Estimate
Estimate
Foundation
Height Width
Residence of
Bhavadasan
Location
India
123
1/123
H PCC
0.1
0.95
Plot No
H1
0.3
0.75
Survey No
H2
0.3
0.55
H3
0.45
0.35
H4
Brick Size
I:
Mortar
Area
Brick Masonry
RR Masonry Plinth
I:
Mortar
Wall Thickness =
.
Perimeter
GF
125.53
48.94
FF
64.30
34.88
0.2
No
1 Wall 01
Long Wall
11.2
1 Wall 01
Cross Wall
4.23
2 Wall 02
5.24
2 Wall 02
3.73
3 Wall 03
4.23
3 Wall 03
6.35
4 Wall 04
5.96
4 Wall 04
2.23
5 Wall 05
12.93
5 Wall 05
4.23
6 Wall 06
6 Wall 06
Concrete
No
Length
G.F
Mix M
15
No
No
11.07
1.6
Roof GF
0.1
4.22
4.17
1.52
Roof FF
0.1
5.16
2.5
8.08
Steel
1.5
Beam
Wood Work
F.F
Slab Thickness
Slab
2.5
9
%
kg/sqm
GF
FF
D1
2.1
D2
2.1
0.9
No
Stair
D3
2.1
0.8
4.14
0.25
0.3
Rise
0.17
W1
2.48
0.25
0.3
Tread
0.25
W2
1.35
1.8
1.65
0.25
0.3
Width
Beam
G.F
F.F
W3
1.35
1.2
First Flight
W4
1.5
V1
0.9
0.6
No. of rise
V2
G.F
Kitchen
Work area
2.8
Bed room
3.3
Lintel
0.15
0.25
12
Slab Thickness
0.12
Flooring
Bed room
Dining Room
Drawing Room
Column
Sun Shade
s
c
B
3.5
Length
5.2
3.5
Nos
3.5
Extra length
Projection
0.6
G.F
F.F
Thickness
0.05
0.45
3.5
Thickness
Plastering
0.04
G.F
No
W/A
0.45
2.5
0.45
0.45
3.5
0.45
Verandah
4.25
Bath 1
2.6
1.6
Thickness mm
Bath 2
2.6
1.5
Ratio
Bath 3
Additional Room
2.5
0.45
Below Stair
BR
0.45
3.5
F.F
BR
0.45
15
1:
F.F
Bed Room
Bed Room
3.3
Bath 1
2.6
1.6
Bath 2
2.6
1.5
0.35
H1 0.45
H2 0.3
0.55
H3 0.3
0.75
H4 0
Unit
Bag
/ tonne
/ cum
Metal 40 mm
Metal 20 mm
Sand
Brick
Wood
/ cum
/cum
/ cum
Nos
/cum
1500
1500
1500
3
40000
5
5
5
5
2
Material consumption
(Quick look)
Rubble
cum
Unit
Rubble
Metal 40 mm
Metal 25mm
Sand
Cement
Brick
Steel
Wood
cum
cum
cum
cum
Bags
Nos
Tonne
cum
add for
waste/void %
5
2
18
Steel Wood
Tonne cum
31.112
12.813
6.919
43.924
13.680
Qty
43.924
13.680
27.234
67.606
504.784
39174.307
3.185
1.359
add for
waste/void %
18
5
5
5
5
5
2
2
3.675
0
18.450
0
18.104
90.884
39174
27.234 13.617
17.548
3.459
205.077
132.140
26.050
7.821
6.726
Qty
Rate
51.83 1000
14.36 1500
28.60 1500
70.99 1500
530.02
250
41133.02
3
3.25 35000
1.39 40000
3.185
1.359
39174 3.185 1.359
Amount
51830.47
21546.01
42893.87
106479.12
132505.76
123399.07
113713.61
55466.38
647834.28
30 %
842184.57
7 %
901137.49
Other components door, electrification, plumbing, floor finish etc to be added in Measurement Sheet.
