eAHSU DEC 2014 - Opt PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 197

Service

Standard
Upgrades
December 2014

Your time is precious


Dear Customers,
As the end of the year approaches, here we are, as promised, with an improved version of the Catalogue of
Standard Upgrades.
In this new version you will find a selection of our Standard Upgrades where we have introduced several new
products. We are increasing the pace of development and look forward to further complementing our offer in
future editions.
In the following pages, you will also find all the necessary information to select the exact kits you need based on
your specific helicopter configuration, as well as the instructions on how to use them.
We know that your time is precious. And our goal is for you to
get what you need, when you need it.This is why the delivery
lead time is clearly laid out for a large majority of kits in the
catalogue to help you plan accordingly.

Hydraulic Equipment

5 months

Electro-Mechanical
Secondary structure

At Airbus Helicopters, we strive to continuously improve


our industrial set up in order to accelerate deliveries.
You can see more details on our delivery objectives as
highlighted in the graph beside.
We are sure that this revised catalogue will give you the tools
you need to quickly and efficiently decide which upgrade is
best for you and your missions. And as always, we remain
at your full disposal should you have any questions or need
any assistance in making your choice.
Thank you for your continued confidence in our services.
Airbus Helicopters

Avionic

6 months

LEAD TIME

8 months

Integrated Fuel Tanks

12 months

Large
Structure
Modification

Airbus Helicopters has set more than 25 subsidiaries all around the world who are committed to offer you, locally, the full
range of Airbus Helicopters products as well as the best support and services you need in four daily operations whether it
may be related to spare parts, repair and overhaul services, technical assistance, maintenance or training.

STANDARD UPGRADES

User Guide
In order to get the most out of this catalogue, first locate your aircrafts Airbus Helicopters product family, and then
search by category.

First by family...

Families
Colibri
Ecureuil Family
EC135 Family
EC145 Family
EC175 Family
Dauphin Family
Super Puma Family
Please note that regarding the version of the catalogue, all the
families are not necessarily represented.

...and then by category


Our categories
Accessories

Airframe & System Upgrades

Cabin & Cabin systems

Cargo Expansion

Door & windows

External loads

Landing Gears

Protection & Mooring

Safety

Version Upgrades
Please note that regarding the version of the catalogue, all the segments are not necessarily represented.

How to read the product page


Back to table of contents
Segment category
Helicopter
Title of the product

Moment

(longitudinale value)

Grounding hours

Weight

Values a re relative
to the scenario of a
largest configuration

Configurations

This table provides the configuration


of the aircraft. It leads to the relevant
kit(s) or spare(s) needed for the
installation of the upgrade presented
into the Kit table.

This table will help you to identify


the kit(s) you need for an
upgrade. Nevertheless and in
case of any question, Airbus
Helicopters remains at your
disposal for a free technical
filtering of your aicraft.

STC Product
Back to table of contents

Additional information
Contact information
Version of the catalogue

What do these icons mean ?


Helicopter

STC Product

Weight

Moment

Grounding hours

On request

This value is based on


the largest configuration
scenario (Maximum
Weight).

This information is
expressed in longitudinal
moment value.

This value is based on


the largest configuration
scenario.

When you see this icon, we


invite you to contact your KAM
or the local Customer Center to
obtain the relevant information.

STC
When you see this
icon, the upgrade is
a Supplemental Type
Certificate.

Table of contents
Colibri
EC120

Accessories
Right Hand Door Handle

Thales AHV16 Radio Altimeter with 100 Ft Alarm for EC130 B4

55

Thales AHV16 Radio Altimeter with 100 Ft Alarm for EC130 T2

57

Battery Relocation Kit

58

GTX330 (mode S) Garmin Transponder for AS355

59

Thales AHV16 Radio Altimeter with 100 Ft Alarm for AS355

60

Thales H321 EHM Standby Horizon for AS355

62

13

Cargo Expansion
Cabin & Cabin Systems
GTX330 (mode S) Garmin Transponder for EC120

15

Thales H321 EHM Standby Horizon for EC120

16

Cargo Pods "Squirrel Cheecks" for AS350

64

Cargo Pods "Squirrel Cheecks" for EC130

65

Cargo Pods "Squirrel Cheecks" for AS355

66

Doors & Windows

Ecureuil Family
AS350 / EC130 / AS355

Forward Opening Rear Cargo Doors for AS350

68

Forward Opening Rear Cargo Doors for AS355

69

External Loads

Accessories

Breeze Electrical Hoist (204 kg/450 lb) for AS350

71

Cargo Mirrors

21

Goodrich Electrical Hoist (136 kg/300 lb) for AS350

73

Electrical Rear View Mirror with De-Iced System

22

Onboard Systems Cargo Swing Fixed Parts for AS350

76

24

Onboard Systems Cargo Swing Fixed Parts for EC130

77

LED Type Anticollision Light

25

Breeze Electrical Hoist (204 kg/450 lb) for AS355

78

Left Hand Litter

27

Left Hand Litter

28

Electrical Rear View Mirror with De-Iced System

29

Landing Gears

Windshield Wiper for AS350

30

Swiveling Retractable Landing Light for AS350

80

External Panoramic Rear-View Mirrors

31

Swiveling Retractable Landing Light for EC130

81

Mirrors installation for cargo hook operations.

32

External Panoramic Rear-View Mirrors

Protection & Mooring

Airframe & System Upgrades

Blade Folding System

83

Forward Short-High Visibility Doors

34

Blade Tie Down Kit for AS350

85

Fuel Management on VEMD

35

Blade-Tie Down Kit for EC130

86

High Visibility Doors

36

Blade Tie Down Kit for AS355

87

Sand Filter for Arriel 2D Engine on AS350

37

Installation of Mooring Rings

88

Tail Rotor Protection

39

Dual Control

40

Sand Filter for Arriel 2D Engine on EC130

41

Cold Weather Start-Up (Second Battery Kit)

42

Cabin & Cabin Systems

Safety
Aerazur Emergency Floatation Gear for AS350

90

Kannad 406 AF-H Emergency Locator Transmitter (ELT) for AS350

92

Aerazur Emergency Floatation Gear for EC130

94

Aerazur Emergency Flotation Gear for EC130

96

Battery Relocation Kit

45

Cable Cutter System

Front Two-Seat Bench on Copilot Side

46

Kannad 406 AF-H Emergency Locator Transmitter (ELT) for AS355

GTX330 (mode S) Garmin Transponder for AS350

48

Thales AHV16 Radio Altimeter with 100 Ft Alarm for AS350

50

Thales H321 EHM Standby Horizon for AS350

52

Adjustable Glare Shield

53

GTX330 (mode S) Garmin Transponder for EC130

54

98
100

Version Upgrades
B to BA Conversion

103

BA to B2 Conversion

104

EC135 Family
EC135

LH/RH Installation of Hand-Grips

143

Overhead Panel Attachment

144

Windshield Wiper Dual Drive

145

Airframe & System Upgrades

Accessories
New Fixation of the Support Rods

109

Rotor Mast Seal

110

Support Rods & Brackets for Helicopters with Inlet Barrier Filter (IBF)

111

Airframe & System Upgrades


Communication System HF-9000

113

Fuel Flow Sensor

114

Inlet Barrier Filter (IBF) install for Pratt & Withney Engines

115

Inlet Barrier Filter System (IBF) for Turbomeca Engines

116

Improved Tail Rotor Actuator

147

Inlet Barrier Filter (IBF) System

148

Main Rotor Blade Erosion Protection

149

Vectorial Mast Moment Monitoring System

150

Cabin & Cabin Systems


New Blower for the Passenger Compartment Ventilation

152

Doors & Windows


Sun Shades

154

Cabin & Cabin Systems


XL or XXL Center Console

118

Doors & Windows


Cockpit Door Locking Devices

120

Sliding Door Windows & Ram-Air

121

Protection & Mooring


Cabin Structure - Large Edge Protection

156

Center Protection for the Skid Tubes

157

Wear Pads for the Cable Deflector

158

Safety
Landing Gears
Center Protection for the Skid Tubes

123

Medium-High Landing Gear

124

Safety
Attitude & Heading Reference System (AHRS)

126

CVFDR and/or UMS and/or SSQAR

127

Emergency Exit Lighting (Exit & Step)

128

Engine Fire Extinguishing System

129

Modification of the Switching Logic

130

Portable Fire Extinguisher

131

Vision 1000 Cockpit Camera

132

Voice Alarm for the Radar Altimeter

133

Weather radar RDR 2000

134

Wire Strike Protection System (WSPS)

135

Emergency Jettison & Locking Mechanism

160

Enhanced ground proximity warning system (EGPWS)

161

Fuel Flowmeter

162

Usage Monitoring System (UMS)

163

Voice Alarm for the Radar Altimeter

164

Dauphin Family
EC155 / AS365

Doors & Windows


Extended Cowling Rod

169

Extended Cowling Rod

170

External Loads
Goodrich Electrical Hoist (272 kg/600 lb) for AS365

Version Upgrades
Admissible Maximum Take-Off Weight 2950 kg (e-Version)

172

137

Safety
Health & Usage Monitoring System (HUMS)

EC145 Family
EC145

Accessories
Cockpit Curtain

141

Drip Catcher Above the Swivel Units of the Fexball Cables

142

175

Super Puma Family


AS332 / EC225

Safety
Visual Icing Indicator for AS332

181

ADSB-Out Activation Procedure

182

GPS Replacement for ADSB-Out Compliance

183

Transponder Replacement for ADSB-Out Compliance

184

Visual Icing Indicator for EC225

185

Standard conditions of sale

187

Colibri
EC120

ACCESSORIES

Accessories

STC

Right Hand Door Handle


Applicable to version(s) : B
This installation adds a light weight PEI (Polyethylenimine) interior door handle to the front doors.
The Door Handle installation eases closing the pilots door from the pilot and/or
rear passenger seating position, allowing for an enhanced grip and arm movement.
BENEFITS
Eases closing the pilots door

WEIGHT

MOMENT

+ 0.37 kg

1.09 m.kg

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.10043307

FAA

FAA.SR03243NY

KIT REFERENCES
REFERENCE

DESCRIPTION

120200014

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

13

CABIN
& CABIN SYSTEMS

Cabin & Cabin Systems

GTX330 (mode S) Garmin Transponder for EC120


Applicable to version(s) : B
Installation of GARMIN transponder GTX 330 mode "S" as replacement for GTX
327 mode "C". This equipment provides information to the air traffic control
services. The GTX 330 uses the mode "S" in addition to modes "A" and "C"
(existing on GTX 327).
The GARMIN transponder GTX 330 is a radio transceiver which uses radar frequencies. The transponder receives interrogations from a ground radar or an onboard
collision avoidance system or TCAS (Traffic Alert and Collision Avoidance System)
on 1,030 MHz and transmits its response by encoded pulses on the 1,090 MHz
frequency. The GTX 330 device supports the IDENT function which allows SPI pulses
(Special Position Identification) to be activated for 18 seconds. The GTX 330 transponder responds interrogations from the ATC radar beacon system or ATCRBS (Air
Traffic Control Radar Beacon System) mode "A", mode "C" and mode "S".
BENEFITS
Requirement set by the European mandate for mode S level 2 surveillance.
Complying with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Transmission of a specific identity code (mode "S").

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.

WEIGHT

MOMENT

GROUNDING

+ 2.15 kg

1 day

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

3 hours

Avionics

5 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) with no TDR GTX327 install (PRE MOD A00494)

Version(s) equiped with TDR GTX327 install (PRE MOD A00494)

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

C345A130205171

TDR GTX330 Kit

20 weeks

C008A034505971

GTX327 to GTX330 Kit

24 weeks

CONFIGURATION

REQUIRED QUANTITY

1, 2

0.5 m

0.2 m

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

EN362805

Lock Wire

EN2266005A004P

Electrical Cable

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

15

Cabin & Cabin Systems

Thales H321 EHM Standby Horizon for EC120


Applicable to version(s) : B
The Thales H321 EHM standby horizon is installed on the instrument panel
in order to duplicate the information relating to horizon datum points.
Installation of a Thales H321 Standby Horizon on the instrument panel. This system is powered by a standalone additional battery.
BENEFITS
Compliant with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Duplication of the information relating to horizon datum points.

WEIGHT

MOMENT

GROUNDING

+ 4.4 kg

15.24 m.kg

1 day

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

8 hours

Structures

2 hours

Not Applicable.

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
S/N 1393 to 8000 and equal to or above 8009

KIT REFERENCES
REFERENCE

DESCRIPTION

C342A006620071

Standby Horizon Kit

CONFIGURATION

LEAD-TIME

40 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

16

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Ecureuil
AS350 / EC130 / AS355 / AS550 / AS555

ACCESSORIES

Accessories

STC

Cargo Mirrors
Applicable to version(s) : D, B, BA, B1, B2, B3
Mirrors installation for cargo hook operations.
The AS350 Cargo Mirrors positions two mirrors directly outside the Pilots chin window for improved visibility when performing cargo hook operations. The mirrors can
be installed on the left hand side, right hand side or both sides of the aircraft.
BENEFITS
Eases maneuverability.
Lightweight.

WEIGHT

MOMENT

+ 3.44 kg*

0.48 m.kg**

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.10042576

FAA

FAA.SR00457NY

KIT REFERENCES
REFERENCE

DESCRIPTION

35020026403

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
Can be installed on the left hand side, right hand side or both sides of the aircraft.
* + 1.72 kg (per side)
** Per side.

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

21

Accessories

Electrical Rear View Mirror with De-Iced System


Applicable to version(s) : B2, B3
This installation enables the monitoring of sling work through the LH front
lower window.
The external electric mirror is controlled by a 4-position button installed on the pilots
cyclic stick. Rear-view mirror with built-in electric motor installed on a stainless steel
tube fitted with a strut.
BENEFITS
Increased monitoring of carried load.
Ground or cabin adjustment of rear-view mirror positioning.
Anti-icing function for use in cold weather.

WEIGHT

MOMENT

GROUNDING

+ 2.7kg

1.3 m.kg*

2 days
PRE-POST REQUISITE / EFFECTIVITY
Applicable to all AS350 B2 and B3 equipped with sling before MOD 073480.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

10 hours

Structures

3 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) B2, PRE MOD 3815 and with Honneywell block

Version(s) B3, PRE MOD 3815 and Bloc Honneywell

Version(s) B2, POST MOD 3815 and Bloc Honneywell

Version(s) B3, POST MOD 3815 and Bloc Honneywell

Version(s) B2, B3, bloc SMS, PRE MOD 073478 and 073479

Version(s) B2, B3, bloc SMS, POST MOD 073478 and 073479, and PRE MOD 073450

Version(s) B2, B3, bloc SMS, POST MOD 073478, 073479, 073450 and PRE MOD 074280

Version(s) B2, B3, Multi bloc and POST MOD 074280

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8280180072

Elec Mirror Fix Parts Kit

20 weeks

350A8280190072

Elec Mirror Removable Parts Kit

1, 2, 3, 4

20 weeks

350A8280181072

Elec Mirror Fix Parts Kit

20 weeks

350AOP38230071

Elec Mirror Fix Parts Kit

20 weeks

350AOP38230171

Elec Mirror Fix Parts Kit

20 weeks

350A8280740072

Elec. Reat View Mirror PF

20 weeks

350A8280190271

Elec Mirror Removable Parts Kit

5, 6, 7, 8

20 weeks

350A8280740271

Elec. Mirror Fix Parts Kit

20 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

22

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8280740471

Elec. Mirror Fix Parts Kit

20 weeks

350A8280740571

Kit Electrically Rear View Mirror FP

20 weeks

CONFIGURATION

REQUIRED QUANTITY

1, 2, 3, 4, 5, 6

1, 2, 3, 4, 5, 6, 7, 8

0.2 m

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

1635574

Contact, Female

4611L19

Adhesive tape

EN2267010A006S

Cable, Electric, 1 line

5, 6

1m

EN2267010A004S

Cable, Electric, 1 line

1m

NOTES
* Longitudinal 1.3 m.kg / Lateral 0.7 m.kg

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

23

Accessories

External Panoramic Rear-View Mirrors


Applicable to version(s) : B, B1, B2, B3, BA, BB, D, L1
The installation of two external panoramic rear-view mirrors enables the pilot
to monitor the whole cargo swing during external load transport missions.
Installation of three fittings located on the lateral arch of the canopy, the front bulb,
the cabin floor and a three-branch support for rear-view mirror attachment.
BENEFITS
Improves the pilot's visibility by installing two rear-view mirrors: one to monitor
the underslung load work, the other one to monitor the cargo swing under the
helicopter.

WEIGHT

MOMENT

GROUNDING

+ 3.81 kg

1.94 m.kg

0.5 day

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

2 hours

Not Applicable.

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Version(s) B, B1, B2, B3, BA, BB, D, L1 , PRE MOD 073365

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8600150371

Kit PF Outs Panoramic View Mirror Rbe

20 weeks

350A8600150471

Kit RP Outside Panoramic Mirror Rbe

20 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

4962L19

Tape, Adhesive Double Neoprene

EN362808

Lock Wire

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

24

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Accessories

LED Type Anticollision Light


Applicable to version(s) : B, B1, B2, B3, BA, BB, D
The installation of a LED (Light Emitting Diode) anticollision light provides
higher performance and reliability than the standard incandescent bulb light.
Replacement of the incandescent bulb light by a LED-type light. Replacement of the
power supply unit and modification of the electrical wiring. This upgrade is adaptable for AS350, 355, 550 and 555 all versions.
BENEFITS
Simple installation.
Increased visibility.
Reduction of maintenance costs.

WEIGHT

MOMENT

GROUNDING

+ 0.85 kg

5.85 m.kg

2 days
PRE-POST REQUISITE / EFFECTIVITY
Not Applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

12 hours

Electrics

12 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) B, BA, BB, B1, B2, B3 or D, PRE MOD 073273 and PRE MOD 073336

Version(s) B2 or B3 POST, MOD 073273 and PRE MOD 073336

Version(s) L1 and PRE MOD 073336

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A0733360171

Anticollision Light Kit Complement

20 weeks

350A0733360071

Anticollision Light Kit

1, 2, 3

28 weeks

350A0733360371

Anticollision Light Kit

20 weeks

350A0733360271

Anticollision Light Kit Complement

20 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

EN2266-005A-004P

Electric wire

All Configurations

1,5 m

E0719BN22

Electric wire

All Configurations

1m

985710-060KCIEL

Electric wire

All Configurations

1m

985710-040K

Electric wire

All Configurations

0,5 m

E0719BN22

Electric wire

All Configurations

1,5 m

EN2266-005A004P

Electric wire

All Configurations

1,5 m

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

25

NOTES
This product exist for version(s) 355, 550 and 555. On request.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

26

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Accessories

STC

Left Hand Litter


Applicable to version(s) : BA, B1, B2
This portable litter installation allows the transportation of an injured person.
The AS350 LH Litter allows for transportation of an injured person on a portable litter.
The litter is secured to the LH cabin floor, with the LH forward seat removed and the
LH aft seats in the stowed position.
BENEFITS
Fixed and detachable provisions can be sold separately.

WEIGHT

MOMENT

+ 13.31 kg*

20.20 m.kg**

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.10038247

FAA

FAA.SR00407NY

KIT REFERENCES
REFERENCE

DESCRIPTION

35020003401

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
Fixed and detachable provisions can be sold separately.
* Weight details: + 0.51 kg (Fixed Provisions) / + 12.80 kg (Detachable Provisions) / - 10.60 kg (Removed Items, LH Seat) / + 2.71 kg (Total)
** Moment details: + 0.49 m.kg (Fixed Provisions) / + 19.71 m.kg (Detachable Provisions) / - 17.07 m.kg (Removed Items, LH Seat) / + 3.13 m.kg (Total)

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

27

Accessories

STC

Left Hand Litter


Applicable to version(s) : E, F, F1, F2, N, NP
This portable litter installation allows the transportation of an injured person.
The AS355 LH Litter allows for transportation of an injured person on a portable litter.
The litter is secured to the LH cabin floor, with the LH forward seat removed and the
LH aft seats in the stowed position.
BENEFITS
Fixed and detachable provisions can be sold separately.

WEIGHT

MOMENT

+ 12.8 kg*

19.71 m.kg**

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.10038249

FAA

FAA.SR00406NY

KIT REFERENCES
REFERENCE

DESCRIPTION

35020003401

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
Fixed and detachable provisions can be sold separately.
* Weight details: + 0.51 kg (Fixed Provisions) / + 12.80 kg (Detachable Provisions) / - 10.60 kg (Removed Items, LH Seat) / + 2.71 kg (Total)
** Moment details: + 0.49 m.kg (Fixed Provisions) / + 19.71 m.kg (Detachable Provisions) / - 17.07 m.kg (Removed Items, LH Seat) / + 3.13 m.kg (Total)

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772

28

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Accessories

Electrical Rear View Mirror with De-Iced System


Applicable to version(s) : B4
This installation enables the monitoring of sling work through the LH front
lower window.
The external electric mirror is controlled by a 4-position button installed on the pilots
cyclic stick. Rear-view mirror with built-in electric motor installed on a stainless steel
tube fitted with a strut.
BENEFITS
Increased monitoring of carried load.
Ground or cabin adjustment of rear-view mirror positioning.
Anti-icing function for use in cold weather.

WEIGHT

MOMENT

GROUNDING

+ 2.60 kg

1.35 m.kg

2 days
PRE-POST REQUISITE / EFFECTIVITY
Not applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

5 hours

Structures

8 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A0738460071

Electrical Rear View FP Kit

On request

20 weeks

350A0738460171

Electrical Rear View FP Kit

On request

20 weeks

350AOP37480071

Electrical Rear View MP Kit

On request

12 weeks

350AOP37480171

Electrical Rear View MP Kit

On request

12 weeks

350AOP37480271

Electrical Rear View MP Kit

On request

12 weeks

350AOP37490071

Electrical Rear View FP Kit

On request

20 weeks

350V8703400071

Nose Cover Rearv Mirror Capa Kit

On request

20 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

ECS0030.27

Glass fabric

All Configurations

0,02 m

ECS2291-B159NOI

Fastener tape

All Configurations

0,01 m

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

29

Accessories

Windshield Wiper for AS350


Applicable to version(s) : B2, B3
This upgrade proposes the installation of pilot and copilot windshield wipers
for better visibility in rainy weather conditions.
Pilot's windshield wiper improves the visibility for the pilot when flying and landing
in rain. The Pilot's windshield wiper does not affect the aircraft flight performance.
Therefore the regulatory performance data specified in the Basic Flight Manual and
in the Supplements remain applicable.
BENEFITS
Improves the visibility
Does not affect the aircraft flight performance
Pilot and Copilot can be install idenpendently.

WEIGHT

MOMENT

GROUNDING

+5. 2kg

2.51 m.kg

2 days
PRE-POST REQUISITE / EFFECTIVITY
Not Applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Structure

4 hours

Electrics

6 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Pilot and copilot installation PRE MOD 073439

Pilot and copilot installation POST MOD 073439

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

REQUIRED QUANTITY

350AEESSG0071

Windscreen Wiper Installation Kit

20 weeks

350AEESSG0E71

Windscreen Wiper Equipment Kit

20 weeks

350AEEGPO0071

Pilot Windscreen Wiper Kit

20 weeks

350AEEGCO0071

Co-Pilot Windscreen Wiper Kit

20 weeks

350AEESSG0071

Windscreen Wiper Installation Kit

20 weeks

350AEESSG0E71

Windscreen Wiper Equipment Kit

20 weeks

350AEEGPO0171

Pilot Windscreen Wiper Kit

20 weeks

350AEEGCO0171

Co-Pilot Windscreen Wiper Kit

20 weeks

ADDITIONAL REQUIRED SPARES

30

REFERENCE

PRODUCT DESCRIPTION

EN3628-0,8
EN3628-0,63

Standard Upgrades - e.AHSU-DEC-2014

CONFIGURATION

REQUIRED QUANTITY

Lock Wire

1, 2

1m

Lock Wire

1, 2

1m

www.airbushelicopters.com

Accessories

External Panoramic Rear-View Mirrors


Applicable to version(s) : E, F, F1, F2, N, NP
The installation of two external panoramic rear-view mirrors enables the pilot
to monitor the whole cargo swing during external load transport missions.
Installation of three fittings located on the lateral arch of the canopy, the front bulb,
the cabin floor and a three-branch support for rear-view mirror attachment.
BENEFITS
Improves the pilot's visibility by installing two rear-view mirrors: one to monitor
the underslung load work, the other one to monitor the cargo swing under the
helicopter.

WEIGHT

MOMENT

GROUNDING

+ 3.81 kg

1.942 m.kg

0.5 day

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

2 hours

Not Applicable.

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Version(s) E, F, F1, F2, N, NP, PRE MOD 073365

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8600150371

Kit PF Outs Panoramic View Mirror Rbe

20 weeks

350A8600150471

Kit RP Outside Panoramic Mirror Rbe

20 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

4962L19

Tape, Adhesive Double Neoprene

EN362808

Lock Wire

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

31

Accessories

Mirrors installation for cargo hook operations.


Applicable to version(s) : The AS355 Cargo Mirrors positions two mirrors directly
outside the Pilots chin window for improved visibility when performing cargo hook
operations. The mirrors can be installed on the left hand side, right hand side or
both sides of the aircraft.
Eases maneuverability.
Lightweight.

WEIGHT

MOMENT

+ 3.44 kg*

0.48 m.kg**

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.

KIT REFERENCES
REFERENCE

DESCRIPTION

35020026403

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
Can be installed on the left hand side, right hand side or both sides of the aircraft.
* + 1.72 kg (per side)
** Per side.

E, F, F1, F2

32

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

AIRFRAME
& SYSTEM UPGRADES

Airframe & System Upgrades

STC

Forward Short-High Visibility Doors


Applicable to version(s) : B, BA, B1, B2, B3
Short version of the forward high visibility door.
The short version of the high visibility door is compatible with the sliding door and
provides a full height continuous window option for aircraft equipped with rear sliding doors. The doors can be installed on one or both sides of the aircraft.
BENEFITS
Increases visibility for pilots and passengers.
No visual interference with binoculars or goggles.
Increases passenger comfort.
No performance restriction.
Same safety features as a standard door (latching, locking and emergency
egress).

WEIGHT

MOMENT

+ 8.0 kg*

12.48 m.kg**

GROUNDING
PRE-POST REQUISITE / EFFECTIVITY
Not applicable.
APPROVALS
EASA

EASA.IM.R.S.01221

FAA

FAA.SR02141NY

KIT REFERENCES
REFERENCE

DESCRIPTION

35020241401

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
* Per Side.
** Per Side.

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772

34

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Airframe & System Upgrades

Fuel Management on VEMD


Applicable to version(s) : B2
The fuel flowmeter is designed to display all fuel management information
on the VEMD.
Display and centralisation of information on the VEMD.
BENEFITS
Calculation of parameters such as engine hourly consumption and remaining
flight time in minutes.

WEIGHT

MOMENT

GROUNDING

+ 0.27 kg

1.12 m.kg

4 hours

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

2 hours

Structures

2 hours

PRE-POST REQUISITE / EFFECTIVITY


Applicable to aircraft equipped with the VEMD installation (MOD 073264).

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
B2 version equiped of VEMD (POST MOD 073264), PRE MOD OP3301

KIT REFERENCES
REFERENCE

DESCRIPTION

350A8250500671

Kit Fuel Flow with VEMD

CONFIGURATION

LEAD-TIME

24 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

E00431C0

Binding clamp

40

E00433C0

Binding clamp

40

EN362808

Lock Wire

1m

E0719BN22

Cable Electrical

1m

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

35

Airframe & System Upgrades

STC

High Visibility Doors


Applicable to version(s) : B, BA, B1, B2, B3
Replacement of the AS 350 original doors with a new composite doorframe
with extra large windows.
The AS350 High Visibility Doors provide pilots and passengers with an increased
viewing field through the extra large windows. The fully composite doorframe replaces the standard door(s) and can be installed individually or in any combination,
including all four doors. The high visibility doors are ideal for law enforcement, tourism and utility missions.
BENEFITS
Increases visibility for pilots and passengers.
Increases passenger comfort.
No change to operational limitations.
Same safety features as a standard door (latching, locking and emergency
egress).
No obstruction for camera, video equipment or goggles.

