DREAM HOUSE
WALL
Length= 30 m
Width= 25 m
Height=8 m
Area Length= L x W
=30 m (3.28 m/ft.) x 8 m (3.28 m/ft.)
=98.4 ft. x 26.24 ft.
=2582.016 sq. ft.
Total Area L1 and L2= 5164.032 sq. ft.
Area Width= L x W
=25 m (3.28 m/ft.) x 8 m (3.28 m/ft.)
=82 ft. x 26.24 ft.
=2151.68 sq. ft.
Total Area W1 and W2= 4303.36 sq. ft.
Total Area of the wall= 9467.392 sq. ft.
No. of CHB= 9467.392 sq. ft.x 1 pc. / 0.879 sq. ft.
= 10770.6393 or 10771 pcs.
Amount of Cement needed for laying CHB
No. of Bags = 10771 pcs. x 1 bag/55 pcs.
= 195.8363 bags or 196 bags
Amount of cement and sand for Mortar
Perimeter= 2 9 ( L x W )
= 2 ( 30 m + 25 m )
= 2 (55 m)
= 110 m

Area= 110 m x 1 m
= 110 sq. m
Amount of cement= 110 sq. m x 0.36 bags/ sq. m
= 39.6 bags or 40 bags
Amount of sand=110 sq. m x 0.019 cu. m/ sq. m
= 2.09 cu. m
Amount of cement and sand for CHB Plaster finish
=110 sq. m x bags/ 1 sq. m
=27.5 bags or 28 bags
In and out wall
=28 bags x 2
= 56 bags
No. of needed steel bars
Horizontal Bars
Area= 110 sq. m
= 110 sq. m x 2.7 m/ sq. m
= 297 m x 1 bag/ 6.096 m
=48.72047 or 49 bars
Vertical bars
Area= 110 sq. m
=110 sq. m x 3 m/ sq. m
=330 m x 1 bar/ 6.096 m
=54.1338 or 55 bars
Total number of bars= 48.7204 + 54.1338= 102.8542 or 103 steel bars
FLOORING
Compute the amount of cement, sand and gravel for flooring using class A/94 lbs cement
Volume= 14 in. x 30 m x 25 m
Volume= 0.10 x 30 m x 25 m
= 75 m
Cement= 75 m x 7.84= 588 bags
Sand= 75 m x 0.44= 33 bags
Gravel= 75 m x 0.88= 66 bags
Compute for the amount of cement for plain cement floor finish
Floor Area= 110 sq. m
Cement = 0.33 bags/ sq. m x 110 sq. m = 36. 3 bags or 37 bags

Sand= 0.00018 cu. m / sq. m x 110 sq. m = 0.0198 cu. m


No. of steel bars
Area= 110 sq. m
No. of bars= 110 sq. m x 3 m/ sq. m
= 330 m x 1 bar/6.096
= 54.1338 bar or 55 bars
Total number of bars needed= 48.7204 + 54.1338 + 54.1338= 156.988 or 157 bars
No. of tiles ( 24 x 24)
Area=L x W
= 30 m ( 3.28 ft/ m) x 25 m ( 3.28 ft/m)
= 98.4 ft x 82 ft
= 8068.8 sq. ft.
No. of tiles= 8068.8 sq. ft. x 1 pc/ 4 ft
= 2017.2 pcs or 2018 pcs.

BILL OF MATERIALS COST ESTIMATES


MATERIALS
1. Gravel
2. Sand
3. CHB
4x8x16
4. Portland
Cement
5. Steel
Bar(10mm)
6. PVC
7. PVC Elbow

8. Faucet
9. PVC Solvent
Cement
10. G.I Wire #16
11. Hose 5 mm

QUANTITY
12 Elf load
12 Elf load
10,771

UNIT COST
1,400.00
1,000.00
5.50

TOTAL
16,800.00
12,000.00
59,240.50

811

182.00

147,602.00

157

175.00

27,475.00

15
25

100.00
15.00

1,500.00
375.00

12
7 small can

130.00
35.00

1,560.00
245.00

20 kg
50 m

65.00
8.00
Grand Total:

1300.00
400.00
268,497.50

PHILIPPINE NORMAL UNIVERSITY

The National Center for Teacher Education


South Luzon Campus
Lopez, Quezon

BASIC CARPENTRY and


MASONRY with TILE
SETTING and
PLUMBING
Rizzia Lyneth A. Sargento
II-JHS

Prof. Hermie Baltan

You might also like