DESCRIPTION

QUANTITY
A. EARTHWORKS
Land Clearing
350 sq. M
Excavation
6.68cu.m
Land fill
108.57cu.m*
Gravel Fill
350sq.m
SUBTOTAL
B. CONCRETE WORKS
FOUNDATION
cement
90 bags
sand
12 cu.m
CHB
400 pcs.
SUBTOTAL
COLUMN
cement
40 bags
sand
1.96 cu.m.
gravel
3.91 cu.m

PRICELIST

AMOUNT

16 mm
10mm
using 16 cm tie wire
SUBTOTAL
BEAMS
cement
sand
gravel

15pcs
53pcs
11.83 kg

310/pc
150/pc
60/kg

70 bags
4 cu.m.
6.9 cu.m.

250/bag
700/cu.m
950/cu.m

17500
2,800
6555

16 mm

100pcs

310/pc

31000

10 mm
using 16 cm tie wire
SUBTOTAL
FLOORING
cement
sand
gravel

80pcs.
30kg

150/pc
60/kg

12000
1800
71655

500bags
20.43 cu.m
40.85 cu.m

250/bag
700/cu.m
950/cu.m

100/sq.m
250/sq.m
200/sq.m
448/sq.m

250/bag
700/cu.m
20/pc

8000

250/bag
700/cu.m
950/cu.m
4650
7950
709.8
28396.3

125000
14301
38807.5

10 mm
43.63pcs
150/pc
using 16 cm tie wire
30kg
60/kg
SUBTOTAL
C. FORMWORKS/ CARPENTRY WOKS
SUBTOTAL
D. MASONRY WORKS
"6 CHB
6,588pcs
20/pc
cement
499 bags
250/bag
sand
68 cu.m
700/cu.m

6544.5
1800
186453

gravel
51 cu.m
10 mm
230pcs
tie wire
SUBTOTAL
E.ROOFING WORKS
Long span roofing
420m
Angular Bar
15pcs
Purlins
30pcs
welding rod
1box
tekscrew
2999pcs
gutter
60m
rigde roll
14pcs
SUBTOTAL
F.PAINTING WORKS
G.PLUMBING
H. ELECTRICAL WORKS
I.DOORS / WINDOW
J.PARKING

48450
34500
360
387420

10000
131760
124750
47600

950/cu.m
150/pc

100/m
630/pc
370/pc
2000/box
2/pc
400/m
248/pc

TOTAL =
2069761.753
LABOR COST (35%)
724416.614

TOTAL =
2788178.367

42000
9450
11100
2000
5998

SUMMARY OF COST ESTIMATE