PRE-POST REQUISITE / EFFECTIVITY


WEIGHT

MOMENT

+ 35.4 kg*

66.74 m.kg**

GROUNDING

Not applicable.
APPROVALS
EASA

EASA.IM.R.S.01195

FAA

FAA.SR01107NY

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

35020201401

LH Clear Windows

On request

On request

35020241402

RH Clear Windows

On request

On request

35020241403

LH Tinted Windows

On request

On request

35020241404

RH Tinted Windows

On request

On request

NOTES
Possibility to buy doors separately.
* Weight details : + 11.9 kg (per Forward Door) / + 5.80 kg (per Rear Door)
** Moment details : + 19.28 m.kg (per Forward Door) / + 14.09 m.kg (per Rear Door)

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772

36

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Airframe & System Upgrades

Sand Filter for Arriel 2D Engine on AS350


Applicable to version(s) : B3
This equipment, mandatory for flights under snowfall, is also used to filter
efficiently sand or dust particles and provides a good ice protection. It protects
the engine from the ingestion of sand. It therefore prevents the premature wear
of the compressor blades due to the ingestion of sand and other contaminants.
In addition, the Sand filter installation also protect the air intake against the
potential induction of flying particles.
Filtering reduces ingress of sand and dust, what enables to reduce premature engine ageing due to erosion. This installation also protects from absorption of sand
and snow. Flights are prohibited under snowfall without the sand filter installed. The
sand filter does not result in any loss of performance.
BENEFITS
Reduces engine premature ageing.
Protects against falling snow absorption.
Self-cleaning system.
Reduces direct maintenance cost.
PRE-POST REQUISITE / EFFECTIVITY
WEIGHT

MOMENT

GROUNDING

+ 7.1 kg

30.89 m.kg

3 days

Applicable to AS350 B3 helicopters powered with an ARRIEL 2D engine with single


or dual hydraulic system.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

3 hours

Structures

16 hours

Pilot

2 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) B3 PRE MOD OP3346

Version(s) B3 POST MOD OP3347

Version(s) B3 with multi bloc (POST MOD 074280, PRE or POST MOD 075606 or 350A08454800) and PRE MOD OP3346

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8250320071

FAS PM Kit

1, 2

20 weeks

350A61172687

Label,"SAND FILT" English

1, 2, 3

12 weeks

350A54114220

Protection Piping F.A.S

28 weeks

350A8250320171

Kit Install Sand Filter Multiblock

36 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

E00431C0

Binding clamp

1, 2, 3

20

E00432C0

Binding clamp

1, 2, 3

20

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

37

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

EN362808

Lock Wire

22208BC050014L

Bolt,Hex.Head

CONFIGURATION

REQUIRED QUANTITY

1, 2, 3

1m

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

38

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Airframe & System Upgrades

Tail Rotor Protection


Applicable to version(s) : B, BA, B1, B2, D, BB, B3
This upgrade is improving the protection of the tail rotor.
The tail rotor arch protects the tail rotor blades during landing. Regarding the MOD
of the helicopter, this upgrade consits in either installing an upper attachment, a
reinforcement guide and a protection tube under the tail boom or just the install of
the protection tube under the tail boom.

WEIGHT

MOMENT

GROUNDING

+1.52 kg

13.18 m.kg

3 days

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Structure

20 hours

PRE-POST REQUISITE / EFFECTIVITY


Helicopters pre-MOD OP0478 (Tail rotor protection) or helicopters versions B2 or B3,
POST-MOD 074326 (Serial incorporation of tail boom protector Fixed Part) and preMOD 074327 (Optional equipment design change following serial incorporation
of tail boom protector Fixed Part). Helicopters on which Revision 0 of this Service
Bulletin was complied with are not concerned by Revision 1.

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) in PRE MOD 074326 and embodiment of MOD OP0478

Version(s) POST MOD 074326 and embodiment MOD 074327

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350AOP04780071

Tail Rotor Protection Kit

20 weeks

350A0743270071

Tail Rotor Protection Improvement Kit

20 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

PR1771B2SEMK654

Sealant

0.1 kg

DHS171141.20

Adhesive

0.1 kg

ASNSA3915040

Plate elastomer 31B4

1 m

ASNSA3915020

Plate elastomer 31B4

1 m

DHS171141.20

Adhesive

0.1 kg

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

39

Airframe & System Upgrades

Dual Control
Applicable to version(s) : T2
Dual command integration. Left side pilot.
This upgrade consists in the install of the twist grip, cyclic control and the rudder
pedal for the co-pilot.
BENEFITS
Safety increased.
Workload reduction for the pilot.
Pilot training school.

WEIGHT

MOMENT

GROUNDING

+ 2.5 kg

3.264 m.kg

1 day

INSTALLATION TIME

PRE-POST REQUISITE / EFFECTIVITY

QUALIFICATION

INSTALLATION DURATION

Mechanics

5 hours

Not applicable.

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
T2 version POST MOD 074215, PRE MOD OP3673, OP4399, OP4403

KIT REFERENCES

40

REFERENCE

DESCRIPTION

350A8270450071

Dual Control Assy EC130 T2 Kit

Standard Upgrades - e.AHSU-DEC-2014

CONFIGURATION

LEAD-TIME

52 weeks

www.airbushelicopters.com

Airframe & System Upgrades

Sand Filter for Arriel 2D Engine on EC130


Applicable to version(s) : T2
This equipment, mandatory for flights under snowfall, is also used to filter
efficiently sand or dust particles and provides a good ice protection. It protects
the engine from the ingestion of sand. It therefore prevents the premature wear
of the compressor blades due to the ingestion of sand and other contaminants.
In addition, the Sand filter installation also protect the air intake against the
potential induction of flying particles.
Filtering reduces ingress of sand and dust, what enables to reduce premature engine ageing due to erosion. This installation also protects from absorption of sand
and snow. Flights are prohibited under snowfall without the sand filter installed. The
sand filter does not result in any loss of performance.
BENEFITS
Reduces engine premature ageing.
Protects against falling snow absorption.
Self-cleaning system.
Reduces direct maintenance cost.
PRE-POST REQUISITE / EFFECTIVITY
On request.
WEIGHT

MOMENT

GROUNDING

+ 7.1 kg

30.89 m.kg

3 days

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Structure

14 hours

Electrics

7 hours

Pilot

2 hours

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Version(s) T2 POST MOD OP3346, 074302, 074280, OP4376 and PRE MOD OP4303

KIT REFERENCES
REFERENCE

DESCRIPTION

350A8250321671

ARRIEL 2D Sand Filter Installation Kit

CONFIGURATION

LEAD-TIME

36 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

EN362808

Lock Wire

2.5 m

ECS242810

LUBRICANT

0.5 l

B3
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

41

Airframe & System Upgrades

Cold Weather Start-Up (Second Battery Kit)


Applicable to version(s) : E, F, F1, F2, N, NP
The installation of a second battery eases start-up under temperatures ranging
from -15C to -35C.

BENEFITS
Increases electrical power required for cold weather start-up.
Increases helicopter availability.

WEIGHT

MOMENT

GROUNDING

+ 16.4 kg

55.9 m.kg

2 days

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

5 hours

Structures

4 hours

PRE-POST REQUISITE / EFFECTIVITY


Aircraft equipped with the battery reference 151CH1 (post MOD 07-2769).

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Helicopters PRE MOD 071123

Helicopters POST MOD 071123 and PRE MOD 071732

Helicopters version(s) F, F1 and F2 POST MOD 071123 and POST MOD 071732 and PRE MOD 073297

Helicopters version(s) F, F1 and F2 POST MOD 071123 and POST MOD 071732 and POST MOD 073297

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8265010673

2nd Battery Complement Pre Mod 071123

28 weeks

350A8265010573

2nd Battery Kit

1, 2, 3, 4

28 weeks

350A8265010773

2nd Battery Complement Pre Mod 071732

28 weeks

350A8265010872

2nd Battery Complement Post Mod 071732

3, 4

24 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

151CH1

Battery

All Configurations

355A62-5017-0001

Glowing 2nd Battery

All Configurations

355A62-5017-02AA

Glowing

All Configurations

DHS754-170.10

Braided sleeve

All Configurations

0,5 m

350A62-2502-20

Battery calliper

All Configurations

22208BC050010L

Screws

All Configurations

23111AG050LE

Washer

All Configurations

10

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

42

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

ASN52320BH050N

Secure hexagon nut

All Configurations

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

43

CABIN
& CABIN SYSTEMS

Cabin & Cabin Systems

STC

Battery Relocation Kit


Applicable to version(s) : B, BA, B1, B2, B3
Battery relocation from the RH cargo compartment to the tail boom.
The AS350 Battery Relocation Kit provides provisions to install a high capacity lead
acid or nickel cadmium battery in the tail boom removing the standard aircraft battery located in the right hand (RH) cargo compartment.It reduces the need for aft
aircraft ballast and increases the usable space in the RH cargo compartment. The
battery is mounted on a removable tray in the left hand (LH) side of the tail boom.
The battery relocation kit is ideal for balancing aircraft equipped with heavily loaded
instrument panels.
BENEFITS
Increases RH cargo capacity.
Reduces the need for tail boom ballast.
The battery can be quickly disconnected, and can be removed while wearing
winter gloves.

WEIGHT
*

MOMENT
**

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.IM.R.S.01073

FAA

FAA.SR00422NY

KIT REFERENCES
REFERENCE

DESCRIPTION

350700324

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
* Lead-Acid : + 27.1 kg (lead acid) / NiCad : + 24 kg
** Lead-Acid : + 257.18 m.kg / NiCad : + 227.76 m.kg

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

45

Cabin & Cabin Systems

Front Two-Seat Bench on Copilot Side


Applicable to version(s) : B, B1, B2, B3, BA, BB, D
The installation of a two-seat bench (with high-back seat) on copilot side is
improving comfort and provide transport capacity up to 7 people, including
the pilot.
Front two seat bench mounted in place of copilot seat.
BENEFITS
Increased passenger transport capacity.
Improves the passenger comfort through the installation of a high-back seat.
Replacement of belts by two safety winder reels harness.
New back cushion.

WEIGHT

MOMENT

GROUNDING

+ 5.1 kg

3.37 m.kg

5 to 10 days
PRE-POST REQUISITE / EFFECTIVITY
Applicable to helicopters pre-MOD 07-4280 (change the SMS block by a multi block
logical).

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Structures

40 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

AS350 PRE MOD OP0046, OP0565, 072444, OP1297, OP1298, 072620, 072603 CFT, 073022 (CFT and STD), 074229 and 074280, POST MOD
072603 STD

AS350 PRE MOD OP0046, OP0565, 072444, OP1297, OP1298, 072620, 072603 STD, 073022 (CFT and STD), 074229 and 074280, POST MOD
072603 CFT

AS350 PRE MOD OP0046, OP0565, 072444, 072620, 072603 CFT, 073022 (CFT and STD), 074229 and 074280, POST MOD OP1297, OP1298 and
072603 STD

AS350 PRE MOD OP0046, OP0565, 072444, 072620, 072603 STD, 073022 (CFT and STD), 074229 and 074280, POST MOD OP1297, OP1298 and
072603 CFT

AS350 PRE MOD OP0046, OP0565, OP1297, OP1298, 072620, 072603 CFT, 073022 (CFT and STD), 074229 and 074280, POST MOD 072444,and
072603 STD

AS350 PRE MOD OP0046, OP0565, OP1297, OP1298, 072620, 072603 STD, 073022 (CFT and STD), 074229 and 074280, POST MOD 072444,and
072603 CFT

AS350 PRE MOD OP0046, OP0565, 072620, 072603 CFT, 073022 (CFT and STD), 074229 and 074280, POST MOD 072444, OP1297, OP1298 and
072603 STD

AS350 PRE MOD OP0046, OP0565, 072620, 072603 STD, 073022 (CFT and STD), 074229 and 074280, POST MOD 072444, OP1297, OP1298 and
072603 CFT

AS350 PRE MOD OP1297, OP1298, 072620, 072603 (STD and CFT), 073022 CFT , 074229 and 074280, POST MOD OP0046, OP0565, 072444 and
073022 STD

10

AS350 PRE MOD OP1297, OP1298, 072620, 072603 (STD and CFT), 073022 STD , 074229 and 074280, POST MOD OP0046, OP0565, 072444 and
073022 CFT

11

AS350 PRE MOD 072620, 072603 (STD and CFT), 073022 CFT, 074229 and 074280, POST MOD OP1297, OP1298, OP0046, OP0565, 072444 and
073022 STD

12

AS350 PRE MOD 072620, 072603 (STD and CFT), 073022 STD, 074229 and 074280, POST MOD OP1297, OP1298, OP0046, OP0565, 072444 and
073022 CFT

13

AS350 PRE MOD OP1297, OP1298, 072603 (STD and CFT), 073022 CFT, 074229 and 074280, POST MOD OP0046, OP0565, 072620, 072444 and
073022 STD

14

AS350 PRE MOD OP1297, OP1298, 072603 (STD and CFT), 073022 STD, 074229 and 074280, POST MOD OP0046, OP0565, 072620, 072444 and
073022 CFT

15

AS350 PRE MOD 072603 (STD and CFT), 073022 CFT, 074229 and 074280, POST MOD OP0046, OP0565, OP1297, OP1298, 072620, 072444 and
073022 STD

16

AS350 PRE MOD 072603 (STD and CFT), 073022 STD, 074229 and 074280, POST MOD OP0046, OP0565, OP1297, OP1298, 072620, 072444 and
073022 CFT

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

46

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

17

AS350 PRE MOD OP1297, OP1298, 072603 (STD and CFT), 073022 (CFT and STD) and 074280, POST MOD OP0046, OP0565, 072620, 072444 and
074229

18

AS350 PRE MOD 072603 (STD and CFT), 073022 (CFT and STD) and 074280, POST MOD OP0046, OP0565, OP1297, OP1298, 072620, 072444 and
074229

19

AS350 PRE MOD OP1297, OP1298, 072603 (STD and CFT), 073022 (CFT and STD) and 074229, POST MOD OP0046, OP0565, 072620, 072444 and
074280

20

AS350 PRE MOD 072603 (STD and CFT), 073022 (CFT and STD) and 074229, POST MOD OP0046, OP0565, OP1297, OP1298, 072620, 072444 and
074280

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A0724440071

Relocation Taps P2 KIT

1, 2, 3, 4

12 weeks

350A0730220071

Two Seats Bench RP Kit

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12

20 weeks

350A0719830073

Two-Seater Bench Seat Installation Kit

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12, 13, 14, 15, 16, 17,
18, 19, 20

20 weeks

350A0447600002

Kit, Seat, Cover, HAR "A"

1, 3, 5, 7

20 weeks

350A00015105CB

Kit Mousse / Housse Banq. Biplace Confort

10, 12, 14, 16

20 weeks

350A8221820671

LH Slide Door Threshold Adapat Kit

13, 14, 15, 16, 17, 18,


19, 20

28 weeks

350A0742370071

Two Seats Bench RP Kit

17, 18

20 weeks

350A0743440071

Two-Seater Bench Seat Install Kit RP

19, 2

40 weeks

350A04476000CA

Mous/Hous Banq Bi Pl.Av Gris

2, 4, 6, 8

20 weeks

350A0726550071

Kit RetrofitTravel Baran

3, 4, 7, 8, 11, 12, 15, 16,


18, 20

12 weeks

350A8296130071

LH Slide Door Fairing Adapt Kit

9, 10, 11, 12, 13, 14, 15,


16, 17, 18, 19, 20

20 weeks

350A00015104CB

Kit Mousse / Housse Banq. Biplace Standard

9, 11, 13, 15

20 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

350A04-4760-0002

Cover/Foam STD

All Configurations

350A04476000CA

Cover/Foam CFT

All Configurations

350A00015104CB

Cover/Foam STD

All Configurations

350A00015105CB

Cover/Foam CFT

All Configurations

BT2

Shapped black rubber

All Configurations

1m

EN3628-0,8

Safety wire

All Configurations

2m

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

8161245

AOV Drilling Board

All Configurations

On request

On request

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

47

Cabin & Cabin Systems

GTX330 (mode S) Garmin Transponder for AS350


Applicable to version(s) : B2, B3
Installation of GARMIN transponder GTX 330 mode "S" as replacement for GTX
327 mode "C". This equipment provides information to the air traffic control
services. The GTX 330 uses the mode "S" in addition to modes "A" and "C"
(existing on GTX 327).
The GARMIN transponder GTX 330 is a radio transceiver which uses radar frequencies. The transponder receives interrogations from a ground radar or an onboard
collision avoidance system or TCAS (Traffic Alert and Collision Avoidance System)
on 1,030 MHz and transmits its response by encoded pulses on the 1,090 MHz
frequency. The GTX 330 device supports the IDENT function which allows SPI pulses
(Special Position Identification) to be activated for 18 seconds. The GTX 330 transponder responds interrogations from the ATC radar beacon system or ATCRBS (Air
Traffic Control Radar Beacon System) mode "A", mode "C" and mode "S".
BENEFITS
Requirement set by the European mandate for mode S level 2 surveillance.
Complying with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Transmission of a specific identity code (mode "S").

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.

WEIGHT

MOMENT

GROUNDING

+ 2.10 kg*

3.1 m.kg**

4 days

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

25 hours

Structures

10 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

B2 B3 versions PRE MOD OP3184, 073273 et 073274 (Bloc Honeywell)

B2 B3 versions POST MOD OP3184 and PRE MOD 073273 et 073274 (Block Honeywell)

B2 B3 versions POST MOD OP3184 and POST MOD 073273 et 073274 (SMS Block)

B2 B3 versions POST MOD OP3184 and 074280 (Multi-Block)

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350AEGTX30171

GTX330 Installation Complement Kit

28 weeks

350AEGTX30071

GTX330 Installation Kit

1, 2, 3, 4

12 weeks

350AEGTX30E71

GTX330 Installation Equipment Kit

1, 2, 3, 4

12 weeks

350AEGTX30271

GTX330 Installation Complement Kit

2, 3

12 weeks

350AEGTX30371

GTX330 Installation Complement Kit

12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

48

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

EN2267-010A004S

Cable, Electric, 1 line

CONFIGURATION

REQUIRED QUANTITY

3m

NOTES
(*) (**) Complete installation

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

49

Cabin & Cabin Systems

Thales AHV16 Radio Altimeter with 100 Ft Alarm for AS350


Applicable to version(s) : B, B1, B2, B3, BA, BB, D
Installation of a radio altimeter with its 100-ft warning.
This equipment is used to measure the height of the aircraft from the ground. Activates a visual and oral warning when the height decreases below the value preselected by the pilot. Alarm triggered when the height decreases below a value that
cannot be selected by the pilot, set to 100 ft by the manufacturer.
BENEFITS
Supplementary navigational aid.
Installation in accordance with ICAO annex 6 Part III and EASA Part CAT (EU
Regulation n965/2012).

WEIGHT

MOMENT

GROUNDING

+ 4.56 kg*

19.66 m.kg

5 to 10 days
PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

On request

Avionics

On request

Composites

On request

Applicable to helicopters pre-Mod 07-4280 (change from SMS control panel to multi-unit). 100-ft warning option : applicable to helicopters B2, B3 post-MODs 073273
and 073274.

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) B2 or B3 POST MOD 074280

Version(s) B2 ou B3 POST MODs 073273/073274 et 073478/073479

Version(s) B2 POST MOD 073273/073274 et PRE MODs OP3276 and 073368

Version(s) B3 POST MOD 073273/073274 et PRE MODs OP3276 and 073368

Version(s) B3 POST MOD 073273/073274 et PRE MOD OP3276 et POST MOD 07336

Version(s) B2 POST MOD 073273/073274 et PRE MOD OP3276 et POST MOD 07336

Version(s) B2 ou B3 POST MOD 073273/073274 et POST MOD OP3276 et PRE MOD 073368

Version(s) B2 ou B3 POST MOD 073273/073274 et POST MOD OP3276 and 073368

Version(s) B2 PRE MOD 073273 and 073274

10

Version(s) B3 PRE MOD 073273 and 073274

11

Version(s) B, BA, BB, B1, D or L1 and for a radio altimeter Indicator in meters

12

Version(s) B, BA, BB, B1, D or L1 and for a radio altimeter Indicator in meters

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A61266523

Label Radio Alti

12 weeks

350A8265520571

FP and RP Kit Radio Alti AHV16

24 weeks

350A0852590171

Kit Complementary Radio Alti B3

10

12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

50

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8263690171

Kit Complementary Radio Alti B3 (Meter)

11

24 weeks

350A8265520071

FP and RP Radio - Alti AHV16 Inst. Kit

11, 12

24 weeks

350A8263690071

Kit Complementary Radio Alti IND821

12

24 weeks

350A8265520471

FP and RP Kit Radio Alti AHV16

24 weeks

350A8265520371

FP & RP Radio-Alti Install. Kit

3, 4, 5, 6

28 weeks

350A6825260171

Module 84E Kit

3, 4, 5, 6, 7, 8

24 weeks

350A68527300AA

Faisceau Rattrapage Radio-Alti

4, 6

20 weeks

350A0844710071

Additionnal Kit, 739S Relay

5, 6, 8

24 weeks

350A0844400071

100Ft Alarm Retrofit Kit AS350

7, 8

24 weeks

350A0852910071

Kit Complementary Radio Alti B2

20 weeks

350A8265520271

FP & RP Radio-Alti Install. Kit

9, 1

24 weeks

CONFIGURATION

REQUIRED QUANTITY

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12

1m

ADDITIONAL REQUIRED SPARES


REFERENCE
EN2267010A004S

PRODUCT DESCRIPTION
Cable, Electric, 1 line

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

CEL992210-00

Testing kit for Radio Altimeter

All Configurations

On request

On request

NOTES
* Weight for the complete installation. Possibility to install only the alarm 100 ft : Weight : +0.7 kg.
For helicopters AS350 B2 and B3, a 100-ft warning may be installed.
A second altimeter can be installed for helicopters IFR two-pilots.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

51

Cabin & Cabin Systems

Thales H321 EHM Standby Horizon for AS350


Applicable to version(s) : B2, B3
The Thales H321 EHM standby horizon is installed on the instrument panel
in order to duplicate the information relating to horizon datum points.
Installation of a Thales H321 Standby Horizon on the instrument panel. This system is powered by a standalone additional battery.
BENEFITS
Compliant with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Duplication of the information relating to horizon datum points.

WEIGHT

MOMENT

GROUNDING

+ 4.4 kg

None

1 day

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

6 hours

Structures

2 hours

Applicable to helicopters pre-Mod 07-4280 (change from SMS control panel to multi-unit). 100-ft warning option : applicable to helicopters B2, B3 post-MODs 073273
and 073274.

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Version(s) B2, B3, POST MOD 073273 and 073274, PRE MOD OP3393

KIT REFERENCES
REFERENCE

DESCRIPTION

350AOP33930071

Standby Horizon Kit

CONFIGURATION

LEAD-TIME

24 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

52

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Cabin & Cabin Systems

STC

Adjustable Glare Shield


Applicable to version(s) : B4
Adds an adjustable glare shield to the helicopter instrument panel.
The Adjustable Glare Shield modification kit allows tilting of the glare shield to adjust
to the pilots height.
BENEFITS
Improved comfort for tall pilots.
Easy to adjust by hand, while on the ground to upper or low position, depending
on the pilots height.

WEIGHT

MOMENT

+ 1.09 kg

1.06 m.kg

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.10041736

FAA

FAA.SR03286NY

KIT REFERENCES
REFERENCE

DESCRIPTION

130885114

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

53

Cabin & Cabin Systems

GTX330 (mode S) Garmin Transponder for EC130


Applicable to version(s) : B4
Installation of GARMIN transponder GTX 330 mode "S" as replacement for GTX
327 mode "C". This equipment provides information to the air traffic control
services. The GTX 330 uses the mode "S" in addition to modes "A" and "C"
(existing on GTX 327).
The GARMIN transponder GTX 330 is a radio transceiver which uses radar frequencies. The transponder receives interrogations from a ground radar or an onboard
collision avoidance system or TCAS (Traffic Alert and Collision Avoidance System)
on 1,030 MHz and transmits its response by encoded pulses on the 1,090 MHz
frequency. The GTX 330 device supports the IDENT function which allows SPI pulses
(Special Position Identification) to be activated for 18 seconds. The GTX 330 transponder responds interrogations from the ATC radar beacon system or ATCRBS (Air
Traffic Control Radar Beacon System) mode "A", mode "C" and mode "S".
BENEFITS
Requirement set by the European mandate for mode S level 2 surveillance.
Complying with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Transmission of a specific identity code (mode "S").

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.

WEIGHT

MOMENT

GROUNDING

+ 0.2 kg

0.169 m.kg

1 day

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

9 hours

Structures

3 hours

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
All B4

KIT REFERENCES

54

REFERENCE

DESCRIPTION

350A0852280071

GTX 327 converstion kit into 330

Standard Upgrades - e.AHSU-DEC-2014

CONFIGURATION

LEAD-TIME

24 weeks

www.airbushelicopters.com

Cabin & Cabin Systems

Thales AHV16 Radio Altimeter with 100 Ft Alarm for EC130 B4


Applicable to version(s) : B4
Installation of a radio altimeter with its 100-ft warning.
This equipment is used to measure the height of the aircraft from the ground. Activates a visual and oral warning when the height decreases below the value preselected by the pilot. Alarm triggered when the height decreases below a value that
cannot be selected by the pilot, set to 100 ft by the manufacturer.
BENEFITS
Supplementary navigational aid.
Installation in accordance with ICAO annex 6 Part III and EASA Part CAT (EU
Regulation n965/2012).

WEIGHT

MOMENT

GROUNDING

+ 4.56 kg*

19.66 m.kg

5 to 10 days
PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME

Applicable to aircraft post-MOD 07-3537, control panel 30 Alpha (SMS).

QUALIFICATION

INSTALLATION DURATION

On request

On request

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) POST MOD 073587, PRE MOD 074363

POST MOD 073537, 073540, 073245 et 073538 and PRE MOD 073587

POSTMOD 073537, 073540, 073245 et PREMOD 073538, 073587

POST MOD OP3720,OP2893,OP2913 and OP3668, PRE MOD 073537, 073540 and 073245

POST MOD OP2893, OP2913 and OP3668, PRE MOD OP3720, 073537, 073540 and 073245

POST MOD 073537, OP2998 and 073587

POST MOD 073537, OP2998 and PRE MOD 073587

POST MOD 073537, 073587, OP2998 and 073514 or 073850

POST MOD 073537, OP2998 and 073514 or 073850, PRE MOD 073587

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A0734340171

Radio-Alt with Alarm 100 Ft Compl. Kit 2

12 weeks

350A0734340071

Radio-Alt with Alarm 100 Ft Compl. Kit 1

1, 2, 3

12 weeks

350R6921202371

RA AHV16 Alarm 100 FT SMS Compl. Kit 3

1, 2, 3

12 weeks

350AB4HV160071

Radio Alti Compl. Fixed Parts Kit

1, 2, 3, 4, 5

28 weeks

350AEAHV160071

Radio Alti AHV16 Fixed Parts Kit

1, 2, 3, 4, 5

24 weeks

350AEAHV160E71

Rad Alti Equip.Communal Kit

1, 2, 3, 4, 5

24 weeks

350AEAHV161E71

Rad Alti Warning Comp. Kit

1, 2, 3, 4, 5, 6, 7, 8, 9

24 weeks

350A0734340371

Radio-Alt with Alarm 100 Ft Compl. Kit 4

1, 6, 8

12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

55

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350R6591200271

RA AHV16 Alarm 100 FT SMS Compl. Kit 2

12 weeks

350RB4HV160071

Radio-Alt with Alarm 100 Ft Compl. Kit 3

2, 3, 4, 5

28 weeks

350A0734340471

Radio-Alt with Alarm 100 Ft Compl. Kit 5

2, 3, 7, 9

12 weeks

350R6591200171

RA AHV16 Alarm 100 FT SMS Compl. Kit 1

12 weeks

350R6901000071

RA AHV16 Alarm 100 FT Honn. Compl. Kit 1

4, 5

12 weeks

350A6852350371

Add Alarm 100Ft Rad-Alti Compl.Kit 3

6, 7, 8, 9

12 weeks

350A0844400172

Add Alarm 100Ft Rad-Alti Compl.Kit 1

6, 8

12 weeks

350A0844400271

Add Alarm 100Ft Rad-Alti Compl.Kit 2

7, 9

12 weeks

350A6825260071

Module 84E Kit

24 weeks

350A685260071

Module 84E Kit

20 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

E00431C0P

Binding clamp

1, 2, 3, 4, 5

30

E00433C0P

Binding clamp

1, 2, 3, 4, 5

30

E00434C0P

Binding clamp

1, 2, 3, 4, 5

30

VG95343T05F005M

SHEATH,HT-SHRINK.,UNINFL

1, 2, 3, 4, 5

1m

BT2

EXTRUS. RUBBER BLACK

1, 2, 3, 4, 5, 6, 7, 8, 9

250 mm

350AEAHV161E71

RAD ALTI WARNING COMP. KIT

6, 7, 8

VG95343T05A010A

SHEATH,HT-SHRINK.,UNINFL

6, 7, 8, 9

1m

NOTES
* Weight for the complete installation. Possibility to install only the alarm 100 ft : Weight : + 0.7 kg.
A second altimeter can be installed for helicopters IFR two-pilots.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

56

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Cabin & Cabin Systems

Thales AHV16 Radio Altimeter with 100 Ft Alarm for EC130 T2


Applicable to version(s) : T2
Installation of a radio altimeter with its 100-ft warning.
This equipment is used to measure the height of the aircraft from the ground. Activates a visual and oral warning when the height decreases below the value preselected by the pilot. Alarm triggered when the height decreases below a value that
cannot be selected by the pilot, set to 100 ft by the manufacturer.
BENEFITS
Supplementary navigational aid.
Installation in accordance with ICAO annex 6 Part III and EASA Part CAT (EU
Regulation n965/2012).

