Geotechnical Final Assignment Final
Geotechnical Final Assignment Final
Here, we have
Thickness of clay stratum H =
Pore water pressure distribution Uo =
4m
100 kPa
Time t =
0.135
z
t
1 m spacing
24 month (24-0)
Determining operator
= 2.16
Finite diffrence equation should be within the range of 1/2 1/6
Taking the value of
0.35
By using time increment of 5 units i.e t =
4.32 month
n = 6.17
Therefore
wi,jw
0
1
2
3
4
0
100
100
100
100
100
1
0
100.0
100.0
100.0
100.0
2
0
65.0
100.0
100.0
100.0
n=
m=
7.00
4
3
0
54.5
87.8
100.0
100.0
4
0
47.1
80.4
95.7
100.0
5
0
42.3
74.1
91.9
97.0
6
0
38.6
69.2
87.4
93.4
[ =Cv*t/(z)2]
7
0
35.8
64.9
83.1
89.2
Note: Layer 4 is a impermiable boundary
Ui,j+1= Ui,j + (2Ui-1,j -2Ui,j)
Solution:
Here,
Thickness of clay stratum H =
Pore water pressure distribution Uo =
4m
100 kPa
Time t =
Time factor is
Considering the value of Z & t
0.165
z
t
1 m spacing
24 month (final - initial)
b=0.4
Computing operator
= 2.64
finite diffrence equation should be in the range of 1/2 1/6
Taking the value of
0.45
And using time increment of 6 units i.e t =
n = 5.87
Therefore
for
wi,jw
0
1
2
3
4
0
100
100
100
100
100
1
0
100.0
100.0
100.0
100.0
2
0
55.0
100.0
100.0
100.0
n=
m=
6.00
4
3
0
50.5
79.8
100.0
100.0
4
0
40.9
75.7
90.9
100.0
n=Tv* m^2
5
0
38.2
66.9
88.2
91.8
6
0
33.9
63.5
80.2
88.5
We have,
Total pore water press
Therefore,
4 month
U=
=
0.440
44
400
Solution:
Here, we have
Thickness of clay stratum H =
Pore water pressure distribution Uo =
4m
100 kPa
Time t =
0.15
z
t
1 m spacing
24 month (24-0)
Determining operator
= 2.4
[ =Cv*t/(z)2]
0
100
100
100
100
100
1
0
100.0
100.0
100.0
100.0
2
0
60.0
100.0
100.0
100.0
n=
m=
6.00
4
3
0
52.0
84.0
100.0
100.0
4
0
44.0
77.6
93.6
100.0
n=Tv* m^2
5
0
39.8
70.6
89.8
94.9
6
0
36.2
66.0
84.1
90.8
We have,
Total initial pore pressure of
Therefore,
U=
0.413
41.336
=
41
4.8
0.48
n=Tv* m^2
We have,
al pore pressure of 4 layers is equal to 400