Dream House: Philippine Normal University
Dream House: Philippine Normal University
April 4, 2016
DREAM HOUSE
WALL
Length= 30 m
Width= 25 m
Height=8 m
Area Length= L x W
=30 m (3.28 m/ft.) x 8 m (3.28 m/ft.)
=98.4 ft. x 26.24 ft.
=2582.016 sq. ft.
Total Area L1 and L2= 5164.032 sq. ft.
Area Width= L x W
=25 m (3.28 m/ft.) x 8 m (3.28 m/ft.)
=82 ft. x 26.24 ft.
=2151.68 sq. ft.
Total Area W1 and W2= 4303.36 sq. ft.
Total Area of the wall= 9467.392 sq. ft.
No. of CHB= 9467.392 sq. ft.x 1 pc. / 0.879 sq. ft.
= 10770.6393 or 10771 pcs.
Amount of Cement needed for laying CHB
No. of Bags = 10771 pcs. x 1 bag/55 pcs.
= 195.8363 bags or 196 bags
Amount of cement and sand for Mortar
Perimeter= 2 9 ( L x W )
= 2 ( 30 m + 25 m )
= 2 (55 m)
= 110 m
Area= 110 m x 1 m
= 110 sq. m
Amount of cement= 110 sq. m x 0.36 bags/ sq. m
= 39.6 bags or 40 bags
Amount of sand=110 sq. m x 0.019 cu. m/ sq. m
= 2.09 cu. m
Amount of cement and sand for CHB Plaster finish
=110 sq. m x bags/ 1 sq. m
=27.5 bags or 28 bags
In and out wall
=28 bags x 2
= 56 bags
No. of needed steel bars
Horizontal Bars
Area= 110 sq. m
= 110 sq. m x 2.7 m/ sq. m
= 297 m x 1 bag/ 6.096 m
=48.72047 or 49 bars
Vertical bars
Area= 110 sq. m
=110 sq. m x 3 m/ sq. m
=330 m x 1 bar/ 6.096 m
=54.1338 or 55 bars
Total number of bars= 48.7204 + 54.1338= 102.8542 or 103 steel bars
FLOORING
Compute the amount of cement, sand and gravel for flooring using class A/94 lbs cement
Volume= 14 in. x 30 m x 25 m
Volume= 0.10 x 30 m x 25 m
= 75 m
Cement= 75 m x 7.84= 588 bags
Sand= 75 m x 0.44= 33 bags
Gravel= 75 m x 0.88= 66 bags
Compute for the amount of cement for plain cement floor finish
Floor Area= 110 sq. m
Cement = 0.33 bags/ sq. m x 110 sq. m = 36. 3 bags or 37 bags
8. Faucet
9. PVC Solvent
Cement
10. G.I Wire #16
11. Hose 5 mm
QUANTITY
12 Elf load
12 Elf load
10,771
UNIT COST
1,400.00
1,000.00
5.50
TOTAL
16,800.00
12,000.00
59,240.50
811
182.00
147,602.00
157
175.00
27,475.00
15
25
100.00
15.00
1,500.00
375.00
12
7 small can
130.00
35.00
1,560.00
245.00
20 kg
50 m
65.00
8.00
Grand Total:
1300.00
400.00
268,497.50