WEIGHT

MOMENT

GROUNDING

+ 5.6 kg

19.66 m.kg

5 to 10 days
PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME

Not Applicable.

QUALIFICATION

INSTALLATION DURATION

Structure

36 hours

Avionics

29 hours

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
POST MOD 074363 (multibloc) and PRE MOD OP4372 (installation radio-alti AHV16)

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350AEAHV160071

Radio Alti AHV16 Fixed Parts Kit

24 weeks

350AOP43720071

Radio Alti OP4372 Fixed Parts Kit

12 weeks

350AEAHV160E71

RAD Alti Equip. Communal Kit

24 weeks

350AEAHV161E71

RAD Alti Warning Comp. Kit

24 weeks

350A6826160E71

Radio Alti AHV16+ Equipment Kit

24 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

VG95343T05A010A

SHRINKTUBE BK

1m

E00431C0P

Binding clamp

30

E00434C0P

Binding clamp

30

E00433C0P

Binding clamp

30

E07180230

HEAT SHRINKABLE SLEEVE

1m

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

57

Cabin & Cabin Systems

STC

Battery Relocation Kit


Applicable to version(s) : F1, F2
Battery relocation from the RH cargo compartment to the tail boom.
The AS355 Battery Relocation Kit provides provisions to install a high capacity lead
acid or nickel cadmium battery in the tail boom removing the standard aircraft battery located in the right hand (RH) cargo compartment.It reduces the need for aft
aircraft ballast and increases the usable space in the RH cargo compartment. The
battery is mounted on a removable tray in the left hand (LH) side of the tail boom.
The battery relocation kit is ideal for balancing aircraft equipped with heavily loaded
instrument panels.
BENEFITS
Increases RH cargo capacity.
Reduces the need for tail boom ballast.
The battery can be quickly disconnected, and can be removed while wearing
winter gloves.

WEIGHT
*

MOMENT
**

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.IM.R.S.01073

FAA

FAA.SR00800NY

KIT REFERENCES
REFERENCE

DESCRIPTION

355700324

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
* Lead-Acid : + 27.1 kg (lead acid) / NiCad : + 24 kg
** Lead-Acid : + 257.18 m.kg / NiCad : + 227.76 m.kg

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772

58

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Cabin & Cabin Systems

GTX330 (mode S) Garmin Transponder for AS355


Applicable to version(s) : N, NP
Installation of GARMIN transponder GTX 330 mode "S" as replacement for GTX
327 mode "C". This equipment provides information to the air traffic control
services. The GTX 330 uses the mode "S" in addition to modes "A" and "C"
(existing on GTX 327).
The GARMIN transponder GTX 330 is a radio transceiver which uses radar frequencies. The transponder receives interrogations from a ground radar or an onboard
collision avoidance system or TCAS (Traffic Alert and Collision Avoidance System)
on 1,030 MHz and transmits its response by encoded pulses on the 1,090 MHz
frequency. The GTX 330 device supports the IDENT function which allows SPI pulses
(Special Position Identification) to be activated for 18 seconds. The GTX 330 transponder responds interrogations from the ATC radar beacon system or ATCRBS (Air
Traffic Control Radar Beacon System) mode "A", mode "C" and mode "S".
BENEFITS
Requirement set by the European mandate for mode S level 2 surveillance.
Complying with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Transmission of a specific identity code (mode "S").

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.

WEIGHT

MOMENT

GROUNDING

Negligeable

1 day

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

5 hours

Avionics

8 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) NP PRE MOD OP3910 and OP3936

Version(s) N PRE MOD OP3296, POST MOD OP0471, OP0472 and 070915

Version(s) N equiped of "cyclone " fan, PRE MOD OP3296 , POST MOD OP0471, OP0472 and 070915

KIT REFERENCES
REFERENCE

DESCRIPTION

355A8260740071

FP and RP TDR GTX330 KIT AS355 NP

355A0852250071

TDR KT76A to GTX330 Kit

CONFIGURATION

LEAD-TIME

24 weeks

2, 3

24 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

DHS61211106

FLEXIBEL HOSE

1m

85007200010S8

GROMMET

E00435C0

Binding clamp

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

59

Cabin & Cabin Systems

Thales AHV16 Radio Altimeter with 100 Ft Alarm for AS355


Applicable to version(s) : NP
Installation of a radio altimeter with its 100-ft warning.
This equipment is used to measure the height of the aircraft from the ground. Activates a visual and oral warning when the height decreases below the value preselected by the pilot. Alarm triggered when the height decreases below a value that
cannot be selected by the pilot, set to 100 ft by the manufacturer.
BENEFITS
Supplementary navigational aid.
Installation in accordance with ICAO annex 6 Part III and EASA Part CAT (EU
Regulation n965/2012).

WEIGHT

MOMENT

GROUNDING

+ 4.56 kg*

19.66 m.kg

5 to 10 days
PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME

Not Applicable.

QUALIFICATION

INSTALLATION DURATION

Structures

On request

Avionics

On request

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) NP mono-pilote PRE MOD OP3912 and OP3937

Version(s) NP IFR bi-pilote PRE MOD OP3912, OP3937 and OP3957

Version(s) NP mono-pilote POST MOD OP3912 et OP3937

Version(s) NP IFR bi-pilote POST MOD OP3912 et OP3937 and PRE MOD OP3957

Version(s) NP IFR bi-pilote POST MOD OP3912, OP3937 et OP3957

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

355A8260760171

FP and RP Radio - Alti AHV16 Inst Kit

1, 2

24 weeks

355AOP39570071

Compl Kit 2Nd Indic R/A Instal

2, 4

28 weeks

355A0844430071

100 Ft Alarm Retrofit Kit AS355

3, 4, 5

24 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

E0261CF22U

Cable Electrical

3, 4, 5

1m

LM53611-005W

Connector, White

3, 4, 5

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

60

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

CEL992210-00

Testing box "simulation AHV16"

All Configurations

On request

On request

NOTES
* Weight for the complete installation. Possibility to install only the alarm 100 ft : Weight : + 0.7 kg.
A second altimeter can be installed for helicopters IFR two-pilots.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

61

Cabin & Cabin Systems

Thales H321 EHM Standby Horizon for AS355


Applicable to version(s) : NP
The Thales H321 EHM standby horizon is installed on the instrument panel
in order to duplicate the information relating to horizon datum points.
Installation of a Thales H321 Standby Horizon on the instrument panel. This system is powered by a standalone additional battery.
BENEFITS
Compliant with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Duplication of the information relating to horizon datum points.

WEIGHT

MOMENT

GROUNDING

+ 4.4 kg

Negligeable

1 day

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

6 hours

Structures

2 hours

Not Applicable.

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Version(s) NP, PRE MOD OP3948

KIT REFERENCES
REFERENCE

DESCRIPTION

355AOP39480071

Standby Horizon Kit

CONFIGURATION

LEAD-TIME

24 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

62

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

CARGO
EXPANSION

Cargo Expansion

STC

Cargo Pods "Squirrel Cheecks" for AS350


Applicable to version(s) : D, B, BA, B1, B2, B3
This installation increases the helicopter cargo compartments.
The AS350 Cargo Pods increase the volume of both the left hand (LH) and right
hand (RH) cargo compartments. They can be installed individually or in pairs. The
composite material pod has a hinged door which opens widely for easy access to
the storage area and is held open by a gas strut. The door fastens securely for flight
with three positive latches. The installation also includes a door open warning annunciator.The upper portion of the cargo pod surface includes an excellent standing
area for maintenance activities. The fuel filler and EPU access are unaffected. The
cargo pods are ideal for utility missions, tourism and corporate passenger transport.
BENEFITS
Increases the cargo load capacity by 70% over the standard AS350 cargo
compartment.
Increases cargo volume capacity by 90% over the standard AS350 cargo compartment.
Eases access.
Platform for maintenance.
Aerodynamic design.
Dual or single installation.

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS

WEIGHT

MOMENT

+ 32 kg

112.96 m.kg*

GROUNDING

EASA

EASA.IM.R.S.01031

FAA

FAA.SR00699NY

KIT REFERENCES
REFERENCE

DESCRIPTION

350200814824

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
Can be installed individually or in pairs.
* Per Side.

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772

64

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Cargo Expansion

STC

Cargo Pods "Squirrel Cheecks" for EC130


Applicable to version(s) : B4
This installation increases the helicopter cargo compartments.
The EC130 Cargo Pods increase the volume of both the left hand (LH) and right
hand (RH) cargo compartments. They can be installed individually or in pairs. The
composite material pod has a hinged door which opens widely for easy access to
the storage area and is held open by a gas strut. The door fastens securely for flight
with three positive latches. The installation also includes a door open warning annunciator.The upper portion of the cargo pod surface includes an excellent standing
area for maintenance activities. The fuel filler and EPU access are unaffected. The
cargo pods are ideal for utility missions, tourism and corporate passenger transport.
BENEFITS
Increases the cargo load capacity by 35% over the standard EC130 cargo
compartment.
Eases access to the engine deck and provides a good maintenance platform.
Aerodynamic design.
Dual or single installation.
PRE-POST REQUISITE / EFFECTIVITY
Not applicable.
WEIGHT

MOMENT

+ 19.9 kg

70.64 m.kg

GROUNDING
APPROVALS
EASA

EASA.IM.R.S.01410

FAA

FAA.SR2016NY

KIT REFERENCES
REFERENCE

DESCRIPTION

130201024

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
The cargo doors must be installed in pairs.

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

65

Cargo Expansion

STC

Cargo Pods "Squirrel Cheecks" for AS355


Applicable to version(s) : E, F, F1, F2
This installation increases the helicopter cargo compartments.
The AS355 Cargo Pods increase the volume of both the left hand (LH) and right
hand (RH) cargo compartments. They can be installed individually or in pairs. The
composite material pod has a hinged door which opens widely for easy access to
the storage area and is held open by a gas strut. The door fastens securely for flight
with three positive latches. The installation also includes a door open warning annunciator.The upper portion of the cargo pod surface includes an excellent standing
area for maintenance activities. The fuel filler and EPU access are unaffected. The
cargo pods are ideal for utility missions, tourism and corporate passenger transport.
BENEFITS
Increases the cargo load capacity by 70% over the standard AS350 cargo
compartment.
Increases cargo volume capacity by 90% over the standard AS350 cargo compartment.
Eases access.
Platform for maintenance.
Aerodynamic design.
Dual or single installation.

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS

WEIGHT

MOMENT

+ 32 kg

112.96 m.kg*

GROUNDING

EASA

EASA.IM.R.S.01031

FAA

FAA.SR00795NY

KIT REFERENCES
REFERENCE

DESCRIPTION

355200814824

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
Can be installed individually or in pairs.
* Per Side.

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772

66

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

DOORS & WINDOWS

Doors & Windows

STC

Forward Opening Rear Cargo Doors for AS350


Applicable to version(s) : D, B, BA, B1, B2, B3
The original rear cargo door is replaced by a forwards opening door.
The AS350 Forward Opening Rear Cargo Door replaces the existing door. The dualhinged side mounted door improves access for loading and unloading of the rear
cargo compartment.
BENEFITS
Facilitates maintenance by allowing easy access.
Facilitates loading and unloading.
Equipped with a gas strut to keep door in open position.

WEIGHT

MOMENT

**

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.IM.R.S.01321

FAA

FAA.SR00676NY

KIT REFERENCES
REFERENCE

DESCRIPTION

350201014

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
* Same as standard door
** Same as standard door

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772

68

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Doors & Windows

STC

Forward Opening Rear Cargo Doors for AS355


Applicable to version(s) : E, F, F1, F2
The original rear cargo door is replaced by a forwards opening door.
The AS355 Forward Opening Rear Cargo Door replaces the existing door. The dualhinged side mounted door improves access for loading and unloading of the rear
cargo compartment.
BENEFITS
Facilitates maintenance by allowing easy access.
Facilitates loading and unloading.
Equipped with a gas strut to keep door in open position.

WEIGHT

MOMENT

**

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.
APPROVALS
EASA

EASA.IM.R.S.01321

FAA

FAA.SR00678NY

KIT REFERENCES
REFERENCE

DESCRIPTION

350201014

Complete Package

CONFIGURATION

LEAD-TIME

On request

On request

NOTES
* Same as standard door
** Same as standard door

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

69

EXTERNAL LOADS

External Loads

Breeze Electrical Hoist (204 kg/450 lb) for AS350


Applicable to version(s) : B3
Installation of both fixed and removable part of the Breeze electrical hoist
enabled to hoisting loads up to 204 kg/ 450 lbs at variable speed.
Swiveling tubular arm equipped with a two-position locking device. The potentiometer enables to adapt the speed and direction of the unwound cable. Dual
emergency jettison device controlled by the pilot and hoist operator. Cable length:
50 meters.
The number of consecutive cycles is unlimited.
BENEFITS
Increases of capacities enabling to carry out a wide range of missions.
Emergency jettison device directly controlled by the pilot.

WEIGHT

MOMENT

GROUNDING

+ 47.5 kg*

5 days
PRE-POST REQUISITE / EFFECTIVITY
Applicable to AS350 B3 Arriel 2B and Arriel 2B1. Requires the installation of the
200-A starter generator. Cannot be operated at the same time as some installations.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

20 hours

Structures

30 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) B3, PRE MOD 073808, 073273/073274, 073368, 073450, 074280, OP3000 and OP0807, 073004

Version(s) B3, PRE MOD 073808, 073273/073274, 073368, 073450, 074280, OP3000 , 073004, POST MOD OP0807

Version(s) B3, PRE MOD 073273/073274, 073368, 073450, 074280, OP3000, OP0807 and 073004, POST MOD 073808

Version(s) B3, PRE MOD 073273/073274, 073368, 073450, 074280, OP3000 and 073004, POST MOD 073808 and OP0807

Version(s) B3, PRE MOD 073368, 073450, 074280, OP3000, OP0807 and 073004, POST MOD 073808 and 073273/073274

Version(s) B3, PRE MOD 073368, 073450, 074280, OP3000 and 073004, POST MOD 073808, 073273/073274 and OP0807

Version(s) B3, PRE MOD 073450, 074280 and 073004, POST MOD 073808, 073273/073274, 073368 and OP3000

Version(s) B3, PRE MOD 074280 and 073004, POST MOD 073808, 073273/073274, 073368, OP3000 and 073450

Version(s) B3, PRE MOD 073004, POST MOD 073808, 073273/073274, 073368, OP3000, 073450 and 074280

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8403110372

450 Lbs Hoist Instal FP Kit

1, 2, 3, 4, 5, 6, 7, 8, 9

24 weeks

350A77138506

Shim Assy, Interior

1, 2

20 weeks

350A77138507

Shim Assy, Interior

1, 2

20 weeks

350A0738080171

450 Lbs Hoist Kit Compl Pre 073273 - 3274

1, 2, 3, 4

24 weeks

350A0730040071

Cowling Obturation Kit

1, 2, 3, 4, 5, 6, 7, 8

20 weeks

350AOP28130071

450 Lbs Hoist Removal Parts

1, 2, 3, 4, 5, 6, 7, 8, 9

32 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

71

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A0717870171

Long Footstep Instal Kit

1, 3, 5, 8

28 weeks

350A0717870071

Long Footstep Instal Kit

2, 4

28 weeks

350A0738080271

450 Lbs Hoist Kit Compl Post 073273 - 3274

5, 6

28 weeks

350A0733680071

Kit Complementary Hoist 450Lbs F.P

12 weeks

350A0742490071

New Label Jett and New Connect Kit

28 weeks

350A0742860071

Complementary Multi Block Kit

32 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

50D5EP1-6X16

Self-adhesive silicone strip

All Configurations

1m

200SGL130Q

Gene-starter

All Configurations

515-030

Gene-starter

All Configurations

704A38710039

Etoupille

All Configurations

ASNA2051DXJ4010

Rivet

All Configurations

350A77-1385-07

Equipped inner bilge

All Configurations

350A77-1385-06

Equipped outer bilge

All Configurations

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

4501K82-8003-00

Drilling/Cropping top cover and hoist

All Configurations

On request

On request

350A41-0185-4801

Drill tooling high steps

All Configurations

On request

On request

NOTES
* Total weight including Fixed and Mobile parts (Detail on request).

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

72

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

External Loads

Goodrich Electrical Hoist (136 kg/300 lb) for AS350


Applicable to version(s) : B3
This upgrade consists in the install of the Fixed Part (FP) and/or Removable
Parts (RP) of the rescue hoist reference 76370-140D, able to hoist a capacity of 136 kg (300 lb) in hovering configuration through the left side of the
helicopter.
Installation on the left side of the helicopter of both fixed and removable parts of
the Goodrich rescue hoist 76370-140D (Category 2) capable to well over a weight
of up 136 kg / 300 lb in high hover situation. Galvanized steel cable lenght of 132
ft (40 m).
BENEFITS
In passengers transport mission, the winchman's control and locking handles
in cabin can be removed.
A safety device stops the cable at either end.
At any moment during the operation the pilot can shear the hoist cable in the
event of an emergency.

PRE-POST REQUISITE / EFFECTIVITY


WEIGHT

MOMENT

GROUNDING

+ 43.6 kg

121 m.kg*

6 days

Input power : electric 28 VDC/60 A with 133 daN. This optional equipment is subject
to specific compatibility restrictions. For further information, please refer to the aircraft Table of Constraints in force.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Structure

38 hours

Mechanics

36 hours

Electrics

10 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Helicopter equipped with an SMS block (073273 and 073274) post-MOD 073808 (Fixed part adaptation, 300/450lb hoist),OP3802 (Structure capability
for 300/450lb hoist), OP3804 (450lb hoist capability), OP3000 (DART long foot board) and pre-MOD 073450 (Control grip modification: reorganization
of the collective pitch grip + replacement CI20/22A), 073004 (Blanking of the left cowling hole for the hoist), 073340 (column installation upon taking
squib test), OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb hoist), 350R840031.00 (Adaptation of hoist operator anchoring
ring)

Helicopter equipped with an SMS block (073273 and 073274) post-MOD OP0807 (Emergency flotation equipment), 073808 (300/450-lb hoist Fixed
Part adaptation), OP3802 (300/450lb hoist structure capability), OP3804 (450lb hoist capability) and pre-MOD 073450 (Control grip modification:
reorganization of the collective pitch grip + replacement CI20/22A), OP3000 (DART long foot board), 071787 (Hoist footboard), 073004 (Blanking of
left cowling hole for the hoist), 073340 (column installation upon taking squib test), OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP
300lb hoist), 350R840031.00 (Adaptation of hoist operator anchoring ring)

Helicopter equipped with an SMS block (073273 and 073274) post-MOD 073808 (300/450lb hoist Fixed Part adaptation), OP3802 (Structure capability
for 300/450lb hoist), OP3804 (450lb hoist capability) and pre-MOD OP0807 (Emergency flotation equipment), 073450 (Control grip modification:
reorganization of the collective pitch grip + replacement CI20/22A), OP3000 (DART long foot board), 071787 (Hoist footboard), 073004 (Blanking of left
cowling hole for hoist), 073340 (Column installation upon taking squib test), OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb
hoist), 350R840031.00 (Adaptation of hoist operator anchoring ring)

Helicopter equipped with an SMS block (073273 and 073274) post-MOD OP3000 (DART long foot board), 073450 (Control stick modification:
reorganization of the collective pitch grip + replacement CI20/22A), 073808 (300/450lb hoist Fixed Part adaptation), OP3802 (Structure capability for
300/450lb hoist), OP3804 (450lb hoist capability) and pre-MOD 073004 (Blanking of left cowling hole for hoist), 073340 (Column installation upon
taking squib test), OP3803 (structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb hoist), 074248 (Collective pitch grip modification: new
connection cable and label on the collective pitch grip), 350R840031.00 (Adaptation of hoist operator anchoring ring)

Helicopter equipped with an SMS block (073273 and 073274) post-MOD OP0807 (Emergency flotation equipment), 073450 (Control stick modification:
reorganization of the collective pitch grip + replacement CI20/22A), 073808 (300/450lb hoist Fixed Part adaptation), OP3802 (Structure capability for
300/450-lb hoist), OP3804 (450lb hoist capability) and pre-MOD OP3000 (DART long foot board), 071787 (Hoist footboard), 073004 (Blanking of left
cowling hole for hoist), 073340 (Column installation upon taking squib test), OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb
hoist), 074248 (Collective pitch grip modification: new connection cable and label on the collective pitch grip), 350R840031.00 (Adaptation of hoist
operator anchoring ring)

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

73

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Helicopter equipped with an SMS block (073273 and 073274) post-MOD 073450 (Control stick modification: reorganization of the collective pitch grip
+ replacement CI20/22A), 073808 (300/450lb hoist Fixed Part adaptation), OP3802 (Structure capability for 300/450lb hoist), OP3804 (450lb hoist
capability) and pre-MOD OP0807 (Emergency flotation equipment), 071787 (Hoist footboard), OP3000 (DART long foot board), 073004 (Blanking of left
cowling hole for hoist), 073340 (Column installation upon taking squib test), OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb
hoist), 074248 (Collective pitch grip modification: new connection cable and label on the collective pitch grip), 350R840031.00 (Adaptation of hoist
operator anchoring ring)

Helicopter equipped with an SMS block post-MOD OP3000 (DART long foot board), 073808 (Fixed part adaptation, 300/450lb hoist), OP3802 (Structure
capability for 300/450lb hoist), OP3804 (450lb hoist capability), 074280 (Replacement of SMS block with the logical Multi block) and pre-MOD
OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb hoist), 073004 (Blanking of left cowling hole for hoist), 073340 (column
installation upon taking squib test), 350A826545.02 by means of the MOD 074286 (Replacement of SMS block by the installation of Multi block due to
the selection of 300lb and 450lb Hoists), 350R840031.00 (Adaptation of hoist operator anchoring ring)

Helicopter equipped with multi block post-MOD OP0807 (Emergency flotation equipment), 073808 (300/450lb hoist Fixed Part adaptation), OP3802
(Structure capability for 300/450lb hoist), OP3804 (450lb hoist capability), 074280 (Replacement of SMS block with the logical Multi block) and
pre-MOD OP3000 (DART long foot board), 071787 (Hoist footboard), OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb hoist),
073004 (Blanking of left cowling hole for hoist), 073340 (column installation upon taking squib test), 350A826545.02 by means of the MOD 074286
(Replacement of SMS block by the installation of Multi block due to the selection of 300lb and 450lb Hoists), 350R840031.00 (Adaptation of hoist
operator anchoring ring)

Helicopter equipped with a multi block post-MOD 073808 (300/450lb hoist Fixed Part adaptation), OP3802 (Structure capability for 300/450lb
hoist), OP3804 (450lb hoist capability), 074280 (Replacement of SMS block with the logical Multi block) and pre-MOD OP0807 (Emergency flotation
equipment), OP3000 (DART long foot board), 071787 (Hoist footboard), OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb hoist),
073004 (Blanking of left cowling hole for hoist), 073340 (Column installation upon taking squib test), 350A826545.02 by means of the MOD 074286
(Replacement of SMS block by the installation of Multi block due to the selection of 300lb and 450lb Hoists), 350R840031.00 (Adaptation of hoist
operator anchoring ring)

10

Helicopter equipped with a Honeywell block post-MOD 071737 (New placement of the push buttons (optional impact), OP3000 ( DART long foot board),
OP3802 (Structure capability for 300/450lb hoist), OP3804 (450lb hoist capability), 073808 (300/450lb hoist Fixed Part adaptation) and pre-MOD
071833 (Wiring adaptation in the hoist circuit to control release), 073190 (Modification of the electrical fixed parts of the 300lb hoist (time-delay fuse),
OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb hoist), 073004 (Blanking of left cowling hole for hoist), 073340 (column
installation upon taking squib test), 350R840031.00 (Adaptation of hoist operator anchoring ring)

11

Helicopter equipped with a Honeywell block post-MOD OP0807 (Emergency flotation equipment), 071737 (New placement of the push buttons (optional
impact), OP3802 (Structure capability for 300/450lb hoist), OP3804 (450lb hoist capability), 073808 (300/450lb hoist Fixed Part adaptation) and
pre-MOD OP3000 ( DART long foot board), 071787 - (Hoist footboard), 071833 (Wiring adaptation in the hoist circuit to control release), 073190 (Modification of the electrical fixed parts of the 300lb hoist (time-delay fuse), OP3803 (Structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb hoist),
073004 (Blanking of left cowling hole for hoist), 073340 (column installation upon taking squib test), 350R840031.00 (Adaptation of hoist operator
anchoring ring)

12

Helicopter equipped with a Honeywell block post-MOD 071737 (New placement of the push buttons (optional impact), OP3802 (Structure capability
for 300/450lb hoist), OP3804 (450lb hoist capability), 073808 (300/450lb hoist Fixed Part adaptation),and pre-MOD OP0807 (Emergency flotation
equipment), OP3000 (DART long footboard), 071787 - (Hoist footboard), 071833 (Wiring adaptation in the hoist circuit to control release), 073190
(Modification of the electrical fixed parts of the 300lb hoist (time-delay fuse), OP3803 (structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb
hoist), 073004 (Blanking of left cowling hole for hoist), 073340 (Column installation upon taking squib test), 350R840031.00 (Adaptation of hoist
operator anchoring ring)

13

Helicopter equipped with a Honeywell block post-MOD 071737 (New placement of the push buttons (optional impact), OP3000 (DART long foot board)
and pre-MOD 073808 (300/450lb hoist Fixed Part adaptation), OP3802 (structure capability for 300/450lb hoist), OP3804 (450lb hoist capability),
071833 (Wiring adaptation in the hoist circuit to control release), 073190 (Modification of the electrical fixed parts of the 300lb hoist (time-delay fuse),
OP3803 (structure FP for 300/450lb hoist), OP3806 (Additional FP 300lb hoist), 073808 (300/450lb hoist Fixed Part adaptation), 073004 (Blanking of
left cowling hole for hoist), 073340 (column installation upon taking squib test), 350R840031.00 (Adaptation of hoist operator anchoring ring)

14

Helicopter equipped with a Honeywell block post-MOD 071737 (New placement of the push buttons (optional impact), OP0807 (Emergency flotation
equipment) and pre-MOD 071787 (Hoist footboard), 071833 (Wiring adaptation in the hoist circuit to control release), OP3000 (DART long foot board),
073004 (Blanking of left cowling hole for hoist), 073190 (Modification of the electrical fixed parts of the 300lb hoist (time-delay fuse), 073340 (Column
installation upon taking squib test), OP3802 (Structure capability for 300/450lb hoist), OP3804 (450lb hoist capability), OP3803 (FP structure for
300/450lb hoist), OP3806 (Additional FP 300lb hoist), 073808 (300/450lb hoist Fixed Part adaptation), 350R840031.00 (Adaptation of hoist operator
anchoring ring)

15

Helicopter equipped with a Honeywell block post-MOD 071737 (New placement of the push buttons (optional impact), and pre-MOD OP0807 (Emergency flotation equipment), 071787 (Hoist footboard), 071833 (Wiring adaptation in the hoist circuit to control release),- OP3000 (DART long foot board),
073004 (Blanking of left cowling hole for hoist), 073190 (Modification of the electrical fixed parts of the 300lb hoist (time-delay fuse), 073340 (Column
installation upon taking squib test), OP3802 (Structure capability for 300/450lb hoist), OP3804 (450lb hoist capability), OP3803 (Structure FP for
300/450lb hoist), OP3806 (Additional FP 300lb hoist), 073808 (300/450lb hoist Fixed Part adaptation), 350R840031.00 (Adaptation of hoist operator
anchoring ring)

16

Helicopter equipped with an SMS or multi block having had a Fixed Part 136kg Hoist installed and not having been fitted with removable parts (modifications 073306 and 350A828002.05)

17

Helicopter equipped with Honeywell block having had a Fixed Part 136kg hoist installed and not having been fitted with Removable Parts (modifications
073306 and 071499)

KIT REFERENCES

74

REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350AOP38060071

Supplementary FP SMS Block Kit (PRE-MOD 07340)

1, 2, 3

12 weeks

350AHOISTFP071

136kg Common Hoist FP Kit

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12, 13, 14, 15

20 weeks

350AOP38060171

Supplementary FP Honeywell Block Kit

10, 11, 12, 13, 14, 15

28 weeks

350AOP38020071

136kg Capability Kit

13, 14, 15

32 weeks

350A0710940071

Cutter Installation Kit

16

12 weeks

350AHOIST00E71

136kg Hoist Equipment Kit

16, 17

48 weeks

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350AHOIST01E71

Supplementary 136kg Hoist Equipment Kit

16, 17

12 weeks

350AHOISTRP071

136kg Common Hoist RP Kit

16, 17

48 weeks

350A0710940071 or
350A0710940171

Cutter Installation Kits

17

20 weeks

350A0717870071

Long footboard installation kit (with Flotta)

2, 5, 6, 8, 11, 12, 14, 15

28 weeks

350A0717870171

Long footboard installation kit (without Flotta)

3, 9

28 weeks

350A0742480071

Supplementary FP SMS block kit (post-MOD 073450)

4, 5, 6

12 weeks

350A0742860171

Supplementary FP multi block kit

7, 8, 9

12 weeks

NOTES
When the aircraft is not fitted with the standard left rear sliding door, all hoisting operations involve prior removal of the optional hinged left rear door.
*Maximum weight including skid and removable part.

