in pic. 1 (0,0,0,0)
Pic 1
2. Run the generator manually and check the values on the
generator controller and on the IPMU display (make sure all
the 3 phase display are available)
3. Calibrate the value to 170V (see calibrate procedure)
4. With the generator still running, Change the IPMU rear
buttons to the position that you can see in pic. 2 (2,2,2,0),
check the values on the generator controller and on the
IPMU display (make sure all the 3 phase display are
available) make sure the value are between 180V to 310V
Pic. 2
5. Shutdown the generator and put it on Auto mode
6. Calibrate the value "BTS BATTERY VOLTAGE" to the actual
value using the calibration menu
7. Change the IPMU rear buttons to the position that you can
11.
Pic. 4
15.
change the value "BTS BATTERY LOW" to 47