International Productivity List PDF
International Productivity List PDF
International Productivity List PDF
Remaks
Sr.No.
Remaks
Sr.No.
Sr.No.
Description
Description
1 Rule of Thumb
27 Landscaping
2 Demolition
54 Steel Frames
3 Underpinning
55 Steel Strutting
4 Removable Anchors
30 Fencing Works
5 Cutting Chases
31 Formwork
6 Reinforcement Ratios
32 Reinforcement
7 Sheet Piling
33 Concrete Mixing'
59 Grit Blasting'
8 Tower Cranes
34 Concrete Placement
60 Plumbing
9 Cutting Switchboxes
35 Concrete Finishing
61 Drainage
56 Metal Decking
Concrete Work
57 Sheeted Roofs
10 Site Investigation
36 Screeding
11 Dewatering
37 Waterproofing
12 Site Claerance
38 Roof Insulation
13 Termite Control
14 Bulk Excavation
Earth work
15 Loading
62 Land drains
Insulation
63 Bathroom
68 Electrical System
69 Power Supply
45 Floor Finishes
20 Trench Excavation
46 Wall Finishes
70 NATM Tunnels
47 Ceiling Finishes'
71 Commercial Kitchen
22 Rock Tunnels
48 Partitioning
72 Restoration Works
49 Curtain Walling
73 Trackwork
50 Stone Works
74 Post Tensioning
25 Bored Piling
51 Wall Papering
75 Secant piling
26 Slurry Mix
27 Cutting Back
76 Working Platforms
77 Rendering
1/35
17 hauling
18 Basement Excavation
Remaks
Activity List
Task / Description
Formwork Fixing
Slow
Ave
5.0
4.0
Fast Units
3.0 days/no
50.0
- m3/day
10.0
8.0
6.0 days/no
12.0
- m2/day
Reinforcement Fixing
0.7
Concrete Placement
16.0
- Tonnes/day
- m3/day
140.0
- m3/day
Blockwork Laying
7.0
- m2/day
12.0
- m2/day
10
Blockwork Laying
7.0
12.0
17.5 m2/day
11
Stonework Cladding
5.1
- m2/day
12
Window Glazing
1.5
- m2/hr
13
Granolithic Flooring
4.5
- m2/hr
14
Floor Screeding
4.5
- m2/hr
15
Floor Screeding
60.0
16
1.5
Slow
Ave
2.5
- m2/day
- m2/hr
Demolition
Task / Description
Weight, Structural Steel
Fast Units
- Tonnes/m3
2.0
2.5
3.4 m2/hr
8.7
- m2/hr
7.1
- m2/hr
5.7
- m2/hr
3.2
4.6
5.0 m2/hr
2.1
3.1
5.9 m2/hr
3.9
- m2/hr
3.2
- m2/hr
4.0
- m2/hr
1.3
- m2/hr
2.6
- m2/hr
1.8
- hrs/100
1.9
- hrs/no
6.2
- m2/hr
16.5
- m/hr
7.3
- hrs/no
0.6
- hrs/no
0.8
- hrs/no
0.9
- hrs/no
0.3
- hrs/on
0.1
- hrs/no
1.1
- hrs/m
3.9
- hrs/m
1.4
- /hrs/no
0.8
- /hrs/no
6.1
- m/hr
2/35
Rule of Thumb
Underpinning
Task / Description
Slow
Ave
1.2
2.2 m/day
0.4
0.7 m2/hr
0.1
0.3
- m2/hr
Fast Units
0.2
- m2/hr
0.8
- m/hr
0.7
- m/hr
0.5
- m/hr
Fast Units
Removable Anchors
Slow
Ave
Task / Description
7.0
6.0
- hrs
Grout in strands
2.0
- hrs
Slow
1.5
1.2
1.0
0.9
3.1
2.5
2.1
1.8
2.1
1.6
1.4
1.2
4.2
3.3
3.3
2.5
3.8
3.2
2.6
2.3
7.7
5.9
5.2
4.7
1.9
1.6
1.3
1.2
3.8
3.2
2.7
2.3
Ave
2.1
1.6
1.4
1.2
4.0
3.3
2.9
2.4
2.7
2.3
1.9
1.6
5.5
4.5
4.5
3.3
5.0
4.2
3.4
3.1
10.0
7.7
7.2
6.3
2.6
2.1
1.8
1.5
5.0
4.2
3.6
3.1
Fast
3.1
2.5
2.1
1.8
5.8
5.0
4.2
3.7
4.1
3.5
2.8
2.5
11.1
6.7
6.7
5.0
7.7
6.3
5.3
4.5
14.2
11.1
10.0
9.1
3.8
3.2
2.7
2.3
7.7
6.2
5.2
4.5
Slow
Ave
Fast Units
Cutting Chases
Task / Description
Concrete, cutting by hand, < 25mm wide
Concrete, cutting by hand, 25-50mm wide
Concrete, cutting by hand, 50-75mm wide
Concrete, cutting by hand, 75-100mm wide
Concrete, cutting by machine, < 25mm wide
Concrete, cutting by machine, 25-50mm wide
Concrete, cutting by machine, 50-75mm wide
Concrete, cutting by machine, 75-100mm wide
Brickwork, cutting by hand, < 25mm wide
Brickwork, cutting by hand, 25-50mm wide
Brickwork, cutting by hand, 50-75mm wide
Brickwork, cutting by hand, 75-100mm wide
Brickwork, cutting by machine, < 25mm wide
Brickwork, cutting by machine, 25-50mm wide
Brickwork, cutting by machine, 50-75mm wide
Brickwork, cutting by machine, 75-100mm wide
Light Blockwork, cutting by hand, < 25mm wide
Light Blockwork, cutting by hand, 25-50mm wide
Light Blockwork, cutting by hand, 50-75mm wide
Light Blockwork, cutting by hand, 75-100mm wide
Light Blockwork, cutting by machine, < 25mm wide
Light Blockwork, cutting by machine, 25-50mm wide
Light Blockwork, cutting by machine, 50-75mm wide
Light Blockwork, cutting by machine, 75-100mm wide
Heavy Blockwork, cutting by hand, < 25mm wide
Heavy Blockwork, cutting by hand, 25-50mm wide
Heavy Blockwork, cutting by hand, 50-75mm wide
Heavy Blockwork, cutting by hand, 75-100mm wide
Heavy Blockwork, cutting by machine, < 25mm wide
Heavy Blockwork, cutting by machine, 25-50mm wide
Heavy Blockwork, cutting by machine, 50-75mm wide
Heavy Blockwork, cutting by machine, 75-100mm wide
- hrs
Units
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
Task / Description
442
14.8
- % ratio
443
13.2
14.1 % ratio
444
20.6
25.6 % ratio
445
15.6
- % ratio
446
15.8
18.7
28.7 % ratio
447
14.7
15.0
- % ratio
3/35
Rule of Thumb
Sheet Piling
Slow
Ave
Fast Units
Task / Description
55.0
60.0 m/day
3.5
32.0
10.5 m/day
Slow
Ave
Fast Units
7.5 days
Task / Description
345
11.0
346
347
348
349
-
-
-
-
10.0
3.2
0.5
3.3
Slow
Ave
-
-
-
-
days
mins/lift
mins/15m
seconds/m
Cutting Switchboxes
Task / Description
Fast Units
7.1
9.5
12.5 no/hr
3.6
4.5
5.6 no/hr
6.6
9.5
12.5 no/hr
4.2
5.3
6.3 no/hr
20.0
23.0
25.0 no/hr
10.0
12.5
14.3 no/hr
7.7
10.0
12.5 no/hr
3.8
4.8
5.9 no/hr
Slow
Ave
Termite Control
Task / Description
Slab and walls, residential
Fast Units
17.5
m2/hr
Comercial Minimum
29
m2/hr
Comercial Maximum
19
m2/hr
Slow
Task / Description
Ladder with Cage
Ladder without Cage
Bumper Rail For garage
Railing Steel or galvanized
Railing Stainless Steel or high polish
Wall rail, alum.,pipe satin finish
42
Steel pipes
Task / Description
Black steel & Seamless Pipe & Hangers 1/4" to 3/4"
Black steel & Seamless Pipe & Hangers 1" to2"
Valves up to 1"
Valves over 1"
Slow
4/35
Ave
15
26
50
48
36
60
Fast Units
m/hr
m/hr
57 m/hr
m/hr
m/hr
m/hr
Ave
2.4
3
21
11
Fast Units
m/hr
m/hr
Ea/day
m/hr
m/hr
m/hr
Rule of Thumb
Site Investigation
Task / Description
Slow
Ave
Fast Units
8.0
10.0
14.0 m/hr
2.5
3.2
3.9 m/hr
0.4
0.8
0.9 m/hr
0.2
0.5
0.7 m/hr
0.1
0.4
0.7 m/hr
Slow
Ave
Fast Units
10.0
8.0
6.0 days
21.0
- days
2.5
- days/pump
3.5
- days/pump