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

75

External Loads

Onboard Systems Cargo Swing Fixed Parts for AS350


Applicable to version(s) : B2, B3
The Cargo Swing equipment is used to undersling heavy and voluminous loads
outside the helicopter for a maximum weight of 1,160 kg / 2257 lb by means
of an Onboard type cargo hook.
Installation of the fixed parts of a cargo swing (long line) enabling to perform lifting
operations with the cargo swing at a higher distance from the ground.
BENEFITS
Easier lifting operations.
Sling work possibilities increased.

WEIGHT

MOMENT

GROUNDING

+ 0.3 kg

Negligeable

3 days

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

24 hours

Applicable to helicopters pre-Mod 07-4280 (change from SMS control panel to multi-unit) equipped with a cargo swing.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350P0849600074

Lower Sling Set

On request

32 weeks

350A8280860071

Unit Sms Lower Sling Set

On request

32 weeks

350A8280860171

Unit Sms Lower Sling Set

On request

24 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

E0043-2C0

Frettage contact

All Configurations

20

E0043-3C0

Frettage contact

All Configurations

20

E0043-1C0

Frettage contact

All Configurations

20

640629-1

Mechanical coding

All Configurations

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

76

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

External Loads

Onboard Systems Cargo Swing Fixed Parts for EC130


Applicable to version(s) : B4
The Cargo Swing equipment is used to undersling heavy and voluminous loads
outside the helicopter for a maximum weight of 1,160 kg / 2257 lb by means
of an Onboard type cargo hook.
Cargo swing equipment used to undersling heavy and voluminous loads outside
the helicopter. Load indicator installed on the vertical mount of the pilots canopy.
BENEFITS
The stabilization system of this equipment enables to handle loads in hover
flight configuration, during acceleration and turns.
Reduces the moment applied by the underslung load to the helicopter.

WEIGHT

MOMENT

GROUNDING

+ 2.45 kg

3.48 m.kg

6 days
PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME

Applicable to aircraft equipped with SMS or Honeywell control panels.

QUALIFICATION

INSTALLATION DURATION

Electrics

19 hours

Structures

19 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) B4 with Honeywell Block (PRE MOD 073537, 073540 and 073245), PRE MOD OP 2914, 073281, 073428, 073581, OP3630 and 073595

Version(s) B4 with SMS Block (POST MOD 073537, 073540 and 073245), PRE MOD OP 2914, 073281, 073428, 073581, OP3630 and 073595

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8280360072

1160KGS C.Swing (FP) (Honeywell)

44 weeks

350A8280370072

C.Swing 1160kg Reinforcing Cradles

1, 2

24 weeks

350A82804801

RP Cargo Swing On Board EC130

1, 2

12 weeks

350A0735370071

(SMS) C.Swing 1160kg (FP)

44 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

E0043-6C0

Frettage contact

All Configurations

E0043-5C0

Frettage contact

All Configurations

20

E0043-7C0

Frettage contact

All Configurations

20

350A82-8048-01

Removable parts Cargo Swing

All Configurations

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

77

External Loads

Breeze Electrical Hoist (204 kg/450 lb) for AS355


Applicable to version(s) : F2, N, NP
The Breeze electrical hoist enables hoisting loads up to 204 kg/ 450 lbs at
variable speed.
Swiveling tubular arm equipped with a two-position locking device. The potentiometer enables to adapt the speed and direction of the unwound cable. Dual emergency
jettison device controlled by the pilot and hoist operator. Cable length: 50 meters.
The number of consecutive cycles is unlimited.
BENEFITS
Increases of capacities enabling to carry out a wide range of missions.
Emergency jettison device directly controlled by the pilot.

WEIGHT

MOMENT

GROUNDING

+ 47.5 kg*

5 days
PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

20 hours

Structures

30 hours

Requires the installation of the 200-A starter generator. Cannot be operated at the
same time as some installations*.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

355A0730670071

450 Lbs Hoist Installation Kit

On request

24 weeks

355A0730670171

450 Lbs Hoist PF Instal Kit

On request

24 weeks

355P0843920071

450 Lbs Hoist Complement Kit

On request

24 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

355A82-8035-00

Removable parts Hoist

All Configurations

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

4801S58-3519-20

Drilling/Cropping top cover BTP

All Configurations

On request

On request

NOTES
* Total weight including Fixed and Mobile parts (Detail on request).

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

78

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

LANDING GEARS

Landing Gears

Swiveling Retractable Landing Light for AS350


Applicable to version(s) : B2, B3
Installation of a 450 W white retractable and swiveling landing light located at
the front belly panel in replacement of the 150 W taxi light.
Installation of a 450 W white retractable and swiveling landing light located at the
front belly panel in replacement of the 150 W taxi light.
BENEFITS
Improves visibility during approach.
Range angle capacities : 110 vertically et 360 horizontally.

WEIGHT

MOMENT

GROUNDING

+ 3.43 kg

6.231 m.kg

0.5 day

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

3 jours

Mechanics

6 hours

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

On request

On request

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8265130072

Oriented Light Instaling

On request

24 weeks

350A8265130171

Oriented Light Instaling

On request

24 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

ASNA4018

Loctite 242

All Configurations

ALD

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

80

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Landing Gears

Swiveling Retractable Landing Light for EC130


Applicable to version(s) : B4
Installation of a 450 W white retractable and swiveling landing light located at
the front belly panel in replacement of the 150 W taxi light.
Retractable light installed at the front belly panel, off-centered to the left. Defection
angle : 85 vertically et 360 horizontally.
BENEFITS
Improves visibility during approach.

WEIGHT

MOMENT

GROUNDING

+ 4.29 kg

1.09 m.kg

2 days

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

7 hours

Structures

10 hours

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

On request

On request

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8265160072

Steerable Light Kit

All Configurations

20 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

81

PROTECTION
& MOORING

Protection & Mooring

Blade Folding System


Applicable to version(s) : B, B1, B2, B3, BA, BB, D
This system is used to reduce the helicopter dimensions when parked.
Reinforcement plates and anchoring points installed on tail boom and new specific
blade pins on MRH sleeves.
BENEFITS
Eases the following operations : camouflage, helicopter on ship, parking in a
hangar, long-lasting mooring and down time.
Can be performed by 2 operators in 3 minutes and under 45-knot winds in
any direction.

WEIGHT

MOMENT

GROUNDING

Negligeable

Negligeable

1 day

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

4 hours

Structures

4 hours

Not Applicable.

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

PRE MOD 076160, POST MOD 076209, POST MOD 076221 or POST ASB 62.00.24, PRE MOD 076222, PRE MOD 076232 and PRE SB 62.00.31, PRE
MOD 076227 and PRE SB 62.00.26

POST MOD 076160, POST MOD 076209, POST MOD 076222 or POST MOD 076233, PRE MOD 076232 and PRE SB 62.00.31, PRE MOD 076227 and
PRE SB 62.00.26

POST MOD 076160, POST MOD 076209, POST MOD 076222 or POST MOD 076233, POST MOD 076232 or POST SB 62.00.31, PRE MOD 076227 and
PRE SB 62.00.26

POST MOD 076160, POST MOD 076217, POST MOD 076222 or POST MOD 076233, POST MOD 076232 or POST SB 62.00.31, PRE MOD 076227 and
PRE SB 62.00.26

POST MOD 076160, POST MOD 076209, POST MOD 076217, POST MOD 076221 or POST ASB 62.00.24, PRE MOD 076222 and PRE MOD 076233, PRE
MOD 076232 and PRE SB 62.00.31, PRE MOD 076227 and PRE SB 62.00.26

POST MOD 076160, POST MOD 076209, POST MOD 076217, POST MOD 076222 or POST MOD 076233, PRE MOD 076232 and PRE MOD SB 62.00.31,
PRE MOD 076227 and PRE SB 62.00.26

POST MOD 076160, PRE MOD 076209, PRE MOD 076217, PRE MOD 076221 and PRE ASB 62.00.24, PRE MOD 076222 and PRE MOD 076233, PRE
MOD 076232 and PRE MOD SB 62.00.31, PRE MOD 076227 and PRE SB 62.00.26

POST MODpareils POST MOD 076160, PRE MOD 076209, PRE MOD 076217, PRE MOD 076221 and PRE ASB 62.00.24, PRE MOD 076232 and PRE MOD
SB 62.00.31, POST MOD 076227 or POST SB 62.00.26

POST MOD 076160, POST MOD 076209, PRE MOD 076217, POST ASB 62.00.24 (POST MOD 076221), PRE MOD 076222, PRE MOD 076232 and PRE
MOD SB 62.00.31, PRE MOD 076227 and PRE SB 62.00.26

10

PRE MOD 076160, PRE MOD 076217, PRE MOD 076221 and PRE MOD ASB 62.00.24, PRE MOD 076232 and PRE SB 62.00.31, POST MOD 076227 or
POST SB 62.00.26

11

POST MOD 076160, PRE MOD 076209, PRE MOD 076221 and PRE MOD ASB 62.00.24, PRE MOD 076222 and PRE MOD 076233, PRE MOD 076232
and PRE MOD SB 62.00.31, PRE MOD 076227 and PRE SB 62.00.26

12

PRE MOD 076160, PRE MOD 076217, PRE MOD 076221 and PRE ASB 62.00.24, PRE MOD 076232 and PRE SB 62.00.31, POST MOD 076227 or POST
SB 62.00.26

13

PRE MOD 076160, PRE MOD 076217, PRE MOD 076221 and PRE MOD ASB 62.00.24, PRE MOD 076232 and PRE MOD SB 62.00.31, PRE MOD 076227
and PRE MOD SB 62.00.26

14

POST MOD 076160, PRE MOD 076209, PRE MOD 076221 and PRE MOD ASB 62.00.24, PRE MOD 076222 and PRE MOD 076233, PRE MOD 076232
and PRE SB 62.00.31, POST MOD 076227 or POST SB 62.00.26

15

PRE MOD 076160, PRE MOD 076217, PRE MOD 076221 and PRE MOD ASB 62.00.24, PRE MOD 076232 and PRE MOD SB 62.00.31, PRE MOD 076227
and PRE SB 62.00.26

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

83

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

REQUIRED QUANTITY

350AOP63050171

Fixed Parts Blade Folding

28 weeks

350A31186120

Weight Balancing

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12, 13, 14, 15

28 weeks

29

350A0714970171

Fixed Parts Blade Folding

10

28 weeks

350A0714970571

Fixed Parts Blade Folding

12

28 weeks

350A0714970471

Fixed Parts Blade Folding

13

28 weeks

350AOP63050471

Fixed Parts Blade Folding

14

28 weeks

350A0714970871

Fixed Parts Blade Folding

15

28 weeks

350AOP63050271

Fixed Parts Blade Folding

2, 11

28 weeks

350AOP63050371

Fixed Parts Blade Folding

28 weeks

350A0726680171

Fixed Parts Blade Folding

28 weeks

350A0726680271

Fixed Parts Blade Folding

28 weeks

350A0726680371

Fixed Parts Blade Folding

28 weeks

350A0726680471

Fixed Parts Blade Folding

28 weeks

350A0726680571

Fixed Parts Blade Folding

28 weeks

350A0726680671

Fixed Parts Blade Folding

28 weeks

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY
9
1

23310CA030035

PIN, SPLIT

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12, 13, 14, 15

355A92115004

FOLDING ASSY, BLADES

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12, 13, 14, 15

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

84

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Protection & Mooring

STC

Blade Tie Down Kit for AS350


Applicable to version(s) : D, B, BA, B1, B2, B3
Blade tie-down kit installation.
The Blade Tie-Down Kit prevents the blades from flapping in windy conditions while
the helicopter is parked.
BENEFITS
Easy and efficient one-person installation.
No additional equipment required.
Compact and light ground support equipment for on-board storage.

WEIGHT

MOMENT

+ 0.14 kg

0.21 m.kg

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.
APPROVALS
EASA

EASA.10043426

FAA

FAA.SR00540NY

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350700414

Complete Package

On request

On request

350700424

Fixed Provisions

On request

On request

13070047401

Detachable Kit

On request

On request

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

85

Protection & Mooring

STC

Blade-Tie Down Kit for EC130


Applicable to version(s) : B4
Blade tie-down kit installation.
The Blade Tie-Down Kit prevents the blades from flapping in windy conditions while
the helicopter is parked.
BENEFITS
Easy and efficient one-person installation.
No additional equipment required.
Compact and light ground support equipment for on-board storage.

WEIGHT

MOMENT

+ 0.13 kg*

0.24 m.kg

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.
APPROVALS
EASA

EASA. 0043426

FAA

FAA.SR00540NY

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

130700414

Complete Kit

On request

On request

130700424

Fixed Provisions

On request

On request

13070047401

Detachable Kit

On request

On request

NOTES
* Weight details: Permanent installation only: + 0.13 kg / Strapping kit : + 1.05 kg
Can be installed individually or in pairs.

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772

86

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Protection & Mooring

STC

Blade Tie Down Kit for AS355


Applicable to version(s) : E, F, F1, F2
Blade tie-down kit installation.
The Blade Tie-Down Kit prevents the blades from flapping in windy conditions while
the helicopter is parked.
BENEFITS
Easy and efficient one-person installation.
No additional equipment required.
Compact and light ground support equipment for on-board storage.

WEIGHT

MOMENT

+ 0.14 kg

0.21 m.kg

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.
APPROVALS
EASA

EASA.10043426

FAA

FAA.SR00539NY

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350700414

Complete Package

On request

On request

350700424

Fixed Provisions

On request

On request

13070047401

Detachable Kit

On request

On request

FOR ORDER PLACEMENT, PLEASE CONTACT AIRBUS HELICOPTERS CANADA LIMITED AT OPTIONS@EUROCOPTER.CA OR BY PHONE AT 905-871-7772
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

87

Protection & Mooring

Installation of Mooring Rings


Applicable to version(s) : E, F, F1, F2, N, NP
Installation of mooring rings for easier access to the forward mooring point in
addition to strong wind mooring.

BENEFITS
Aircraft quick mooring.
Enables lashing after aircraft deck-landing.

WEIGHT

MOMENT

GROUNDING

+ 1.2 kg

3.25 m.kg

2 hours

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Structures

2 hours

PRE-POST REQUISITE / EFFECTIVITY


Installation is possible on high landing gear and low landing gear.

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) E, F, F1, F2, N, NP equiped with high skid

Version(s) E, F, F1, F2, N, NP equiped with low skid

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8280250071

High L/G Mooring Ring Kit

28 weeks

350A8280250171

Low L/G Mooring Ring Kit

28 weeks

CONFIGURATION

REQUIRED QUANTITY

1, 2

0.5 m

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

DHS28511101

Antiskid

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

88

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

SAFETY

Safety

Aerazur Emergency Floatation Gear for AS350


Applicable to version(s) : B, B1, B2, B3, BA, BB, D
The emergency floatation equipment is intended to keep the helicopter afloat
after ditching. It aids in keeping the rotorcraft sufficiently upright to allow safe
and orderly evacuation. This equipment is attached to the helicopter's landing
gear.
Two separated flotation gear with four strechable wateright compartmentson either
side of the helicopter, triggered simultaneously.
BENEFITS
Sea-State 7 approval*.
Fully compatible with towing tooling.
OEM warranty.
Strong product liability.
Extends the helicopter's operational capabilities to maritime areas.
AH Support (AOG, Spares, Technical Queries).

WEIGHT

MOMENT

GROUNDING

+ 64.14 kg**

201.1 m.kg

15 days

PRE-POST REQUISITE / EFFECTIVITY


For helicopters which have not integrated the following modifications 071156,
071306, 071583 et 071605, please apply the Service Bulletin number 39-00-09
prior to equip with the floatation system.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

20 hours

Structures

40 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) PRE MOD 070799, OP3000, 073273, 071737 and 071736, POST MOD 073106

Version(s) PRE MOD OP3000, 073273, 071737 and 071736, POST MOD 073107 and 070799

Version(s) PREMOD 073272, 073273 and 071737, POST MOD 071306 and OP3000

Version(s) PREMOD 073273 and 071737, POST MOD 073272, 071306 and OP3000

Version(s) PREMOD 073273, 070799 and OP3000, POST MOD 071737 and 071306

Version(s) PREMOD 073273 and 073272, POST MOD OP3000, 071737 and 071306

Version(s) PREMOD 073273 and OP3000, POST MOD 071736, 071737 and 071306

Version(s) PREMOD 073273 , POST MOD OP3000, 073272, 071737 and 071306

Versions B2, B3, POST MOD 073273, 073272 and OP3000

10

Versions B2, B3, PRE MOD OP3000, POST MOD 073273

11

Versions B2, B3, POST MOD 073273 and 073450

12

Versions B3, PRE MOD 074284, POST MOD 074280

KIT REFERENCES
REFERENCE

DESCRIPTION

350A8280410471

Floating HONEYWELL Kit

CONFIGURATION

LEAD-TIME

1, 2, 3, 4

28 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

90

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8280410173

Flotta AERAZUR Fixe Part Kit

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12

12 weeks

350A8280420072

Emergency Floatation AERAZUR R.P. Kit (PM)

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12

20 weeks

350A0726460071

Rear Footstep Changing Kit 350 (for A/C with High Landing Gear)

1, 2, 5, 7, 10

28 weeks

350A8280410672

Emergency Floatation Complementary Kit

11

12 weeks

350A8280410872

Multi Block Flotta Complementary Kit

12

12 weeks

350A8280410371

Floating HONEYWELL Kit

5, 6, 7, 8

28 weeks

350A8280410572

30 Alpha SMS Flota Kit

9, 1

24 weeks

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

2007402

CYLINDER ASSY EC130

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12

E00431C0

Binding clamp

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12

44

E00433C0

Binding clamp

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12

40

350A4110161261

PAD, Left, Short Footstep (Low Landing Gear)

1, 5

350A4110161263

PAD, Assy, LH, High, L/G (High Landing Gear)

1, 5

350A4110161361

PAD, Right, Low Foostep (Low Landing Gear)

1, 5

350A4110161363

PAD, Right, High, L/G (High Landing Gear)

1, 5

ASNA0078A505

Blind Rivet

3, 4, 6, 8, 9

16

350A84013023

Heel

3, 6

350A84013032

Floatation Gear Protection Heel

4, 8, 9

ADDITIONAL REQUIRED SPARES


REFERENCE

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

4801K63-6026-00

Drilling support breaker

All Configurations

On request

On request

4801K63-4022-00

Drilling flotta box

All Configurations

On request

On request

4801K84-0510-00

Drilling blocking bottle

All Configurations

On request

On request

703A97-6708-00

Switch "toupilles extincteur"

All Configurations

On request

On request

703A97-6705-00

Testing box etoupilles

All Configurations

On request

On request

NOTES
*Seat-State 7 : Certified to resist with waves up to 9 meters.
** Mobile Parts.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

91

Safety

Kannad 406 AF-H Emergency Locator Transmitter (ELT) for AS350


Applicable to version(s) : B, BA, B1, B2, B3
Omni-directional signal system enables the emergency services to locate the
position of the transmitter. Transmits on three international distress frequencies: 121.5 MHz, 243 MHz and 406 MHz.
Omni-directional system that enables the emergency services to locate the position
of the transmitter. Two installations are proposed: Upgrading from Kannad 121 AF-H
to 406 AF-H or a complete new installation.
BENEFITS
Compliant with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Designed to use both the usual distress frequency means and the COSPAS-SARSAT satellite network.
Usable in portable configuration with the addition of an antenna.

WEIGHT

MOMENT

GROUNDING

+ 2 kg*

2 days

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

8 hours

Structures

6 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s)s B1, B2 or BA and PRE MOD OP3203, OP3119 and 074205

Version(s) B3, PRE MOD OP3203, OP3119 and 074205

Version(s) B3, POST MOD OP3203, OP3119 and 074205

Version(s) B

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8260440473

KANNAD 406 AF-H F.P. Kit

24 weeks

350A8260440771

Mobile Parts KANNAD 406

1, 2, 3

12 weeks

350A8260440572

KANNAD 406 AF-H F.P. Kit

24 weeks

350A65719203AA

FX KANNAD AHF406 277R 95R

12 weeks

On request

On request

On request

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

ECS2049254NOI

Hook-and-loop tape

1, 2, 3

0.2 m

EN362808

Safety wire

1, 2, 3

0.5 m

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

92

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

MBBN34067

Trim profiles set

On request

On request

CONFIGURATION

REQUIRED QUANTITY

1, 2, 3

1m

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

MPC43

Insulation tester

All Configurations

On request

On request

NOTES
Transmits on three international distress frequencies: 121.5 mhz, 243 mhz and 406 mhz.
*For complete installation : Upgrade from Kannad 121 AF-H : + 0.15 kg

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

93

Safety

Aerazur Emergency Floatation Gear for EC130


Applicable to version(s) : B4
The emergency floatation equipment is intended to keep the helicopter afloat
after ditching. It aids in keeping the rotorcraft sufficiently upright to allow safe
and orderly evacuation. This equipment is attached to the helicopter's landing
gear.
Two separated flotation gear with four strechable wateright compartmentson either
side of the helicopter, triggered simultaneously.
BENEFITS
Sea-State 7 approval*.
Fully compatible with towing tooling.
OEM warranty.
Strong product liability.
Extends the helicopter's operational capabilities to maritime areas.
AH Support (AOG, Spares, Technical Queries).

WEIGHT

MOMENT

GROUNDING

+ 57.4 kg**

201.1 m.kg

2 days

PRE-POST REQUISITE / EFFECTIVITY


Not Applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

20 hours

Mechanics

43 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) B4 PRE MOD 073537, 073587, PRE MOD 73629 or OP3720

Version(s) B4 PRE MOD 073537 et 073588 , POST MOD 073629 or OP3720

Version(s) B4 PRE MOD 073587, POSTMOD 073537

Version(s) B4 POST MOD 073537 and 073587

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A0736290072

Kit Capa. Struc. Floatation B

28 weeks

350A21011621

Plug

20 weeks

350A0736270071

Floatation Kit, B4 (PF)

1, 2

52 weeks

350A0738810071

Buoyancy Kit - Removable Parts

1, 2, 3, 4

28 weeks

350A0736270172

Floatation B4 Kit (FP)

24 weeks

350A0736270271

Floatation B4 Kit (FP)

24 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

94

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

133800L19

CLIP

E00431C0

Binding clamp

30

2007402

CYLINDER ASSY EC130

1, 2, 3, 4

EN362805

Lock Wire

1, 2, 3, 4

1m

EN362808

Lock Wire

1, 2, 3, 4

1m

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

4801K63-6026-00

Drilling template

All Configurations

On request

On request

NOTES
*Seat-State 7 : Certified to resist with waves up to 9 meters.
** Mobile Parts.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

95

Safety

Aerazur Emergency Flotation Gear for EC130


Applicable to version(s) : T2
The emergency floatation equipment is intended to keep the helicopter afloat
after ditching. It aids in keeping the rotorcraft sufficiently upright to allow safe
and orderly evacuation. This equipment is attached to the helicopter's landing
gear.
Two separated flotation gear with four strechable wateright compartmentson either
side of the helicopter, triggered simultaneously.
BENEFITS
Sea-State 7 approval*.
Fully compatible with towing tooling.
OEM warranty.
Strong product liability.
Extends the helicopter's operational capabilities to maritime areas.
AH Support (AOG, Spares, Technical Queries).

WEIGHT

MOMENT

GROUNDING

+ 57.4 kg**

201.1 m.kg

2 days

PRE-POST REQUISITE / EFFECTIVITY


Not applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

30 hours

Avionics

20 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) T2 PRE MOD OP4409, 074472, OP4410 and 074473, POST MOD AL4510

Version(s) T2 PRE MOD OP4409, 074472, OP4410 and 074473, PRE MOD AL4510

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350AECFLOT0071

(FP) Emergency Floatation Kit

24 weeks

350AECFLOT1071

(RP) Emergency Floatation Kit

12 weeks

350AECFLOT0E71

Emergency Floatation Equip. Kit

20 weeks

350AECFLOT1E71

(RP) Emergency Floatation Equip. Kit

32 weeks

350AECFLOT0071

(FP) Emergency Floatation Kit

24 weeks

350AECFLOT1071

(RP) Emergency Floatation Kit

12 weeks

350AECFLOT0E71

Emergency Floatation Equip. Kit

20 weeks

350AECFLOT1E71

(RP) Emergency Floatation Equip. Kit

32 weeks

350AECFLOT2071

(FP) Emergency Floatation Compl. Kit

24 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

96

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

EN362805

Lock Wire

1m

EN362808

Lock Wire

1m

E00437C0

Binding clamp

100

EN362805

Lock Wire

1m

EN362808

Lock Wire

1m

E00437C0

Binding clamp

100

NOTES
*Seat-State 7 : Certified to resist with waves up to 9 meters.
** Mobile Parts.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

97

Safety

Cable Cutter System


Applicable to version(s) : E, F, F1, F2, N, NP
The system cuts the electrical cables in case of hit. This installation includes
two knives located on the windshield at the ends of a rail used to steer the
cable towards the cutting blades.
Two cutting knives above and below the cabin, as well as a guiding rail located on
the windshield.
BENEFITS
Protects the helicopter when encountering electrical cables in flight in particular under adverse climatic conditions.

WEIGHT

MOMENT

GROUNDING

+ 6.64 kg

0.93 m.kg

4 weeks

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Structures

10 hours

Applicable to helicopters pre-MOD 07-3439 (new canopy) and post-MOD OP-3814


(canopy with inner reinforcements).

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) E, F, F1, F2, N equiped with VFR (PRE-MOD 070874) and POST MOD 072213

Version(s) E, F, F1, F2, N equiped with IFR (POST MOD 07874)

Version(s) NP PRE MOD OP3961

Version(s) NP POST MOD OP3961

Version(s)E, F, F1, F2, N equiped with VFR (PRE-MOD 070874) and PRE MOD 072213

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

355A6151952801

Support (PF)

1, 2, 3, 4, 5

36 weeks

355AOP19450071

PM Cable Cutter Install.