Additional Room
0.95
Not to scale
Measurements
Item
Unit
Quantity
LS
LS
Rate
Amt
2,000.00
107
cum
52.103
5,574.99
1500
1500
250
3250
3570
cum
7.4
26,572.40
31.1 1000
300 1000
1300
cum
6.76
3.38
25.5
320
31.112 done
40,444.95
cum
12.813
1900.000
24,343.99
cum
43.924
cun
0.000 cum
0.000
2000
0.00
cum
36.5616
350
12796.56
6 Ground Floor
cum
First Floor
Total
cum
44.096
34.252
2400
2500
105,831.56
85,630.33
sqmt
40.860
40.86
22.338
10.531
4300
4500
96,051.54
47,390.85
Plinth re-filling
Brick Masonry
cum
78.349
8 Ground Floor
9 First Floor
Total
Steel bending hooking
cum
32.869
3.185255
3.1852551
35000 111483.93
Plastering
10 GF
11 FF
sqmt
sqmt
753.432
366.401
100
105
75,343.23
38,472.11
PCC
12 Floor
cum
7.617
7.62
sqm
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
12.00
5.60
27.20
0.00
18.20
14.00
8.50
8.06
0.00
8.00
500
500
500
500
9.6
500
500
500
300
1
500
80
6,000.00
2,800.00
13,600.00
0.00
9,100.00
7,000.00
4,250.00
2,418.00
0.00
4,000.00
768.00
sqmt
sqmt
14.00
8.06
500
300
7,000.00
2,418.00
Total
Floor / tiles
G.F
Kitchen
Work area
Bed room
Bed room
Dining Room
Drawing Room
Verandah
Bath rooms
Additional Room
Below Stair
13
14
15
16
17
18
19
20
21
22
23 Stair stepps
sqmt
1119.833
F.F
24 Bed Room
25 Bath rooms
26 Additional Room
27 Bed Room
28 W/C wall tile (Dado)
TOTAL
sqmt
sqmt
sqmt
10.00
13.20
56.19
500
500
200
5,000.00
6,600.00
11,238.00
754,176.91
Item
Unit
Qty
Rate
C/F
Wood Work
Door / Window
Wood for Door / window Frame
Door Panel
Window Pane
Ventilator
12 mm round bar
07mm x 30 mm flat
1.359 40000
22.017 2000
24.547 1600
1.498 1600
Cum
sqmt
sqmt
sqmt
kg
kg
311.322
227.088
35
35
sqmt
sqmt
sqmt
sqmt
249.9023
136.581
484.27
219.905
70
75
60
60
GF Outside
FF Outside
GF Inside
FF inside
Painting Door / Window
Multiplying factor
Door Frame
Door pannel
Window Frame
Window Pannel
Ventilator
Metal 40 mm
Sand
Cement
1
1
1
1
1
6.761091
3.380546
25.45592
1500
1500
250
320
10141.636536
5070.818268
6363.97875
21576.433554
3191.265060241
3511.265060241
23739.98268168
sqmt
sqmt
sqmt
sqmt
sqmt
tile
82,192.00
671,984.91
Amount
754176.911445
Plumbing
Unit Qty
Rate
10 Cold Water
54378.8
44034
39275.84
2396.16
10896.27
7948.08
17493.161
10243.575
29056.2
13194.3
Rmt
20
Rmt
45
Kitchen Sink
4000
4200
Wash Basin
800
Hot Water
Supplying and fixing 25 mm CPVC pipe including all pipe
specials and fixtures etc
Rmt
Sewerage
Supplying and fixing 110 mm PVC pipe including all pipe
specials and fixtures etc
Rmt
Supplying and fixing 40 mm PVC pipe including all pipe specials Rmt
and fixtures etc
983093.2974452
45
Amount
983093.297445
Unit
Qty
Rate
Electrical
No
No
No
No
6
24
600
500
850
3000
650
750
No
2000
No
No
No
No
No
3000
1400
750
650
1500
Amount
Amount
Kitchen
Work
Bath 1
GF
Bath 2
GF
Bath 3
FF
Bath 4
FF
Long
Body
Helth Pt Flush
1
3
1
8
1
4
1
4
Wash
Basin