Dewatering
Task / Description
Setup small 2 hole system
5/35
Site Investigation
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
Task / Description
Excavation Bulking Factor, Sand/Soil
Excavation Bulking Factor, Gravel
Excavation Bulking Factor, Clay/Chalk
Excavation Bulking Factor, Boulder Clay
Excavation Bulking Factor, Rock
Spoil Weight, Rock
Spoil Weight, Concrete
Spoil Weight, Landfill/CDG
Spoil Weight, Sand
Rail Mounted Grab, 2.0m3 bucket 2.4min lift cycle
Crane Mounted Clamshell Grab, 2.0m3 bucket 2.9min lift cycle
Crane Mounted Clamshell Grab, 2.5m3 bucket 2.9min lift cycle
Hydraulic Jack Hammer, Clay/Chalk
Hydraulic Jack Hammer, Hard Ground
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil
Hydraulic Excavator, 0.5m3 bucket, Sand/Soil
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.3m3 bucket, Hard Ground
Hydraulic Excavator, 0.4m3 bucket, Hard Ground
Hydraulic Excavator, 0.5m3 bucket, Hard Ground
75 HP Dozer open site Sand & gravel
150 HP Dozer open site Sand & gravel
75 HP Dozer open site Clay
150 HP Dozer open site Clay
200 HP Dozer open site Clay
Loading Shovel
Loading Shovel
Loading Shovel
Loading Shovel
Task / Description
0.50 m3 bucket No hauling
1.1 m3 bucket No hauling
2.25 m3 bucket No hauling
3.8 m3 bucket No hauling
Task / Description
Hydraulic Excavator, 0.35m3 bucket
Hydraulic Excavator, 0.50m3 bucket
Hydraulic Excavator, 0.75m3 bucket
Hydraulic Excavator, 1.00m3 bucket
150 HP Dozer open site Sand & gravel
Hauling
Hauling
Hauling
Hauling
Hauling
Hauling
Hauling
Hauling
Hauling
Hauling
Task / Description
12m3 Dump Truck 2Km round trip
12m3 Dump Truck 4Km round trip
12m3 Dump Truck 8Km round trip
12m3 Dump Truck 16Km round trip
12m3 Dump Truck 32Km round trip
15m3 Dump Truck 2Km round trip
15m3 Dump Truck 4Km round trip
15m3 Dump Truck 8Km round trip
15m3 Dump Truck 16Km round trip
15m3 Dump Truck 32Km round trip
Basement Excavation
Task / Description
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk - Basement Works
Hydraulic Excavator, 0.3m3 bucket, Hard Ground - Basement Works
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil - Basement Works
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds - Basement Works
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk - Basement Works
Hydraulic Excavator, 0.4m3 bucket, Hard Ground - Basement Works
Hydraulic Excavator, 0.5m3 bucket, Sand/Soil - Basement Works
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds - Basement Works
Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk - Basement Works
Hydraulic Excavator, 0.5m3 bucket, Hard Ground - Basement Works
6/35
Slow
-
-
-
-
-
-
-
-
-
30.0
25.0
34.0
Ave
15.0
33.0
40.0
45.0
60.0
2.5
2.4
1.9
1.8
48.0
33.0
42.0
15
4.5
8.7
28.6
50.0
7.1
25.0
40.0
7.1
25.0
40.0
6.1
22.2
28.6
45
66
25
36
75
Fast
20.0
-
-
-
-
-
-
-
-
59.0
41.0
52.0
Slow
40
85
150
220
Ave
50
100
170
250
Fast
60
110
190
270
Slow
Ave
15
35
45
50
Fast Units
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
Slow
Ave
32
22
13
10
6
40
25
17
13
9
Fast Units
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
Slow
6.4
5.5
5.2
4.7
12.6
11.7
10.9
9.7
18.2
16.5
15.4
13.3
Ave
8.0
6.9
6.5
5.9
15.4
14.3
13.3
11.8
20.0
18.1
16.7
15.4
Fast
9.4
8.1
7.9
8.2
18.9
16.7
15.6
14.0
23.0
20.0
19.3
17.7
6.9
23.4
45.5
5.6
20.5
36.8
5.6
20.5
37.0
4.5
17.9
25.7
10.2
33.4
58.0
8.2
29.0
46.0
8.3
28.7
46.0
7.2
25.0
32.9
Units
%
%
%
%
%
Tonnes/m3
Tonnes/m3
Tonnes/m3
Tonnes/m3
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
Units
m3/hr
m3/hr
m3/hr
m3/hr
Units
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
Bulk Excavation
Task / Description
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay
Load Spoil to Barge, capacity 2,000m3
Load Spoil to Barge, capacity 1,500m3
Load Spoil to Barge, capacity 1,000m3
Spoil conveyor, 600mm belt, 150m/min
Trench Excavation
Task / Description
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.3m3 bucket, Hard Ground
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.4m3 bucket, Hard Ground
Hydraulic Excavator, 0.5m3 bucket, Sand/Soil
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds
Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.5m3 bucket, Hard Ground
Excavate and Board Trench , 0.5-1.5m deep, < 2.0m wide
Excavate and Board Trench , 1.5-3.0m deep, < 2.0m wide
Excavate and Board Trench , 3.0-4.5m deep, < 2.0m wide
Excavate and Board Trench , 0.5-1.5m deep, > 2.0m wide
Excavate and Board Trench , 1.5-3.0m deep, > 2.0m wide
Excavate and Board Trench , 3.0-4.5m deep, > 2.0m wide
Task / Description
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.3m3 bucket, Hard Ground
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.4m3 bucket, Hard Ground
Hydraulic Excavator, 0.5m3 bucket, Sand/Soil
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds
Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.5m3 bucket, Hard Ground
Rock Tunnels
Task / Description
Excavation, non explosive chemical method, cycle time
Excavation, non explosive chemical method, Class I Granite
Excavation, non explosive chemical method, Class II Granite
Excavation, non explosive chemical method, Class III Granite
Slow
14.5
15.2
12.3
11.2
25.4
25.6
22.5
18.9
-
-
-
-
Ave
20.0
20.4
18.5
16.9
30.3
31.3
27.8
24.4
8.0
6.5
5.5
260.0
Fast
25.6
25.6
23.2
21.3
35.7
37.0
33.3
30.3
-
-
-
-
Units
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
hrs
hrs
hrs
m3/hr
Slow
5.6
4.8
4.8
9.7
20.5
18.2
18.2
17.0
26.0
26.3
26.3
22.7
3.3
3.0
2.7
6.6
6.2
5.8
Ave
7.1
6.1
6.1
5.4
25.0
22.2
22.2
20.0
28.6
28.6
28.6
25.0
4.5
4.2
4.0
7.1
6.7
6.2
Fast
8.2
7.3
7.1
6.4
29.2
26.0
26.0
23.4
33.1
33.2
33.2
28.8
6.8
6.5
6.0
8.8
9.2
10.5
Units
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
Slow
6.7
3.2
3.3
3.3
8.2
7.1
6.5
6.3
12.2
10.2
9.7
6.1
Ave
8.4
4.5
4.1
4.1
10.0
8.7
8.3
7.7
13.3
11.1
10.5
6.7
Fast
9.9
5.0
5.2
5.2
11.7
10.2
9.4
9.1