1, 2, 3, 4, 5

20 weeks

355AOP19470072

Fix Part Cable Cutter Install. Kit

1, 2, 5

20 weeks

355A0726160071

Static Vent Instal. VFR (PM)

1, 5

12 weeks

355A0722490072

Static Vent Instal. VFR (PM)

28 weeks

355AOP39610071

Cable Cutter Reinf. (PF)

20 weeks

355AOP39620071

Cable Cutter Reinf POSTMOD OP3961 Kit (PF


)

20 weeks

355A76607323

Union, Line (PF)

36 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

355A6151953001

SUPPORT UPPER (PF)

1, 2, 3, 4, 5

ASNA0077A402

Blind Rivet (PF)

1, 2, 3, 4, 5

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

98

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

ASNA0078A404

Blind Rivet

1, 2, 3, 4, 5

12

E00431C0

Binding clamp (PF)

1, 2, 3, 4, 5

E00433C0

Binding clamp (PF)

1, 2, 3, 4, 5

ECS003026

TISSU DE VERRE (PF)

1, 2, 3, 4, 5

2 m

ECS003028

TISSU DE VERRE (PF)

1, 2, 3, 4, 5

2 m

355A61509920

Bracket (PF)

1, 2, 3, 5

DHS21113801

Adhesive, Black (PF)

1, 2, 4, 5

1m

DHS211138.01

Adhesive, Black (PF)

1m

355A61-5099-20

Bracket (PF)

ECS2126DI05D070

TUBE PA11/PA12 (PF)

1m

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

4801K25-0090-00

Drill tooling

All Configurations

On request

On request

4801K25-1463-20

Drill tooling

All Configurations

On request

On request

4801K25-0082-02

Drill tooling

All Configurations

On request

On request

4802K25-0090-00

Drill tooling

All Configurations

On request

On request

4801K25-0071-00

Drill tooling

All Configurations

On request

On request

4901K77-0240-00

Drill tooling

All Configurations

On request

On request

350A21004001TG

Drilling board

All Configurations

On request

On request

4803k77-0240-00

Drilling tool

All Configurations

On request

On request

4901K00-8900-00

Drill tooling

All Configurations

On request

On request

4801K77-0240-00

Drill tooling

All Configurations

On request

On request

4802K77-0240-00

Drill tooling

All Configurations

On request

On request

4803K25-0090-00

Drill tooling

All Configurations

On request

On request

4803K25-0082-02

Drill tooling

All Configurations

On request

On request

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

99

Safety

Kannad 406 AF-H Emergency Locator Transmitter (ELT) for AS355


Applicable to version(s) : E, F, F1, F2, N, NP
Omni-directional signal system enables the emergency services to locate the
position of the transmitter. Transmits on three international distress frequencies: 121.5 MHz, 243 MHz and 406 MHz.
Upgrading from Kannad 121 AF-H to 406 AF-H or complete new installation.
BENEFITS
Compliant with ICAO annex 6 Part III and EASA Part CAT (EU Regulation
n965/2012).
Designed to use both the usual distress frequency means and the COSPAS-SARSAT satellite network.
Usable in portable configuration with the addition of an antenna.

WEIGHT

MOMENT

GROUNDING

+ 2.13 kg

2 days
PRE-POST REQUISITE / EFFECTIVITY
Not Applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

8 hours

Structures

6 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Version(s) E, F, F1, F2, N, or NP and PRE MOD OP3203, OP3119 and 074205

Version(s) E, F, F1, F2, N, or NP, POST MOD OP3203, OP3119 and 074205

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

350A8260440473

KANNAD 406 AF-H F.P. KIT

24 weeks

350A8260440771

Mobile Parts KANNAD 406

12 weeks

350A65719203AA

FX KANNAD AHF406 277R 95R

12 weeks

350A8260440771

Mobile Parts KANNAD 406

12 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

ECS2049254NOI

Hook-and-loop tape

1, 2

0.2 m

EN362808

Safety wire

1, 2

0.5 m

MBBN34067

Trim profiles set

1, 2

1m

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

100

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

MPC43

Insulation tester

All Configurations

On request

On request

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

101

VERSION UPGRADES

Version Upgrades

B to BA Conversion
Applicable to version(s) : B
The B to BA conversion has been developed to improve the performance using
AS350 main rotor blades.
Given the complexity of this Service bulletin, please contact your usual commercial
point of contact for additional information.
The main modifications are:
- New AS350 main rotor blades (by standard exchange) and new main rotor
frequency adapters.
- New indicators: NR, torque meter and airspeed.
- Modified landing gear (high cross members or low reinforced members).
- New AS350 tail rotor blades (by standard exchange).
BENEFITS
Increased MTOW by 150 kg (331 lbs).
Increased payload (+ 127 kg / 280 lbs) and sling load (+ 50 kg / 110 lbs).
Better take-off rate of climb.
Velocity Not to Exceed: + 8 kts - Recommended cruise: + 5.5 kts.
Fleet dynamic components harmonisation (within a AS350 and AS355 fleet).
Increased aircraft value.
Access to another possible conversion / BA to B2 upgrade.

WEIGHT

MOMENT

PRE-POST REQUISITE / EFFECTIVITY


All AS350 version B.

GROUNDING

+ 23 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

40 hours

NOTES
For this upgrade, please contact your usual Airbus Helicopters contact. A technical filtering is requested to identify the kit(s) you may need.
Airspeed indicator and MGB/engine link casing to be ordered separately.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

103

Version Upgrades

BA to B2 Conversion
Applicable to version(s) : BA
The BA to B2 conversion has been developed to improve AS350 BA helicopter
performance characteristics up to the AS350 B2 level.
Given the complexity of this Service bulletin, please contact your usual commercial
point of contact for additional information.
This modification consists in replacing ARRIEL 1B engine by an ARRIEL 1D1
engine.
The main modifications are:
- New engine ARRIEL 1D1 engine.
- Tail boom modifications (including load compensator installation).
- New instrumentation.
- New demisting system.
- MGB/Engine link casing reinforcement (recommended).

BENEFITS
Increased MTOW by 150 kg (331 lbs).
Increased payload (+ 55 kg / 118 lbs) and sling load (+ 350 kg / 766 lbs).
Better take-off rate of climb (at 1800 kg / 3974 lbs : up to + 335 ft/min).
Higher operational performance for aerial work.
Increased power margins and NG synthetic presentation for pilot workload
reduction.
No addictional aircraft maintenance.
Increased aircraft value.

WEIGHT

MOMENT

PRE-POST REQUISITE / EFFECTIVITY


All AS350 version BA.

GROUNDING

+ 95 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

On request

Mechanics

On request

NOTES
For this upgrade, please contact your usual Airbus Helicopters contact. A technical filtering is requested to identify the kit(s) you may need.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

104

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

EC135
EC135 / EC635

ACCESSORIES

Accessories

New Fixation of the Support Rods


Applicable to version(s) : According to Service Bulletin
Improved Fastening.
Improved fixation of the support rods (while not in use) to the engine and transmission covers. Until now, the support rods were fastened to retaining clips on the
respective covers. There is now an improved solution, where the support rods can be
fastened to brackets on the respective covers using the Camloc fasteners.
BENEFITS
Improved fixation of support rods while not in use.

WEIGHT

MOMENT

GROUNDING

+ 0.2 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

On request

PRE-POST REQUISITE / EFFECTIVITY


Valid for all S/N. Incompatible with helicopters with an inlet barrier filter system (IBF)
. For helicopters with IBF and without the improved attachment of the support rods,
please refer to TIP EC135-71-40. Incompatible with helicopters with split gear covers
(hoist).

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-71-039-2C1

Holders for the Engine Covers

All Configurations

2 - 8 weeks

SB-135-71-039-2C2

Holders for the Transmission Covers

All Configurations

2 - 12 weeks

SB-135-71-039-2C3

Standard Parts (Engine Covers)

All Configurations

2 - 4 weeks

SB-135-71-039-2C4

Standard Parts (Transmission Covers)

All Configurations

2 - 4 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

109

Accessories

Rotor Mast Seal


Applicable to version(s) : According to Service Bulletin
Introduction of a rotor mast seal prevents the penetration of humidity.
Installation kit for the rotor mast seal. Thus, the penetration of humidity and oil vapors is widely prevented.
BENEFITS
Main transmission protection against humidity.
Rotor hub-shaft and mast moment system protection against the penetration
of humidity and oil vapors. Improved durability of the strain gauge bridge on the
rotor hub-shaft.

WEIGHT

MOMENT

GROUNDING

+ 0.1 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

8 hours

Effective for all helicopters up to S/N 929. No incompatibility with other systems.
Compliance is recommended.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-63-016-2C-2

Retrofit Kit Rotor Mast Seal

All Configurations

8 - 9 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

110

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Accessories

Support Rods & Brackets for Helicopters with Inlet Barrier Filter (IBF)
Applicable to version(s) : According to Service Bulletin
Makes it easier to work on the engines and on the main transmission.
Installation of support rods and brackets for the engine and transmission covers for
helicopters with IBF (Inlet Barrier Filter).
BENEFITS
Makes it easier to accomplish minor maintenance work and repair on the engines and on the main transmission.

WEIGHT

MOMENT

GROUNDING

+ 1 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

2 hours

Composites

14 hours

PRE-POST REQUISITE / EFFECTIVITY


Effective for all models with IBF (Inlet Barrier Filter) up to and including S/N 1013. No
incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-71-040-2C1

Material Kit - Installation of Support Rods and the Brackets for Engine Covers

All Configurations

2 - 4 weeks

SB-135-71-040-2C2-1

Material Kit - Installation of Support Rods and Brackets for the Transmission Covers

All Configurations

2 - 8 weeks

SB-135-71-040-2C3

Standard Parts Kit for the Engine Covers

All Configurations

2 - 8 weeks

SB-135-71-040-2C4-1

Standard Parts Kit for the Transmission Covers

All Configurations

2 - 8 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

111

AIRFRAME
& SYSTEM UPGRADES

Airframe & System Upgrades

Communication System HF-9000


Applicable to version(s) : According to Service Bulletin
For operational and approval requirements.
Installation of HF Communication System HF-9000.
BENEFITS
Provider and platform independent communication system.
99 free programmable channels.

WEIGHT

MOMENT

GROUNDING

+ 4.5 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

On request

PRE-POST REQUISITE / EFFECTIVITY


Effective for all EC135/635, all models, without HF-9000. The ability to retrofit depends on the helicopter's configuration and is verified with the reply form sheet.
Please notice, that avionics deck and space for installation will be prerequisites.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

Specific - On request

Retrofit Kit HF - 9000

All Configurations

On request

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

113

Airframe & System Upgrades

Fuel Flow Sensor


Applicable to version(s) : According to Service Bulletin
Fuel consumption monitoring.
Change of a fuel flow sensor. The current fuel flow / consumption and the remaining
flight time can be indicated.
BENEFITS
Direct fuel consumption monitoring.
The remaining fuel ist indicated.
The precise remaining flight time can be determined.

WEIGHT

MOMENT

GROUNDING

+ 1.3 kg

INSTALLATION TIME

PRE-POST REQUISITE / EFFECTIVITY

QUALIFICATION

INSTALLATION DURATION

Electrics

70 hours

Mechanics

80 hours

Effective for all S/N EC135/EC635 CPDS. No incompatibility with other systems.
Compliance is optional. The accomplishment of the Service Bulletins given below is
required for the accomplishment of Service Bulletin EC135-28-015 depending from
the engine configuration.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-28-015-2C

Wire Harness for Turbomeca

All Configurations

2 - 12 weeks

SB-135-28-015-2C2

Wire Harness for Pratt & Whitney

All Configurations

2 - 12 weeks

SB-135-28-015-2C3

Fuel Flow Sensor

All Configurations

2 - 12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

114

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Airframe & System Upgrades

Inlet Barrier Filter (IBF) install for Pratt & Withney Engines
Applicable to version(s) : According to Service Bulletin
Inlet Barrier Filter System.
Installation of an Inlet Barrier Filter (IBF). During flights in dusty or polluted ambient
air at all heights the engines are subject to special stresses such as erosion and
FOD. The installation of the IBF is recommended if the helicopter is operated in dusty
or polluted ambient air. With a filtration performance of more than 99 % increased
wear of the compressor blades and other engine components is avoided.
BENEFITS
Reduced wear of the engine compressor components.
Filtration performance of more than 99 %.
Easy maintenance.
Environmentally friendly filter oil.
Failure and advisory indication on CAD and IBF remote panel.

WEIGHT

MOMENT

GROUNDING

+ 26.5 kg

PRE-POST REQUISITE / EFFECTIVITY


All EC135 P2 and P2+ / EC635 P2 and P2+ helicopters, CPDS software version
V2001A and higher, without removable and fixed part of the sand filter and without
external power receptacles for the compressor washing device.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

120 hours

Mechanics

120 hours

Composites

120 hours

Paint Work

20 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

On request

Retrofit Kit IBF

All Configurations

12 weeks

SB-135-71T-037-2C10

EC135 IBF Short - Term Cover

All Configurations

12 weeks

SB-135-71T-037-2C13

Maintenance Kit

All Configurations

12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

115

Airframe & System Upgrades

Inlet Barrier Filter System (IBF) for Turbomeca Engines


Applicable to version(s) : According to Service Bulletin
Filtration Performance of more than 99 %.
Installation of an Inlet Barrier Filter (IBF). During flights in dusty or polluted ambient
air at all heights the engines are subject to special stresses such as erosion and
FOD.The installation of the IBF is recommended, if the helicopter is operated in dusty
or polluted ambient air. With a filtration performance of more than 99 % increased
wear of the compressor blades and other engine components is avoided.
BENEFITS
Reduced erosion of the engine compressor components.

WEIGHT

MOMENT

GROUNDING

+ 30 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

120 hours

Mechanics

120 hours

Composites

120 hours

Paint Work

20 hours

Refer to SB-Preview EC135-71T-038, Section 1.A.1. for effectivity and incompatibility.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

On request

Retrofit Kit IBF - S/N 0103 - 0121 - 0216 - 0300 - 0594 - 0596 - 0831 - 0833 - 0999

All Configurations

24 weeks

SB-135-71T-038-2C9

EC135 IBF Short - Term Cover

All Configurations

24 weeks

SB-135-71T-038-2C12

Maintenance Kit

All Configurations

24 weeks

SB-135-71T-038-2C13

Center Console - Conversion From Standard to Xl

All Configurations

24 weeks

SB-135-71T-038-2C14

Center Console - Conversion From Xl to Xxl

All Configurations

24 weeks

SB-135-71T-038-2C15

Fire Extinguisher on CenteRPost

All Configurations

24 weeks

SB-135-71T-038-2C16

Tra - Wash - Box

All Configurations

24 weeks

SB-135-71T-038-2C17

Hoselines for Compressor Washing Device

All Configurations

24 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

116

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

CABIN
& CABIN SYSTEMS

Cabin & Cabin Systems

XL or XXL Center Console


Applicable to version(s) : According to Service Bulletin
Additional space in the center console.
Installation of two different versions of an extended center console. The XL center
console has a length of 71 cm and the XXL center console of 83 cm. With the
extended consoles, there is the possibility to install additional control panels in the
center console.
BENEFITS
Additional space for control panels.
More flexibility to arrange control panels.

WEIGHT

MOMENT

GROUNDING

+ 0.26 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

7 hours

Mechanics

5 hours

Valid for all S/N. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-31-068-2C1

XL center console

All Configurations

16 weeks

SB-135-31-068-2C2

XXL center console

All Configurations

16 weeks

SB-135-31-068-2C3

Holder of the fire extinguisher (on XL center console)

All Configurations

16 weeks

SB-135-31-068-2C4

Holder of the fire extinguisher (on XXL center console)

All Configurations

16 weeks

SB-135-31-068-2C5

Standard parts (for center console with connector doubler)

All Configurations

16 weeks

SB-135-31-068-2C6

Standard parts (for XXL center console)

All Configurations

16 weeks

SB-135-31-068-2C1

XL center console

All Configurations

16 weeks

SB-135-31-068-2C2

XXL center console

All Configurations

16 weeks

SB-135-31-068-2C3

Holder of the fire extinguisher (on XL center console)

All Configurations

16 weeks

SB-135-31-068-2C4

Holder of the fire extinguisher (on XXL center console)

All Configurations

16 weeks

SB-135-31-068-2C5

Standard parts (for center console with connector doubler)

All Configurations

16 weeks

SB-135-31-068-2C6

Standard parts (for XXL center console)

All Configurations

16 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

118

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

DOORS & WINDOWS

Doors & Windows

Cockpit Door Locking Devices


Applicable to version(s) : According to Service Bulletin
Fully open position of the cockpit door.
Installation of pilot-door locking devices on the pilot and co-pilot side. The locking
devices hold the pilot doors in the fully open position and prevent unintentional
closing.
BENEFITS
More space to get on the cockpit.
Easier entrance for mechanics during maintenance tasks in the cockpit.
Unlocking of the door holder via lever in the cockpit and standalone closing
of the door.

WEIGHT

MOMENT

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


All EC135/635 without optional equipment pilot-door locking devices.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

8 hours

Mechanics

Max. 30 hours

Paint Work

On request

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-52-011-2C1

Right Pilot - Door Locking Device

All Configurations

4 - 16 weeks

SB-135-52-011-2C2

Pilot - Door Locking Device with Pitot Tube on the Left Side

All Configurations

4 - 16 weeks

SB-135-52-011-2C3

Pilot - Door Locking Device without Pitot Tube on the Left Side

All Configurations

4 - 16 weeks

SB-135-52-011-2C4

Placard German

All Configurations

4 - 16 weeks

SB-135-52-011-2C5

Placard English

All Configurations

4 - 16 weeks

SB-135-52-011-2C6

Placard French

All Configurations

4 - 16 weeks

SB-135-52-011-2C7

Placard Italian

All Configurations

4 - 16 weeks

SB-135-52-011-2C8

Placard Polish

All Configurations

4 - 16 weeks

SB-135-52-011-2C9

Standard Parts for S/N 0005 Up and Including S/N 0192 without Pitot Tube on the Left Side

All Configurations

4 - 16 weeks

SB-135-52-011-2C10-1

Standard Parts for Retrofitting one Side

All Configurations

4 - 16 weeks

SB-135-52-011-2C11

Standard Parts for Locking Device without Pitot Tube on the Left Side

All Configurations

4 - 16 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

120

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Doors & Windows

Sliding Door Windows & Ram-Air


Applicable to version(s) : According to Service Bulletin
Improved fresh air supply for the cabin.
Installation of sliding door window panes with sliding windows. Thus, the fresh air
supply for the cabins is improved. Two different big sliding windows are offered. Additionally, the Installation of wind deflectors for the sliding windows in the sliding door
window panes and in the pilot door window panes is offered.
BENEFITS
The improved fresh air supply makes the cabin more convenient.
Easier control of the temperature.

WEIGHT

MOMENT

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

7 hours

Valid for all S/N. No incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-56T-005-2C1

LH and RH Small Sliding Window - Not Tinted

All Configurations

12 - 13 weeks

SB-135-56T-005-2C2

LH and RH Small Sliding Window - Dark Tinted

All Configurations

12 - 13 weeks

SB-135-56T-005-2C3

LH and RH Small Sliding Window - Light Tinted

All Configurations

12 - 13 weeks

SB-135-56T-005-2C4

LH and RH Big Sliding Window - Not Tinted

All Configurations

12 - 13 weeks

SB-135-56T-005-2C5

LH and RH Big Sliding Window - Light Tinted

All Configurations

12 - 13 weeks

SB-135-56T-005-2C6

LH and RH Big Sliding Window - Dark Tinted

All Configurations

12 - 13 weeks

SB-135-56T-005-2C7

LH and RH Wind Deflector for Sliding Door Window Pane

All Configurations

12 - 13 weeks

SB-135-56T-005-2C8

LH and RH Wind Deflector for Pilot Door Window Pane

All Configurations

12 - 13 weeks

SB-135-56T-005-2C9

LH and RH Big Inverse Sliding Window - Not Tinted

All Configurations

12 - 13 weeks

SB-135-56T-005-2C10

LH and RH Big Inverse Sliding Window - Light Tinted

All Configurations

12 weeks

SB-135-56T-005-2C11

LH and RH Big Inverse Sliding Window - Dark Tinted

All Configurations

12 - 13 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

121

LANDING GEARS

Landing Gears

Center Protection for the Skid Tubes


Applicable to version(s) : According to Service Bulletin
Prevents the skid tubes from getting damaged.
Installation of a center skid protection for the skid tubes.
BENEFITS
Improved protection of the skid tubes when the helicopter is landed on unsurfaced ground.
Prevents the skid tubes from getting damaged by stones and sharp edges.

WEIGHT

MOMENT

GROUNDING

+ 3.4 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

4 hours

PRE-POST REQUISITE / EFFECTIVITY


Valid for all S/N equipped with standard landing gear / medium-high landing gear /
high landing gear. Not compatible with the following snow skids - L327M2801051 L327M2801052 - L327M2817051 - 117-84202. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-32-018-2C1-1

Retrofit Kit for Center Skid Protection

All Configurations

2 - 12 weeks

SB-135-32-018-2C2-1

Standard Parts

All Configurations

2 - 12 weeks

SB-135-32-018-2C3

Flat Head Screws

All Configurations

2 - 12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

123

Landing Gears

Medium-High Landing Gear


Applicable to version(s) : According to Service Bulletin
Increase of the helicopters ground clearance by 10 centimeters.
Installation from the standard landing gear to the medium-high landing gear the
height of which is between the standard landing gear and the high landing gear.
Entrance steps, multi-purpose carriers and skids can be taken from the standard
landing gear.
BENEFITS
Increased ground clearance.
Easier loading and unloading.

WEIGHT

MOMENT

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

Additional kits are necessary for the following optional equipment: Entrance steps,
snow skids, emergency flotation system, multi-purpose carriers, external loudspeaker.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-32-015-2C1-1

Kit for Retrofit to Medium - High Landing Gear

All Configurations

2 - 16 weeks

SB-135-32-015-2C2-1

Additionally Required for Standard Entrance Step Before S/N 0830

All Configurations

2 - 16 weeks

SB-135-32-015-2C3-1

Additionally Required for Snow Skid L327M2826 101

All Configurations

2 - 16 weeks

SB-135-32-015-2C4

Additionally Required for Snow Skid L327M2801 052

All Configurations

2 - 16 weeks

SB-135-32-015-2C5

Additionally Required for Helicopters without Emergency Flotation System

All Configurations

2 - 16 weeks

SB-135-32-015-2C6

Additionally Required for Helicopters with Emergency Flotation System

All Configurations

2 - 16 weeks

SB-135-32-015-2C7

Additionally Required for Helicopters with Emergency Flotation System and Entrance Step - LH
L321M5821 054 or L321M5824 054

All Configurations

2 - 16 weeks

SB-135-32-015-2C8

Additionally Required for Helicopters with Emergency Flotation System and Entrance Step - RH
L321M5822 054

All Configurations

2 - 16 weeks

SB-135-32-015-2C9

Additionally Required for Helicopters with Emergency Flotation System and Multi - Purpose
Carriers - LH L853M2847 053 - L853M2849 053 or L853M2850 051

All Configurations

2 - 16 weeks

SB-135-32-015-2C10

Additionally Required for Helicopters with Emergency Flotation System and Multi - Purpose
Carriers - RH L853M2848 053 or L853M3837 052

All Configurations

2 - 16 weeks

SB-135-32-015-2C11

Additionally Required for Helicopters with External Loudspeaker LH

All Configurations

2 - 16 weeks

SB-135-32-015-2C12

Additionally Required for Helicopters with External Loudspeaker RH

All Configurations

2 - 16 weeks

SB-135-32-015-2C13

Additionally Required for Helicopters Before S/N 0121 with Multi - Purpose Carriers LH

All Configurations

2 - 16 weeks

SB-135-32-015-2C14

Additionally Required for Helicopters Before S/N 0121 with Multi - Purpose Carriers RH

All Configurations

2 - 16 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

124

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

SAFETY

Safety

Attitude & Heading Reference System (AHRS)


Applicable to version(s) : According to Service Bulletin
Improvement of AHRS near interfering fields.
Attitude and Heading Reference System (AHRS) Free Steering Mode (FSM). When
oil platforms or large steel platforms are being approached, the monitoring system
of the magnetic sensor can transfer into the error mode due to disturbance of the
earth's magnetic field and can thus lead to a failure of the heading display. The Free
Steering Mode enables the magnetic sensors to be manually switched off. The flight
attitude is then calculated by the internal AHRS laser gyros.
BENEFITS
Protection of a failure of the heading display while approaching oil or huge
steel platforms.
Switch off the magnetic sensors of the AHRS manually.

WEIGHT

MOMENT

GROUNDING

+ 0.7 kg

PRE-POST REQUISITE / EFFECTIVITY


Effective for all S/N EC135 with optional equipment AHRS. No incompatibility with
other systems. Compliance is optional.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

Max. 16 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-34-015-2C1

Retrofit Kit AHRS "Free Steering Mode"

All Configurations

2 - 12 weeks

SB-135-34-015-2C2

Retrofit Kit for Cpds Configuration Lower Than V2003

All Configurations

2 - 12 weeks

SB-135-34-015-2C3

Retrofit Kit for Cpds Configuration Lower Than V2003

All Configurations

2 - 12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

126

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

CVFDR and/or UMS and/or SSQAR


Applicable to version(s) : According to Service Bulletin
Extensive data recording.
Installation of a Cockpit Voice and Flight Data Recorder (CVFDR) and/or of an Usage
Monitoring System (UMS) with Solid State Quick Access Recorder (SSQAR).
BENEFITS
Clearer evidence for incidents and accidents.
Flight data acquisition of the last 25 FH.
Pilot, copilot and passengers voice recording for the last 2 flight hours (FH).
Flight-relevant data recording*.
Continuous recording of all important flight data**.

WEIGHT

MOMENT

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

Max. 400 hours

Mechanics

Max. 100 hours

Structures

Max. 145 hours

Effective for all EC135/635, all models with CPDS, FCDS and autopilot. The ability to
Installation depends on the helicopters configuration and is verified with the reply
form sheet.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

Specific - On request

Retrofit Kit CVFDR

All Configurations

On request

Specific - On request

Retrofit Kit SSQAR/UMS

All Configurations

On request

NOTES
* e.g. flight time, main rotor speed, mast moment, engine temperature, warnings and error messages, flight records
** e.g. engine parameters, position of the collective lever, navigation parameters

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

127

Safety

Emergency Exit Lighting (Exit & Step)


Applicable to version(s) : According to Service Bulletin
Illuminated exit area during night missions and in cases of emergency.
Installation of exit lights for the LH and RH cabin door area and of step lights for the
LH and RH entrance step.
BENEFITS
Installation in accordance with ICAO annex 6 Part III and EASA Part CAT (EU
Regulation n965/2012).
The exit lights and the step lights identify and illuminate the exit area of the
cabin during night missions and in emergency cases.

WEIGHT

MOMENT

GROUNDING

+ 3.2 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

36 hours

Mechanics

24 hours

Effective for all helicopters starting with S/N 0337. No incompatibility with other
systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-33-008-2C1-1

Retrofit for Emergency Exit Lighting

All Configurations

2 - 12 weeks

SB-135-33-008-2C2

Retrofit for Lettering of Overhead Panel

All Configurations

2 - 12 weeks

SB-135-33-008-2C3

Consumable Material to Be ordered Separately

All Configurations

On request

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

128

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

Engine Fire Extinguishing System


Applicable to version(s) : P1, P2, P2+, T1, T2, T2+
Quick extinguishing of fire in the engine area.
Installation of a single engine fire extinguishing system.
BENEFITS
More safety by the quick extinguishing of fires in the engine area.
Quick release of the fire extinguishing system in case of fire.

WEIGHT

MOMENT

GROUNDING

+ 3.8 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

5 hours

Mechanics

15 hours

PRE-POST REQUISITE / EFFECTIVITY


Effective for all S/N EC135 and EC635 in version P2+, T1, T2+. No incompatibility
with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-26-002-2C3

Retrofit Kit for Engine Fire Extinguishing System - Assy

All Configurations

16 - 17 weeks

SB-135-26-002-2C4

Auxiliary Kit for Helicopters S/N 0005 Up to and Including S/N 0120

All Configurations

16 - 17 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

129

Safety

Modification of the Switching Logic


Applicable to version(s) : According to Service Bulletin
Reduced unintentional activations of the fire extinguisher.
Modification of the switching logic which activates the fire extinguisher system. Up
to now, the cartridge of the fire extinguishing bottle has been automatically ignited
when the fire warning system was active and N1 turbine speed dropped below 50%.
Sometimes, the cartridge of the fire extinguishing bottle was ignited on the ground.
After completion of the Service Bulletin SB EC 135-26-006, the cartridge of the fire
extinguishing bottle is only ignited when the fuel shut-off valve is also closed by
pressing the "EMER OFF SW" switch in the warning unit.
BENEFITS
Protective maintenance feature.
Prevention of cost-intensive unintentional activations.

WEIGHT

MOMENT

GROUNDING

+ 0.5 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

On request

Mechanics

On request

Effective for S/N 0005 to and including S/N 0955 with optional equipment single
engine fire extinguishing system. As of S/N 0956, the modified switching logic for
triggering the fire protection system is installed by Airbus Helicopters Deutschland.
No incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-26-006-2C1-1

Parts for Modification of the Fire Extinguishing System

All Configurations

2 - 12 weeks

SB-135-26-006-2C2

Parts for Modification of the Fire Extinguishing System

All Configurations

2 - 12 weeks

SB-135-26-006-2C3

Parts for Modification of the Fire Extinguishing System

All Configurations

2 - 12 weeks

SB-135-26-006-2C4

Parts for Modification of the Fire Extinguishing System

All Configurations

2 - 12 weeks

SB-135-26-006-2C5

Angle Bracket

All Configurations

2 - 12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

130

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

Portable Fire Extinguisher


Applicable to version(s) : According to Service Bulletin
Relocation of the portable fire extinguisher to the front of the center post.
Relocation of the portable fire extinguisher from the original installation position,
including the cockpit floor, the center console or the side of the center post to a new
position at the front of the center post.
BENEFITS
Additional position for the portable fire extinguisher to allow for other aircraft
modifications.
Better access to the portable fire extinguisher.

