (3-Phase) (v)Maximum Demand Indicator or CT | Rs.550/- chamber (WIP T fuses Rs.550/- 3. | Fuse Replacement Replacing Consumer's fuse TNil 4. | Reconnection Charges (1) Domestic consumer | Rs. 100/- Non-Domestic consumer Rs. 200/- iiJAP. consumer | Rs. 100/- WILT. Industrial consumer (upto 20 Rs. 500/- = kW) V)LT Industrial consumer (above 20 | Rs. 1500/- kW) viH.T. Industrial consumer Rs. 3000/- vipBulk Supply & Street Lighting | Rs. 1500/- consumer 27 D/tiew foler 2016/05,¢-2016 5. | Testing Consumer's installation ') For initial testing of new installation | or of any extension to an existing installation if the installation is found | to be in order and the wiring contractor or his representative is Present at the site. Nil \i)For initial or subsequent testing of a New installation or an extension to an existing installation if the installation is found to be defective or the wiring contractor or his representative fails to be present: (@) Single Phase LT installation Rs.100/- (Payable in advance for each subsequent visit for the purpose of testing the installation.) (b) Three Phase LT installation Rs.200/- (Payable in advance for each subsequent visit for the Purpose of testing the installation) (c) Three Phase HT installation Rs.500/- (Payable in advance for each Subsequent visit for the purpose of testing the installation) | | Provision of meter reading cards including PVC jacket (for DS & NDS | consumers) Meter Reading Cards (New/Replacement) (Domestic and Non-Dome Z| consumers) Replacement of meter card found to | be missing on consumer's premises Rs. 15/- per card 7. | Supply of duplicate copies of electricity bills: ')Domestic consumers Rs. 5/- li)Non-Domestic consumers li)L.T. Industrial (upto20 kW) & AP consumer |MLT. Industrial (above 20 RW) ET Street lighting consumer W)H.T. Industrial consumer. & bulk supply Rs. 5/- Rs. 5 Rs. 10 Rs. 20/- 8. Supply of duplicate copies of deman; !) Domestic consumers ii) Non-Domestic consumers ii) L.T. Industrial (upte20 kW) & AP consumer 248 New tolder vL0/U.d.6-a0Ly iv) LT. Industrial (above 20 kW) & | Rs.20/- Street lighting consumer | v) HT. Industrial & bulk supply | Rs. 50/- consumer. vi) Supply of detailed print out of Rs50- meter recording | 9 | Review of electricity bill: If the accuracy of licensee's bill is challenged by the consumer and a review of the bill is demanded: [1 @ Domestic, & AP consumers. [Rs. 10/- (i) Others Rs. 20/- NOTE: If the bill is found to be incorrect, the credit of fee will be given to the consumer, otherwise it will be forfeited 10. | Meter Security Charges In case the meter is supplied by the licensee, the licensee shall be entitled to charge an amount as meter security which shall be recovered as part of the demand notice. The amount of meter security shall be equal to the cost of electric meter as stated in Cost Data | Book for that year. In addition, the licensee shall charge meter rental with every bill at the rate approved by the Commission. “In case of connections where the meter has been procured by the consumer, no security | | | and meter rental shall be charged from the consumer. | [41. | Cost of Meter Cup Board (MCB) | a) Single Phase Meter Rs. 250/- | t — | _[b) Three Phase Meter Rs, 350/- | | | | /42__| Testing charges of Transformers or other equipment of consumer or private party i) Protective Relays: Testing including | Rs. 1100/ per relay current and time setting ijPower and Distribution Transformers: a)insulation resistance tests of | Rs. 770/- per transformer winding b)General checking of breather and | Rs. 400/- per transformer other accessories | ©)Dielectric strength test of ol Rs. 220/- per transformer d)Testing of buchholz relay and | Rs. 800/- each temperature indicators functioning ii)Circuit Breaker 400 volts, 11KV| Rs. 800/- each 29 Dy New folder 2036/0 5.¢-2015 | and33~ KV General checking of | ] breaker and testing of the tripping mechanism iv)Current transformer and Potential | Sa oarner| transformer and meter: | a)Testing of LT current transformer } Rs. 165/- each bTesting of 3 phase LT current] Re 440/- each ‘ | transformer | o)Testing of 17 KV &33 KV CT Rs. 550/- each dTesting of three phase 17 KV & 33 | Rs. 11007 each | kvcT e)Testing & recalibration of single | Rs. 90/- per meter phase energy meter | Testing & recalibration of three | Rs. 330/- per meter ] phase LT energy meter without CT | | | |g)Testing & recalibration of three | Rs 660/- per meter Phase LT energy meter with CT | hyTesting & recalibration of HT 7 EMT gy metering equipment | ()Without CT & PT Rs. 2000/- per meter Re | ee ce = | (With CT7PT combined Rs. 2500/- per unit | | DTesting & recalibration of maximum | Rs. 660/- per meter Ae. sis | demand indicator ee _Dlesting and adjustment of volimeter/ | Rs. 165). each | ammeter v)Checking of capacitor (Other than initial checking on consumer's | request )400 volts Rs. 110/ per job | b) 11 KV and above | Rs. 1107 per job || vi) General ar | | | @) Dielectric strength of oll of various | Rs. 220/- per sample equipment ae a | b)Earth resistance test of substation | Rs. 230): per earth | c)Measurement of insulation | Rs. 220 per sample resistance of cables/equipments | L L 250 Uy WeW ToWder £u20/U.