Professional Documents
Culture Documents
Method Statement FOR Ceiling Works
Method Statement FOR Ceiling Works
Method Statement FOR Ceiling Works
Rev.
1
Project
Package
Originator
Discipline
Doc.
Type
Unit n
Serial n
Serial n
RAPID
P0014
0008
CON
MST
0001
0019
Page
/ 26
METHOD STATEMENT
FOR
CEILING WORKS
OWNER Approval :
Name :
Date (DD-MMM-YY) :
Signature :
Document Class :
2,9,11 ,6 & 17
"In accordance with Article 41 of the Conditions of Contract, the ownership in this document shall vest in OWNER. No part of this document may be
reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise)
without the permission of the OWNER.
CONFIDENTIAL Not to disclose without authorization
Document Number
Project
Package
Originator
Discipline
Doc.
Type
Unit n
Serial n
Serial n
RAPID
P0014
0008
CON
MST
0001
0019
Rev.
Page
/26
26-Sept-16
Amirul Ashraf
6-Sept-16
Siti Rodhiana
Ihsan Idris
15-July-16
Siti Rodhiana
Ahmad Zulaimi
Ihsan Idris
25-June-16
Siti Rodhiana
Ahmad Zulaimi
Ihsan Idris
20-May-16
Siti Rodhiana
Ahmad Zulaimi
Ihsan Idris
REV.
DATE
DD-MMM-YY
WRITTEN BY
(name & signature)
CHECKED BY
(name & signature)
APPROVED BY
(name & signature)
CONTENTS
1. Introduction..................................................................................................................3
2. Objective and Scope of Work......................................................................................4
3. Reference....................................................................................................................5
4. Resources Planning....................................................................................................5
4.1 Material Planning..................................................................................................5
4.2 Machinery And Equipment....................................................................................6
4.3 Manpower..............................................................................................................6
5. Construction Work Methodology.................................................................................7
5.1 Honeycomb Repair........................................................................................ 7
5.1.1 Less Than 50mm Depth.............................................................................7
5.1.2 More Than 50mm Depth.....8
5.2 Concrete Bulging...................10
5.3 Protruded Steel Bar.11
5.4 Cutting Steel Bar on Concrete Surface.13
5.5 Uneven Concrete Finish .....14
5.6 Crack Repair ..15
5.7 Incomplete Casting
...16
"In accordance with Article 41 of the Conditions of Contract, the ownership in this document shall vest in OWNER. No part of this document may be
reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise)
without the permission of the OWNER.
CONFIDENTIAL Not to disclose without authorization
6.
QAQC Aspect.
...21
6.1 Documentation..21
7. Safety,Health & Environmental Aspects.....................................................................21
"In accordance with Article 41 of the Conditions of Contract, the ownership in this document shall vest in OWNER. No part of this document may be
reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise)
without the permission of the OWNER.
CONFIDENTIAL Not to disclose without authorization