In-Plant Training Report Chapter

01

1. TRAINING ESTABLISHMENT

1.1. About the Training Organization


A body of people formed to achieve common
objectives. It means that organization is an
arrangement of activities which divided among group
of people is responsible for duties and authorizes in
order to meet the object. Thus the organization is

Fig.1.1.Company Logo

meant to manage, plan, co-ordinate and control


various activities and resource towards common
objectives in a systematic way. RR construction (Pvt)
Ltd is one of the premier construction companies in
Sri Lanka with wide range of expertise in different
engineering disciplines.

1.2. Profile of the organization

Name
Head office

Telephone
Fax
E-mail
Aim of the company

:
:

:
:
:
:

RR construction (Pvt) Ltd.


No. 865, Danisder de Silva Mawatha, Colombo 09.
Work shop
: 626, Sri Samurdi Mawatha,
Keenagahawela,
Henathuduwa, Sapugaskanda
0112433427
0112232998
RRc@slt.lk
Achieve the highest degree of customer satisfaction at
Correct cost used inappropriate technology.

1.3 Introduction of project


1

In-Plant Training Report Chapter


01

Project
:
Address
:
Client
:
Consultant
:
Contractor
:
Sub contactor
:
Scoop of sub contractor :

Colombo port expansion project


PO BOX 01, Colombo port, Colombo 01.
Sri Lanka port authority(SLPA)
Scott Wilson (pvt) ltd.
Hyundai Engineering & Construction Company.
RR Construction (pvt) ltd
Temporary Diversion Road of South Asia Gateway
Terminals (SAGT).

Cost of sub contract

145 million

1.4. Site Organization Chart

Project Coordinate

Project Manager

Site Engineer (Civil)

Supervisor

Site Engineer (Elec.)

Technical Officer
Fig.1.4.Site Organization Chart

1.5. Construction Sequence

Ass. Engineer

Foremen

In-Plant Training Report Chapter


01

Mobilizati
on

Site surveying & cleaning

Setting out work

Construction of
service corridorArea 02
Excavation

Procurement of
manholes

Service corridor

Placing of storm water


manhole
Procureme
` of RC
nt
pipe

Procurement of Elec
& Communication
pits

Placing of elect,
communication manholes
Procurement
of u PVC pipe

Granular filling & RC Pipe


placing

Sand bedding & u PVC


pipe placing

Back filling & compaction

Sand filling, back filling &


compaction

Preparation of curb & slab


paving

In-Plant Training Report Chapter


01

Construction of area 3, 4 &


area 5

Construction of structure
(Buildings)

Excavation of top soil &


removing surplus material

Construction of sub
structure (Foundation)
Fabrication of
steel structure
Erection of steel
structure

Preparation of sub base

Compaction test

Preparation CBM

Compaction test
Binder & wearing course

Traffic diversion

Construction of stage 3
(Existing road area)

Binder & wearing course

Fig.1.5. Construction Sequence

Compaction
Compaction
test
test

Excavation
Excavation
ofof
top
top
soil
soil
&&
removing
removing
surplus
surplus
material
material
Preparation
Preparation
ofof
sub
sub
base