>4-4010 Remarks: i) The above charges include the visiting charge of M&T staff as well. il) The charges of testing vans or trucks if needed for the purpose will be extra. All charges shall be got deposited before undertaking the testing work | iii) Test report on prescribed form will be issued by the S.D.O (Operation) / M&T lab, which | will be produced by the applicant along with the wiring contractor's test report The insulation, earth and oil tests as well as general checking and inspections should be performed by the operation sub-division. Other tests requiring M&T lab facilities shall be arranged by the operation sub-division. B - SCHEDULE OF MISCELLANEOUS CHARGES Meter Service Charges (per meter! per month): These charges shall be leviable in case the meter has been supplied by the licensee and also that the meter is installed inside the consumer premises or on pole outside the consumer premises. i)Single phase Meter — Rs. 20/- ii)Three phase Whole Current Meter | Rs. 30/- ii) Three phase C.T. Operated meter | Rs. 150/- iw)Three phase L.T. Tri-vectormeter | 3% of actual cost of meter (s) & metering ‘equipment and the installation of the same = | ee ae v) HT. Tri-vector meter [3% of actual cost of meter (s) & metering equipment and the installation of the same Sr. | No. | vi) EAT. Tri-vector meter 3% of actual cost of meter (s) & metering equipment and the installation of the same Line Service Charges (per month) _ Nil | Service connection charges | The service connection chargesicost of extension of distribution system to be carried out by | the licensee for release of new connection/extension of load, calculated in accordance with Annexure | to these Regulations shall be payable by the applicant. In case the applicant opts for execution of work on his own, the supervision charges calculated in accordance | with Regulation 3.10 shall be payable, Besides this, in case the service connection charges calculated as given below are more than the actual cost of such works which are to be finally handed over to the licensee, the difference of the service connection charges and the actual cost would also be paid by the applicant, For New Connections. The applicant shall bear the Service Connection Charges/Cost as prescribed hereunder:~ Category "| Service Connection Charges (in Rs.) per KW of the connected load or part thereof. Single phase Domestic Supply upto 2 | Rs. 200/- KW connected load 251 yew folder 2016/0.c-2016 | Single phase Domestic Supply above | Rs. 500/- 2 KW connected load ti, | Three phase Domestic Supply Rs. 10007 \v. | Single phase Non Domestic Supply | RS-1000L ¥.__| Three phase Non Domestic Supply Rs 20007 7 [vi Bulk supply & LT. Industrial Supply | Rs. 2000/- | vi. THT Industrial Supply Rs.2000/- per kVA of the contract demand or part thereof, vii. [AP Supply Actual expenditure to be incurred Tor release oF connection which shall include cost of LTIMT line and that of distribution transformer. In case more than one consumers are released connections from the same transformer, the cost of distribution transformer shall be shared on prorata basis Corresponding to the load of each consumer. | Street light | Actual cost as per deposit work estimate Other Consumers Service connection charges as applicable for | be required to pay additional charges of Rs. 175 per meter for loads up to 50 KW and | | Rs.250/- per meter for loads in excess of 50 kW. lain case, the proposed connection is to be released on voltage level of 11 kV, the actual | Cost involved for releasing the connection would also be worked out as per Standard Cost Data Book and the amount recoverable shall be the higher of the following:- @) Actual cost. 5) Total service connection charges applicable to the respective category | NOTE (a) Actual cost (©) Total service connection charges applicable to the respective category, | Note:- The actual cost shail include cost of the