Heater
1
1
2
1
2
Shower
1
1
1
1
4
Masonary Eatimate
Foundation
Masonry
Wall Thickness =
Wall / Ceiling Height
H1
H2
H3
H4
0.45
0.3
0.3
0
0.10
Foundation Depth
Excavation
No
1
1
1
1
1
0
>>>>>>>PCC
G.F
Kitchen
Work area
Bed room
Bed room
Dining Room
Drawing Room
Verandah
Bath 1
Bath 2
Bath 3
Additional Room
Below Stair
F.F
Bed Room
Bath 1
Bath 2
Additional Room
Bed Room
12
5.6
27.2
18.2
14
8.5
8.06
0
8
14
8.06
10
13.2
146.82
L
4
2.8
4
4
5.2
4
4.25
2.6
2.6
0
0
4
B
3
2
3.3
3.5
3.5
3.5
2
1.6
1.5
0
0
2
4
2.6
2.6
5
4
3.5
1.6
1.5
2
3.3
1
2
3
4
5
6
Stone Masonry
Along
Wall 01
Wall 02
Wall 03
Wall 04
Wall 05
Wall 06
1
2
3
4
5
6
Across
Wall 01
Wall 02
Wall 03
Wall 04
Wall 05
Wall 06
0.2
3
2
2
2
1
3
0
Area
1
1
0
1
1
12
5.6
13.2
14
18.2
14
8.5
4.16
3.9
0
0
8
101.56
14
4.16
3.9
10
13.2
45.26
17.94
Perimetre
14
9.6
14.6
15
17.4
15
12.5
8.4
8.2
0
0
12
126.7
15
8.4
8.2
14
14.6
60.2
Add stepps =
Lean Mortar for tile
Area
cum
cement kg
cement bag
total bags
156.42
156.42
7.821
43
0.86 /cum
6.72606
Ceiling Are
146.82
Total Perimeter
Outside GF
Outside FF
Parapet
186.9
48.9386
34.88
GF Floor area =>>>
Concrete MIX
cement
1
M15
M20
M15
M20
sand
metal
1
2
4
1
1.5
3
0.207143 0.41428571 0.828571
0.263636 0.39545455 0.790909
Brick Work
6
58
Brick Work 1:
Cement required
Sand
No of Bricks / Size
78.349
58 Kg/cum
B
0.19
0.229
0.22
0.09
0.112
0.1
0.09
0.07
0.065
1
1
1
0.2
0.239
0.23
0.1
0.122
0.11
0.1
0.08
0.075
Septic Tank
D1
D2
Q=
1
1
1
1.72
1.5
0.556376
B
S
O
hc
500
429
527
100
H
1
1.72
1.28
1.866106
Total
Unit Weight
Metal
Brick
Cement
Sand
1700 Kg/cum
1750
1500
1500
2.422482
0.2
Width
H4
Foundation Depth
Excavation
L1
L2
L3
L4
0.35
0.55
0.75
0
0.95
0.7
52.10275
11.2
5.24
4.23
5.96
12.93
0
1
1
1
1
1
1
0.35
0.55
0.75
0
0.95
0.44
0.59
0.59
0
0.59 ok
Hcc
Wall
11.2
11.2
11.2
11.2
11.2
11.2
5.24
5.24
5.24
5.24
5.24
5.24
1
1
1
1
1
1
4.23
4.23
4.23
4.23
4.23
4.23
1
1
1
1
1
1
5.96
5.96
5.96
5.96
5.96
5.96
1
1
1
1
1
1
0
4.23
3.73
6.35
2.23
4.23
0
Tile
c
c
c
c
c
c
Doors =
12 Wall Height
5.6
1
1
1
1
1
1
1
1
4.23
4.23
4.23
4.23
4.23
4
3
0.1
bath
L1
L2
L3
L4
Hcc
Wall
2
2
2
2
2
3.73
3.73
3.73
3.73
3.73
2
2
2
2
2
6.35
6.35
6.35
6.35
6.35
2
2
2
2
2
16.12
Stair
Plaster
dado =
56.19
9.6
GFOutside
181.073
FFOutside
104.64
113.1 Parapet
29.3632
156.42
Plaster loft sunshade
Outside inside
Sunshade
GF
210.436
481.66
58.72632
FF
104.64
225.86
41.856
Plastering 1:. 4
Cement
15
59 Kg/cum
Paint
loft
Deduct
Out side
21.87 19.26 753.43
249.9023
3.96 9.915 366.4
136.581
1119.8
1090.6583
1119.83
0.03918
1:
cum/10sq
132.14
Sand
0.1567
Plinth refilling
cum/10sq
17.548
36.5616
cement
cum
101.56
7.617 cum
0.038512 cum
0.231072 cum
Vol
No/m3
0.001539 649.77258
0.001795 556.991355
0.00143 699.300699
0.002
500
0.002333 428.698813
0.001898 527.009223
Cement =
26.05014
sand
Metal
3.4595 6.9189
1.45 cum
