No. Construction Works Lithology Thickness Bedrocks Rock Class (M) Upper Dam
No. Construction Works Lithology Thickness Bedrocks Rock Class (M) Upper Dam
Construction Works
Upper Dam
Lower Dam
Waterways
Intakes
a
b
Headrace Tunnels
Headrace Tunnel 1
Headrace Tunnel 2
Inspection Adit
Surge Tanks
Penstocks
Tailrace Tunnels
Tailrace Tunnel 1
Thickness
Lithology
Rock Class
(m)
Bedrocks
Tuff Breccia
Sandstone
Sandstone/ Siltstone
Tuff Breccia
Shale/ Sandstone
Andesite
Marl/ Sandstone
Tuff Breccia,
Sandstone/ Siltstone
Sandstone/ Siltstone,
Sandstone,
Tuff Breccia,
Andesite
Sandstone/ Siltstone,
Sandstone,
Tuff Breccia,
Andesite
II
III
IV
661.07
539.98
15.94
II
III
IV
521.1
579
57.9
II
III
178.25
178.25
II
III
200
184.07
Andesite,
Sandstone/ Siltstone
II
III
II
III
II
III
II
III
177.95
89.65
92.95
148.47
44.34
166.8
119.31
67.11
Sandstone/ Siltstone,
Andesite,
Sandstone
Sandstone/ Siltstone,
II
III
IV
III
115
497.83
15
143.78
Sandstone/ Siltstone,
Tuff Breccia
Sandstone/ Siltstone,
Tuff Breccia,
Andesite
Tailrace Tunnel 2
Tailrace Tunnel 3
Tailrace Tunnel 4
4
a
Powerhouse
Access Tunnel
Transformer Tunnel
Work Tunnel 2
Work Tunnel 1 + 1A
Ventilation Tunnel
Powerhouse Cavern
Cabble Tunnel
Andesite,
Sandstone
Sandstone/ Siltstone,
Andesite,
Tuff Breccia
Sandstone/ Siltstone,
Andesite,
Tuff Breccia
Sandstone/ Siltstone,
Andesite,
Andesite,
Sandstone/ Siltstone
Andesite,
Sandstone/ Siltstone
IV
35.95
III
IV
432.56
13.38
III
IV
300
45.94
II
III
IV
II
III-IV
II
III
IV
V
113.69
138.34
37.99
36.31
110.36
41.62
15.71
Percentage Geological
(%)
Structure
Fault
54.32
44.37
1.31
Fault
45
50
5
Fault
Estimated
Estimated
66.5
33.5
38.5
61.5
21
79
64
36
18.32
79.29
2.39
80
Fold
20
97
3
Estimated
Estimated
39.2
47.7
13.1
17.8
54.1
20.4
7.7