15.4
12.9
12.1
7.7
Units
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
Slow
8.0
0.3
2.0
1.2
Ave
6.0
0.9
2.6
1.4
Fast
5.5
1.2
2.9
1.8
Units
mins
m3/cycle
m3/cycle
m3/cycle
Site Clearance
Slow
Ave
Fast Units
Task / Description
25.0
38.0 m2/hr
2.9
- m2/hr
14.0
- m2/hr
18.0
- hrs/no
22.0
- hrs/no
26.0
- hrs/no
0.9
- m/hr
0.8
- m/hr
0.6
- m/hr
7/35
Bulk Excavation
Slow
Grader
Ave
150
Fast Units
m3/hr
m2/hr
m2/hr
13.9
20.4
25.0 m3/hr
7.6
9.5
12.6 m3/hr
14.2
20.4
25.6 m3/hr
7.6
10.2
12.8 m3/hr
12.7
18.4
23.2 m3/hr
6.9
8.9
11.6 m3/hr
11.6
16.9
21.3 m3/hr
6.3
8.2
10.4 m3/hr
23.8
28.5
35.7 m3/hr
16.7
18.5
20.4 m3/hr
25.0
32.0
37.0 m3/hr
17.2
19.3
21.2 m3/hr
21.7
27.5
33.3 m3/hr
15.1
16.9
18.8 m3/hr
19.6
24.5
30.3 m3/hr
13.7
15.9
17.5 m3/hr
18.6
28.5
38.5 m3/hr
24.4
37.2
50.0 m3/hr
18.9
28.6
38.4 m3/hr
24.2
37.2
50.0 m3/hr
15.8
23.5
31.2 m3/hr
19.2
29.6
40.0 m3/hr
17.2
26.4
35.7 m3/hr
22.2
33.8
45.4 m3/hr
43.5
48.0
52.6 m3/hr
55.5
61.1
66.7 m3/hr
43.8
48.3
52.9 m3/hr
55.5
61.1
66.7 m3/hr
37.1
40.3
43.5 m3/hr
47.6
51.6
55.6 m3/hr
43.8
45.7
47.6 m3/hr
55.6
59.1
62.5 m3/hr
Slow
Ave
0.5
0.65
0.8 m3/hr
50
m2/hr
25
m3/hr
50
m3/hr
1.3
m3/hr
m3/hr
Backfill
Task / Description
2Labor+Compactor (Manual spread & leveling)
Fast Units
m2/hr
m2/hr
8/35
Ground Compaction
Ground Compaction
Task / Description
Slow
Ave
Fast Units
330.0
380.0
465.0 m3/hr
28.5
31.2
45.2 m2/hr
Vibro-Roller, Soil
58.8
- m2/hr
Vibro-Roller, Clay
55.6
- m2/hr
Vibro-Roller, Hardcore
38.4
- m2/hr
Vibro-Roller, Ash
57.8
- m2/hr
m3/hr
Vibrating plate
8.5
m3/hr
26
m3/hr
17
m3/hr
13
m3/hr
53
m3/hr
35
m3/hr
27
m3/hr
40
m3/hr
26
m3/hr
20
m3/hr
80
m3/hr
50
m3/hr
32
m3/hr
250
m3/hr
165
m3/hr
124
m3/hr
450
m3/hr
330
m3/hr
248
m3/hr
250
m3/hr
165
m3/hr
124
m3/hr
450
m3/hr
330
m3/hr
248
m3/hr
m3/hr
9/35
Ground Compaction
Bored Piling
Task / Description
Cycle Time, 5-20m deep
Cycle Time, 20-40m deep
Cycle Time, 40-70m deep
Cycle Time, 70-90m deep
Cycle Time, 90-135m deep
Move piling setup to next location
Excave shaft by grab, general fill/uppr levels
Excave shaft by grab, sand/minor rubble
Excave shaft by grab, marinve/aluvium
Excave shaft by grab/RCD, CDT
Excave shaft by grab/RCD, CDG <150
Excave shaft by RCD, CDG 150-200
Excave shaft by RCD, CDG >200/gravel
Excave shaft by RCD/Chisel, corestones
Excave Rock Socket by RCD, grade IV/V rock
Excave Rock Socket by RCD, grade II/III rock
Excave Rock Socket by RCD, tendering rate
Add/remove RCD plant
Add/remove RCD drill string/drill bit
Remove Obstruction, above water hand hammers
Remove Obstruction, below water heavy chisel
Concrete Plug, RCD off/tremmie/concrete/cure/RCD on
Install air lift tremmie tube
Fabricate reinforcement cages
Install reinforcement cages
Shaft cleaning, air lifting after excavation
Shaft cleaning, air lifting after cage installed
Shaft concreting/extract casing 5-70m deep
Shaft concreting/extract casing 70-95m deep
Shaft concreting/extract casing 95-135m deep
Concrete curing prior to remove telescopic casing
Concrete Testing, Coring Test
Concrete Testing, Sonic Logging Test
Concrete Testing, Vibration Test
Task / Description
Crane grab, cement/bentonite and sheet piles
Slow
8.0
10.0
25.0
45.0
60.0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
60.0
-
-
-
-
-
-
-
-
-
-
-
-
Ave
4.0
8.0
10.0
25.0
45.0
2.0
3.5
2.1
2.5
0.5
1.5
1.0
0.5
0.5
0.2
0.1
0.1
2.0
5.0
0.8
0.5
53.0
5.0
2.5
2.0
8.0
2.0
12.0
14.0
48.0
72.0
3.2
2.5
6.5
Fast
4.0
-
-
-
-
-
-
-
-
-
-
-
-
-
0.3
0.2
-
-
-
-
-
50.0
-
-
-
-
-
-
-
-
-
2.2
-
-
Units
days/no
days/no
days/no
days/no
days/no
hrs
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
hrs
hrs
m/hr
m/hr
hrs
hrs
hs/cage
hrs/no
hrs
hrs
hrs
hrs
hrs
hrs
m/hr
hrs/no
hrs/no
Slow
1.8
Ave
2.5
Fast Units
3.4 m/day
Fast Units
Cutting Back
Slow
Ave
Task / Description
0.6
0.3 hrs/no
1.5
0.4 hrs/no
1.8
0.8 hrs/no
1.9
0.8 hrs/no
2.5
1.1 hrs/no
4.2
2.3 hrs/no
9.2
8.2 hrs/no
10.1
9.5 hrs/no
10.2 hrs/no
11.5
15.2
11.5
- m/hr
6.7
- m/hr
- m/hr
0.2
- m3/hr
2.5
- m/day
10/35
Piling
Landscaping
Slow
Ave
Task / Description
2.5
Fast Units
- m2/hr
25.0
- m2/hr
4.0
- no/hr
1.5
- no/hr
1.7
- no/hr
16.8
- m2/hr
Slow
2.7
2.3
1.5
1.1
1.7
1.6
-
-
-
0.9
-
-
-
Ave
-
-
-
-
-
-
0.3
0.2
2.5
1.3
1.0
10.5
2.5
Task / Description
Concrete Slabs, laid on bedding, to slight falls
Concrete Slabs, laid on bedding, to steep falls
Concrete Slabs, laid in mortar, to slight falls
Concrete Slabs, laid in mortar, to steep falls
Concrete Slabs, laid on sand, to slight falls
Concrete Slabs, laid on sand, to steep falls
Cobble Stones, laid in mortar, no patterns
Cobble Stones, laid in mortar, with patterns
Artificial Stone, laid on sand, with patterns
Brick Paviors, in mortar, straight joints
Brick Paviors, in mortar, herringbone pattern
Gravel Paths, including preparation of sub-base
Concrete Paths, 100mm thick, including preparation of sub-base
Fast
4.2
2.7
2.3
1.5
2.8
1.9
-
-
-
1.9
1.2
-
-
Units
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
997
998
-
-
6.2
4.5
- m/hr
- m/hr
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
-
-
-
-
-
-
-
-
-
-
5.0
5.5
3.5
7.7
5.8
6.2
7.1
6.6
5.8
8.3
-
-
-
-
-
-
-
-
-
-
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
no/hr
no/hr
no/hr
Road surfacing
Task / Description
Slow
Ave
Fast Units
70 m3
m3/day
115 m3
m3/day
550 m2
m2/day
500 m2
m2/day
M25
1000 m2
m2/day
1500:3000
m2/day
RC2
1000 M2
m2/day
700 m3
m3/day
Slow
Ave
Fast Units
Asphaltic Concrete Pavement for highways and large paved area Binder Course < 5cm thick
6450
m2/day
Asphaltic Concrete Pavement for highways and large paved area Binder Course 5cm thick
5300
m2/day
Asphaltic Concrete Pavement for highways and large paved area Binder Course 7.5cm thick
4100
m2/day
Asphaltic Concrete Pavement for highways and large paved area Binder Course 10cm thick
3450
m2/day
Asphaltic Concrete Pavement for highways and large paved area Wearing Course 2.5cm thick
