Professional Documents
Culture Documents
Jasraj - Exercises For Sertica Training
Jasraj - Exercises For Sertica Training
5.
General Features:
1.
2.
3.
4.
Criticality Urgent
Activities
1. Search
3. Create an Activity Ship Board Incident Reporting Overflow of Oil From New Waste Oil Tank
4. Create an Activity Risk Assessment Navigation in Shallow Water Activity No 0145 Form
RA058-UKC
Status Completed
Save
Create form
Select
Save
5. Create an Activity PSC Inspection report PSC Inspection Activity No 0119
Planned Maintenance:
Counters
Update Conters for Diesel Engines,Motor Aggregates AE1,Motor Aggregates AE2,HFO Purifier No
1 Main Air Compressor No1,Deck Air Compressor,Provision Refrigeration Plant Compressor No
1,Air Condition Plant Compressor No1,Service Air Compressor No1.
Jobs
1. Planned jobs
Select keep job history open and show job history screen.
Job Text - Towing wire was found broken. Has been replaced as per manual.
Job trigger Run Trigger once
Resources - 3rd Officer, 2nd Officer
Spare Parts None
Procedures None
Job Groups Overhaul
Documents add photos Broken Towing wire, Towing wire
Requisitions None
Activate the job
Update Job History i. Remarks - Broken towing wire replaced with new towing wire
ii. Completed on Time Yes
iii. Resources dont add more
iv. Documents add 2 photos
v. Finalize - Kep Job History Open and show job history screen
Rotating Components
1. Rotate ME Piston with rod and stuffing box Unit 1(601.004.001) with ME Piston with rod
and stuffing box Spare 2(601.004.008).
2. Note the counter Values for both the components as there is no spare part number
3. Activate Job Replace Piston with Stuffing Box Complete
Save
Activate Job
Rotate Components
Procurement
Certificates
Create Cargo Ship Safety Report
Report no 012
Add Cargo ship Safety.pdf