individual Service line and proportionate cost of the | | common portion of the main line upto the feeding sub-station including the line bay as per | {he Cost Data Book. In case the service line is to emanate from the feeding sub-station, the 282 uptew UIwe! euaey saree creation of new sub-Station or augmentation of existing substation shall be carried out by | the distribution licensee/transmission licensee at its own cost to be recovered through ARR of the distribution licensee/transmission licensee. (4) The creation of a new substation as well as augmentation of existing substation (33 kV and above), if required, shall be carried out by the distribution licensee/transmission licensee at their own cost. As such while calculating the actual costs as mentioned under Paras 2 and 3 above, the cost involved for augmentation of existing grid substation or | creating a new substation would not be taken into account. (6) In Group Housing Societies or Residential or Residential cum Commercial Complexes developed by developers, where internal LT/HT infrastructure including G.O switches, distribution transformers, cables upto the metering point have been laid by the Group Housing Societies/Developers at their own cost but individual connections have been given | on LT supply to the residents and for common services or for other commercial loads by the licensee, in such cases also such equipment upon energization shall become the property of the licensee and the maintenance/replacement of such equipment shall be carried out by the distribution licensee at their own cost as per provision under Regulation 4.10 For Extension of Load: (6) The consumer shall pay service connection charges at the rates given under Para 1 above for additional load/demand only. (7) Where there is a change of category from L.T (upto 50 kW) to H.T (above 50 KW), the charges would be levied on the additional kVA demand, calculated as under (as an example) subject to provision under Para 8 below. 1, Existing Sanctioned load 40kW 2. Applied Load 150 kW with Contract Demand of : 140 kVA | | | 3. Additional Demand 140-(40/0.90)=95.55 kVA. | | | (8) In case the supply is at 11 KV or above or in case of change of category from LT to HT, | |the consumer shall pay actual cost of release of additional load/demand or service | connection charges as worked out above whichever is higher. | Notes: i) The line service charges on the original load, if already being levied, shall continue. However, in cases where category changes from LT to HT or from 11 kV to voltage higher than 17 kV and the consumer is required to pay actual expenses for release of connection at Il kV or higher Voltage, the line service charges if being levied for | existing load shall be discontinued ii) While assessing the connected load for industrial connections, both general and industrial loads shall be taken into account. | ili) Load exceeding 50 kW shall be catered on Il KV and above. The above limit shall be applicable both for new and extension cases after taking into account the existing load | iv) An increase in the connected load without increase in Contract Demand shall not call for payment of service connection charges. However, consumers seeking extension in Contract Demand within the sanctioned connected load shall be required to pay service connection charges on KV A basis on the incremental contract demand et) ___actual cost whichever is higher. 253 D/tew folter 2016/05.6-2016 |) In case due to non-avallabily of material with the licensee, the applicant supplies the] material, due credit of the cost of material supplied shail be given to the applicant from the Service Connection Charges as worked Out above. The rates of material | ould be worked out on the basis of stock issue rates ae fixed by the Controller of Stores or the actual cost on which it is purchased by the applicant, whichever is tes | The license~ shall account, under ;ppropriate account head, all service connection | charges recovered by him under Regulation 4 The amount so recovered shall be deducted | from the Gross Fixed Assets to artive at the value of Net Fixed Assets } | Power to require security 6.1 In pursuance of Section 47 of the Act, the licensee may require any person, who pave of LPPIY of electricity in his premises,. to give him reasonable security for the | Payment of all monies, which may become due to him: | (@) in respect of the electricity supplied to such person; (b) where any electric line or electrical plant or Clectric meter is to be provided for supplying | | sag