1.45
RCC
32.869
0.0332
Plinth
.+
12.812625
Plinth RR masonry
12.812625 kg/cum
cement
72
sand
Cement. Kg
fdn
31.112
.=
total
43.924
6
cum
0.0478 18.45
0.2868 3.6753
72
58
43
RCC
GF
FF
90.8844
18.1042
500
429
527
Bricks
S
Slab
12.313
6.43
18.743
39174.307
500
Lintel
Loft
2.5923 0.6318
1.7643 0.1144
4.3566 0.7462
S.Shade
1.712544
1.0464
2.758944
RR Masonry =
PCC =
Brick Masonry
GF
FF
Partition Wall
GF
FF
RCC
GF
FF
527
Coping GF
FF
1.8
Stair Rise
Tread
Width
Slab Thickness
.=
.=
18.24 djusted 18
.=
.=
.=
.=
.=
H1
0.25
13
.=
.=
.=
5
4
1
1.78
H2
Slant Height
1
2
12
3
2.14
11.55
11.75
11.95
11.2
5.59
5.79
5.99
5.24
4.58
4.78
4.98
4.23
6.31
6.51
6.71
5.96
13.28
13.48
13.68
12.93
0
0
0
0
RR
12.15
6.19
5.18
6.91
13.88
HCC
11.4
5.44
4.43
6.16
13.13
WALL
12.93
12.93
12.93
12.93
12.93
12.93
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
PCC 1:3:6
0.6568
7.76
7.36
6.96
8.46
6.76
6.36
5.96
7.46
12
11.6
11.2
12.7
1.88
1.68
1.48
2.23
11.64
11.04
10.44
12.69
0
0
0
0
0
0
0
0
0
0
0
0
6.56
8.06
5.56
7.06
10.8
12.3
1.28
2.03
9.84
12.09
0
0
0
0
0
0
0
0
0
0
0
17.94
17.94
17.94
17.94
17.94
2.23
2.23
2.23
2.23
2.23
1
1
1
1
1
4.23
4.23
4.23
4.23
4.23
L
3
3
3
3
3
B
H
3.5 0.45
0.3 0.55
0.3 0.65
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Q
0.7088
0.0908
0.1268
1.8525
0.45
0.55
0.65
fdn thickness
0.15
0.5567
0.0239
1.161
inside
484.27
219.91
Cement comsumption kg/10m2
4
15
12
15
3
66
0
0
0
0
0
Column
B
Length
Nos
LINTEL
lintel
L
GF
FF
15
72
15
72
Thickness
0.15
0.15
0.04
15
15
15
4
5
6
54
43
36
B
0
0
0
0
0
Total>>>
H
0
0
0
0
0
1: 5
1: 6
1: 8
86
72
54
59
48
40
59 G.F No
48 W/A
2
40
0
1
59 K
1
0
1
D
1
BR
1
0
0
F.F
BR
1
0
0
0
0
0
0
0
0
Column
1.8525
0.887
1.8525
Beam
0.62025
0
0.62025
43.924 cum
7.443 cum
78.349 cum
44.09648
Steel
Beam quantity
Lintel
stair
4
0
0.45
0
0.04
0.04
0.2
0.2
Slab Area
GF slab
FF slab
loft
Sun shade
9 kg/sqm
8 kg/sqm
total steel=
coping
1.728 22.3376 correct
1.176 10.5313 correct
2.904 32.8689 correct
Foundation PCC
pcc
cement sand metal
7.617 26.0501 3.459 6.9189
7.443 25.4559 3.381 6.7611
Brick Nos
39174
RR masonry
9.6
0.2
0.2
0.2
0.2
0.2
0.2
0.2
5.8638233192
0.146595583
1.1581051055
R
Sqm
Sqm
cum
cum
cum
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.620250
4.3566
0.8869733192
34.25213
25.86
15
32.869
22.33757
10.5313
W
0.45
0.45
0.45
0.45
0.45
0.45
0
2.5 %
Stair
0.887
L
3
2.5
3
3.5
2.5
4
0
43.924125
31.1115
12.812625
0
0
0
0
39174.3070476
Nos
cum
bag
cum
Q
6.506325
6.98115
9.74475
0
23.232225
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
4.20945
24.336
GF
6.3063
6.2766
8.109
0
20.6919
3.2338
24.924
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
3
3
3
3
3
3
3
3 Cross
3
6
1
3
4.17
3
3
0
0
3
0
0
3
0
0
3
Cross Total
3
Parapet Length
48.9386
Q=
5.872632
FF
59.886
Q
13.044
2.412
2.976
4.728
0
23.16
3.48
7.146
0
0
0
