Onshore Rig Move Plan

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Onshore Rig Move Plan - Table of Content

1. Rig move preparation


Location survey
Road Survey
Preparation of advanced loads
Administration (Rig move plan)
Equipment Inspection
2. Preparation of new location and camp
3. Logistics
Number of Cranes
Number of truck loads
Lowboy truck loads
4. Load dimensions and weight
Description of loads in their sequence
List of wide loads for convoy
5. Rig move descriptions
5.1 Preparation
5.2 Pre-move loads
5.3 Rig release
5.4 Move safety meeting
5.5 Line of responsibility -- 1. Chart of responsibility & 2. Job Descriptions
5.6 Daily move plan
5.7 Lower/ Raise mast procedures
5.8 Re-assembly substructure
6. Rig checklist Lowering Derrick
Raising Derrick
7. Critical lifts
8. Lay-outs
Rig Lay out
Camp Lay-out rig site
Camp Lay-out
9. Pre-spud inspection
Safety
General
Drill floor
Derrick
Mud tanks
Mud pumps
Engines
Equipment
Drawworks
10. Daily move report
11. Rig drawing
12. Medivac procedures
Ambulance Drill
Notification chart
Emergency Instructions

You might also like