tecticity to such person, in respect of the Provision of such line or plant or meter: and if that person fails to give such security, the Gistribution licensee may, if he thinks fit, refuse to give the supply of electricity or to provide the line or plant or meter for the period | | during which the failure continues | 5.2 Where any person has not given such security as is mentioned in Regulation 5.1 or the | 5.3 If the person referred to in Regulation 5.2 fails to give such security, the distribution | | licensee may, if he thinks fit, discontinue the Supply of electricity for the period during whieh | the failure continues. | | 54 The distribution licensee Shall Not be entitled to require security in pursuance of clause | @) of Regulation 5.1 if the person requiring the supply is prepared to take the supply | | through a pre-payment meter. | i} | 5.5 Security Deposit (1) In pursuance of Regulation 5. |, a Security deposit shall be made by all the consumers | to cover: Initially the applicant shall deposit the She aebtion security at the fat rates as mentioned | under Regulation 6.6. Subsequently the Security shall be revised annually as per the | | Procedure defined under Regulation 5.9 (1) 254 D/New folder 4ui9/u.9..-2440 (b) The cost of electric meter that is to be provided for supplying electricity to a premises. (2) In case of enhancement of load, only additional security to cover the additional consumption shall need to be deposited, estimated as per the methodology given under Regulation 5.9 (1), (3) As stated under Regulation 5.5 (I), the consumption security deposit shall be revised annually as per the procedure defined under Regulation 5.9 (1). Any excessideficient amount shall be adjusted within three subsequent bills of the consumer. (4) The consumption security deposit shall be returned to consumer upon termination of Agreement and within 30 days of adjustment of all dues. In case of delay, interest equivalent to the State Bank of India base rate as on the | st of April of the financial year shall be payable to the consumer. §.8 Interest on Security Deposit | 5.8.1 The licensee shall pay interest to the consumer at the Bank rate as determined by the Reserve Bank of India on 1st April of each year or more as specified by the Commission payable annually on the consumer's security deposit. The interest accrued during the year | shall be adjusted in the consumer's bill for the first billing cycle of the ensuing financial year. | 5.8.2 In case the interest accrued during the year is not adjusted in the consumer's bill for the first billing cycle of the ensuing financial year, tlie licensee shall be liable to pay interest at the rate of 18% for the period for which the payment of interest accrued is delayed. 5.9 Review of Security Deposit for power consumption (ACD) (1) At the beginning of the financial year, the licensee shall review the consumption pattern of the consumer for the adequacy of the security deposit from April to March of the previous year. A consumer, except the HT industrial supply consumer, is required to maintain a sum equivalent to his average payment for the period of two billing cycles. An HT industrial supply consumer, is required to maintain a sum equivalent to his average | payment for the period of one and haff billing cycles. Where ‘average payment! shall be equal to the average of actual bills paid in the last financial year: Provided that for a consumer whose electricity connection is less than one year old, the security deposit shall not be revised at the beginning of the ensuing financial year: | Provided further that average payment shall not include the arrears of any kind recovered in the last financial year pertaining to the prior period. (2) The security deposit available with the licensee in respect of each consumer shall be shown in the bill issued to the consumer. Refund of excess security to the consumer by the licensee, as and when arises, shall be made by way of adjustment in subsequent energy bills showing negative amount where necessary. ‘Advance Consumption Deposit (ACD): As per regulation 5.4.1 of the Haryana Electricity Regulatory Commission (Duty to supply electricity on request, Power to recover expenditure incurred in providing supply & Power to require security) Regulations, 2005 new applicants | shall deposit consumption security at the flat rates given hereunder: Category of consumer | Consumption Security Amount (Rs/KW or part | thereof of the connected load). | Agriculture supply 7100 Domestic supply/Bulk Supply | 750 (Domestic) ii. | LT Industrial supply “| 1000 255 D/new folder 2016/0S.