WEIGHT

MOMENT

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

6 hours

Effective for S/N 0005 up to and including S/N 0576 with portable fire extinguisher
HAL1-74-00. No incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE
SB-135-26-007-2C

DESCRIPTION

CONFIGURATION

LEAD-TIME

Bracket Fire Extinguisher Assy and Standard Parts

All Configurations

2 - 12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

131

Safety

Vision 1000 Cockpit Camera


Applicable to version(s) : According to Service Bulletin
The Vision 1000 is a cockpit imaging and flight data monitoring device and is
installed on the center post. The system captures critical inertial and GPS positioning data as well as cockpit imagery and ambient noises. The flight data,
imagery and noises are stored on a crash-hardened memory module as well
as on a removable SD HC card for use in the management and visualization
program.
Recording of positioning data, cockpit imagery and ambient noises.
BENEFITS
Increased operational safety - Can be used to replay the flight scenarios during
training.
Recording of positioning data (location, altitude, etc.).
Recording of cockpit imagery (instrument panel, flight controls, partial exterior
view) and ambient noises.
Analysis of recorded data with the management and visualization software
(included).
Additional 3D software available at www.appareo.com (not included).
PRE-POST REQUISITE / EFFECTIVITY
Effective for all S/N. Incompatible with EC135 "Hermes". Compliance is optional.
WEIGHT

MOMENT

GROUNDING

+ 0.8 kg*

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

30 hours

Mechanics

25 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-31-070-2C1

Vision 1000 camera

All Configurations

12 weeks

SB-135-31-070-2C2

Retrofit of the reading light

All Configurations

12 weeks

SB-135-31-070-2C3

Name plates CB I, CB II, SW III

All Configurations

12 weeks

SB-135-31-070-2C4

Retrofit of the reading light

All Configurations

12 weeks

SB-135-31-070-2C1

Vision 1000 camera

All Configurations

12 weeks

SB-135-31-070-2C2

Retrofit of the reading light

All Configurations

12 weeks

SB-135-31-070-2C3

Name plates CB I, CB II, SW III

All Configurations

12 weeks

SB-135-31-070-2C4

Retrofit of the reading light

All Configurations

12 weeks

NOTES
* Per pilot door window pane.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

132

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

Voice Alarm for the Radar Altimeter


Applicable to version(s) : According to Service Bulletin
Windshield wiper system.
Installation of a voice alarm when the minimum height of 100 ft and/or the decision
height (DH) is undercut.
BENEFITS
To give the crew an audible warning of the height.
Enhanced safety for the crew and helicopter.

WEIGHT

MOMENT

GROUNDING

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

On request

PRE-POST REQUISITE / EFFECTIVITY


Effective for all EC135/635, without voice alarm. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

Specific - On request

Content of the Kit Will Depend on the S/N of the Helicopter

All Configurations

On request

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

133

Safety

Weather radar RDR 2000


Applicable to version(s) : Depending on equipment installed in the helicopter
The Honeywell RDR 2000 weather radar designed to detect critical weather.
Installation of the Honeywell RDR 2000 weather radar designed to detect thunderstorms and other critical weather phenomena up to adistance of 240 NM.The system
consists of a 10'' antenna, the ART 2000 Receiver/Transmitter and theconfiguration
module. The weather intensity can be displayed in four different colours on standalone screens. The RDR 2000 is equipped with the "Vertical Profile" function. It is not
only possible to monitor the horizontal expansion of a weather phenomenon but
also the vertical shape of it.
BENEFITS
Increased awareness of weather situation.
Increased safety during operations.

WEIGHT

MOMENT

GROUNDING

+ 7 kg

PRE-POST REQUISITE / EFFECTIVITY


Landing lights have to be relocated. No metallic paint is allowed in the area of the
nose cover. Short time covers and fast track holder are not considered.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

165 hours

Mechanics

80 hours

Paint Work

10 hours

NOTES
Please return filled Reply Form Sheet stated in T.I.P.I. and contact department: contact.customized-sb@eurocopter.com
The installation of this equipment depends on the helicopter's configuration and will be verified as soon as the reply form sheet has been received.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

134

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

Wire Strike Protection System (WSPS)


Applicable to version(s) : According to Service Bulletin
Protective system for cable collision.
When the helicopter is operated close to aerial lines and cables there is a significant
risk of collision. Through the Installation of deflectors in the area of the windshield
wiper system and to the skids the cable will be systematically deflected when it
collides with these components. The colliding wire will be cut on the upper and
lower fuselage structure.
BENEFITS
Increased operational safety for flights close to aerial lines.
Protection against accidents caused by collision with tension ropes of buildings, towers and masts.

WEIGHT

MOMENT

GROUNDING
PRE-POST REQUISITE / EFFECTIVITY
Valid for all S/N. No incompatibility with other systems. Compliance is optional.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

40 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-85-024-2C1

Upper Wire Strike Protection System - Fixed and Removable Part

All Configurations

16 weeks

SB-135-85-024-2C2

Lower Wire Strike Protection System - Fixed and Removable Part

All Configurations

16 weeks

SB-135-85-024-2C3

AFt Deflector of the Windshield Wiper Including the Installation Material

All Configurations

16 weeks

SB-135-85-024-2C4

forward Deflector of the Windshield Wiper Including the Installation Material

All Configurations

16 weeks

SB-135-85-024-2C5

Skid Deflector - LH and RH - Fixed and Removable Part

All Configurations

16 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

135

VERSION UPGRADES

Version Upgrades

Admissible Maximum Take-Off Weight 2950 kg (e-Version)


Applicable to version(s) : According to Service Bulletin
Higher payload by increasing the maximum take-off weight.
Increase of the maximum take-off weight (MTOW) to 2950 kg. The payload is increased by up to 40 kg and can be used for operations in low altitudes (see flight
manual FLM and Supplements FMS). An important content is the improvement of
the main rotor system by installing a new generation of lead-lag dampers in the
main rotor blades.
BENEFITS
GM above 2910 kg maximum.
Operating Altitude 8000 ft (PA).
GM above 2910 kg: max.
Altitude 6000 ft (DA) for Hover IGE.
Take-off and Landing.
CAT A VTOL II (Short Field) up to 2950 kg.
CAT A VTOL III (Confined Heliport) up to 2950 kg.
PRE-POST REQUISITE / EFFECTIVITY
WEIGHT

MOMENT

GROUNDING

Effective for all EC135 T2+ / EC135 P2+ and EC635 T2+ / EC635 P2+ with an admissible maximum take-off weight of 2910 kg (helicopter S/N i.a.w. the "Effectivity
Sheet"). By way of this Service Bulletin the helicopters are retrofitted to version T2+
or P2+. Compliance is optional.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

40 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-135-62-028-2C1

Placard 2950 Kg - Placard VNE - Lead - Lag Dampe - Effectivity Sheet and Service Bulletin

All Configurations

24 weeks

SB-135-62-028-2C2

Placard 2950 Kg - Placard VNE - Effectivity Sheet and Service Bulletin

All Configurations

4 - 5 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

137

EC145
BK117

ACCESSORIES

Accessories

Cockpit Curtain
Applicable to version(s) : According to Service Bulletin
Separation of cockpit and cabin.
Installation of a NVG cockpit curtain which separates the cockpit from the cabin.
During a night flight even small light sources in the cabin can impair the pilot's night
vision. The curtain provides more comfort for passengers during VIP missions and is
available in grey color only.
BENEFITS
Increased passenger comfort.
NVG compatible.
Reduced impact on the pilot's night vision.

WEIGHT

MOMENT

GROUNDING

+ 1.1 kg
PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

11 hours

Valid for all S/N except the version Corporate Mercedes-Benz Style. No incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-25-010-2C

Curtain Assembly

All Configurations

12 - 13 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

141

Accessories

Drip Catcher Above the Swivel Units of the Fexball Cables


Applicable to version(s) : According to Service Bulletin
Improvement of the corrosion protection.
Installation of a drip catcher above the swivel units of the flexball cables.
BENEFITS
Corrosion protection.

WEIGHT

MOMENT

GROUNDING

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

7 hours

PRE-POST REQUISITE / EFFECTIVITY


Valid for S/N 9004 up to and including S/N 9550. No incompatibility with other
systems. Compliance is recommended.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-67-017-2C1

Drip Catcher

All Configurations

4 - 12 weeks

SB-117C2-67-017-2C2

Standard Parts

All Configurations

4 - 12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

142

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Accessories

LH/RH Installation of Hand-Grips


Applicable to version(s) : C2
Easier entrance to the cockpit.
Installation of hand grips. In order to make it easier to enter the cockpit, hand grips
can be installed on the LH and RH cockpit structure.
BENEFITS
Makes it easier and safer to enter and exit the cockpit.

WEIGHT

MOMENT

GROUNDING

+ 0.1 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

3 hours

Paint Work

0.5 hour

PRE-POST REQUISITE / EFFECTIVITY


Valid for all S/N. No incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-25-004-2C

LH and RH Handle

All Configurations

8 - 9 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

143

Accessories

Overhead Panel Attachment


Applicable to version(s) : According to Service Bulletin
Improved attachement of the overhead panel.
Strengthen fixation for the overhead panel.
BENEFITS
Significant reduction of overhead panel vibration.
Significant reduction of wear of the attachment screws and boreholes of the
overhead panel.

WEIGHT

MOMENT

+ 0.2 kg

Negligeable

GROUNDING

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

8 hours

PRE-POST REQUISITE / EFFECTIVITY


Valid for BK117 C-2 S/N 9001 up to and including S/N 9500. No incompatibility with
other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-24-009-2C-1

Parts to Retrofit the Overhead Panel Attachment

All Configurations

2 - 16 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

144

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Accessories

Windshield Wiper Dual Drive


Applicable to version(s) : According to Service Bulletin
Improvement of the reliability and stability of the windshield wiper system.
Dual drive to increase both the reliability and the stability of the windshield wiper
system. This installation significantly improves the torque transmitted between gearbox and wiper arm.
BENEFITS
Improvement of the reliability and the stability of the windshield wiper system.
Installation in accordance with ICAO annex 6 Part III and EASA Part CAT (EU
Regulation n965/2012).
Increase of the torque transmitted between gearbox and wiper arm.
Reduction of wear on the splined shaft.

WEIGHT

MOMENT

GROUNDING

+ 0.1 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

1 hour

Mechanics

9 hours

MBB-BK117 C-2, all models, S/N 9004 up to and including S/N 9150 with optional
equipment windshield wiper. Starting with S/N 9151 the dual drive is installed as
standard equipment by Airbus Helicopters Deutschland.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-30-001-2C

Retrofit Kit for Dual Drive

All Configurations

4 - 5 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

145

AIRFRAME
& SYSTEM UPGRADES

Airframe & System Upgrades

Improved Tail Rotor Actuator


Applicable to version(s) : According to Service Bulletin
More control comfort and lower direct maintenance costs.
Improved tail rotor actuator. The previous tail rotor actuator will not be available as a
new spare part any longer and will be replaced by the improved version.
BENEFITS
Improved durability, in particular for the sealing system.
No life limits, "On condition" maintenance.
Reduced pedal forces need for tail rotor pitch adjustment.
Better feedback on control of the helicopter and yaw control margin.

WEIGHT

MOMENT

GROUNDING

+ 0.6 kg
PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

2 hours

Mechanics

12 hours

Valid for S/N 9004 up to and including S/N 9430. No incompatibility with other systems. Compliance is optional. This Service Bulletin must be accomplished if the tail
rotor actuator P/N B673M40A1001 is to be replaced by a new one.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-67-013-2C1

Tail Rotor Actuator

All Configurations

12 - 13 weeks

SB-117C2-67-013-2C2

Kit - without Chip Detector

All Configurations

12 - 13 weeks

SB-117C2-67-013-2C3

Kit - with Chip Detector

All Configurations

12 - 13 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

147

Airframe & System Upgrades

Inlet Barrier Filter (IBF) System


Applicable to version(s) : According to Service Bulletin
Reduced erosion of the engine compressor components.
Inlet Barrier Filter (IBF) System which totally covers each inlet plenum chamber of
the engines. Per design intent the IBF system prevents foreign objects such as grass,
sand or dust or any other particles from being ingested into the engine inlet air
stream. With a filtering efficiency better than 99%, the device serves as a means
to reduce erosion of compressor blades and other engine components in case of
operations in dusty or polluted atmosphere.
BENEFITS
Reduced erosion of the engine compressor components.
Filtering efficiency better than 99 %.
Less inspections and exchanges of engine parts due to erosion.
Completely covered installation under the transmission cowling.

WEIGHT

MOMENT

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY


S/N 9004 and up. Incompatibility with the sandfilter system. Compliance is optional.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

290 hours

Mechanics

220 hours

Composites

115 hours

Structures

25 hours

Paint Work

5 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

Details s. SB (incl. kits


C1-C5)

Retrofit Kit Detachable Provisions

All Configurations

2 - 6 weeks

Details s. SB (incl. kits


C6-C16)

Retrofit Kit Fixed Provisions

All Configurations

2 - 6 weeks

SB-117C2-71-0052C17-1

Optional Maintenance Kit

All Configurations

2 - 6 weeks

SB-117C2-71-0052C18-1

Optional Filter Kit

All Configurations

2 - 6 weeks

SB-117C2-71-005-2C19

Optional Equipment XMSN Cover LH

All Configurations

2 - 6 weeks

SB-117C2-71-005-2C20

Optional Equipment XMSN Cover RH

All Configurations

2 - 6 weeks

SB-117C2-71-005-2C21

Optional Equipment Generator Cover Assy

All Configurations

2 - 6 weeks

SB-117C2-71-005-2C22

Optional Equipment WeatheRProtection

All Configurations

2 - 6 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

148

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Airframe & System Upgrades

Main Rotor Blade Erosion Protection


Applicable to version(s) : According to Service Bulletin
Longer main rotor blade durability.
Application and repair procedure of a sprayable erosion protection for the main
rotor blades. The initial coating can only be done by Airbus Helicopters Deutschland/
Airbus Helicopters, Inc..
BENEFITS
Better protection in high sandy environment.
Increased operating time and availability.
Avoids labor-intensive repair costs.

WEIGHT

MOMENT

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Paint Work

3 hours

Valid for all S/N. No incompatibilty with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

B621M1002103 +
B621M1015051

New Main Rotor Blade with Erosion Protection Coating

All Configurations

21 - 22 weeks

B621M1015051

Erosion Protection Coating 1Ea (Own Blade) with Receiving Inspection

All Configurations

6 - 7 weeks

SB-117C2-62-008-2C

Repair Kit

All Configurations

9 - 10 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

149

Airframe & System Upgrades

Vectorial Mast Moment Monitoring System


Applicable to version(s) : C2
Vectorial mast moment indication.
Installation of a vectorial mast moment system. The bending moment of the main
rotor hub-shaft and the relative direction to the helicopter center axis is shown with a
circular scale and a pointer. If the vectorial mast moment indication is not available,
the linear mast moment indication is automatically shown on the VEMD.
BENEFITS
Easy avoidance of limit exceedance.
Qualitative improvement of mast moment direction.
Relative direction to the helicopter center axis of the bending moment.
Coloured indication.

WEIGHT

MOMENT

GROUNDING

+ 0.4 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

40 hours

Valid for all S/N. No incompatibility with other systems. CPDS Version V2006 (retrofit
with Service Bulletin MBB-BK117 C-2-31-016) is required for the vectorial mast moment system. Compliance is optional.

KIT REFERENCES
REFERENCE
SB-117C2-63-003-2C

DESCRIPTION

CONFIGURATION

LEAD-TIME

Retrofit Kit Vectorial Mast Moment System

All Configurations

8 - 9 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

150

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

CABIN
& CABIN SYSTEMS

Cabin & Cabin Systems

New Blower for the Passenger Compartment Ventilation


Applicable to version(s) : According to Service Bulletin
Life time extension of the blower.
Improved, brushless blower for the passenger compartment ventilation.
BENEFITS
A considerably life time extension of the blower.
Low-maintenance due to elimination of the brushes.
Decreased costs for maintenance and for exchange.

WEIGHT

MOMENT

GROUNDING

- 0.1 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

40 hours

PRE-POST REQUISITE / EFFECTIVITY


Valid for all MBB-BK117 C-2 S/N 9004 up to and including S/N 9230. No incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-21-004-2C1

Retrofit Kit Brushless Blower

All Configurations

2 - 12 weeks

SB-117C2-21-004-2C2

Retrofit Kit Circuit Breaker (for S/N 9004 Up to and including S/N 9109)

All Configurations

2 - 12 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

152

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

DOORS & WINDOWS

Doors & Windows

Sun Shades
Applicable to version(s) : According to Service Bulletin
Provides protection from strong sun rays.
Installation of the sun shades protects the cockpit from strong sun rays and high UV
radiation. Work steps to be done: Removal of the front roof panelling, Installation of
the fixed part, Installation of the sun shades, Installation of the front roof panelling.
BENEFITS
Protection from sun rays by installation of the sun shades above the pilot/
copilot seats.
Improvement of flight safety through glare protection.

WEIGHT

MOMENT

GROUNDING

+ 2.1 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

5 hours

Valid for all S/N. No incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-25T-007-2C

Sun Shades LH and RH - Mounting Materials

All Configurations

4 - 5 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

154

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

PROTECTION
& MOORING

Protection & Mooring

Cabin Structure - Large Edge Protection


Applicable to version(s) : C2
This installation reinforce the protection of the cabin entry area.
Large edge protection for the lower cabin structure.This edge protection protects the
cabin entry areas against abnormal wear and damage.
BENEFITS
Protection against abnormal wear and damage.
Scratch-resistant surface.
Protection of the lower cabin structure.

WEIGHT

MOMENT

GROUNDING

INSTALLATION TIME

PRE-POST REQUISITE / EFFECTIVITY

QUALIFICATION

INSTALLATION DURATION

Mechanics

12 hours

Valid for all S/N. No incompatibility with other systems. Compliance is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-85-012-2.C

Edge Protections Large

All Configurations

6 - 7 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

156

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Protection & Mooring

Center Protection for the Skid Tubes


Applicable to version(s) : According to Service Bulletin
Prevents the skid tubes from getting damaged.
Installation of a center skid protection for the skid tubes.
BENEFITS
Improved protection of the skid tubes when the helicopter is landed on unsurfaced ground.
Prevents the skid tubes from getting damaged by stones and sharp edges.

WEIGHT

MOMENT

GROUNDING

+ 2.6 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

6 hours

PRE-POST REQUISITE / EFFECTIVITY


Valid for all S/N, except for landing gears equipped with snow skids or emergency
flotation system.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-32-006-2C2

Retrofit Kit for Center Skid Protection

All Configurations

4 - 16 weeks

SB-117C2-32-006-2C2

Standard Parts

All Configurations

4 - 16 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

157

Protection & Mooring

Wear Pads for the Cable Deflector


Applicable to version(s) : According to Service Bulletin
Reduce the wear on the hoist cable.
Installation of wear pads for the cable deflector of the emergency floatation system.
The pads help to protect the hoist cable from excessive wear.
BENEFITS
Reduces the wear on the hoist cable.

WEIGHT

MOMENT

GROUNDING

+ 0.6 kg

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

5 hours

PRE-POST REQUISITE / EFFECTIVITY


Effective for all S/N equipped with external mounted hoist system and emergency
flotation system. The cable deflector must have already been installed. Compliance
is optional.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-32-008-2C1

Retrofit kit of wear pads

All Configurations

4 weeks

SB-117C2-32-008-2C2

Standard parts

All Configurations

On request

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

158

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

SAFETY

Safety

Emergency Jettison & Locking Mechanism


Applicable to version(s) : According to Service Bulletin
Increased safety for air crew.
Installation of an emergency jettison system for the cockpit doors. Furthermore, the
Installation of a locking mechanism for the emergency jettison lever can be ordered for emergency jettison systems that have already been installed. This locking
mechanism prevents an unnoticed reset of the emergency jettisoning lever, once
it has been activated. Additionally, a red paint mark appears when the emergency
lever has intentionally or unintentionally been moved.
BENEFITS
In case of an emergency a faster exit is possible.
Increased safety for air crew.
Prevention of an unintentional activation.

WEIGHT

MOMENT

GROUNDING
PRE-POST REQUISITE / EFFECTIVITY
Valid for all S/N. Compliance is optional. For possible operational incompatibilities
FLM and FMS must be respected.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

30 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-52-005-2C1-1

Emergency Jettison System

All Configurations

2 - 16 weeks

SB-117C2-52-005-2C2

Locking Mechanism

All Configurations

2 - 16 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

160

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

Enhanced ground proximity warning system (EGPWS)


Applicable to version(s) : Depending on equipment installed in the helicopter
Installation of an Enhanced Ground Proximity Warning System (EGPWS).

BENEFITS
Real-time data-based situational awareness display of surrounding terrain and
obstacles in relation to the helicopters altitude and flight path.
Visual and audible warning system factoring in terrain, man-made obstacles
and other primary scenarios associated with Controlled Flight Into Terrain (CFIT)
risks.

WEIGHT

MOMENT

GROUNDING

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

230 hours

Mechanics

20 hours

Structure

80 hours

Paint Work

10 hours

Not Applicable.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-34-015

Enhanced Ground Proximity Warning System retrofit kit

All Configurations

On request

NOTES
Please return filled Reply Form Sheet stated in T.I.P.I. and contact department: contact.customized-sb@eurocopter.com.
The installation of this equipment depends on the helicopter's configuration and will be verified as soon as the reply form sheet has been received.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

161

Safety

Fuel Flowmeter
Applicable to version(s) : C2
Display of the current fuel flow / fuel consumption and the remaining helicopter flight time on the CPDS.
Installation of a fuel flowmeter. With the installation of a fuel flowmeter on engine
fuel supply lines, the current fuel flow / fuel consumption and the remaining helicopter flight time will be shown on the central panel display system (CPDS).
BENEFITS
Display of the current fuel flow.
Display of the current fuel consumption.
Improvement of the flight time management.

WEIGHT

MOMENT

GROUNDING

+ 1.0 kg
PRE-POST REQUISITE / EFFECTIVITY
Effective for all S/N. No incompatibility with other systems. Compliance is optional.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

35 hours

Mechanics

5 hours

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-28-002-2C

Retrofit Kit for Fuel Flowmeter

All Configurations

12 - 13 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

162

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

Usage Monitoring System (UMS)


Applicable to version(s) : According to Service Bulletin
Recording of engine data, limit exceeding and flight time.
Installation of a usage monitoring system (UMS) for helicopters with an installed
cockpit voice and flight data recorder (CVFDR).
BENEFITS
Recording of engine data, limit exceeding and the flight time.
Improves flight safety and increases the helicopter availability.
Provides a management aid for scheduled as well as unscheduled maintenance.

WEIGHT

MOMENT

GROUNDING

+ 1.8 kg

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

80 hours

Mechanics

40 hours

Effective for all S/N that have an installed cockpit voice and flight data recorder
(CVFDR). A free mounting slot in the center console is necessary (max. 38 mm).
Compliance is recommended.

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

SB-117C2-31-050-2C1

Retrofit of UMS for Helicopters Up to and Including S/N 9109

All Configurations

2 - 8 weeks

SB-117C2-31-050-2C2

Installation of Additional SSQAR Parameters for Helicopters Up to and Including S/N 9109

All Configurations

2 - 8 weeks

SB-117C2-31-050-2C3

Retrofit of UMS for Helicopters Starting with S/N 9110

All Configurations

2 - 8 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

163

Safety

Voice Alarm for the Radar Altimeter


Applicable to version(s) : According to Service Bulletin
To give the crew an audible warning of the height.
Installation of a voice alarm.
BENEFITS
To give the crew an audible warning of the height (below 100 feet).
Enhanced safety for the crew and helicopter.
Prerequisite for NVG operation.

WEIGHT

MOMENT

GROUNDING

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Electrics

On request

Mechanics

On request

PRE-POST REQUISITE / EFFECTIVITY


Effective for all EC145, all models, with Radar Altimeter KRA405B. The ability to Installation depends on the helicopter's configuration and is verified with the reply form
sheet. Compliance is optional.

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

164

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Dauphin
AS365 / EC155

DOORS & WINDOWS

Doors & Windows

Extended Cowling Rod


Applicable to version(s) : B, B1
Replacement of engine cowling torque links to extend the opening capacity.
This upgrade improves the opening of the removable engine cowlings so as to facilitate maintenance in the engine compartments. It consists in replacing the removable engine cowling torque links by a new system composed of a rod and new
cowling stops.
BENEFITS
Reduces direct costs of maintenance.

WEIGHT

MOMENT

GROUNDING

Not applicable

Not applicable

2 days

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

8 hours

Composites

9 hours

PRE-POST REQUISITE / EFFECTIVITY


Helicopters pre-MOD 0750B40 (Improvement of engine cowling torque links).

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Version(s) pre-MOD 0750B40 (Improvement of engine cowling rod torque links)

KIT REFERENCES
REFERENCE

DESCRIPTION

365A5817400071

Engine Cowling Torque Link Replacement Kit

CONFIGURATION

LEAD-TIME

24 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

VG95343T05E005A

Tubing, heat-shrink, self extinguishing

10 cm

ECS001010

Adhesive

100 g

ECS204340

Fiberglass, hybrid

1 m

BJ00930

Powder, Micro-ballon

100 g

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

169

Doors & Windows

Extended Cowling Rod


Applicable to version(s) : N, N1, N2, N3
Replacement of engine cowling torque links to extend the opening capacity.
This upgrade is also applicable to military versions F, F1, Fs, K and GA.
This upgrade improves the opening of the removable engine cowlings so as to facilitate maintenance in the engine compartments. It consists in replacing the removable engine cowling torque links by a new system composed of a rod and new
cowling stops.
BENEFITS
Reduces direct costs of maintenance.

WEIGHT

MOMENT

GROUNDING

Not applicable

Not applicable

1 day

PRE-POST REQUISITE / EFFECTIVITY

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Mechanics

8 hours

Composites

9 hours

Helicopters pre-MOD 0750B40 (Improvement of engine cowling torque links).

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Version(s) pre-MOD 0750B40 (Improvement of engine cowling rod torque links)

KIT REFERENCES
REFERENCE

DESCRIPTION

365A5817400071

Engine Cowling Torque Link Replacement Kit

CONFIGURATION

LEAD-TIME

24 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES

170

REFERENCE

PRODUCT DESCRIPTION

VG95343T05E005A

Tubing, heat-shrink, self extinguishing

10 cm

ECS001010

Adhesive

100 g

ECS204340

Fiberglass, hybrid

1 m

BJ00930

Powder, Micro-ballon

100 g

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

EXTERNAL LOADS

External Loads

Goodrich Electrical Hoist (272 kg/600 lb) for AS365


Applicable to version(s) : N3
For missions such as rescue work, hoisting up or lowering loads or personnel. The category 1 hoist is fitted with a translating drum and a fixed cable
guide, for improved efficiency during hoisting operations (reduction of cable
movements due to fixed reference point, winding up regularity improvement
reducing cable blocking risks).
Installation of a hoist for lifting heavy loads at a speed and height greater than those
of the CAT 2 hoist. The Goodrich Category 1 electrical hoist installation, on Dauphin
family has been certified under FAR29.865 amdt 43 for both Class B and D of
rotorcraft load combination.
BENEFITS
Increase the maximum rated load to 272 kg/ 600 lb.
The hoist can be used continously with maximum load.
Possible faster rescue operation.
DMC reduction.
Possible cable tilting up to 45.
For helicopters already equipped with a hoist, the tubular structure is kept.

WEIGHT

MOMENT

GROUNDING

+ 66 kg*

PRE-POST REQUISITE / EFFECTIVITY


Applicable to helicopters equipped with Cat. 2 or Cat. 1 hoist Fixed Part. Incompatible with VIP versions, helicopters equipped with stretcher, medical mobile part or
swing-doors. Input power: 28 VDC.

