RENCANA ANGGARAN BIAYA (RAB)

Proyek : WANAPRASTA CONDOTEL


Lokasi : TABANAN - BALI
No.
2
2.1
1

Uraian Pekerjaan

Sat.

Vol.

Material

PEKERJAAN STRUKTUR
PEKERJAAN PONDASI DAN PILE CAP
Pekerjaan Bor Pile
a. Galian Tanah
b. Buis Beton 80 cm
c. Beton cyclop
d. Pekerjaan pembesian
- Besi beton diam.13
- Besi beton diam.8

m3
m'
m3

128.70
404.80
101.69

63,551.00
485,000.00
697,200.00

kg
kg

1,888.00
1,616.26

8,400.00
8,400.00

Upah

Harga Sat.

Jumlah

884,520.00
31,450.00
76,100.00

948,071.00
516,450.00
773,300.00

122,012,983.34
209,058,960.00
78,633,598.21

1,300.00
1,300.00

9,700.00
9,700.00

18,313,557.72
15,677,705.78

443,696,805.04