¢-2016 iv. [HT Industrial supply | 1000 v | Non-Domestic suppiy 1000 vi. | Bulk Supply 1000 vi. | MITC | 1000 vili. | Lift Irrigation z 4000 a aig ix. | Public Water Works 1500 es z al %, Street Light 2000 I xi. | Railways 1500 xii, | Independent” Hoarding/Decorative | 2000 a Lighting | ll.” | Temporary Metered Supply | Four times of the rate of category in which The temporary supply is required. NOTES: 1 In case of consumers who are sanctioned additional connected load, the additional Consumption security shall be got deposited for the additional connected load, | 5. | Capacitor Service Charges (permonth) Eon gl ime | | Capacitor Size | AP Consumer | Industrial Consumer | a | Capacitors upto 2 | Rs.5/- [Rs.tor a a | KVAR | [b | Capacitors of 3) Rs ior | Rs.207- ] KVAR | | ¢ | Capacitors of 4) Rs 16e | Rs.30- KVAR | a | Capacitors “of 5 | Rs. 207 | Rs.40/- ae oh _KVAR e | Capacitors of 77) Rs.30- Rs.60/- | KVAR | | | 6. | Administration charges for dishonoured cheque: The actual charges levied by the bank shall be recovered by the licensee for bouncing of | cheque against payment of charges to the licensee | 7. | Testing Fee for Capacitor, transformer Ol and Insulation Resistance of Cable/ Other Equipment: Routine checking shall be done by licensee nd no charges shall be levied on | the consumers for such routine checking. However, in case the checking is done at the | | Tequest of the consumer then the following charges shall be leviable. | | (1)Capacitors at 230/440 Voltage | Rs.200 per visit level (2)Capacitors at 11kV and above | Rs.400 per visit 5 en ea 256 D/New tolder 201b/U.3.L-2U36 Voltage level = ] )(@)Checking of the Transformer Oil Rs.200 for first sample and RS.150 for every | additional sample | | | | (4)Checking of insulation | Rs.300 per cable/equipment resistance of cables and other equipment Shifting charges for Tlwell _—*(| R's.7000 per span for new work and erection | | charges for use of old material and dismantlement | charges for old site work | a ae Application Form for new connection (if purchased from the licensee) (A) AP and DS category | Rs.10/- (B) HT category fi | Rs.200/ 2 (C) All other categories Rs.20/ mi General Notes: Wherever in the above schedule, rate is expressed as a rate per month or as a monthly rate, it means a proportionate charge. If the period of charge is less than month, ii. In case where disconnection and connection takes place in the same month, a full month's charge shall be recovered. iii In case a consumer elects to pay the cost of the service line, the amount payable by him shall be the estimated cost of the service line (excluding the cost of 30 meters) and equipment and of installing the same. iv. Incase of temporary supply, if the service line and meter are provided and installed by the licensee, the consumer shall be charged four times the relevant charges provided above for each period of 30 days or less. Concession of first 30 meters of free service line is not to be allowed. The above instructions are applicable w.e.f. the date of their publication in the official Gazette of Haryana ie. July 19, 2016 For clarification if any, the Regulation No. HERC/34/2016 is available from HERC website i.e. www.herc.gov.in. Sales Circular No. U-27/2011 is superseded and U-25/2016 is amended to the above extent. The above instructions should be brought to the notice of all concerned for strict and meticulous compliance. DA/Annexure -I General Seticomm| for Chief General Manager/Comml., UHBVN,\Pahchkula, 257 D/tew folder 2016/0s.c-2016 ANNEXURE-| (See Regulation 4.8.) Calculation of Service Connection Charges/Cost of Extension of Distribution System: (1) For New Connections. The applicant shall bear the Service Connection Charges/Cost as prescribed hereunder:- [ Sr. | Category | Service Connection Charges (in Rs.) per KW of No. the connected load or part thereof. 1 | Single phase Domestic Supply upto 2 | Rs. 200/- fe | KW connected load 2 | Single phase Domestic Supply above | Re S00 2 KW connected load [3 | Three phase Domestic ‘Supply | Rs. 1000/- i 4 Single phase Non Domestic Supply | RS. 1000/-- ee 1 5 Three phase Non Domestic Supply | Rs. 20007 5 | Bulk supp < Industrial Supply | Rs. 20007 | 7 | H.T Industrial Supply Rs.2000/- per KVA of the contract demand of | part thereof. | 8 ‘AP Supply Actual expenditure to be incurred for release of connection which shall include cost of LT/HT line and that of distribution transformer. In case more | | than one consumers are released connections from | |the ‘same transformer, the cost of distribution | | | ‘ansformer shall be shared on prorata basis | Corresponding to the load of each consumer 9) Street light | Actual cost as per deposit work estimate | 10 | Other Consumers | Service connection charges as applicable for L | LT/HT Industrial supply (2) In case, the proposed connection is to be released on voltage level of 11 kV, the a) Actual cost, ) Total service connection charges applicable to the respective category 288 ‘OyNew Tolder 2U10/U.