Professional Documents
Culture Documents
List of TOC (Taking Over Certificate)
List of TOC (Taking Over Certificate)
KONTRAKTOR
( BOOK 1 )
- 2016 -
PROYEK
TUNJUNGAN PLAZA IVV, MIXED USE DEVELOPMENT
JL. EMBONG MALANG - SURABAYA
KONTRAKTOR
( BOOK 2 )
- 2016 -
Project
Date of Issue
: .. June 2016
Employer
Contractor
: PT. ..
Jl. .
Surabaya
Works
: PACKAGE .. WORKS
On behalf of the Employer and in accordance with Clause 48.1 in the Condition of Contract we hereby confirm that with the
exception of the work listed on our Berita Acara Serah Terima Pertama (defect list) , the above mentioned works have been
completed to the satisfaction of the Engineer & Authorised Consultant, as of June 2016.
The defects list may not be all inclusive, and the failure to include any item does not release the CONTRACTOR from the
responsibility to complete all the Work in accordance with the Contract Documents. The Items in the tentative defect list shall be
completed or corrected by CONTRACTOR within 30 calendar days of the above Taking Over
: .. June 2016
: 12 Months
: .. June 2017
Executed by Engineer on
Copies to :
Uraian
Bobot
(%)
Prestasi s/d
Bulan ini (%)
Rekapitulasi Progress
Realisasi s/d
Bulan ini (%)
100,00
Keterangan
TOTAL
Demikian Berita Acara Pemeriksaan Kemajuan Pekerjaan ini dibuat dengan sebenar benarnya untuk
dapat dipergunakan sebagaimana mestinya.
Diperiksa Oleh,
Construction Management
PT. Jaya CM
Diperiksa Oleh,
Main Contractor
PT PP (Persero) Tbk.
Diajukan Oleh,
Kontraktor
PT.
Musrif M
Construction Manager
(Nama)
(Jabatan)
Diperiksa Oleh,
Quantity Surveyor
PT Korra Antar Buana
Disetujui Oleh,
Pemberi Tugas
PT Pakuwon Jati, Tbk
Ir. Yusrin
Quantity Surveyor
Syane Lukito
Engineer Representative
KOP PERUSAHAAN
Tanggal
Nomor
Lampiran
Perihal
: .............................
: .................. (Lampirkan BA 100%, Defect List + Target penyelesaian defect)
: Pemberitahuan Penyelesaian Pekerjaan 100 %
Kepada Yth,
PT. PAKUWON JATI
Up. Mr. Noel Morrow
Dengan Hormat,
Bersama ini kami sampaikan bahwa Paket Pekerjaan .........................................................
dengan LoA/SPK No............................................... tanggal ................................................... secara
substansi pelaksanaan pekerjaan tersebut telah selesai 100%, akan tetapi saat ini masih
ditemukan kekurangsempurnaan pelaksanaan pekerjaan ( defect )
Defect list dan target penyelesaiannya dan Berita Acara Penyelesaian Pekerjaan, terlampir
dalam surat ini.
Hormat kami,
( ..................................... )
Director/Project Manager
Logo Kontraktor
KELENGKAPAN DOKUMEN
TAKING OVER CERTIFICATE ( TOC )
Paket pekerjaan
NO
: .
URAIAN
Buku 1 Buku 2
5 Set
1.
2.
2a.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Taking Over Certificate ( TOC ) ; di print di kertas tebal dan warna cream
Surat pemberitahuan dari Kontraktor ke Engineer ( Mr. Noel Morrow ) yang
menyatakan bahwa pekerjaannya telah selesai. Lampirkan No. 2a dan No. 5
Berita Acara Pemeriksaan Bersama Akhir Pekerjaan : Menyatakan bahwa
pekerjaannya telah selesai (100%)
Surat tanggapan dari Engineer terkait dengan Surat Kontraktor No.2
Surat Perintah Kerja / Surat Penunjukkan /LoA ( copy )
Defect List dan target penyelesaian defect list
Surat Jaminan / Garansi Instalasi dan Material /Peralatan
Dokumen copy di jilid ; Dokumen Asli di collect terpisah
- Waterproofing
- Cat
- Anti Rayap
- Metal Roof
- Peralatan / Equipment
- ........................................
Berita Acara Surat Ijin Dari Instansi Pemerintahan ( Asli )
- Surat Ijin DPK untuk Instalasi Pemadam Kebakaran
- Surat Ijin Depnaker untuk Instalasi Genset
- Surat Ijin Depnaker untuk Instalasi Elevator / Lift
- Surat Ijin Depnaker untuk Instalasi Escalator / Travelator
- Surat Ijin Depnaker untuk Instalasi Penangkal Petir
- Surat Ijin Depnaker untuk Instalasi Pemasangan Gondola
- Surat Ijin Depnaker untuk Instalasi dan Pemasangan Boiler
- Surat Ijin Depnaker untuk Instalasi dan Pemasangan Chiller
- Surat Ijin Depnaker untuk Instalasi Listrik
- Surat Ijin Pembuangan Limbah Cair (IPLC )
- Surat Keterangan Tera untuk Kwh Meter dan Water Meter
- .................................................................................
Surat Keaslian Software dan Windows / Computer Operating System
List personil untuk Maintenance Period
Foto - Foto Pelaksanaan ( Sipil + Finishing )
Approval Material termasuk list of material
Certificate Of Origin khusus untuk Material Import : (Asli)
After Sales Service / List of Supplier / Distributor >>>> Sipil + Finishing
BAST Parsial (Untuk seluruh pekerjaan)
Berita Acara Training Operator
Berita Acara Testing & Commisioning
Manual Book / Manual Operation
- Hardcopy
:
5 set
- Softcopy
:
5 set
As-Built Drawings
- Kalkir 1 set
- Blue print ukuran A1 : 5 set ( Dijilid + Hardcover )
- Foto copy ukuran A3 : 5 set ( Dijilid + Hardcover )
- Soft copy ( CD ) : 5 set ; dalam Format PDF dan DWG
5 Set
Buku 3
5 Set
LOCATION : MALL
Disepakati pada Rapat Kamis, 19 Mei
2016
Warna Cover :
Seluruh Supplier >> Warna Putih
FF >> Merah
Plumbing >> Biru
VAC >> Hijau
FA >> Merah
Elektrikal >> Kuning
Elektronik >>> Kuning
Dibuat dalam Bahasa Indonesia
KONTRAKTOR
LOGO
1
2
Logo PJ
Logo JCM
AREA
NO
NAMA PERALATAN
LOKASI
Logo MC
Logo DC
QTY
SPESIFIKASI
STATUS
FISIK
Menjelaskan model/type,
kapasitas alat, daya listrik, flow
cap, dll
FUNGSI
BERITA ACARA
TEST
ST
KETERANGAN