8800
m2/day
Asphaltic Concrete Pavement for highways and large paved area Wearing Course 4cm thick
6450
m2/day
Asphaltic Concrete Pavement for highways and large paved area Wearing Course 5cm thick
5300
m2/day
Asphaltic Concrete Pavement for highways and large paved area Wearing Course 6cm thick
4580
m2/day
Asphaltic Concrete Pavement for highways and large paved area Wearing Course 7.5cm thick
4100
m2/day
75
m2/day
58
m2/day
45
m2/day
11/35
Landscaping
Pavement Base
Task / Description
Slow
Ave
Fast Units
1250
m2/day
3000
m2/day
Base Course For roadways and large areas crushed 3/4" stone base, compacted 7.5cm deep
3300
m2/day
Base Course For roadways and large areas crushed 3/4" stone base, compacted 15cm deep
3200
m2/day
Base Course For roadways and large areas crushed 3/4" stone base, compacted 20cm deep
2400
m2/day
Base Course For roadways and large areas crushed 3/4" stone base, compacted 30cm deep
1950
m2/day
Base Course For roadways and large areas crushed 1-1/2" stone base, compacted 7.5cm deep
4300
m2/day
Base Course For roadways and large areas crushed 1-1/2" stone base, compacted 15cm deep
3250
m2/day
Base Course For roadways and large areas crushed 1-1/2" stone base, compacted 20cm deep
2500
m2/day
Base Course For roadways and large areas crushed 1-1/2" stone base, compacted 30cm deep
1500
m2/day
Slow
-
Ave
0.4
Fast Units
- m3/hr
12.5
- m2/hr
7.7
- m2/hr
6.7
- m2/hr
Parking Barriers
20
- m2/hr
Fencing Works
Slow
Ave
Fast Units
Task / Description
1.0
1.2
- m/hr
3.3
4.5
- no/hr
3.2
4.0
- no/hr
4.2
- m/hr
4.4
- m/hr
5.5
- m/hr
23.8
- m/hr
33.3
- m/hr
-
-
-
-
-
41.6
71.4
100.0
125.0
4.1
12/35
-
-
-
-
-
m/hr
m/hr
m/hr
m/hr
no/hr
Landscaping
Task / Description
Shaft Slip Forming
Slow
Ave
Fast Units
300.0
500.0 mm/hr
Fast Units
Ave
350
Ref
Pilecaps, < 0.7m2
Task / Description
0.9
1.6
2.0 m2/hr
351
Pilecaps, 0.7-2.5m2
1.6
2.0
2.3 m2/hr
352
Pilecaps, 2.5-3.0m2
2.0
2.3
2.5 m2/hr
353
2.3
2.5
3.1 m2/hr
354
1.1
1.7
1.8 m2/hr
355
1.7
1.8
2.5 m2/hr
356
1.8
2.5
2.6 m2/hr
357
2.5
2.6
3.5 m2/hr
358
0.6
0.8
1.2 m2/hr
359
0.9
1.0
1.1 m2/hr
360
1.0
1.1
1.3 m2/hr
361
1.2
1.3
1.5 m2/hr
362
1.5
1.6
1.8 m2/hr
363
1.4
1.5
1.7 m2/hr
364
5.3
7.1
10.0 m2/hr
365
0.9
1.8
1.9 m2/hr
366
1.0
2.2
2.5 m2/hr
367
1.2
2.5
2.9 m2/hr
368
1.0
1.4
2.0 m2/hr
369
1.9
2.3
3.3 m2/hr
370
2.3
2.8
3.5 m2/hr
371
3.2
4.5
4.0 m2/hr
372
3.8
4.8
5.4 m2/hr
373
Ground Slabs
1.0
1.5
1.8 m2/hr
374
3.2
4.1
5.4 no/hr
375
1.2
2.8
3.2 no/hr
376
1.3
1.6
1.8 m2/hr
377
1.8
2.1
2.4 m2/hr
378
0.4m2
2.0
2.3
2.5 m2/hr
379
7.9
9.5
10.3 m2/hr
380
6.9
7.5
8.3 m2/hr
381
8.5
10.2
12.0 m2/hr
382
dia
3.5
4.5
6.0 m2/hr
383
5.2
6.5
7.5 m2/hr
384
2.5
3.5 hrs/no
385
0.7
0.8
1.0 m2/hr
386
0.8
0.9
1.2 m2/hr
387
0.4
0.6
- m2/hr
388
0.7
0.8
- m2/hr
389
2.5
2.8 m2/hr
390
391
392
393
394
395
396
397
398
2.3
2.6 m2/hr
1.1
1.4
1.8 m2/hr
300.0
2.1
3.2
3.8 m2/hr
1.9
3.0
3.5 m2/hr
15.6
17.5 m2/hr
43.5
47.5 m2/hr
29.3
31.2 m2/hr
2.8
3.5
4.2 m2/hr
13/35
500.0 mm/hr
Formwork
Task / Description
Slow
Ave
Fast Units
399
1.2
1.5
1.9 m2/hr
400
0.9
1.1
1.4 m2/hr
401
7.6
8.2
9.1 no/hr
402
3.1
3.9
4.5 no/hr
403
4.5
6.2
7.1 no/hr
404
3.1
3.7
4.5 no/hr
Slow
Ave
Fast Units
1.8
- m2/hr
11.2
14.2
20.2 m2/hr
7.7
- m/hr
6.2
- m/hr
Slow
Ave
Fast Units
3.2
1.9 hrs/m3
5.5
4.1
3.7 hrs/m3
5.2
3.9 hrs/m3
Breaking Out
Task / Description
Concrete Slabs , unreinforced 50-150mm
9.1
6.2
4.7 hrs/m3
4.7
3.9
3.1 hrs/m3
5.6
4.7
3.9 hrs/m3
3.6
3.3
3.0 hrs/m3
5.4
5.1
4.8 hrs/m3
Concrete Beams
7.5
6.5
5.6 hrs/m3
Concrete Columns
9.2
8.2
7.3 hrs/m3
1.9
1.7
1.5 hrs/m3
2.1
1.6 hrs/m3
2.1
1.7 hrs/m3
3.6
- hrs/m3
2.4
1.8
1.3 hrs/m3
Brickwork, foundations
2.7
2.1
1.5 hrs/m3
14/35
Formwork
Ave
Fast
405
Ref
Task / Description
40.3
38.4
36.5 hrs/tonne
Units
406
28.2
26.9
25.8 hrs/tonne
407
22.5
20.6
20.1 hrs/tonne
408
16.9
16.3
15.4 hrs/tonne
409
12.0
11.5
10.9 hrs/tonne
410
9.2
8.6
8.2 hrs/tonne
411
6.9
6.7
6.5 hrs/tonne
412
5.7
5.5
5.2 hrs/tonne
413
5.3
5.1
4.9 hrs/tonne
414
5.2
4.9
4.6 hrs/tonne
415
55.4
52.8
50.6 hrs/tonne
416
38.8
37.0
35.1 hrs/tonne
417
29.5
28.4
26.9 hrs/tonne
418
23.4
22.4
21.9 hrs/tonne
419
16.6
15.8
15.1 hrs/tonne
420
12.4
11.9
11.3 hrs/tonne
421
9.9
9.2
8.7 hrs/tonne
422
6.8
6.6
6.2 hrs/tonne
423
6.1
5.9
5.6 hrs/tonne
424
6.1
5.9
5.6 hrs/tonne
425
41.2
40.8
39.1 hrs/tonne
426
29.2
28.6
27.4 hrs/tonne
427
22.7
22.0
21.2 hrs/tonne
428
17.6
17.3
16.9 hrs/tonne
429
12.4
12.2
11.8 hrs/tonne
430
9.4
9.2
8.7 hrs/tonne
431
7.4
7.2
7.0 hrs/tonne
432
7.0
6.8
6.4 hrs/tonne
433
6.4
6.1
5.9 hrs/tonne
434
5.3
5.1
4.8 hrs/tonne
435
48.9
48.0
45.5 hrs/tonne
436
34.4
33.6
31.9 hrs/tonne
437
26.6
25.8
24.3 hrs/tonne
438
20.9
20.4
19.5 hrs/tonne
439
14.6
14.4
13.8 hrs/tonne
440
11.3
10.8
10.5 hrs/tonne
441
8.6
8.4
8.2 hrs/tonne
15/35
Reinforcement
Task / Description
Concrete Weight, 1m3
Readymix Lorry, Length
Readymix Lorry, Width
Readymix Lorry, Height
Readymix Lorry, Length
Readymix Lorry, Turning Circle
Readymix Lorry, Allowable Access Ramp Gradient
Mixing Concrete, By Hand
Mixing Concrete, Single Drum Paddle Mixer
Mixing Concrete, Double Drum Paddle Mixer
Mixing Concrete, Single Drum Plant Pan Mixer
Mixing Concrete, Dry Mix Plant
Task / Description
Placing concrete, lorry based pump
Hollorib Decking, concrete topping
Hollorib Decking, concrete topping, incl PowerFloat
Placing Concrete, By Wheelbarrow over 1-10m
Placing Concrete, By Wheelbarrow over 10-20m
Placing Concrete, By Wheelbarrow over 20-50m
Placing Direct From Readymix Lorry, Mass Fill
Placing Direct From Readymix Lorry , 50mm Blinding
Placing Direct From Readymix Lorry, Ground Beams
Placing Direct From Readymix Lorry, Pile Caps
Placing Direct From Readymix Lorry, Duct Walls
Placing Direct From Readymix Lorry, Stub Columns
Placing Direct From Readymix Lorry, Ground Slab
Placing Direct From Readymix Lorry,Drains Bed and Cover
Placing From Tower Crane, Pile Caps
475
476
477
478