>.4-2u40 applicant shall bear the entire expenditure including cost of the breaker. However, creation of new sub-station or augmentation of existing substation shall be carried out by the licensee at its own cost as per provision under Regulations 4.4, 4.5 and 4.7. (3) _ Incase, the proposed connection is to be released on voltage higher than II kV, the actual cost involved for releasing the connection would also be worked out as per Standard Cost Data Book and the amount recoverable shall be the higher of the following:- (a) Actual cost (b) Total service connection charges applicable to the respective category. Note:- The actual cost shall include cost of the individual service line and proportionate cost of the common portion of the main line upto the feeding sub-station including the line bay as per the Cost Data Book. In case the service line is to emanate from the feeding sub-station, the applicant shall bear the entire expenditure including cost of the breaker and bay. However, creation of new sub-station or augmentation of existing substation shall be carried out by the distribution licensee/transmission licensee at its own cost to be recovered through ARR of the distribution licensee/transmission licensee. (4) The creation of a new substation as well as augmentation of existing substation (33 kV and above), if required, shall be carried out by the distribution licensee/transmission licensee at their own cost. As such while calculating the actual costs as mentioned under Paras 2 and 3 above, the cost involved for augmentation of existing grid substation or creating a new substation would not be taken into account. (5) _ In Group Housing Societies or Residential or Residential cum Commercial Complexes developed by developers, where internal LT/HT infrastructure including G.O switches, distribution transformers, cables upto the metering point have been laid by the Group Housing Societies/Developers at their own cost but individual connections have been given on LT supply to the residents and for common services or for other commercial ioads by the licensee, in such cases also such equipment upon energization shall become the property of the licensee and the maintenance/replacement of such equipment shall be carried out by the distribution licensee at their own cost as per provision under Regulation 4.10 For Extension of Load: (6) The consumer shall pay service connection charges at the rates given under Para 1 above for additional load/demand only. (7) Where there is a change of category from L.T (upto 50 kW) to H.T (above 50 kW), the charges would be levied on the additional kVA demand, calculated as under (as an example) subject to provision under Para 8 below: 1. Existing Sanctioned load 40kW 2. Applied Load 150 kW with Contract Demand of : 140 kVA 3. Additional Demand 140-(40/0.90)=95.55 kVA. (8) Incase the supply is at 11 kV or above or in case of change of category from LT to HT, the consumer shall pay actual cost of release of additional load/demand or service connection charges as worked out above whichever is higher. 259 Yew folder 2016/055¢-2016 Notes: i) vy) While assessing the connected load for industrial connections, both general and industrial loads shall be taken into account Load exceeding 50 KW shall be catered on Il KV and above. The above limit shall be Payment of service connection charges. However, consumers seeking extension in Contract Demand within the sanctioned connected oad shall be required to pay service connection charges on KV A basis on the incremental Contract demand or actual cost whichever is higher, In case due to non-availability of material with the licensee, the applicant supplies the material, due credit of the cost of material Supplied shall be given to the applicant from the Service Connection Charges as worked out above. The rates of material would be worked out on the basis of stock issue rates as fixed by the Controller of Stores or the actual cost on which it is purchased by the applicant, whichever is lesser.

You might also like