Schedule of Relevant Correspondence: Reference: Please Refer To The Annexure 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Ref: ANREI/PDD/ PD02/15/06 /DTG/1120/LOA

Date: 04 February 2016


ABC Contracting Co. L.L.C.
P.O. Box 12345
Dubai, United Arab Emirates
Attention

Mr.Xyz General Manager

Project

PQRS Development on Plot No. 1234567, Hor Al Anz East, Dubai, UAE.

Subject

MW01 Main Works for Construction


Letter of Acceptance

Reference

: Please refer to the Annexure 1 Schedule of Relevant Correspondence

Dear Sir,
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Scope of Works
Contract Price / Schedule of Rates
Payment Terms
Performance Security
Insurances and Indemnities
Commencement and Programme of Works
Liquidated Damages
Services to be provided by the Employer, free of cost
Severability
Other Conditions

The Employers Representative for the above project is:


The Project Manager for the above project is:
The Engineer for the above project is:

Yours Faithfully,
For Al Naboodah Real Estate Investment (L.L.C.)
Signed for and on behalf of
We, the ABC Contracting Co. L.L.C, hereby
acknowledge the receipt of this Letter of
Acceptance and confirm the agreement to
the same.

DEFG
Chairman
S& M Holding LLC
Encl.

Annexure 1
correspondence

Schedule

of

relevant

Name: ..
Designation: .
Date: .
1 of 1

You might also like