INTRODUCTION
LOAD
SHEDDING
1
CAUSES OF LOAD-SHEDDING
Load shedding has been experienced by many least developing
countries and countries of third world mainly because of following
reason:
When consumption of electricity is greater than
the production then country experience loadshedding.
Less availability of of the sources that generate
electricity. For example when in a country there
is a deficiency of natural resources like water oil
gases coal etc etc.
Low price of electricity is also a cause of loadshedding. electricity price should be suitable. It
should not be so expensive and it should not be
so cheap.
3
1
2
3
LOADSHEDDING
PAKISTAN
IN
akistan is situated in
the south of Asia. It
is
the
sixth-most
populous country. It
is one of the independent
FLAG
EMBLEM
country with national religion
Islam. Pakistan share
its
Motto:
Iman,Ittihad,Nazm
border with Iran , Afghanistan
Anthem:
Qaumi
, China , and India. Pakistan
is
taranah
the most important country in
C
Capital city:
Islamabad
the world map due to its
Official language:
geographical location.
Urdu,English
Pa
Religion:
Islam
kistan was created in 1947 as
Current
an independent state. From
Mamnoon hussain
the day of its president:
creation the
Prime minister:
development of the country is
Nawaz sharif
in progress. Recently Pakistan
is going through its worst
Population:
time of energy crises.
The
199,085,847(2015)
country is facing so many
Area:
881,913 km2
severe problems including
Water:
3.1%
corruption, poverty, terrorism,
low literacy rate, international
propagandas ,load-shedding
etc. etc.
Load-shedding is
one of the worst
problem
currently
the
country
is
facing. There is big energy
Load-shedding of electricity
People of Pakistan experiencing this load shedding
from many years. Heavy load shedding starts in 2008and it is
continue in 2016. According to the recent news of 2016 there
will be a power cuts for six to eight hours a day in local and
commercial areas but this schedule was set by the government
of Pakistan. The actual practice of load-shedding is something
else. In big cities the duration of load-shedding is 8-10 hours
where as in small villages it is 15-16 hours in summer. Pakistan
needs 9500MW of electricity. It is presently facing a shortfall of
more than 2500MW. There is a great loss in national economy
due to the heavy load-shedding.
ELECTRICITY
DIFFERENT
PRODUCERS
PRODUCE
BY
POWER
1.
WAPDA
a.W
APD
A
7
HYDEL
Tarbela
Mangla
Ghazi barotha
Warsak
Chashma
Dargai
Rasul
Shadi-waal
Nandi pur
Kurram garhi
Renala
Chitral
Jagran(AK)
3478 MW
1000 MW
1450 MW
243 MW
184 MW
20 MW
22 MW
18MW
14MW
4MW
1MW
1MW
30MW
TOTAL
HYDEL
6461
MW
b. WAPDA THERMAL
Gas Turbine Power Station,
Shahdra
Steam Power Station, Faisalabad
Gas Turbine Power Station,
Faisalabad
Gas Power Station, Multan
Thermal Power Station,
Muzaffargarh
Thermal Power Station, Guddu
Gas Turbine Power Station, Kotri
Thermal Power Station,
8
59MW
132MW
244MW
195MW
1350MW
1655MW
174MW
850MW
Jamshoro
Thermal Power Station, Larkana
Thermal Power Station, Quetta
Gas Turbine Power Station,
Panjgur
Gas Turbine Power Station,
Panjgur
150MW
35MW
39MW
17MW
4811MW
TOTAL
THERMAL
2.
K-ELECTRIC
POWER STATIONT
AMOUNT
316 MW
80 MW
TOTAL
1756 MW
100 MW
1260 MW
3. Independent Power
Producers (IPPs)
POWER STATIONS
AMOUNT
1292 MW
362 MW
10
365 MW
29 MW
157 MW
136 MW
140 MW
120 MW
131 MW
232 MW
412 MW
114 MW
135 MW
126 MW
586 MW
165 MW
225 MW
MW
1638 MW
Total (IPPs)
6365
MW
11
AMOUNTS
KANUPP
CHASNUPP-1
137 MW
325 MW
TOTAL
6365 MW
12
13
14
SHORTAG
E OF GAS
GROWTH
OF
POPULATI
ON
CORRUPT
ION
DEBT
15
SHORTAGE
OF WATER
LACK OF
MANAGEM
ENT
WASTAG
E OF
ELECTRI
CITY
UNPAID
BILLS
POWER
THEFT
do
not
have
enough
dams.
We d
o n
ot h
ave e
nou g h dam
s.
Dams are capable
storing
D
am
s
a
re
ca
pa
ble
of
storing
water.
