Professional Documents
Culture Documents
SDLC Estimating Template
SDLC Estimating Template
Purpose: (Enter Information about estimate purpose; Feasibility, Business Case, Scheduled Project etc)
Activity/Task
Optimistic
Effort Hrs
Effort Hrs
Initiation/Administration
Status Meetings
Status Reporting
Planning
Requirements/Scope Review
Resource Requirements Review
Assumptions and Constraints Specification
Analysis
Functional Impact Analysis
Process Model Review and Update
Functional Requirements Specification
Application Impact Analysis
Design
Technical Design Development
Logical Database Design
Prototype Presentation
Design Acceptance
Construction
Coding
Unit Testing
Test Plan Updates
Test Data Validation
Software Configuration Management
Release/Build Updates
Technical Documentation
User Documentation
Testing
Test Environment Setup
Test Plan Finalization
QA Testing
Documentation Validation
Integration Testing
Performance Testing
Implementation
Final Documentation Review
Deployment Dress Rehearsal
Internal Staff Training
Deployment Support
Support
Post Production Warranty Support
Post Implementation Reviews
Work Estimate Totals
0.00
0.00
0.00
Factor
75%
85%
95%
99.5%
Supporting Document Links: (Enter Links to Requirements,
Confidence Confidence Confidence Confidence Specifications, or other supporting documents in this column)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Notes:
331660986.xls
Generated by
This Free Estimating Template has a companion video presentation available from
WAHolscher Consulting Inc. The 31 minute MPEG2 video presentation provides estimating
best practices, tips and real world experience to maximize the benefits associated with this
document. Use the following link for further information:
IT Professionals Bullitt Proof Your SDLC Estimates
This video presentation is intended for all IT professionals regardless of position,
organizational size, structure and environment. The video covers effective estimating
techniques for the IT Professional. A solid written estimate enhances performance and
quality, justifies work, and shows effective time management, while reflecting
professionalism and integrity.
The video presentation provides the IT professional with valuable knowledge and insights
into effective work estimating. Solid and accurate work estimating techniques are the very
foundation of organizational and professional performance. How IT professionals establish
their task delivery schedules utilizing effective estimating can be the difference between
operational failures and meeting strategic organizational performance objectives.
This video presentation will cover several topics that will assist you in building this solid
estimating foundation that can be successfully applied to your current professional career
and workplace environment.
Visit our Website at:
W A Holscher Consulting Inc.