Plan Take Off
Plan Take Off
Plan Take Off
PRELIMINARIES
PERMITS
DAILY WORK SCHEDULE
ADVANCE PAYMENT
RETENTION
BILL OF QUANTITIES
B.1
CSA(CIVIL/STRUCTURAL/ARCHITE
B.1.1
B.1.2
B.1.3
B.1.4
B.2
MEPF (MECHANICAL/ELECTRICAL
B.2.1
B.2.2
B.2.3
B.2.4
B.2.5
SA(CIVIL/STRUCTURAL/ARCHITECTURAL) WORKS
EARTHWORKS
CLEARING & GRUBBING
EXCAVATION
BACKFILL & COMPACTION
HAULING & DISPOSAL
SOIL POISONING
GRAVEL BEDDING
SLOPE PROTECTION
TRIMMING
DREDGING
SITEWORKS
LANDSCAPING
BOLLARDS
DRAINAGE
MANHOLE
CATCH BASIN
TRENCH
CURBS & GUTTER
PAINT MARKING
PERIMETER FENCE
EXTERIOR LIGHTINGS
ARCHITECTURAL
FINISHES
PARTITION
METAL WORKS
MISCELLANEOUS ITEM
TOILET ACCESSORIES
OTHERS
STRUCTURAL
BEAMS & GIRDERS
SLAB
COLUMN
SHEARWALL/ COREWALL
STAIR
SLAB ON GRADE
RC WALL*
RAMP
RETAINING WALL
PILE
PILE CAP
FOOTING
UNDERTANKS
OTHERS
TERMITE CONTROL
SHEET PILE
SOIL NAILING
SOFT SCAPING
HARD SCAPING
TEMPORARY FENCING
FLOOR FINISH
WALL FINISH
CEILING FINISH
MASONRY
DRYWALL
LOW WALL
GLASS WALL
CURTAIN WALL
RC WALL*
(ALUMINUM COMPOSITE PANEL)
PHENOLIC BOARD
BUNDWALL
SQM.
WHEELSTOPPER (QTY)
SKIRTING
CURTAIN COVE
HEADBOARD
DIAPHRAGM WALL
BORED PILE
DRIVEN PILE
SECANT PILE
CFA(CONTINUOS FLIGHT AUGER) PILE
ISOLATED
COMBINED
MAT/RAFT
SPREAD/ WALL FOOTING
TRENCH PIT
CORBELS
RAKER BEAM
PEDESTAL
LINK BEAM
BOND BEAM/ CAPPING FOR SHEETPILE
TRENCH
ELEVATED WATER TANK SUPPORT
CONCRETE PAD
PRECAST
STEEL SECTION
TENDONS
SHEAR STUDS
SEALANT
WATERSTOP
REMOVAL/RELOCATION OF TREES
GRASS
TILE
TROWELED FINISH*
FLOOR HARDENER
PAINTING WORKS
(TO FLOOR)
PLASTERING
ACOUSTIC
GYPSUM
BARE
(ALUMINUM COMPOSITE PANEL*) SQM
200MM
150MM
100MM
LINTEL BEAMS (METER)
STIFFINER COLUMN (METER)
CEMENTITIOUS WATERPROFING
LIQUID WATERPROOFING MEMBRANE
BITUMINOUS MEMBRANE
BITUMINOUS COATING
POLYURETHANE LIQUID MEMBRANE
(PUBLIC TOILET)
SOLDIER PILE
WALER
TIEBACK
STRUTS
HOMOGENOUS TILE
CERAMIC
WOOD LIKE TILE
NON SKID TILE
BOTTON TILE
VINYL TILE
MOISTURE RESISTANCE
ORDINARY
SHEARWALL
EXTERIOR WALL OR INTERIOR WALL
INTERIOR WALL
(RAMP)
PARKING
PROCUREMENT
CLIENT/OWNER
PLANNING/CONCEPTUALISING DESIGN
FEASIBILITY STUDY
COST STUDY (BUDGET)
PREPARATION OF TENDER DOCUMENT
PERMITS
CONTRACT
CONSTRUCTION DRAWING
SPECIFICATION
COST PLAN
PRELIMINARIES
BILL OF QUANTITIES
QUANTITY TAKE OFF
COSTING
BIDDING STAGE
TENDER INVITATION
BID EVALUATION
TENDER REPORT
NEGOTIATION/BARGAINING
AWARD
CONSTRUCTION STAGE
MONITORING
BILLING
COMPLETION & MAINTENANCE
a profession that..
a
calculate the amount of materials needed
b
manage all costs relating matter of a project
c
seek to minimise the cost of a project
d
know as "measurer" or estimator
e
able to work for a contractor, government or privately
f
did you know as quantity surveyor, you serve as engine
responsiblities of quantity surveyor in construction
project manager
conctractor
assist the PM in providing advice on procurem
receives monthly valuation from the main co
assist with negotiations with the contractor i
of a project
ernment or privately
r, you serve as engineer, lawyer and also an accountant
onstruction
or quotation
ess billing during construction stage)
nder Report)
nt building contracts in current use
roject manager
architect
client
ther parties
nder documents
document
ayment application
nd subcontract payment application
ng and provide the costs update to the client
progress