479
480
481
482
483
484
Task / Description
Surface Finishing, Steel Float By Hand
Surface Finishing, Wood Float By Hand
Surface Finishing, Power Float
Surface Finishing, Light Brush on Trowel
Surface Finishing, Brush on Trowel Margin
Surface Finishing, Sprayed By Pump, expose aggregate
Surface Finishing, Wire Brush, expose aggregate
Making Good Walls, prepare, shutter, pour
Making Good Columns, prepare, shutter, pour
Making Good Sides of Beams, prepare, shutter, pour
Making Good Slab Soffits, prepare, shutter, pour
Making Good Bolt Holes, prepare, shutter, pour
Making Good Rubdown Precast Concrete, prepare, shutter, pour
Making Good Scabble 3 head brush hammer, prepare, shutter, pour
Task / Description
Sand/Cement Floor Screed, 15-20mm thick
Sand/Cement Floor Screed, 20-30mm thick
Sand/Cement Floor Screed, 30-40mm thick
Sand/Cement Floor Screed, 40-50mm thick
Sand/Cement Floor Screed, 50-65mm thick
Sand/Cement Floor Screed, 65-100mm thick
Fix/Setout Screed Battens
16/35
Slow
-
-
-
-
-
-
-
-
158.0
315.0
-
-
Ave
2.4
8.3
2.5
3.7
24.4
16.4
17.0
0.3
180.0
370.0
120.0
90.0
Fast
-
-
-
-
-
-
20.0
-
210.0
420.0
-
-
Units
Tonnes
m
m
m
Tonnes
m
degrees
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
Slow
30.0
85.0
40.0
2.1
1.5
0.8
2.8
-
1.5
1.0
-
-
2.1
-
1.2
Ave
40.0
100.0
50.0
2.3
1.8
1.1
3.1
1.3
-
1.5
0.8
0.4
2.3
0.9
1.4
Fast
50.0
120.0
70.0
2.5
2.1
1.5
3.3
1.6
1.7
2.3
1.1
0.6
2.6
1.0
1.6
Units
m3/hr
m2/hr
m2/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
4.0
0.9
1.2
0.9
0.6
0.8
0.5
0.6
0.6
0.4
4.5
1.3
1.5
1.1
0.7
1.0
0.6
0.8
1.1
0.5
5.5
1.7
1.8
1.2
0.9
1.1
0.8
1.0
1.5
0.6
Slow
9.2
11.7
13.9
55.8
28.8
65.0
15.0
-
-
-
-
14.8
-
30.7
Ave
13.9
17.2
20.8
90.1
48.5
95.0
25.0
5.5
2.8
2.8
4.2
16.8
18.0
59.5
Fast
25.0
29.4
37.0
170.0
85.0
145.0
30.0
8.6
6.9
7.0
5.5
25.8
-
73.8
Units
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
no/hr
m2/hr
hrs/m2
Slow
-
-
3.2
2.0
-
-
-
Ave
4.8
4.6
4.2
3.8
3.3
3.0
10.0
Fast
5.7
5.5
5.3
5.2
3.9
3.6
-
Units
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
Concrete Mixing
Task / Description
Slow
Ave
3.5
4.2
5.8 m2/hr
1.2
1.7
2.2 m2/hr
4.8
5.0
6.3 m2/hr
1184
3.3
3.5
4.4 m2/hr
1185
3.8
4.0
4.8 m2/hr
1186
3.3
3.5
4.2 m2/hr
1187
20.0
- m2/hr
1188
18.7
25.0
31.3 m2/hr
1189
11.2
15.0
17.3 m2/hr
1190
1191
-
-
75.0
38.0
- m2/hr
- m2/hr
Slow
Ave
140
- m/day
80
- m/day
70
- m/day
54
- m/day
54
42
- m/day
Polyurethane 1 or 2 componant
40
- m/day
50
60
75 m/day
1181
1182
1183
Fast Units
Fast Units
70 m/day
Ave
541
Ref
Polystyrene Boards
Task / Description
8.5
Fast Units
- m2/hr
542
543
-
-
12.0
19.0
- m2/hr
- m2/hr
Slow
Ave
18.0
- m2/day
8.5
- m2/day
Fast Units
36.0
- m2/day
-
-
52.0
26.0
- m2/day
- m2/day
Slow
Ave
45.0
Fast Units
- m2/day
39.0
- m2/day
52.0
- m2/day
35.0
- m2/day
1.4
17/35
- Tons/day
Task / Description
English Bond, 0.5 Brick thick
English Bond, 1.0 Brick thick
English Bond, 1.5 Brick thick
English Bond, 2.0 Brick thick
Flemish Bond, 0.5 Brick thick
Flemish Bond, 1.0 Brick thick
Flemish Bond, 1.5 Brick thick
Flemish Bond, 2.0 Brick thick
Flemish Garden Wall Bond, 0.5 Brick thick
English Garden Wall Bond, 0.5 Brick thick
Stretcher Bond, 0.5 Brick thick
Building in Metal Door Frame
Building in Metal Window
Building in Wood Door Frame
Building in Wood Window
Building Brick on Edge Coping
Building Brick on Edge Canted Cills
Pointing to Frames
Bitumen DPC, horizontal under 100mm wide
Bitumen DPC, horizontal 100-255mm wide
Bitumen DPC, horizontal over 255mm wide
Bitumen DPC, vertical under 100mm wide
Bitumen DPC, vertical100-225mm wide
Bitumen DPC, vertical over 225mm wide
Reinforcement ExMet, horizontal under 100mm wide
Reinforcement ExMet, horizontal over 100mm wide
Reinforcement ExMet, vertical under 100mm wide
Reinforcement ExMet, vertical over 100mm wide
Face Finish as work Proceeds, Raking Out
Face Finish as work Proceeds, Flush and Rubbed
Face Finish as work Proceeds, Struck Pointing
Face Finish as work Proceeds, Bag Rubbed
Face Finish as work Proceeds, Bucket Handle
Face Finish as work Proceeds, Recessed 5-10mm
Face Finish after completion, Flush and Rubbed
Face Finish after completion, Struck Pointing
Face Finish after completion, Bucket Handle
Slow
0.7
0.6
0.4
0.3
0.8
0.6
0.3
0.3
0.8
0.8
1.0
0.5
0.6
0.4
0.6
-
-
12.4
-
-
-
-
-
-
-
-
-
-
26.3
4.2
2.8
-
5.4
4.2
1.9
-
2.5
Ave
0.8
0.8
0.5
0.4
0.9
0.7
0.8
0.4
1.2
1.0
1.3
0.5
0.5
0.3
0.5
3.7
1.8
15.4
2.9
9.1
14.3
5.8
7.8
10.0
5.8
9.1
3.8
5.8
27.8
4.3
3.0
1.1
5.6
4.7
2.0
1.3
2.7
Fast
1.1
0.9
0.6
0.5
1.2
0.9
1.0
0.5
1.4
1.3
1.6
0.3
0.4
0.2
0.4
-
-
17.8
-
-
-
-
-
-
-
-
-
-
29.4
4.5
3.1
-
5.8
4.9
2.1
1.2
2.9
Slow
1.8
1.4
1.2
1.5
1.4
1.2
1.4
1.2
1.1
-
-
-
-
-
-
-
-
-
-
-
-
Ave
2.5
1.9
1.6
2.2
1.9
1.6
2.1
1.6
1.4
71.4
29.4
17.6
2.5
1.6
1
5
4.4
4.2
Fast
3.2
2.5
2.1
2.9
2.1
2.0
2.9
2.1
1.8
-
-
-
-
-
-
-
-
-
-
-
-
Units
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
hrs/no
hrs/no
hrs/no
hrs/no
hrs/m
hrs/m
hrs/m
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
Blockwork
Task / Description
Thermalite Blockwork, under 100mm thick
Thermalite Blockwork, under 100-150mm thick
Thermalite Blockwork, over 150mm thick
Lightweight Concrete Blockwork, under 100mm thick
Lightweight Concrete Blockwork, under 100-150mm thick
Lightweight Concrete Blockwork, over 150mm thick
Heavyweight Concrete Blockwork, under 100mm thick
Heavyweight Concrete Blockwork, under 100-150mm thick
Heavyweight Concrete Blockwork, over 150mm thick
Face Finish, Raked Out
Face Finish, Bag Rubbed
Face Finish, Flush Pointing
Common Brick 10x6x20, 10cm thick also if reinf.
Common Brick 10x6x20, 20cm thick also if reinf.
Common Brick 10x6x20, 30cm thick also if reinf.
No Scaf. Concrete or Glazed Block 20x40, 10 or 15 cm thick, reinf. Or not.
No Scaf. Concrete or Glazed Block 20x40, 20 cm thick, reinf. Or not.
No Scaf. Concrete or Glazed Block 20x40, 25 or 30 cm thick, reinf. Or not.