The
food
can
be
control
w
a ter. Th
e f
ood ca
n b
e con
trol
by
the
level
b
y dams.
d am s. When
W h en th
e le
ve l of
water in a river rises dam store
w
a
ter
in
a
rive
r
rise
s
d
am
sto
re
this
extra
water
and
water
th
is ex
tra w
ater an
d this w
ate r is
use to
electricity
use
to produce
produ ce e
lectricity
la
ck
lack
o
off
Dam
Dam
s
SOCIAL EFFECTS
Load-shedding greatly affects the social life. The effects on
social life are as follows:
1. AFFECT
ON STUDENT LIFE
16
The life of students has been greatly disturbed by loadshedding. Students are unable to prepare well for their exams.
Students belongs to the middle class and lower class of the
society are specially the victims of this dreadful load-shedding.
Due to the unscheduled load-shedding in Pakistan student life
suffers the most.
2.
DIFFICULTY IN PRAYING
We cannot offer our
3. DEATH
OCCURS
In
Pakistan the duration of summer
season is greater than any other
season. In June 2015 the southern
part of Pakistan witnessed the
highest temperature. In this year
the rise in temperature caused
the deaths of about 2000 people
from dehydration and heat stroke,
mostly in Sindh province and its
17
4.
SHORTAGE
OF WATER
Load-shedding causes
shortage of water. We
fill our tanks through
electric motors. If we
do not have electricity than water supply will be impossible.
Those areas where load-shedding is greater the shortage of water
is greater.
5.
PROTESTS
6.
HEALTH FACILITIES
Load shedding also possess greater risk for hospital and patients.
Electricity is essential for public health facilities. When the supply
is
unstable
patients
undergoing
emergency treatment and surgery are
at
great
risk.
Furthermore
organs,vaccines and medication that
18
PSYCOLOGICAL EFFECT
Load shedding has a great infuence on psycology of
human. Some psychological effects are as follows:
1.
DEPRESSION
19
2.
HEALTH
3.
LESS CONCENTRATION
4.
20
FRUSTRATION
ECONOMICAL EFFECTS
1.
LOW PRODUCTION
2.
UNEMPLOYMENT
22
3. LOW CROP
PRODUCTION
Pakistan is an agricultural
country. Pakistans economy
depends
on
its
crop
production. Various farm
work of agriculture required
electricity but heavy loadshedding decreases the production of agricultural sector. Crop
crises is the result of load shedding.
4.
23
5. COMPETITION IN
INTERNATIONAL
MARKET
In this modern age, there is a big
competition in an international market.
. If the country is economically strong then
it can conquer the battle of international
market. But load-shedding will not let the country to become
economically strong and country
remain behind in an
international market. This is what happening with Pakistan in
recent years.
24
SOLUTION OF LOADSHEDDING
Solving power issues is certainly a difficult task. It needs a lot of
research and planning considering the availability of resources
and funds. Fortunately, Pakistan is rich with a lot of natural
resources. If these natural resources are properly handled than it
can be used to reduce load-shedding. But this can be achieved by
the sincere efforts of Government. Following are some
suggestions for solving electricity crises in Pakistan.
1.
ROLE OF GOVERNMENT
As government handles all the affairs of the state therefore, loadshedding cannot be reduced without by the sincere efforts of
government. If government show serious concern to this problem
and handle this shortage smartly then the biggest curse on the
nation can be eliminated.
2.
CONSUMER
The consumers should also play their parts in solving this crucial
problem.We should carefully use the electricity and do not waste
it. We should not steal the electricity and should pay our bills on
time.
3.
NATURAL
GASES
In Balochistan there
are huge reserves of
25
4.
CONSTUCTION OF DAMS
5.
SOLAR ENERGY
26
6. WIND
ENERGY
Wind energy can
be
used
to
produce
electricity. It is the
cheap source for
the production of
electricity.
Over
40 wind power
plants in Pakistan
are
under
development. These plants can produce 3.5 GW of electricity.
Once, these power plants become operational the curse of loadshedding can be reduced
7. sATOMIC
ENERGY
Electricity
can
be
produced
by
atomic
energy .Pakistan is an
atomic power but still
Pakistan is not using its
atomic power to generate
electricity. If we use this
power for the production
of
electricity then load-shedding can be decreased to some extent
27
8. COAL RESERVES OS
PAKISTAN
Pakistan is rich in coal reserves. Pakistan's largest coal reserves
are found in Sindh with approximately 184.623 billion tones. The
coal found in Pakistan is bad in quality but this coal can be used
to produce large amount of electricity. According to Dr. Qadeer
khan
If we use this coal to produce electricity then in future
Pakistan will be able to export electricity
By using the reserves of coal we can eliminate the shortage of
electricity from the country
CONCLUSION
Although they have started mega projects to produce electricity but they will
take time of more than 5 years. So it is our turn. We have to survive in such
intense heat of summer for this we have to use solar panels by ourselves and
produce energy to run house appliances.in this way we can play our role in
saving electricity
28
REFERENCE
Wikipedia
www.pakistantoday.pk
www.down.com
www.infopakistan.com
www.financialmail.co.za
www.articlefactory.com
29