4 days

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

10 hours

Mechanics

15 hours

Structures

7 hours

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Version(s) N3 equiped by class2 FP hoist (POST MOD OP2288), PRE MOD OP45C76, OP45C72 and 0745C82

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

365A8280330171

Kit Fix. Sec. Winch

24 weeks

365A8280360171

Kit Instal. Moving Section

44 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

E00433C0

Binding clamp

150

23321

Wire,Snap,Copper,D:0,3

0.2 m

E00431C0

Binding clamp

30

42315281

Cartridge for Cable Cutter

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

172

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

REQUIRED TOOLING FOR INSTALL


REFERENCE

PRODUCT DESCRIPTION

CONFIGURATION

REQUIRED QUANTITY

AVAILABILITY

600-061

Manual pliers (Pince BAND-IT "TIE-DEX")

All Configurations

On request

On request

NOTES
* Weight of complete installation

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

173

SAFETY

Safety

Health & Usage Monitoring System (HUMS)


Applicable to version(s) : B, B1
The Health Usage Monitoring System (HUMS) records the status of critical
systems and components on your helicopter. The objective is to detect at an
early stage progressive defects.
The HUMS system is using sensors installed throughout the airframe. This material
is linked to a central computer unit with a data recording and storage system. This
is allowing the support to identify if the helicopter is likely to develop faults that
would need an intervention. This system is monitoring the health of all significant
vibrating and spinning parts such as engines, gearboxes, shafts, fans, rotor systems
etc. Thanks to the record of all of these data, the maintenance of the helicopter can
be proactively performed.
BENEFITS
Maintenance flights are not required anymore.
Mission aborts reduction.
Flight safety improvement.
Improved Helicopter's performance.
Fuel consumption reduction.
AOG rate reduction.
Help to define what rectification can be applied to avoid immediate effect on
operational safety.

WEIGHT

MOMENT

+ 9.52 kg

6.902 m.kg

PRE-POST REQUISITE / EFFECTIVITY


This upgrade is not applicable to helicopters integrating the following modifications:
365R001052.00, 365R001052.01 or 365R001052.02.

GROUNDING

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Structure

30 hours

Electrics

55 hours

Mechanics

30 hours

Pilot

1 hour

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

All configurations with the following modifications: OP31B27, OP31B28, 0739C02 and OP31B22, OP31B23, 0731B39, 0739C17, 0739C26, 0764B46 or
0761B27

All configurations with the following modifications: OP31B27, OP31B28, 0739C02 and 0724C37, 0724C38, 0731B74, 0731B39, 0731B56 or 0731B74,
0739C26 and 0761B27

All configurations with the following modifications: OP31B27, OP31B28, 0739C02 and 0724C37, OP31B22, OP31B23 + 0731B35 and 0764B46

All configurations with the following modifications: OP31B27, OP31B28, 0739C02 and 0724C37, OP31B22, OP31B23, 0764B46, 0731B39

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

365AECHUMS1071

Full HUMS Inst. Compl.

28 weeks

365AECHUMS0071

Full HUMS Installation

1, 2, 3, 4

20 weeks

365AECHUMSE071

Full HUMS Equip. Inst.

1, 2, 3, 4

48 weeks

365AECHUMS2071

Full HUMS Inst. Compl.

28 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

175

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

365AECHUMS3071

Full HUMS Inst. Compl.

12 weeks

365AECHUMS4071

Full HUMS Inst. Compl.

28 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

176

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Super Puma
AS332 / EC225

SAFETY

Safety

Visual Icing Indicator for AS332


Applicable to version(s) : L2
Outside visual icing indicator on pilot's door to visually provide icing level
reached. Authorizes the flight in limited icing conditions (See supplement 4
of the Flight Manual).
Indicator in the form of a disc with graduated luminescent concentric circles, located outside the helicopter on the pilot's door. Measurement unit: millimeters.
BENEFITS
Provides the icing level indication in case of unavailability or removal (whether
part or full) of the IPS system components.
By night or under poor visibility conditions, a light strip lights the visual indicator.

WEIGHT

MOMENT

GROUNDING

+ 0.32 kg

0,41 m.kg

1 day
PRE-POST REQUISITE / EFFECTIVITY
Not applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

2 hours

Structures

2 hours

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Helicopter(s) S/N 2380, 2493, 2471

KIT REFERENCES
REFERENCE

DESCRIPTION

332P0837610071

Ice Indicator Kit

CONFIGURATION

LEAD-TIME

20 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

E00434C0

Binding clamp

20

E00431C0

Binding clamp

20

E00433C0

Binding clamp

20

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

181

Safety

ADSB-Out Activation Procedure


Applicable to version(s) : LP
Bring the helicopter to AMC20-24 and DO-260-A standards by enabling the
ADSB-Out function through FDS (Flight Display System) application software
change of the PU (Processing Units) from version V5.11 to V5.11A and through
a wiring environment modification.
The ADS-B Out is a system designed to improve air traffic management. This system is provided especially for surveillance in a non radar-controlled environment.
The ADS-B Out transmits periodically the helicopters parameters, supplied by the
airborne equipment to the ATC (Air Traffic Control) ground stations without any pilot
action. The message transmitted by the ADS-B Out includes parameters such as the
position (latitude, longitude, altitude), the speed (horizontal and vertical) and the
heading.
BENEFITS
Position reports by voice no longer required for identified ADS-B aircraft.
Weather radar through flight flight information service-broadcast (FIS-B).
Broadcast terrain overlay.
ADS-B ground stations cheaper to install and operate compared to primary and
secondary radar systems.

PRE-POST REQUISITE / EFFECTIVITY


For effectivity, this software upgrade may need the modifications "GPS and TDR Replacement for ADSB-Out Compliance" (See in this catalogue.)

WEIGHT

MOMENT

GROUNDING

Negligeable

Negligeable

2 days

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Helicopters in configuration PRE 2010 with CMA9000

Helicopters in configuration PRE 2010 with RTU

Helicopters in configuration POST 2010

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

332P0838960071

ADS-B-OUT Activation Kit PRE-2010

On request

24 weeks

332P0838560071

ADS-B-OUT Activation Kit POST-2010

On request

24 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

182

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

GPS Replacement for ADSB-Out Compliance


Applicable to version(s) : LP
Ensure conformity with ADS-B Out standard DO-260-B by replacing the GPS's
receptor (Global Positioning System) CMA 3024 by the receptor GPS CMA
5024.
The ADS-B Out is a system designed to improve air traffic management. This system is provided especially for surveillance in a non radar-controlled environment.
The ADS-B Out transmits periodically the helicopters parameters, supplied by the
airborne equipment to the ATC (Air Traffic Control) ground stations without any pilot
action. The message transmitted by the ADS-B Out includes parameters such as the
position (latitude, longitude, altitude), the speed (horizontal and vertical) and the
heading.
BENEFITS
Position reports by voice no longer required for identified ADS-B aircraft.
Weather radar through flight flight information service-broadcast (FIS-B).
Broadcast terrain overlay.
ADS-B ground stations cheaper to install and operate compared to primary and
secondary radar systems.
PRE-POST REQUISITE / EFFECTIVITY
For full effectivity, this upgrade may need the modifications "Activation for ADS-B Out
Procedure and TDR Replacement for ADSB-Out Compliance" (See in this catalogue.)
WEIGHT

MOMENT

GROUNDING

Negligeable

Negligeable

4 hours

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Helicopters in conf Configuration PRE 2010

Helicopters in conf Configuration POST 2010

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

332R0850840572

GPS CMA 5024 Installation Kit

On request

24 weeks

332P0838990E71

GPS CMA 5024 Replacement Kit

On request

24 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

183

Safety

Transponder Replacement for ADSB-Out Compliance


Applicable to version(s) : LP
Make ADS-B Out installation possible by the replacement of the TRD94D status
008 transponder by a TRD94D status 409.
The ADS-B Out is a system designed to improve air traffic management. This system is provided especially for surveillance in a non radar-controlled environment.
The ADS-B Out transmits periodically the helicopters parameters, supplied by the
airborne equipment to the ATC (Air Traffic Control) ground stations without any pilot
action. The message transmitted by the ADS-B Out includes parameters such as the
position (latitude, longitude, altitude), the speed (horizontal and vertical) and the
heading.
BENEFITS
Position reports by voice no longer required for identified ADS-B aircraft.
Weather radar through flight flight information service-broadcast (FIS-B).
Broadcast terrain overlay.
ADS-B ground stations cheaper to install and operate compared to primary and
secondary radar systems.
PRE-POST REQUISITE / EFFECTIVITY
WEIGHT

MOMENT

GROUNDING

Negligeable

Negligeable

1 day

For full effectivity, this upgrade may need the modifications "Activation for ADS-B Out
Procedure and GPS Replacement for ADSB-Out Compliance" (See in this catalogue.)

CONFIGURATION MATRIX
CONFIGURATION

PRE-MOD STATUS

Helicopters in configuration PRE 2010

Helicopters in configuration POST 2010

KIT REFERENCES
REFERENCE

DESCRIPTION

CONFIGURATION

LEAD-TIME

332R0850850371

TDR94 Installation Kit

On request

24 weeks

332R0850850E71

TDR94 Replacement Kit

On request

24 weeks

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.

184

Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

Safety

Visual Icing Indicator for EC225


Applicable to version(s) : LP
Outside visual icing indicator on pilot's door to visually provide icing level
reached. Authorizes the flight in limited icing conditions (See supplement 4
of the Flight Manual).
Indicator in the form of a disc with graduated luminescent concentric circles, located outside the helicopter on the pilot's door. Measurement unit: millimeters.
BENEFITS
Provides the icing level indication in case of unavailability or removal (whether
part or full) of the IPS system components.
By night or under poor visibility conditions, a light strip lights the visual indicator.

WEIGHT

MOMENT

+ 0.32 kg

0.41 m.kg

GROUNDING
PRE-POST REQUISITE / EFFECTIVITY
Not applicable.

INSTALLATION TIME
QUALIFICATION

INSTALLATION DURATION

Avionics

2 hours

Structures

2 hours

CONFIGURATION MATRIX
CONFIGURATION
1

PRE-MOD STATUS
Helicopters S/N 2600, 2623, 2645, 2656, 2659, 2663, 2666, 2670, 2674, 2676, 2678, 2685, 2687, 2691, 2692, 2693, 2702, 2715, 2716, 2721, 2725,
2739, 2742, 2744, 2747, 2749, 2750, 2753, 2755, 2756, 2759, 2767, 2797, 2824, 2854, 2883, 2885, 2901, 2921

KIT REFERENCES
REFERENCE

DESCRIPTION

332P0837610071

Ice Indicator Kit

CONFIGURATION

LEAD-TIME

20 weeks

CONFIGURATION

REQUIRED QUANTITY

ADDITIONAL REQUIRED SPARES


REFERENCE

PRODUCT DESCRIPTION

E00434C0

Binding clamp

20

E00431C0

Binding clamp

20

E00433C0

Binding clamp

20

FOR ORDER PLACEMENT, PLEASE ADVISE YOUR USUAL BUSINESS CONTACT OR YOUR LOCAL ORDER ADMINISTRATION DEPARTMENT STATING YOUR HELICOPTER'S S/N.
Standard Upgrades - e.AHSU-DEC-2014

www.airbushelicopters.com

185

Standard Conditions of Sale

187

STANDARD CONDITIONS OF SALE


1- DEFINITIONS
- AOG (Aircraft On Ground) means a situation in which the Helicopter is unable to fly or is
ineligible to return to service because of an unscheduled need for replacement or major
repair of components, not related to schedule maintenance tasks.
- BFE/CFE means Buyer Furnished Equipment / Customer Furnished Equipment
- Certificate of Conformity (or Statement of Conformity) means the document issued by
the Seller quality assurance organization after completion of procedures approved by
the respective authorized national agency certifying the Products conformity with the
Sellers applicable specifications.
- CAMO means Continuing Airworthiness Management Organization
- Contract means the agreement between the Seller and the Customer of which these
Standard Conditions of Sale form part, comprising the applicable Specific Annex and the
Purchase Order or Order Confirmation.
- Core Unit means the used Part sent by the Customer to the Seller in case of exchange
for an overhauled or repaired Part under the standard exchange service.
- Customer means the person, entity, or company to whom the Seller sells any Products
and/or Services under the Contract.
- Documentary Credit means an irrevocable, confirmed and non-transferable documentary credit.

- SCS means general Standard Conditions of Sale for Products and Services.
- SB means Service Bulletin
- STC means Supplemental Type Certificate and also refers to an equipment which has
a STC
- TAT means Turn Around Time, from the time the Seller receives the Customers Item to
the time the Item is at the Customers disposal, less the Customers approval lead time
and/or less lead time due to Customers responsibility discrepancies.
- Training Items means training software, training documentation and courseware.
- Training means training need analysis, training courses, simulator sessions and on-job
training.
- TSN, TSO, TSR, TBO mean respectively Time Since New, Time Since Overhaul, Time Since
Repair and Time Between Overhaul.

2- SUBJECT AND SCOPE


These general Standard Conditions of Sale apply to any sale of Products and/or Services
sold by the Seller to its Customer(s), excluding brokerage or other distributor activities.
The purchase of the Products and/or Services by a Customer is considered to be performed
within the framework of its professional activities.

- EASA means European Aviation Safety Agency

These general Standard Conditions of Sale are supplemented by the relevant Specific
Annex as quoted hereinafter, when applicable:

- Helicopter means helicopter manufactured by the Seller

- for Helicopter sales:

- Item means transmission components, blades and/or equipment.

Sale of new Helicopters and associated services

- OTL, SLL mean respectively Operating Time Limit and Service Life Limit

Sale of second hand Helicopters and associated services

- Part means a piece of an Item.

- and for Products (other than Helicopters) and Services:

- Party/Parties mean either separately or collectively the Customer and/or the Seller.

Sale of Spare Parts

- Product(s) means the goods to be provided by the Seller under the Contract in conformity with the applicable specification and/or definition, including all types of Helicopters,
optional equipment, Spare Parts, tools, other equipment, documentation, technology,
data, software (and any other goods mentioned under the Specific Annex, when applicable).

R&O Services
Technical publications, technical assistance, technical expert services, tool rental
Training Services and Training Items
Helicopter maintenance, repair, overhaul, inspection, upgrade and retrofit

- Production Organization Approval (POA) means approvals issued by the respective


competent authority to the Seller in compliance with EASA part 21/G regulation.
- Order Confirmation means the acknowledgement of receipt of the Customers order by
the Seller, either the confirmation sent by the Seller to the Customer in order to take into
account the Customers order or the approval sent by the Customer to the Seller on the
Quotation of Services not included in the Sellers price list
- Purchase Order (or Order) means the order covering the acquisition of Products and/
or Services
- Quotation means the priced offer and associated conditions, sent to the Customer by
the Seller.
- RMA means Return Material Authorization format provided by the Seller for the purposes
of the warranty article
- R&O means the following activities: repair, overhaul, standard exchange, inspection and
modification of an Item
- Seller means Airbus Helicopters (SAS) located in Marignane, France and/or Airbus Helicopters Deutschland GmbH, located in Donauwrth, Germany.
- Service(s) means the services which may be performed under the Contract consisting
of:
performance of R&O
technical publications, technical assistance, technical expert services, and/or tool
rental
performance of Training, and
any other services mentioned under the Specific Annex, when applicable

- Specific Annex means the annex of SCS detailing specific conditions


- Spare Parts means new parts to be provided by the Seller.

188

3 - PURCHASE ORDER / QUOTATION


3.1 Sale of Helicopters and associated Services
Purchase Order
The Helicopter Contract shall be binding when signed by both the Seller and the
Customer and will come into force at receipt of the initial down-payment.

3.2 Products and Services sold independently


of a Helicopter sale
Order issuance, acceptance
Orders of a Customer shall be confirmed by the Seller in writing. The Contract shall
become binding upon receipt by the Customer of the Sellers Order Confirmation and
will come into force at receipt of the down payment when relevant (as mentioned under
article 6.2 hereinafter). The delivery schedule shall become effective upon receipt of the
down payment.
In case the Customer requires a Quotation from the Seller, the Contract shall become
binding when the Seller receives the Customers written approval of such Quotation
issued without changes. Such Quotation duly signed by the Customer will constitute the
Order Confirmation when received by the Seller.

3.3 Purchase Order modifications

5 - PRICES

3.3.1 Seller Purchase Order modifications

5.1 General

Pursuant to new manufacturing or engineering requirements, obsolescence or new


regulations, the Seller may carry out modifications without the consent of the Customer,
as long as such modifications do not affect the specification and/or performance of the
Product and/or Services, and/or delivery time. Should the requirements affect specification
and/or performance of the Product and/or Services, related costs and/or delivery time,
the Seller and the Customer shall agree separately on the contractual consequences.
If after one (1) month, the Parties fail to reach an agreement, the Seller is entitled to
terminate the Contract under the conditions stated in article 14.1 hereinafter.

3.3.2 Customer Purchase Order modifications


Any changes or configuration changes requested by the Customer require mutual written
agreement of the Parties and may lead to an adjustment of the price and/or delivery
time.

4. EXPORT AND IMPORT LICENCES


AUTHORIZATIONS, CUSTOMS
4.1 Export and Import licences - authorizations
All Products, including but not limited to item(s)/commodity(ies) (goods/hardware,
software and technology(ies)) and/or Services may be subject to export laws and
regulations as well as national, foreign and international regulations, and the
Parties acknowledge that violations to such laws and regulations are prohibited.
The Seller will perform all necessary and appropriate procedures for requesting any
official authorizations (such as export licenses) needed for the performance of this
Contract. The Customer agrees to provide reasonable assistance or documentation or
certificate requested by the Seller to obtain the necessary authorizations and/or to
ensure compliance with the applicable laws and regulations.
The Seller shall not be liable towards the Customer in case such authorizations are not
granted or are granted with delay or if an authorization that has been granted is revoked
or not renewed. Such event shall be considered as a force majeure case as per article
13.1 hereinafter.
The Customer shall obtain in due time any import license/authorization demanded in
its country for the Products and/or Services covered in the Contract. The Seller agrees
to provide, upon Customers request, reasonable assistance and any documentation for
obtaining the import licenses and/or to ensure compliance with the applicable laws and
regulations.
Export licences/authorizations are provided for a specific end-use/end-user and/or with
specific provisions and/or conditions. The Customer undertakes to abide by the content
of governmental licences/authorizations and to warrant and represent certificates
signed in the context of application procedures. Any change in the end-use/end-user of
the corresponding items/commodities and/or Services requires the prior authorization of
the government that has issued the said export licences/authorizations. The Customer
shall therefore notify the Seller prior to any transfer of control, possession, registration,
title, ownership, etc. of items/commodities and/or services to any third party in order
to allow the Seller to assess the necessary actions to be taken and procedures to be
applied. Then the Customer shall follow the instructions given by the Seller.
The Parties also agree not to re-export any technical information or technology that may
be exported under this Contract without first obtaining the other parties approval and,
when necessary, Governmental approval from the relevant authorities.

4.2 Export and Import - Customs


Irrespective of the applicable Incoterm, if Products are exported directly to a country
outside the European Union, the Seller will take over the responsibility to provide appropriate
export customs documentation to the Customer or its designated freight forwarder. The
Customer guarantees correct closure of the respective customs procedure in due time
on leaving the European Union or the country of dispatch. In case of non-compliance,
the Customer shall be liable for any additional costs and charges imposed on the Seller
by national tax administration.
In case of transportation by the Seller of Products by ferry-flight, the Customer will have
to provide additional documentation to the Seller to prove exportation for value added
tax purposes. The Seller will inform the Customer about the required documentation in
due time before the delivery date.

Prices are indicated and payable in Euros.


Helicopter prices and other Products and Services sold together with Helicopters
are according to the baseline Helicopter definition in force at the date of signature
of the Contract and to the specific configuration and scope detailed in the Contract.
For Products and Services sold independently of Helicopters, all invoices for Products
and Services will be at the prices indicated in the relevant Sellers price list in force,
or in the relevant Quotation. The Sellers price lists are subject to regular updates.
Prices are for Products and Services delivered in accordance with the Incoterms mentioned in each specific Annex of this SCS.

5.2 Duties and taxes, VAT


Prices are exclusive of taxes, duties and/or charges resulting from administrative and
legislative regulations in force in any country other than the Sellers country and of any
customs and duty charges, which shall be borne by the Customer.
Prices are exclusive of Value Added Tax (VAT) or sale taxes or turnover taxes or similar
taxes. If applicable, such taxes will be applied additionally.

5.3 Additional costs/ Chargeable amounts


Prices, unless otherwise stipulated in the Contract, do not include any preparation,
packing and crating charges nor modifications carried out at Customers request before
and after delivery, expenses incurred for the inspection of Products by third parties, expenses relating to freight forwarding, carriage by sea, air or land, ferry-flight, storage and
insurance costs after Customers acceptance.
For all orders below a minimum purchase amount of two hundred (200) Euros, the Seller
reserves the right to invoice a minimum chargeable amount of two hundred (200) Euros.

6 - PAYMENTS
6.1 General
The payment obligation will be considered fulfilled at the time the due amount is irrevocably
credited in full to the Sellers bank account as mentioned in the Contract.
The Customer shall make the payment by bank transfer (swift), which, on request of the
Seller, may be secured by a stand-by letter of credit or a Documentary Credit.
Any down payments are non-refundable, as they are necessary to partially cover the
production, procurement, financial, administrative and other costs.
In case of payment by Documentary Credit, the Customer shall at the time of the initial
down payment and/or Purchase Order, open at its own expense, a Documentary Credit
in favour of the Seller for the Contract price, reduced by the initial down-payment, if any.
Such Documentary Credit shall permit partial deliveries and shall be valid for the total
specified period of delivery or performance plus three (3) months so as to cover the time
required for preparing necessary documents and for performing the payment.
The Documentary Credit shall be payable at sight in favour of the Seller as deliveries are
made upon presentation of the following documents by the Seller to the bank:
- In case of Helicopter sale :
Commercial invoice in triplicate, and
Statement of conformity or Certificate of Conformity for Helicopters and optional
equipment installed therein,
Authorized Release Certificate (EASA* Form 1) for packed optional equipment and
Spare Parts and
Certificate of Conformity for miscellaneous parts and tools which are not subject
to installation on Helicopter.

- In case of Products and Services sold independently of a Helicopter sale


Commercial invoice in duplicate, and
Any document specified by the Seller and mentioned under the Contract.
Should the Documentary Credit expire before full delivery is completed, the Cus-

tomer shall in due time extend, at its expense, the Documentary Credit without any
need for action in this respect on the part of the Seller.

189

6.2 Payment terms

- a maintenance organisation approval in compliance with the EASA Part 145 regulation,
and

6.2.1 Sale of Helicopters and associated Services

- a training organisation approval in compliance with the EASA Part 147 for maintenance
staff and helicopter Part FCL for aircrews

The Customer shall perform the following payments:


- An initial down payment of thirty (30) per cent of the contractual amount no later than
fifteen (15) calendar days after the signature of the Contract,
- An intermediate down payment of
Twenty (20) per cent of the contractual amount, six (6) months prior to delivery for
EC120, AS350, EC130, AS355, EC135 and EC145 Helicopters, or
Thirty (30) per cent of the contractual amount, nine (9) months prior to delivery for
AS365, EC155, EC 175, AS332 L1e and EC225 Helicopters,

- The balance of the total contractual amount at the time of the acceptance of the Products
and Services and prior to delivery.
In case of sale of second-hand helicopter(s), the Customer shall perform the following
payments:
- An initial down payment of thirty (30) per cent of the contractual amount no later than
fifteen (15) calendar days after the signature of the Contract,
- The balance of the total contractual amount at the time of the acceptance of the Products
and prior to delivery.

6.2.2 Products and Services sold independently of a Helicopter sale


For any Order, the Customer shall perform the following payment:
- Upon Contract agreement, a thirty (30) per cent down payment of the total amount of
the Contract shall be paid by the Customer no later than fifteen (15) day following the
date of invoice;
- Upon delivery of the Products / performance of the Services, the balance of the invoiced
amount of the delivered Products or Items / performed Services shall be paid by the
Customer no later than thirty (30) days following the date of invoice.
For Spare Part or R&O Service orders not exceeding two hundred thousand (200,000)
Euros, full payment shall be made upon delivery no later than thirty (30) days following
the date of invoice.
Payment terms for Services such as Helicopter maintenance, repair, overhaul, upgrade,
retrofit or inspection are specific and defined in the relevant Specific Annex.
Unless otherwise agreed, no discount shall be granted by the Seller to the Customer in
case of early payment.

6.3 Penalties for late payment


Payment shall in no case be postponed or apportioned for any reason whatsoever. Thus,
in case of late payment, the Customer shall pay to the Seller interest on the unpaid
amount at the rate calculated on the basis of 10 percentage points per annum
computed on the basis of 365 days/year and the actual number of days elapsed since
the due date until the actual date of payment without any need for a formal demand or
any prior notice.
Without prejudice to the above, in the event of a delay or failure by the Customer to
pay, the Seller will be entitled to extend the schedule for an equivalent time period and/
or suspend performance of the Contract and/or in all cases, definitively retain any
payments already made by the Customer. The retention of any such payment shall not
preclude the Seller from seeking compensation from the Customer for further damages.
In the event of a delay or failure by the Customer to pay for more than two (2) months,
the Seller shall be entitled to terminate the Contract for default of the Customer under
the conditions defined under article 14.2 hereinafter.

7 - QUALITY ASSURANCE AND AIRWORTHINESS


7.1 General
Airbus Helicopters and Airbus Helicopters Deutschland GmbH hold, issued by its respective national civil aviation authorities,
- a POA in compliance with the EASA Part 21/G regulation,

190

The privileges of an approved production organization include the issuance of


airworthiness documents.
The Seller holds a CAMO approval certificate issued by its national civil aviation authority
in compliance with EASA Part M/ Subpart G.
The official recognition that Products and repaired / overhauled / standard exchange
Items have satisfied the quality assurance procedures is attested by the issuance of the
following documents:
For Helicopter(s) in baseline definition and installed optional equipment:
- A Statement of Conformity or Certificate of Conformity issued by the Sellers quality
organization to certify compliance with the contractual specification,
- An Aircraft Statement of Conformity (EASA Form 52) for Helicopters sold to customers
of EASA member states signed by the Sellers authorized certifying staff within the above
mentioned Production Organization Approval. The EASA Form 52 allows the issuance by
the National Civil Aviation Authority of the certificate of airworthiness for the European
countries members of EASA, or
- A certificate of airworthiness for export, for Helicopters sold outside the European Union,
issued by the national civil aviation authority upon submission by the Seller to the EASA
representative body of the above mentioned original Helicopter Statement of Conformity
(EASA Form 52),
- Upon request, a certificate of non-registration issued by the national civil aviation authority.
For optional equipment delivered packed, Spare Parts and repaired / overhauled / standard
exchange Items:
- Upon request, a Certificate of Conformity or other equivalent document issued by the
Sellers authorized certifying staff, for standard components,
- An authorized release certificate (EASA Form 1) for other certified components or
non-standard Spare Parts issued on behalf of the national civil aviation authority by the
Seller or the Sellers selected workshop.
- A Log Card if applicable
- A dual or tri release if required through a bi/tri lateral agreement between authorities
(e.g. FAR 145 / TCCA 145).
For miscellaneous parts and tools which are not subject to installation on the Helicopter
(if applicable):
- A Certificate of Conformity issued by the Seller.
The Customer who has its civil helicopter registered in a country under EASA regulation
is responsible of any task related to the management of the continuing airworthiness of
the helicopter or shall transfer this obligation by signing a contract with a CAMO in order
to ensure the proper accomplishment of the airworthiness management activities in
accordance with the regulation in force (Part M/ Subpart G). At the time of the signature of
the Contract with the Seller, the Customer shall indicate who will assume the responsibility
of the CAMO.

7.2 Modifications after delivery


The Seller will notify the Customer of any modifications that the competent national
airworthiness government agency has decided to impose on Helicopters or Spare Parts
of the same type. In the event of such modifications, the Seller shall make available to the
Customer, within a reasonable time, at the latters request and expense, the equipment kits
required to incorporate such modifications to the Helicopter and Spare Parts previously
delivered.
For this purpose, the Customer shall receive at no additional cost the technical
information bulletins relating to the type of Helicopter mentioned in the Contract for
as long as at least one Helicopter of the type remains in service with the Customer.

8 - ACCEPTANCE AND TRANSFER OF


OWNERSHIP AND RISK

defect and/or non-conformity with the order in a documented registered letter:

8.1 Helicopter acceptance activities

- in case of Products delivered CIP or DAP, the here-above time frames for acceptance
are the following:

- within twenty one (21) calendar days as from the date the Seller has notified that the
Product is ready to be collected, or

8.1.1 Helicopter acceptance activities by the Seller

forty eight (48) hours for AOG orders,

Prior to Customers acceptance activities for new Helicopters, the Seller shall perform
production ground and flight tests on Helicopters. Flight tests will not exceed per Helicopter:

fifteen (15) calendar days after the delivery for Training Items and/or technical publications

- Twenty (20) flight hours for EC120, AS350, EC130, AS355, EC135 and EC145 or,
- Thirty (30) flight hours for AS365, EC155 and EC175 or,
- Fifty (50) flight hours for AS332 L1e and EC225.
- Some equipment and components may be delivered with up to fifty (50) hours.
Additional hours may be flown in the event that development and installation of specific
equipment is requested by the Customer, and the cost of such additional hours shall be
borne by the Customer.
Helicopter non conformities with certified definition, which have an impact on Helicopter
operation and maintenance by the Customer, shall be submitted to the Customer for
approval.
Upon satisfactory completion of the Sellers acceptance activities, a Certificate of Conformity
will be issued by the Seller. As from the date of issuance of this document, the Helicopters
shall be deemed ready for Customers acceptance, referred to as the Ready for Acceptance
date.
Not later than (1) month prior to the date on which a Helicopter is to be Ready for
Acceptance by the Customer, the Seller will provide the Customer with a procedure
describing the acceptance process (organization, schedule, documents, etc) and
document(s) defining the flight tests that could be performed by the Customer (hereinafter
referred to as Acceptance Test Document(s)).The purpose of these tests is not to re-perform
certification tests. These documents shall be valid for all Helicopters of the same type.
Within one (1) week after receipt of the Ready forAcceptance notice,Customer will send to the
Seller the information required from the Customers representatives in order to be admitted
to Customers premises.The Customers inspection team shall not exceed three (3) persons.