18/35
Units
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
Masonary
Task / Description
Slow
Fast Units
18
m2/hr
12.5
m2/hr
4.6
m2/hr
4.6
m2/hr
m2/hr
m2/hr
3.1 m2/hr
Plastering Spatter
1Coat
Ave
654
2.2
4
2.8
655
656
657
658
Browning
Browning
Browning
Browning
2.1
9.9
5.2
3.3
2.6
10.0
5.4
3.6
2.8
10.1
6.4
3.9
m2/hr
m2/hr
m2/hr
m2/hr
659
660
661
662
663
664
Covings
Skimming (topcoat), Internal Walls under 2.5m high
Skimming (topcoat), Internal Walls over 2.5m high
Skimming (topcoat), Reveals and Columns less than 100mm wide
Skimming (topcoat), Reveals and Columns 100-200mm wide
Skimming (topcoat), Reveals and Columns 200-300mm wide
-
6.1
5.5
12.6
7.7
4.5
5.0
6.7
6.1
13.8
8.3
5.0
-
7.3
6.7
15.4
9.8
5.5
m/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
665
3.2
4.5
5.5 m2/hr
666
1.1
1.7
2.4 m2/hr
667
2.7
3.2
5.4 m2/hr
Plasterboard
Slow
Ave
Task / Description
3.6
4.0
5.5 m2/hr
4.0
5.0
6.7 m2/hr
12.5
- m2/hr
16.5
- m2/hr
0.1
- hrs/m
19/35
Fast Units
Plastering
Ave
841
Ref
Prepare Walls
Task / Description
14.2
Fast Units
- m2/hr
842
Prepare Doors
12.5
- m2/hr
843
25.0
- m/hr
844
1.1
- m2/hr
- m2/hr
845
6.7
846
20.0
- m/hr
847
1.7
2.1 m2/hr
848
3.1
3.8 m2/hr
849
3.3
- m2/hr
850
2.2
- m2/hr
851
3.6
- m2/hr
852
2.4
- m2/hr
- m2/hr
853
1.5
854
2.0
855
856
2.0
- m2/hr
857
8.0
- m2/hr
858
6.0
- m2/hr
859
6.0
- m2/hr
860
4.5
- m2/hr
861
2.3
- m2/hr
862
20.0
- m/hr
863
16.5
- m/hr
864
7.1
- m2/hr
865
6.2
- m2/hr
866
2.5
- m2/hr
867
2.0
- m2/hr
868
2.0
- m2/hr
869
1.7
- m2/hr
870
2.9
- m2/hr
871
6.1
- m2/hr
872
5.0
- m2/hr
873
4.2
- m2/hr
874
4.1
- m2/hr
875
1.3
2.4
- m2/hr
876
0.9
1.7
- m2/hr
877
2.5
- m/hr
Slow
Ave
Fast Units
6.9
4.0
- m2/hr
-
m2/hr
Task / Description
Simple Universal Beam Steel Bridge, paintwork to all steel
20/35
- m/day
Painting
Ave
691
Ref
Granolithic Flooring
Task / Description
3.1
692
3.6
- m2/hr
693
4.6
5.1 m2/hr
694
1.5
2.2 m2/hr
695
0.8
1.1 m2/hr
696
2.2
2.8 m2/hr
697
2.6
- m2/hr
698
Linolium/Thermo-Plastic Flooring
3.1
5.0 m2/hr
699
3.3
5.6 m2/hr
700
1.5
2.1 m2/hr
701
3.1
- m2/hr
702
5.6
6.1 m2/hr
703
3.5
4.2 m2/hr
704
705
2.0
3.7
706
6.6
7.2 m2/hr
707
9.5
10.5 m2/hr
21/35
Fast Units
- m2/hr
2.8 m2/hr
4.1
m2/hr
Floor Finishes
Task / Description
Mosaic Tiling, 0.045x0.045m
Clay, quarry Tiles, Window Cills, setout and
level
Clay, quarry Tiles, Window Cills, fix, grout
and clean
Ceramic Tiles 150x150mm,
Ledges/Upstands
Ceramic Tiles 150x150mm, Areas under
2
Slow
Ave
1.1
Fast Units
1.5 no/hr
55.5
- m/hr
1.5
- m2/hr
20.4
27.1
32.0 no/hr
712
0.9
1.0
1.2 m2/hr
713
1.4
1.6
1.9 m2/hr
714
1.5
1.7
2.1 m2/hr
41.6
- no/hr
62.5
- no/hr
717
1.0
1.3
1.5 m2/hr
718
1.6
1.8
2.1 m2/hr
719
1.7
1.9
2.2 m2/hr
720
125.0
- no/hr
721
2.2
2.5
2.6 m2/hr
715
716
22/35
Wall Finishes
Task / Description
Suspended Ceilings, office situations
Suspended Ceilings, First Fix
Suspended Ceilings, Second Fix
Slow
-
-
-
Ave
2.6
0.7
1.2
Fast
3.5
-
-
Units
m2/hr
m2/hr
m2/hr
Slow
5.9
1.6
1.1
5.5
-
0.8
0.3
-
2.6
0.8
3.0
2.2
5.9
3.5
2.9
2.1
-
-
-
-
-
-
-
-
-
-
Ave
6.2
2.0
1.5
6.1
3.2
1.1
0.5
17.8
3.0
1.1
3.5
2.6
7.3
4.6
3.6
2.8
11.1
16.6
28.5
0.8
0.7
0.6
0.6
0.4
0.6
0.1
Fast
6.8
2.5
2.1
6.7
3.6
1.4
0.6
20.2
3.4
1.6
3.9
2.9
9.1
5.8
4.8
3.7
-
-
-
-
-
-
-
-
-
-
Units
m/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
no/hr
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
Slow
-
-
-
-
-
-
-
Ave
14.5
70.0
28.0
35.0
1.2
1.1
25.0
Fast
-
-
-
-
-
-
-
Units
m2/day
m2/day
m2/day
m2/day
m2/hr
m2/hr
m2/day
Slow
5.6
7.2
6.9
-
6.9
-
-
6.9
-
-
Ave
7.0
9.0
8.7
1.8
8.0
2.3
4.0
10.4
1.3
1.1
Fast
7.8
10.1
9.7
-
9.2
3.2
-
12.2
-
-
Units
m2/day
m2/day
m2/day
m2/day
m2/day
m2/day
m2/day
m2/day
m2/hr
m2/hr
Slow
-
-
-
-
Ave
5.0
5.0
4.2
4.0
Fast
-
-
-
-
Units
m2/hr
m2/hr
m2/hr
m2/hr
Partitioning
Task / Description
Timber Studding
Metalwork System (MF) Studding
Tape, Joint Sand and Top Coat Plasterboard
Skimming to Plasterboards
5mm Hardboard Paneling , excluding studding time
100mm Pine Paneling , excluding studding time
Quality Hardwood Paneling, excluding studding time
Fix 50mm Rocksil Insulation to cavities
Fix Timber Studding and Paramount Partitions
Fix Timber Studding and Demountable Partitions
Fix Timber Studding and Hills Duraboard Partitions
Fix Timber Studding and Gyproc Laminated Partitions
Stud Partitions, Butt Jointed, nailed
Stud Partitions, Butt Jointed, screwed
Stud Partitions, T&G Jointed, nailed
Stud Partitions, T&G Jointed, screwed
Stud Partitions, Fix Sole Plates
Stud Partitions, Fix Noggins
Stud Partitions, Drill 25-40mm Holes
Fix Toilet Partition System, Separation panels
Fix Toilet Partition System, Wall Front Panels
Fix Toilet Partition System, Separation Front Panels
Fix Toilet Partition System, End Front Panels
Fix Toilet Partition System, Hang Door to Panel
Fix Toilet Partition System, Hand Door plugged to wall
Fix Toilet Partition System, Fix Head Rails
Curtain Walling
Task / Description
Vertical Glazed Lights, 6m x 2.5m
Vertical Glazed Walls, large scale
Clerestory Frame/Glazing, 3m x 4m
Oriel Window Frame /Glazing, 4m x 2m
Glazed Curtain Wall, First Fix
Glazed Curtain Wall, Second Fix
High Quality Glazed Curtain Walling
Stonework
Task / Description
Fix 0.5m2 Stones to Metal Support Frame
Fix 0.5-0.75m2 Stones to Metal Support Frame
Fix 0.75-1.0m2 Stones to Metal Support Frame
Fix Complex Stonework to Metal Support Frame
Fix Curved Stone Cladding
Fix Stone Edge Beams/Window Reveals
Fix Stone Soffits
Stone Floors
Granite Wall Panels, First Fix
Granite Wall Panels, Second Fix
Wallpapering
Task / Description
Strip Existing Wallpaper (3 layers) & Prepare Walls
Fix Wallpaper and lining paper
Fix Vinyl and Washable paper
Fix Ceiling Lining Paper
23/35
Finishes
Task / Description
Mastic Pointing to Frames
Fix Metal and Timber Windows After Wall Complete
Window Glazing
Window Glazing, Single Glazed Units
Window Glazing, Double Glazed Units
Carpentry Carcassing
