03 Project Charter 1

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Project Code

Version

1.0

Date

12/08/2016

Project Title To reduce the waiting time for chapattis in Hostels Mess during Lunch time (1:30 pm to 2:15
pm)

Problem Statement Last two months of study showed that it takes around 10 minutes for a student to get 2
chapattis during Lunch. This leads to creation of bottleneck near the food counter due to which the
students get impatient and sometimes aggressive. They further get late for the classes and generally
miss the attendance. Students have started skipping Lunch and it further leads to wastage of hostel food.

Project Objective To make the chapattis available to students by reducing the waiting time from 10 to 2
minutes within 2 months

Scope
Focus will be on the ground floor mess of first years hostel. The process improvement will be limited to lunch
time, only during weekdays, and will impact 331 students.

Project Schedule (Mention start and end dates)


Define Phase

Improve Phase

Measure Phase

Control Phase

Analyze Phase

Case study Presentation

Resource Estimation
Resource Required

Value (in INR)

Expert Catering team

6,000

Google form for student survey

Room to talk to mess staf

Expected Benefits
Savings Description

Value (in INR)

Wastage of food will be avoided

10,000/day

Reduction of expenditure by students on outside food

100/student-days

Efficiency and Productivity of students


Team
Sponsor:

ABC

Leader:

XYZ

Charter Prepared by:

Members:

Charter Approved by:

<sign with Date>

<sign with Date>

<sign with Date>

Leader

Champion

Strategic Support

GUIDELINES TO FILL THE PROJECT CHARTER


1.

Project Title

2.

The title by which the project will be identified. Try to emphasize the outcome, i.e.,
result (y) rather than the method (x).

Problem Statement

What is wrong or not meeting our customers need?

When and where do the problems occur?

Magnitude of the problem?

What is the impact of the problem?

Is the problem based on observation or assumption?

The problem statement should not prejudge a root cause?

Poor Example: Our customers are angry with us and we are getting penalty.
Good Example: In the past 6 months the First Time Quality in Group D of UHC account is very
poor. It is ranging between 90% and 93% against the customer requirement of 97%. This leads
to a rework of 30% that in-turn increases the rework cost. This also affects the overall TAT.

3.

Project Objective:

The object must be SMART: (Specific; Measurable; Achievable; Rewaradable; Time bound)

Must not prescribe solution or presume cause.

Definition of the improvement, which the team is seeking to accomplish.

Direction for progress measure (starts with a verb viz., Reduce/Eliminate/Improve etc)

Should include measurable target and completion date

Poor Example: To delight the customer by providing continuous quality.


Good Example: Improve First Time Quality in Grp-D of UHC from 90% to 97% by October 2004.

4.

Scope

What process will the team focus on?

What are the boundaries of the process (start point & stop point).

What is out of bounds for the team?

What constraints must the team work under?

What is the time commitment expected of team members?

What will happen to regular jobs while we are doing the project?

5.

Resource Estimate

Classification of Resources

Additional Requirement
What people /expense will be needed additionally? Please mention the est. $ value.
Subject Matter Expert(s) required for facilitation / reviews / consultation (could be
internal or external)

Internal resources
What people, capital / expense etc., will be needed which are already available in the
organization? In the case of human resources, the required hours need to be captured.

6.

Expected Benefits Benefits often related to Increasing Revenue/Decreasing cost/


Improving Quality & TAT / Improving morale etc.,

Classification of Benefits:

Direct benefits Will fetch direct dollar values

Conditional benefits Will be realized as and when the expected activity occurs.

Example: Building a ramp up model, developing a training model etc

Indirect benefits Benefits will be realized indirectly and at times these may be
difficult to express in terms of dollars.

7.

Example: Release of resources (DCC or DLC), Reduction of consumables etc.

Example: Security, Customer Satisfaction / Employee satisfaction etc.

Project Schedule

Start Date:

Date on which the ELT approve the project.

End Date:

Date on which the project planned to completed.

Indicative timelines for progression of seven steps. The total time duration needs to be
within 4 to 5 weeks.

8.

Team

Would include Sponsor, Team leader, Facilitator & Team Players

No team player can be part of more than 2 six-sigma projects at a given point of time.

9.

Approval

The charter needs to be formally signed and approved by Team Leader, Champion, and
Functional Head.