10.626
33.786
FF
Concrete
Roof GF
Area Slab Thickness Q
125.5
0.1
12.553
64.3
0.1
6.43
Stair
18.983
Deduct
0.24
Add Stair
0.887
Total
19.63
GF
s
c
Brick SQ
RCC SQ
RCC CIR
0.45
3.5
2
0
1.8525 1.85
0
Total
Sun Shade
Q
4.3566
Q
2.5923
1.7643
4.3566
Coping
51.846
35.286
Loft
12.313
GF
FF
Lintel length =
1.7282
1.1762
Projection
0.6 RCC Q
0.05
sunshade area=
2.5923
1.7643
4.3566
GF
L
18.9
L1
24.5
B
0.6
L1
3.4
2.9
3.4
3.9
2.9
4.4
0.4
W1
0.65
0.65
0.65
0.65
0.65
0.65
0.2
Area
4.42
1.885
2.21
2.535
1.885
2.86
0
Q
0.1768
0.0754
0.0884
0.1014
0.0754
0.1144
0
FF
3.06
1.31
1.53
1.76
1.31
1.98
0
10.94
4.4
0.4
0.65
0.2
Area
Qty
2.86
0.1144
1.98
0
0
0
GF
FF
Total
1.98
15.795
2.86 18.655
0.6318 0.1144 0.7462
125.53
64.3
18.655
21.18
189.83 39.835
1.70847 0.31868
total steel=
3.18526
Tonne
8.4
10.8
0.6
Beam
G.F
0
0
0
F.F
No
1
1
1
L
4.14
2.48
1.65
0
0
0
0
0
0
GF
D1
D2
D3
W1
W2
W3
W4
V1
V2
2
4
2
3
6
2
1
2
0
Total
22
14
Length
3
1.6
1.52
2.5
2
1.5
0
Wood Work
FF
No
0
2
3
7
2
4
0
3
4
10
0
2
0
1
2
4
0
0
11
6
Qty
Area
0.9
9
0.48
4.8
0.456
4.56
0.75
7.5
0.6
6
0.9
9
0
0
4.086
40.86
GF+FF
H
2.1
2.1
2.1
1
1.35
1.35
1
0.9
0
B
1
0.9
0.8
1
1.8
1.2
1.5
0.6
0
33
8.8
GF
FF
Qty
2.586
1.5
Area
25.86
15
12.7
8.4
38.8
FF
Area
0
5.67
3.36
0
9.72
0
0
1.08
0
38.52
19.83
7.704
3.966
Round bar
RCC
Lintel length =
GF
FF
26.439 Brick
6.43 Masonry
GF Total
FF Total
Perimeter Extra L
f
GF
48.94 24.44
f
FF
34.88 24.08
35.3
GF
Extra length
24.439
1.059
Extra width
0.8
Extra qty
0.9775
21.18
Total qty
2.7589
plaster area
14.663
Extra length
H
Q
Area
Q
Area
0.05
0.735
14.7 0.977544 14.663
38.690
39.6586
f
f
FF
24.4386
24.08
24.08
0.6
0.7224
14.448
Qty
Area
1.71254 29.3632 GF
No
W1
W2
W3
W4
V1
V2
3
10
2
1
4
0
20
H
1
1.35
1.35
1
0.9
0
Flat
HxN
W1
W2
W3
W4
V1
V2
1.66
1.66
1.66
1.66
1.66
1.66
3
13.5
2.7
1
3.6
0
0.05
0.324
1.059
6.48
21.18
B
0.25
0.25
0.25
H
0.3
0.3
0.3
Q
0.3105
0.186
0.12375
0
0
0
0
0
0
0
0
0
0.62025
cum
Door
0.46907
Window 0.82124
Ventilator 0.06916
1.35947
Area
4.2
13.23
6.72
3
24.30
3.24
1.5
2.16
0
L
0.1
B
0.07
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
58.35
B
1
1.8
1.2
1.5
0.6
0
LXB
0.007
No. of verticals
2
2
2
3
5
4
4
2
1
Total Q
Door Only
Masonry Deducti
CUM
0.07378
0.25333
0.14196
0.08547
0.6034
0.09338
0.03899
0.06916
0
1.35947
0.46907
11.67
length
12 19.92
97.2 161.35
12.96 21.514
6
9.96
8.64 14.342
0
0
No of bar
10
14
14
10
8
0
B1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
H1
0.95
0.84
0.74
0.83
1.53
0.98
1.28
0.48
0
Door =
Window =
Ventilator =
2.05
2.05
2.05
0.88
1.23
1.23
0.88
0.78
0
Area
3.895
12.054
6.068
2.1912
18.819
2.4108
1.1264
1.4976
0
22.017
24.5474
1.4976
227.09
kalli
W.pane width
No. Pane
0
2
4
3
3
1
0
48.062
0.42
0.38
0.33
0.43
0.48
0.00
2.325581
4.186047
2.790698
3.488372
1.395349
0
2
4
3
3
1
0
Room Height
Slab Thickness
.=
.=
3
0.1