Task / Description
Windows, Timber Frames for Bricklaying
Windows, Drill, Screw & Plug extra over
Door Frames, Softwood, 1.0-3.0m2
Door Frames, Softwood, 3.0-7.0m2
Door Frames, Softwood, 7.0-10.0m2
Door Frames, Hardwood, 1.0-3.0m2
Door Frames, Hardwood, 3.0-7.0m2
Door Frames, Hardwood, 7.0-10.0m2
Erect Water Tank Platform
Fix Studding For Bath
Cut Access Hatch
Floor Joists, under 3m
Floor Joists, 3.0-4.5m
Floor Joists, 4.5-6.0m
Ceiling Joists , under 3m
Ceiling Joists , 3.0-4.5m
Ceiling Joists , 4.5-6.0m
Ceiling Joists, Notch to Beams
Ceiling Joists, Pack Joist Ends
Ceiling Joists, Nailing Joists together
Ceiling Joists, Bolting Joists Together
Floor Boards, Butt Jointed
Floor Boards, T&G Boards, under 75mm wide
Floor Boards, T&G Boards, 75-100mm wide
Floor Boards, T&G Boards, 100-125mm wide
Floor Boards, T&G Boards, 125-150mm wide
Plywood Sheeting, Butt Jointed, nailed
Plywood Sheeting, Butt Jointed, screwed
Plywood Sheeting, T&G Jointed, nailed
Plywood Sheeting, T&G Jointed, screwed
Chipboard Sheeting, Butt Jointed, nailed
Chipboard Sheeting, Butt Jointed, screwed
Chipboard Sheeting, T&G Jointed, nailed
Chipboard Sheeting, T&G Jointed, screwed
Task / Description
Windows, Softwood, 3.0-7.0m2
Windows, Softwood, 7.0-10.0m2
Windows, Hardwood, 1.0-3.0m2
Windows, Hardwood, 3.0-7.0m2
Windows, Hardwood, 7.0-10.0m2
Windows, Aluminum, 1.0-3.0m2
Windows, Aluminum, 3.0-7.0m2
Windows, Aluminum, 7.0-10.0m2
Windows, Steel, 1.0-3.0m2
Windows, Steel, 3.0-7.0m2
Windows, Steel, 7.0-10.0m2
Window Boards, nailed
Window Boards, screwed
Mouldings, Softwood, Nailed
Mouldings, Softwood, Screwed
Mouldings, Softwood, Gun Nailed
Mouldings, Hardwood, Nailed
Mouldings, Hardwood, Screwed
Mouldings, Hardwood, Gun Nailed
Skirting , Aluminum, Screwed 150-300mm centres
Skirting , Aluminum, Screwed 300-450mm centres
Skirting, Plastic, Adhesive Fixing
Architrave Mouldings
Architrave, Fix to Doors
Door Stop Mouldings
Glazed Bead Mouldings
Hanging Doors, Softwood, Single Pair Butts
Hanging Doors, Hardwood, Single Pair Butts
Cut Mortice to Receive Lock, Softwood
Cut Mortice to Receive Lock, Hardwood
Cut & Fix Formica Bath Panel
Kitchen Cupboards, Floor Units
Kitchen Cupboards, Wall Units
Kitchen Cupboards, Shelf Units
Staircase, pre-made, simple, straight flight
Staircase, pre-made, 2 straight flights , 1 landing
Staircase, pre-made, 2 straight flights , 2 landings
Staircase, Balustrades/Handrails, fix horizontal
Staircase, Balustrades/Handrails, fix raking
Staircase, Cut and Fix Newel to Walls
Windows, Softwood, 1.0-3.0m2
Raised Flooring, metal system
24/35
Slow
-
-
-
-
-
Ave
9.5
2.0
1.3
2.0
1.3
Fast
-
-
-
-
-
Units
m/hr
m2/hr
m2/hr
m2/hr
m2/hr
Slow
1.1
0.3
-
0.5
1.2
-
0.6
1.4
-
-
-
9.0
6.8
5.5
12.8
10.8
9.6
20.0
20.1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Ave
0.5
0.1
0.2
0.4
0.8
0.3
0.3
1.0
2.3
0.1
0.3
9.6
7.2
5.8
14.0
12.1
10.8
25.0
23.8
23.0
12.6
1.7
3.4
3.8
4.2
5.5
9.1
4.1
8.3
4.0
10.0
5.1
9.3
5.5
Fast
0.1
-
-
-
-
-
-
-
-
-
-
11.6
9.7
7.3
14.7
12.6
11.1
28.5
26.3
-
-
-
-
-
-
-
10.2
4.8
9.1
4.6
11.5
5.8
9.1
5.9
Units
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
no/hr
hrs/m
no/hr
no/hr
no/hr
no/hr
no/hr
no/hr
no/hr
no/hr
no/hr
m/hr
m/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
Slow
0.6
1.3
0.4
0.7
1.6
0.2
0.5
1.2
0.4
1.2
1.4
-
-
-
-
-
-
-
-
-
-
-
9.5
-
10.1
15.5
1.3
1.9
-
-
-
-
-
-
1.9
3.7
-
1.2
0.9
0.9
0.3
-
Ave
0.4
0.9
0.3
0.5
1.2
0.3
0.4
0.8
0.3
0.6
1.2
0.3
0.4
6.3
4.6
8.2
3.3
2.4
8.5
7.6
4.5
8.6
12.2
1.2
16.9
18.6
0.9
1.2
0.2
0.6
0.4
0.8
0.7
0.8
1.5
2.9
6.3
0.6
0.5
-
0.2
0.5
Fast
0.3
0.6
-
0.4
0.7
-
0.3
0.5
0.2
0.5
1.0
0.2
0.3
8.5
5.6
11.1
5.5
3.7
11.3
-
-
-
18.2
-
25.0
20.4
0.6
0.9
-
-
-
0.6
0.5
0.7
1.1
2.6
-
0.1
0.3
0.2
-
-
Units
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/m
hrs/m
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
hrs/door
m/hr
m/hr
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
m2/hr
Timber Frames
Task / Description
Slow
Ave
Fast Units
Roof Trusses
1.3
- no/hr
Wall Plates
2.7
- m/hr
Roof Rafters
1.2
- m/hr
Ceiling Joists
32.1
- m/hr
18.2
20.0
21.7 no/hr
13.3
16.6
18.2 no/hr
14.1
15.6
16.1 no/hr
18.8
20.1
21.7 no/hr
10.4
16.1
16.6 no/hr
5.1
5.4
5.8 no/hr
4.3
4.8
5.1 no/hr
3.5
4.3
4.6 no/hr
5.7
6.6
7.6 no/hr
2.1
2.3
2.5 no/hr
1.3
1.5
1.6 no/hr
8.2
9.0
9.6 no/hr
7.6
8.0
9.1 no/hr
6.5
7.4
8.3 no/hr
12.0
13.1
15.3 no/hr
142.0
166.0
175.0 no/hr
9.2
3.9
- m/hr
9.1
- m/hr
3.8
- m/hr
- m/hr
3.5
- m/hr
1.3
- m/hr
5.1
7.2
9.3 m/hr
1.3
2.5
3.9 m/hr
7.3
8.1
9.0 m/hr
4.6
5.2
5.8 m/hr
5.4
5.9
6.6 m/hr
5.1
- m/hr
25.0
- m/hr
20.5
- m/hr
25/35
timber frames
Steel Frames
Task / Description
Slow
Ave
Fast Units
3.4
1.6
4.6 Tons/day
- Tons/day
5.2
- Tons/day
0.3
- Tons/day
Slow
Ave
Structural Steelwork
Task / Description
Fast Units
1.2
- days/no
3.3
- m/day
Steel Strutting
Slow
Ave
Task / Description
2.0
Fast Units
- days/no
6.0
- days/no
Metal Decking
Slow
Ave
Task / Description
70.0
Fast Units
- m2/day
28.0
- m2/day
9.5
- m2/day
3.0
- m2/day
2.7
- m2/day
2.4
- m2/day
2.1
- m2/day
2.8
- m2/day
1.9
- m2/day
2.5
- m2/day
2.1
- m2/day
1.3
- m2/day
88.0
- m/day
76.0
- m/day
3.5
- m/day
3.3
- m/day
3.2
- m/day
0.8
- no/day
0.7
- m2/day
Slow
Ave
50.0
- m2/day
40.0
- m2/day
54.0
- m2/day
Slow
Ave
17.0
- m/day
Slow
60.0
Ave
80.0
Fast Units
100.0 m2/12hours
Sheeted Roofs
Task / Description
968
Task / Description
Task / Description
Grit Blasting to structural steel frames, standard to SA2.5
26/35
Fast Units
Fast Units
St Steel work
Pathroom Works
Task / Description
Slow
Ave
Fast Units
0.5
Path/day
Path/day
pcs/day
pcs/day
pcs/day
Tubs
pcs/day
shower Bases
pcs/day
10 pcs/day
m/hr
pcs/day
Val water pipes
Val Drainage pipes
1.5
m/hr
m/hr
Fast Units
Ave
Task / Description
30.0
- wks
6.0
- wks
8.0
- wks
1.2
- m/hr
1.3
- hrs/no
2.2
- hrs/no
2.5
- hrs/no
1.1
- m/hr
0.8
- m/hr
0.5
- m/hr
0.4
- m/hr
2.7
- m/hr
2.1
- m/hr
