BOQ Bore Pile
BOQ Bore Pile
Uraian Pekerjaan
Sat.
Vol.
Material
PEKERJAAN STRUKTUR
PEKERJAAN PONDASI DAN PILE CAP
Pekerjaan Bor Pile
a. Galian Tanah
b. Buis Beton 80 cm
c. Beton cyclop
d. Pekerjaan pembesian
- Besi beton diam.13
- Besi beton diam.8
m3
m'
m3
128.70
404.80
101.69
63,551.00
485,000.00
697,200.00
kg
kg
1,888.00
1,616.26
8,400.00
8,400.00
Upah
Harga Sat.
Jumlah
884,520.00
31,450.00
76,100.00
948,071.00
516,450.00
773,300.00
122,012,983.34
209,058,960.00
78,633,598.21
1,300.00
1,300.00
9,700.00
9,700.00
18,313,557.72
15,677,705.78
443,696,805.04