8.1.2 Helicopter acceptance activities by the Customer


The acceptance activities by the Customer shall not exceed, per Helicopter:
- One (1) day for EC120, AS350, EC130, AS355, EC135 and EC145, or
- Two (2) days for AS365 and EC155, or
- Three (3) days for EC175, AS332 L1e and EC225.
The Customer shall bear its own expenses and costs related to the Customer acceptance
activities including but not limited to travel and accommodation of its representatives
during this process.
During the Customers acceptance activities, it may perform acceptance flights, the combined
time of which shall not exceed per Helicopter one (1) flight hour for EC 120, AS350,
EC130, AS355, EC135 and EC145 Helicopters and two (2) flight hours for AS365, EC155,
EC175, AS332 L1e and EC225 Helicopters.
Acceptance flights will follow the format and procedures described in the Acceptance
Test Document(s) provided by the Seller and shall be carried out under the responsibility
of a Sellers pilot acting as pilot in command.
Unless a major deviation from the specification is found during the Customers acceptance,
the Customer shall accept the Helicopters as being in conformity with the contractual
specifications. The acceptance shall be acknowledged by the Customers signature of
an acceptance certificate, designated as Acceptance Protocol and/or Acceptance and
Transfer of Ownership Protocol. In case the acceptance certificate is not signed within
the above acceptance time period, and without such absence of signature being duly
justified in writing explaining the precise reason of the rejection and the contractual
grounds of it, or if the Customer does not attend to the acceptance procedure, the
acceptance shall be deemed to have been granted by the Customer.

8.2 Acceptance of the other Products than the


Helicopters and Services
A Certificate of Conformity or equivalent document is issued by the Seller for other Products
than the Helicopters.

and claims against the carrier have to be made within three (3) working days as from
the date the Product reception. After expiry of such periods, the Customers acceptance
of the Products is deemed given unless a Customers rejection is duly justified in writing
and explaining the precise reason of the rejection and the contractual grounds of it.
For the Services, a certificate of completion of Services or assignment sheet shall be
issued once the Service has been performed. The Customer shall sign the form certifying
that the Service has been provided in accordance with the Contract. Unless a Customers
rejection being duly justified in writing and explaining the precise reason of the rejection
and the contractual grounds of it, the Service will be deemed accepted five (5) days after
issuance of the certificate of completion of Services or of the assignment sheet.

8.3 Collection of Products


The Customer shall collect the Helicopter within two (2) weeks after the transfer of
ownership in case of ferry flight or within one (1) month if it is to be dismantled or
conditioned for sea, air or road transport.
In case the Customer has requested pilots training following the acceptance of its
Helicopter, such duration shall be extended by the time required to train its pilot(s) on
its Helicopter.
The Customer shall collect any optional (i.e. not installed on Helicopter) packed equipment,
Spare Parts, R&O Items and/or tools :
- within four (4 weeks) for Products sold together with Helicopters
- within fifteen (15) days otherwise
following the notification by the Seller to the Customer of its availability.
If the Customer fails to pick up its Products within the above mentioned periods of time:
- The Customer shall reimburse the Seller any expenses incurred by the Seller such as
maintenance, storage, insurance, taxes and levies. The foregoing does not constitute any
obligation of the Seller to maintain, store or insure the Products beyond the date the
Products should have been collected.
- The Seller may terminate the Contract as per article 14.2 hereinafter and will not be
liable for any loss or damage incurred by the Customer as a consequence of termination.
In the event that Products are agreed to be delivered in consigned containers, the
Customer shall return said containers within fifteen (15) days after they are made
available to the Customer by the freight forwarder. After the expiry of this period, the
Seller shall be entitled to invoice the container at its current price.

8.4 Transfer of ownership and risk


8.4.1 Helicopters
Transfer of ownership of the Product is subject to the prior performance by the Customer
of its obligations, in particular full payment of the balance of the Contract and interest,
if any. Upon signature of the Acceptance Protocol or the Acceptance and transfer
of ownership protocol by the Seller and the Customer and upon full payment of the
Contract price, the ownership of the Products is transferred from the Seller to the
Customer. The Seller shall also immediately issue the bill of sale.
All risks relating to the loss of or damage to the Products pass to the Customer upon
delivery.
With respect to the Customers hull all risk and hull war risk insurance coverage, the
Customer shall cause the insurers of the Customers hull insurance policies to waive all
rights of subrogation against the Seller, its assignees and its directors, officers, agents
and employees. This waiver shall be applicable up from the time of the signature of
the Acceptance Protocol and/or the Acceptance and Transfer of Ownership Protocol.
Upon Customers request, at its costs, and according to the terms of the Contract, the
Seller will dismantle and package the Helicopter for transportation after the transfer of
ownership.

Concerning Products other than Helicopters, the Customer shall check and notify any

191

8.4.2 Products other than Helicopters


The transfer of ownership of any Products other than Helicopters takes place:
- at the Sellers facility, at the time of their collection by the forwarding agent appointed
by the Customer, or

- if the Product or any part thereof has suffered an accident, or


- in the event of a defect that is the result of normal wear and tear, or

- in case of Products delivered CIP or DAP, at the mentioned delivery place,

- if the Product has not been delivered by the Seller, or

and is subject to the prior performance by the Customer of its obligations in particular
the full payment of the delivered Products and interest, if any.

- if such Product or any part thereof is not properly stored and protected in accordance
with instructions delivered by the Seller, or

Accordingly, in the event that the Customer fails to pay according to the contractual payment
terms, the Seller reserves the right to terminate the Contract through notification sent by
registered letter and, if the Products are already delivered, to demand that said Products
be returned.

- if the defect is partly or wholly caused by a defective item not provided by the Seller, or

In the event that the laws of the country where the Products are delivered do not allow
the Seller to regain ownership and title, the Seller shall be entitled to benefit from any
other rights that such laws may confer. The Customer shall implement all measures
necessary to protect the Sellers aforementioned rights. In all cases, this will not prevent
the Seller from claiming any damages.

- if the software or the host media is exposed to any computer virus or to any conditions
in excess of those published in the applicable manuals, documentation and instructions
delivered by the Seller, as well as any alteration and/or modification not validated by the
Seller, having an impact on the software.
Normal wear and tear of item such as, but not limited to, seals, tires, inner tubes, bulbs,
packings and similar consumables parts, cannot form the subject of any claim under
the warranty.

Risk of loss or damage to the Products is transferred to the Customer at the time of
delivery of the Products by the Seller as determined by the agreed INCOTERMS 2010.

The warranty is granted to the Customer personally. The warranty constitutes the Sellers
sole liability in case of breach of the warranty obligation, and is exclusive and in lieu of
any other warranty or remedy available under this Contract or at law.

8.5 Adherence to the delivery date

9.2 Warranty period

Adherence to the delivery date is conditioned on the Customer fulfilling all of its contractual
obligations.

The Sellers obligation under the warranty is limited to the repair - or replacement at the
Sellers choice - of the allegedly defective Products or Services that has been returned
to its facility and, at the time of any repair or replacement has been recognized by the
Seller after expertise as defective. To be eligible under this warranty, the alleged failure
must have occurred within the time-limits mentioned here-after:

9 - WARRANTY

- For new Helicopter(s) in baseline definition and installed optional equipment:

9.1 General
The Seller warrants that the Products and Services provided, except the turbine engine(s),
specific equipment with a STC mentioned in the Contract (if any) and MEGHAS avionics
equipment, are free from defects in material and workmanship under normal use and service
and that software identified in the applicable Helicopter specification substantially
provides the functions set forth in the said specification or in the applicable SB.
The turbine engine(s) as well as the MEGHAS avionics equipment installed in the
Helicopter and STCs equipment identified in the Purchase Order are covered by the
warranty granted by the manufacturers of these items (Turbomeca, Pratt & Whitney and
Thales and the STC holder), the benefits of which the Seller hereby assigns on to the
Customer who hereby acknowledges and accepts such assignment.
As soon as possible but at the latest fifteen (15) calendar days after the discovery of a
defect, the Customer shall furnish to the Seller, by using a warranty claim form provided by
the Seller, the full details of its claim and the basis thereof. As soon as it receives a
warranty claim form,the Seller will forward to the Customer a warranty claim acknowledgment
and a RMA form. Within fifteen (15) calendar days from the reception of such documents
the Customer shall return the allegedly defective Parts to the Seller. If the Customer fails
to return the allegedly defective Parts in due time, the Seller reserves the right to invoice
the replacement Parts which have been ordered or produced for the Customer at the
price indicated in the relevant Sellers price list in force, or in the relevant Quotation if no
price is available in the price list in force.
The Seller will reimburse reasonable transportation costs outbound from the Customer
premises to the Sellers premises,for the repairable Parts for which the benefit of the warranty
has been granted by the Seller. The Customer shall send to the Seller the invoice by the
end of the corresponding year. Insurance, customs expenses and other charges as well
as the expenses incurred by the Customer for the removal, re-installation and calibration
operations with respect to such Parts shall be borne by the Customer.
For Parts for which the benefit of the warranty has been granted by the Seller, the return
transportation costs back to the Customer premises shall be borne by the Seller.
The warranty exclusions are the following:
- if the Customer has failed to notify the Seller of its warranty claim within 2 weeks from
the failure occurrence date, or
- if the supply and/or any part thereof is stored, operated, maintained, installed, repaired
or overhauled otherwise than in accordance with the manuals, documentation and
instructions delivered by the Seller, or
- in the event that maintenance activities have not been properly entered in the appropriate
logbook (or in case of failure to produce the logbook to the Seller if so requested), or

192

- if the defective Product or any part thereof has been repaired or altered otherwise than
as prescribed by the Seller or its subcontractors/suppliers, or

Within one thousand (1,000) flying hours or twenty four (24) months after their
acceptance at the Sellers factory, whichever event occurs first, or
Within five hundred (500) flying hours or thirty six (36) months after their accep-

tance at the Sellers factory, whichever event occurs first.


The Customer has to select one (1) of these two (2) options at the time of the
signature of the Contract.

- For Spare Part(s):


Within one thousand (1,000) flying hours or twelve (12) months from the time they
are fitted to the Helicopters or twenty four (24) months after their delivery from the
Sellers factory, whichever event occurs first.

- For tool(s):
Within twenty four (24) months after their delivery from the Sellers factory.

- For Training Item(s):


Within the twelve (12) months after their delivery from the Sellers factory

- For repaired, overhauled and standard exchange Items


Within five hundred (500) flying hours or six (6) months from the time they are
fitted to the Helicopters or twelve (12) months after their delivery from the Sellers site,
whichever event occurs first.

For repaired Item, the warranty is limited to the repair done and/or the Parts replaced.
- For tools repaired, overhauled or returned for calibration:
Within twelve (12) months after their delivery from the Sellers site.

- For workmanship:
Within five hundred (500) flying hours or six (6) months from the signature date of
the acceptance certificate by both Parties, whichever event occurs first.

Warranty periods in case of sale of second-hand Helicopter(s) are defined in the relevant
Specific Annex.
Software identified in the applicable Helicopter specification shall only be considered
as non-conforming, if there are substantial deviations of the functions supported by
software from the Helicopter specifications.The Seller will, at its sole option, remedy such
non-conforming software for the considered Helicopter by providing a correction release
of the software or by finding a reasonable workaround. The Customer shall supply the
Seller with all necessary information and documentation in its possession, to enable the
Seller to investigate and rectify such non-conforming software. The Seller warrants the
software identified in the applicable Helicopter specification provided that the alleged

warranty is notified by the Customer to the Seller within one hundred and eighty (180)
days from the date of delivery of the Helicopter to the Customer.

12 - LIABILITY

The warranty conditions for software embedded in the delivered Spare Parts or in the
delivered repaired/overhauled/ standard exchange Item shall be the ones applicable
to the software delivered with the Helicopter, as mentioned in the previous paragraph.

Notwithstanding any provision to the contrary in the Contract or elsewhere, the total and
cumulated liability of the Seller under the Contract, due to any and all causes whatsoever,
whether based on breach of contract or in tort or otherwise, shall in no event exceed in
aggregate an amount equivalent to ten per cent (10%) of the total net Contract price.
The above limitation shall not apply in the event of gross negligence, willful misconduct,
death or bodily injury.

The warranty period on the repaired or replaced part(s) equals the warranty period that
was remaining on the respective defective part. The part(s) removed for which the Seller
supplies a replacement part(s) shall become the property of the Seller.

9-3 German legal warranty


For Contracts governed by German law, German legal warranty (Sachmngelhaftung)
supersedes the standard warranty conditions described here above for the first twelve
(12) months.
During this period, and providing that that German legal warranty is applicable, the
Seller may elect to repair or replace the defective Products.

Each Party shall be responsible for death or bodily injury arising to its own personnel,
whatever the cause. The Parties therefore waive the right to any claim against the other
in this respect, except if such death or bodily injury is caused by the gross negligence or
willful misconduct of the other Party.
In no event shall the Parties be liable for any indirect, consequential, incidental, special
or punitive damages of any kind, including, but not limited to, damages for any loss of
use or profit, loss of assets, loss resulting from business disruption, loss of goodwill or
loss of contractual opportunity by the other Party.
To the extent permitted at law, the Sellers obligations and liabilities and the Customers
rights and remedies as set forth in this Contract are exclusive and are in replacement of
any and all other remedies under law or otherwise.

10 - CONFIDENTIALITY
During the performance of the Contract,PartiesProprietary Informationshall be protected
as follows: the term Proprietary Information shall mean any information or data in
whatever form (either in writing or orally, subject to the conditions set forth hereinafter,
and including without limitation any written or printed documents, samples, models or
any means of disclosing such Proprietary Information that the disclosing Party may elect
to use during the life of the Contract), disclosed by either Party to the other and which is
designated as proprietary to the disclosing Party by an appropriate stamp, legend or any
other notice in writing, or when disclosed orally, has been identified as proprietary at the
time of disclosure and has been promptly (thirty (30) days at the latest) confirmed and
designated in writing as Proprietary Information of the disclosing Party.
The receiving Party hereby covenants that, from the effective date of the Contract, the
Proprietary Information received from the disclosing Party shall:
a) be protected and kept in strict confidence by the receiving Party, which must use
the same degree of precaution and safeguards as it uses to protect its own Proprietary
Information of like importance, but in no case any less than reasonable care; and
b) be only disclosed to and used by those persons within the receiving Partys organization
who have a need to know and solely for the purpose specified in the Contract; and
c) not be used, in whole or in part, for any purpose other than the purpose of the Contract
without the prior written consent of the disclosing Party; and
d) neither be disclosed nor caused to be disclosed, whether directly or indirectly to any
third party or persons other than those mentioned in subparagraph b) above; and
e) neither be copied nor otherwise reproduced nor duplicated, in whole or in part, where
such copying, reproduction or duplication have not been specifically authorized in
writing by the disclosing Party.
Any Proprietary Information and copies thereof disclosed by either Party to the
other shall, subject to any third party rights, remain the property of the disclosing
Party and shall be returned by the receiving Party immediately upon request.

13 - FORCE MAJEURE AND EXCUSABLE


DELAY
13.1 Force majeure
The Seller shall not be held responsible for failure to perform or delay in performing any
of the contractual obligations of this Contract if such failure or delay is due to, but not
limited to:
- acts of God, war, insurrection, epidemics, sabotage, labour disputes, strikes, lock-outs,
shortages of labour, interruption or delays in transportation, fire, explosion, equipment
or machinery breakdown, failure or delays of the Sellers sources of supply, shortage in
material or energy, or
- acts, orders or priorities resulting from any government action, national or international
authorities, or
- caused by any supplier or subcontractor of the Seller (or lower level subcontractor or
supplier), or
- if such supplier or subcontractor (or lower level subcontractor or supplier) is faced with
a bankruptcy or insolvency event, or
- any other case beyond reasonable control of the Seller.
For the avoidance of doubt, the delay or absence of payment by the Customer cannot be
considered by it as a case of force majeure.
In case of force majeure, the contractual delivery date shall be extended by such period
of time reasonably required to remove and/or overcome the event of force majeure and
its effects.

13.2 Excusable delay

11 - INTELLECTUAL PROPERTY

Any postponement of the contractual dates due to the following causes shall not constitute
a delay:

The Seller retains all rights in respect of developments, inventions, know-how, production
procedures and any intellectual property rights relating to the Products and/or Services.

a) BFE/CFE not delivered according to the schedule stated in the Contract or found defective
and which consequently require to be replaced by the Customer or,

Nothing in the SCS shall be construed as a legal transfer of or license to (other than
indicated hereinbelow),any patent,utility or design model,copyright,trademark,know-how
or other intellectual property right.

b) Changes or additions to the Contract requested by the Customer or,

Copying and or reproducing and or communication and or transmission to a third


party, Sellers Products or technical information or publications, either wholly or partially,
without the Sellers express approval is strictly forbidden (except for the copying by the
Customer of technical documentation provided by the Seller exclusively for the purposes
of operation and maintenance of the Helicopters by the Customer).

c) Any failure or omission by the Customer to perform its obligations set forth in this
Contract.
Any additional costs incurred by the Seller as a result of the occurrence of one of the
events in a), b) and c) above, shall be invoiced by the Seller and paid by the Customer
over and above the Contract Price.

The Seller grants the Customer a non-exclusive, non-transferable license to use the
executable form of the software on the related Product, for the purposes of operating
the Helicopter. This license does not entitle the Customer to receive updates of such
software.

193

14 -TERMINATION

A dispute will be finally settled under the Rules of Arbitration of the International Chamber
of Commerce (ICC) by three (3) arbitrators appointed in accordance with the said Rules.

14-1 Extraordinary termination

In the specific case of a dispute of which the aggregate amount does not exceed ten
million (10 000 000) Euros, the Parties agree to elect for a fast track arbitration process
in accordance with the ICC rules.

Each Party may immediately terminate or reduce the scope of the Contract by notice in
writing to the other Party if:
- A petition is filled, a notice is given, a resolution is passed in connection with the winding
up of the other Party, or
- The other Party becomes bankrupt or insolvent, or
- The other Party is wound up by resolution or an order of a court.

14-2 Termination for default


A Party may terminate all or part of this Contract for default of the other Party in the event
that the other Party persistently fails to perform its obligations and despite the non-defaulting Party having notified by acknowledgment of receipt the defaulting Party to take
adequate corrective measures and provided no such measures have been proven to have
been taken within a two (2) months period, following the above notice. The termination
shall occur without any specific formality other than the above notice.

The place of arbitration shall be Geneva (Switzerland).


The language of the arbitration shall be the English language.
However, in all cases, should the Seller elect to choose a local court jurisdiction due
to arbitration not being adapted to the specific nature of the dispute, in particular the
need for immediate injunctive relief or to recover sums due, then such local court will be
competent to solve the dispute.
The parties hereby consent and agree to be subject to the jurisdiction of the aforesaid
courts and/or arbitration and, to the greatest extent permitted by the applicable law, the
Parties hereby waive any right to seek to avoid the jurisdiction of the above courts on the
basis of the doctrine of forum non conveniens.
Unless otherwise agreed by both Parties, the fact that any dispute has been referred to
arbitration pursuant to this article shall not relieve either Party from any of their obligations
as set out in this Contract.

In the case of termination for default, the following shall apply:


- In case of default of the Customer:
a)the Customer shall reimburse the Seller for all costs (including but not limited to raw
materials, labour, overhead, storage and financial fees) incurred by the Seller or which
the Seller could not avoid incurring (including termination indemnities, if any, under the
contracts between the Seller and its subcontractors or suppliers or under the second
level contracts or subcontracts),
b) the Customer shall pay to the Seller a termination indemnity equal to ten per cent
(10%) of the contractual price as well as an indemnity equal to the damages sustained
by the Seller,
c) the Customer shall indemnify the Seller in case other remedies are available by the
Customer under this Contract, than those mentioned under paragraphs a) to b) above, and
d) the Seller shall be entitled to retain any payments already made by the Customer, until
an agreement is found on the above or the dispute resolution has been implemented
and a decision has been taken in consequence.
- In case of default of the Seller:
a) the Seller shall be entitled to deliver the remaining non-faulty Products and render
the remaining non-faulty Services, and shall be paid the corresponding price thereof,
b) the Seller shall return to the Customer all the BFE/CFE remaining in its premises, once
the Products are delivered and/or the Services are rendered,
c) the Seller shall refund the Customer, the amount of the down payment which refers to
the unfulfilled part of the Contract, and
d) the Customer shall possibly apply the liquidated damages, if any.

14.3 Termination for force majeure


In case of occurrence of a force majeure event as per article 13.1 hereinbefore which
lasts more than six consecutive months, the Parties shall meet in order to determine in
which conditions they wish to pursue the Contract or if they do not reach an agreement
in a one month period, either Party shall be entitled to terminate, without being entitled to
claim for any damages or compensation in any form whatsoever to each other.

15 - APPLICABLE LAW AND DISPUTE


RESOLUTION
The Contract shall be governed by German Law, for the sale of Products and/or Services
by Airbus Helicopters Deutschland GmbH and by French law for the sale of Products
and/or Services by Airbus Helicopters. Whatever the law applicable, the United Nations
Convention for the international sale of goods is excluded.
The Parties shall attempt to solve amicably any dispute, controversy or claim arising
out or in connection with the Contract. If two (2) months after the occurrence of such
dispute, controversy or claim, the Parties have failed to reach an agreement, then the
dispute, controversy or claim, depending on the contractual aggregate amount shall be
settled as follows:

194

16 - MISCELLANEOUS
These SCS along with the Specific Annex and Purchase Order (or Order) constitute
the entire agreement between the Seller and the Customer. They supersede
all previous communications and/or agreements either oral or written, between the Seller and the Customer with respect to any Product or Services.
In the event that one (1) or more of the articles provided for in these SCS is deemed invalid
or unenforceable, the remaining provisions shall remain entirely valid and applicable.
English shall be the language of the Contract. Both Parties shall use English
as the language to exchange, issue and deliver information, documentation
and notices, and any related documents excluding those documents which might be
produced by a governmental institution in the local language.
In the Contract, unless the contrary intention appears:
- headings are for the purpose of convenient reference only and do not form part of the
Contract;
- where the last day of any period prescribed for the doing of an action falls on a day
which is not a working day in the country of the applicable law, the action shall be done
no later than the end of the next working day;
In case of any contradictions and discrepancies between the parts of the Contract,
precedence shall be given in the following decreasing order:
1) Purchase Order, Order or Order Confirmation (as applicable)
2) Present SCS
3) Specific Annex
4) Other Annexes in their numbering.
The provisions of articles Confidentiality, Intellectual Property, Liability,
Applicable law and dispute resolution of the Contract shall survive and continue to have effect after the termination or expiry for any reason whatsoever
of the Contract, and for a period of thirty (30) years thereafter.
No term or provision hereof will be considered waived by either Party, and no breach
excused by either Party, unless such waiver or consent is in writing and signed on
behalf of the Party against whom the waiver is asserted. No consent by either Party to, or
waiver of, a breach by either Party, whether express or implied, will constitute a consent
to, waiver of, or excuse of any other, different or subsequent breach by either Party.
The relationship between the Seller and the Customer is solely that of purchaser and
seller. No joint venture or partnership is intended nor will any be construed. Neither Party
will have the authority to enter into contracts on behalf of or bind the other in any respect.
The Customer shall not be entitled, without the prior written consent of the Seller, to
assign or transfer to a third party all or part of the rights and obligations under the
Contract.

STANDARD CONDITIONS OF SALE SPECIFIC ANNEX


APPLYING TO THE SALE OF SPARE PARTS
B1 - GENERAL
The present Specific Annex is applicable to sale of Spare Parts, including tools, SB kits
and STCs performed by the Seller to any Customer in order to maintain and/or operate
Helicopters.

The Customer shall check the Spare Parts provided in AOG conditions, notify any
recognisable defects in a documented registered letter within forty eight (48) hours as
from the date the Spare Parts have been received by the Customer and put them at
Seller disposal.

B4 - SB kit and STC


B2 - DELIVERY AND INCOTERMS
Except if the Contract stipulates another INCOTERM, Spare Parts shall be delivered
packed Free Carrier (FCA - INCOTERMS 2010) at the Sellers site or logistic platform as
specified in the Purchase Order.
In case of unavailability of the Spare Parts or of raw material, the Seller has the right to
make partial deliveries.

B3 - AOG PURCHASE ORDERS SPECIFICITIES


To guarantee an efficient service to the Customer and respond quickly to any situation
where the Customers Helicopter is AOG, the Seller provides a twenty four (24) hours a
day/seven (7) days a week AOG service. The AOG service is available for orders of Spare
Parts which are essential to bring back a Helicopter into service or to enable it to perform
its mission.
Any Spare Parts listed in the Sellers illustrated Parts catalog can be ordered by the
Customer via AOG service, except main assemblies, raw materials, ingredients and
hazardous material.

Unless otherwise specified, the kits originated from SB or STC modification are defined
on the basis of the as-delivered configuration (i.e. the configuration of the Helicopter at
the time of transfer of title from the Seller to the original customer). It is the responsibility
of the Customer to make sure that the actual configuration of the Helicopter corresponds
to the pre-mod configuration of the relevant SB or STC installation instruction. Any
deviation of the actual configuration that requires the amendment of the SB or the STC
installation instruction is chargeable to the Customer on a time and material basis.

Unless otherwise specified, the STC is sold to the Customer with the certification(s) as
listed in the catalog and specified in the offer. It is the responsibility of the Customer
to make sure that such certification(s) are acceptable to its competent airworthiness
authority before the installation of the kit. The Seller will provide all reasonable support to
the Customer for the additional certification or validation of the existing certification(s)
at the latter sole expenses on a time and material basis.

STC holder of the Product keeps full responsibility for its own Products type design
definition (configuration, definition, necessary changes and continuing airworthiness).
The Seller does not warrant the compatibility of the STC with future mandatory or not
mandatory modifications.

The AOG service is provided to the Customer at the price indicated in the relevant Sellers
price list in force, or in the relevant Quotation. A flat rate for transportation cost will be
added to the price of Spare Parts.
The Customer shall also mention in writing regarding any AOG order placed to the Seller,
the following information:
- Part number/ nomenclature
- Failure description and reason of removal
- Quantity required for the specific AOG
- Ship to address
The Seller, by sending an Order Confirmation shall confirm in writing to the Customer the
price and the delivery time within twelve (12) hours after the reception of the Customers
Order.
The Customer may cancel in writing individual order placed to the Seller no later than
twelve (12) hours after the reception of the Sellers Order Confirmation. Without any
cancellation from the Customer received by the Seller in due time, the Contract shall be
deemed accepted and the Spare Parts delivered. Consequently any cancellation of order
shall be agreed by the Seller afterwards.
The Spare Parts already available in the Seller inventory when receiving the Order from
the Customer will be delivered packed Carriage Insurance Paid (CIP, INCOTERMS
2010) to the nearest international airport to the Customer and within seventy two (72)
hours after the reception by the Seller of the Customers Order, depending on the delivery
location.
The Customer may order in AOG a maximum of three (3) line items per order and in
accordance with the quantity fitted on the Helicopter. In case of several line items ordered,
the Seller has the right to make partial deliveries, depending on the availability of the
Spare Parts.

195

Contacts
For more information, please contact:
sales-promotion@airbus.com

AIRBUS HELICOPTERS, Aeroport


International Marseille Provence - 13725
Marignane Cedex - France - 2014 - All
rights reserved, Airbus Helicopters logo
and the names of its products and services
are registred trademarks.
Airbus Helicopters reserves the right to
make configuration and data changes at
any time without notice. The facts and
figures contained in this document and
expressed in good faith do not constitute
any offer or contract whith Airbus
Helicopters.
Concept design by Kaiman
Photos by DR - Airbus Helicopters
Printed in France
Printed on PEFC certified paper originating
from sustainable forests.
Standard Upgrades 2014

You might also like