0.4
- m/hr
1.8
- m/hr
-
-
1.2
1.1
- m/hr
- m/hr
Fast Units
Land Drains
Slow
Ave
Land Drains, Concrete, butt jointed , under 150mm dia, 0-5m run
Task / Description
11.6
- m/hr
Land Drains, Concrete, butt jointed , under 150mm dia, 5-30m run
14.1
- m/hr
- m/hr
Land Drains, Concrete, butt jointed , under 150mm dia, over 30m run
18.8
8.4
- m/hr
10.2
- m/hr
Land Drains, Concrete, butt jointed , 150-225mm dia, over 30m run
11.9
- m/hr
5.4
- m/hr
6.5
- m/hr
Land Drains, Concrete, butt jointed , 225-300mm dia, over 30m run
7.9
- m/hr
Drainage
Slow
Ave
Fast Units
Task / Description
5.7
- m/hr
8.1
- m/hr
9.5
- m/hr
12.2
- m/hr
15.2
- m/hr
18.2
- m/hr
22.2
- m/hr
27.7
- m/hr
33.3
- m/hr
10.6
- m/hr
12.8
- m/hr
21.2
- m/hr
25.6
- m/hr
4.7
- m/hr
5.5
- m/hr
6.6
- m/hr
4.4
- m/hr
5.0
- m/hr
6.2
- m/hr
3.2
- m/hr
27/35
Plumbing
Drainage
Slow
Ave
Fast Units
Task / Description
3.8
- m/hr
4.5
- m/hr
2.1
- m/hr
2.6
- m/hr
3.1
- m/hr
1.4
- m/hr
1.7
- m/hr
2.4
- m/hr
1.1
- m/hr
1.3
- m/hr
Stoneware Drainage, Cement/Sand Joints, over 375mm dia, over 30m run
1.6
- m/hr
8.3
- m/hr
10.0
- m/hr
- m/hr
12.5
7.7
- m/hr
9.1
- m/hr
- m/hr
10.0
5.2
- m/hr
6.2
- m/hr
7.7
- m/hr
2.7
- m/hr
3.3
- m/hr
4.0
- m/hr
1.7
- m/hr
2.1
- m/hr
- m/hr
2.5
1.4
- m/hr
1.6
- m/hr
- m/hr
Stoneware Drainage, Flexible Joints , over 375mm dia, over 30m run
2.1
2.4
- mins/no
9.1
- m/hr
16.6
- m/hr
20.0
- m/hr
- m/hr
9.1
16.6
- m/hr
20.0
- m/hr
6.6
- m/hr
12.5
- m/hr
- m/hr
14.3
6.2
- m/hr
11.1
- m/hr
- m/hr
12.5
5.8
- m/hr
10.0
- m/hr
12.1
- m/hr
12.5
- m/hr
14.3
- m/hr
11.2
16.6
30.1 m/hr
10.0
- m/hr
12.5
- m/hr
14.3
- m/hr
7.1
- m/hr
9.1
- m/hr
8.3
10.0
13.8 m/hr
6.8
- m/hr
4.5
- m/hr
5.5
- m/hr
2.5
- m/hr
2.9
- m/hr
3.7
- m/hr
1.9
- m/hr
2.3
- m/hr
28/35
Plumbing
Drainage
Slow
Ave
Fast Units
Hepsleve Rubber Joint System, over 375mm dia, over 30m run
Task / Description
2.7
- m/hr
2.8
- m/hr
3.4
- m/hr
3.8
- m/hr
2.7
- m/hr
3.2
- m/hr
3.6
- m/hr
2.5
- m/hr
2.9
- m/hr
3.4
- m/hr
2.4
- m/hr
2.7
- m/hr
3.3
- m/hr
2.2
- m/hr
2.6
- m/hr
2.9
- m/hr
1.1
- m/hr
2.4
- m/hr
2.5
- m/hr
2.9
4.2 m/day
2.5
3.8 m/day
2.1
2.6 m/day
- m/hr
3.6
4.3
- m/hr
5.0
8.0 m/hr
3.4
- m/hr
4.1
- m/hr
4.5
9.0 m/hr
3.3
- m/hr
3.8
- m/hr
4.1
- m/hr
3.0
- m/hr
3.5
- m/hr
4.0
- m/hr
2.8
- m/hr
3.3
- m/hr
3.7
- m/hr
2.6
- m/hr
3.1
- m/hr
3.6
- m/hr
7.0
- m/hr
4.0
5.5
9.0 m/hr
29/35
Plumbing
Ave
Task / Description
1.2
- hrs/no
1.6
- hrs/no
0.3
- m2/hr
0.2
- m2/hr
0.2
- m2/hr
0.9
- hrs/no
1.2
- hrs/no
1.8
- hrs/no
0.1
- hrs/no
0.2
- hrs/no
0.3
- hrs/no
0.3
0.6
1.2 hrs/no
2.2
- no/hr
1.8
- no/hr
1.5
- no/hr
1.2
- no/hr
0.8
- no/hr
0.4
- no/hr
0.3
- no/hr
5.0
- no/hr
PVC Manhole
15.0
Fast Units
- mins/no
Rainwater Works
Slow
Ave
Fast Units
Task / Description
3.3
- m/hr
3.1
- m/hr
3.1
- no/hr
2.1
- m/hr
2.5
- m/hr
2.2
- no/hr
2.5
- m/hr
2.9
- m/hr
1.9
- no/hr
30/35
Lift Installation
Task / Description
3.0
- wks/floor
2.0
- wks/floor
1.0
- day/floor
- 12.0
- wks
Escalators
Task / Description
1.0
- wks
8.0
6.0
4.0 wks
5.0
- wks
2.0
- wks
2.0
- wks
2.0
- wks
31/35
Lift Installation
Electrical System
Task / Description
Boxes 15to30x15x15
Ea/day
Ea/day
0.5
0.5
Ea/day
0.7
Ea/day
0.5
Ea/day
0.7
Ea/day
0.4
Ea/day
Ea/day
safety switches
lighting Exterior Fixtures wall mounted incandescent/mercury vapor
lighting Exterior Fixtures wall mounted floodlight and others
Steel or alum. Pole hieght to 5m
Steel or alum. Pole hieght over 5m
Bracket arms, 1&2 arm
Ea/day
2.5
Ea/day
Ea/day
2.5
Ea/day
Ea/day
Ea/day
Landscape lights
Ea/day
interior lamp
Ea/day
Fluorescent 60cm
Ea/day
Fluorescent 120cm
Ea/day
- 38.0
- wks
- 16.0
- wks
8.0
- wks
6.2
- m/hr
5.6
- m/hr
4.3
- m/hr
3.7
- m/hr
3.5
- m/hr
1.8
- m/hr
1.6
- m/hr
1.0
1.5 m/hr
0.7
1.2 m/hr
0.7
1.2
3.1 m/hr
0.2
- m/hr
0.5
- m/hr
1.3
- m/hr
Power Supply
Task / Description
- 12.0
- days
- 12.0
- days
11.0
5.0
- days
12.0
6.0
- days
5.0
- days
1.0
- days
- 10.0
- days
12.0
9.0
- days
12.0
6.0
- days
1.0
32/35
- m run/day
- days
Electrical system
NATM Tunnels
Slow
Ave
Task / Description
7.0
- m
10.0
- m
Double side Drift Advance Method, used on tunnels with diameter over
10.0
- m
Double side Drift Advance Method, used on tunnels with diameter over
10.0
2.5
2.9
3.2 m/day
1.5
2.0
2.5 m/day
1.0
1.3
1.5 m/day
1.5
1.8
2.0 m/day
1.5
- m/day
1.0
1.5 m/day
1.5
2.0
3.2 m/day
0.5
1.0
2.2 m/day
1.0
1.5
2.2 m/day
0.5
1.0
2.6 m/day
0.8
1.0
1.2 m of circumf/day
0.2
190.0
225.0
279.0 m3/day
255.0
300.0
366.0 m3/day
382.0
450.0
549.0 m3/day
2.1
2.5
2.8 m/day
1.5
2.0
2.4 m/day
1.5
2.0
2.3 m/day
1.0
1.5
1.9 m/day
1.8
2.0
2.5 m/day
2.2
2.5
3.1 m/day
Fast Units
- m
- m/day
2.0
2.3 m/day
1.7
2.0
2.1 m/day
1.6
2.1
2.3 m/day
0.2
0.3 m/day
Insitu Permanent Lining, 12m bays, 350-400mm reinforced with PCV backing
8.4
12.0 m/day
Insitu Permanent Lining, extra over excavate/lining time to allow for permanent lining
25.0
3.2
4.0
4.9 m/day
3.3
3.9
4.2 m/day
2.2
2.5
2.7 m/day
1.2
1.5
1.7 m/day
33/35
- %
NATM tunnels
Commercial Kitchen
Task / Description
3.0
- wks
5.0
- wks
8.0
- wks
1.0
- mandays
2.0
- mandays
Restoration Works
Task / Description
25.0
- m2/day
9.0
- m2/day
12.0
- m2/day
6.5
- m2/day
20.0
- m/day
Trackwork
Task / Description
9.6
- m/day
10.2
- m/day
10.6
- m/day
17.1
41.0
- m/day
35.0
- m/day
35.0
- m/day
20.0
- m/day
34.0
- m/day
29.0
- m/day
4.6
5.7 m/day
3.6
57.0
8.5
- m/day
71.0
- m/day
29.0
- m/day
52.0
- m/day
38.0
- m/day
Post Tensioning
Task / Description
48.0
- hrs
- 120.0
- hrs
Secant Piling
Task / Description
34/35
12.0
- wks
Commercial Kitchen
Working Platforms
Task / Description
Slow
Ave
Fast Units
11.1
11.9
12.5 m run/hr
9.1
10.0
10.5 m run/hr
2.8
3.2
3.8 m run/hr
3.2
3.7
4.6 m run/hr
10.6
12.5
18.5 m3/hr
18.5
22.5
24.5 m3/hr
24.5
30.0
33.5 m3/hr
200.0
- % x erect
Rendering
Slow
Ave
Task / Description
2.2
2.7 m2/hr
1.5
1.7 m2/hr
1.2
1.4 m2/hr
1.5
1.7 m2/hr
1.4
- m2/hr
35/35
Fast Units
Working Platforms