Model Matematik Sistem Transmisi MA Umbulan: Spesifikasi Pipa: V (M/S) : P-Max

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Model Matematik Sistem Transmisi MA Umbulan

Hazen William C :

V (m/s): P-max
1900 1,59
8,7
1900 1,55
8,2
1900 1,52
8,2
1900 1,48
8,4
1800 1,61
7,8
1800 1,56
7,7
1800 1,53
7,2
1800 1,49
7,4
1800 1,47
7,0
1700 1,58
6,9
1600 1,69
6,6
1600 1,54
6,2
1600 1,49
6,1
1600 1,39
6,0
1600 1,29
4,9
1100 1,68
4,8
1000 2,03
6,2
150

Profil Hidrolis Pipa Transmisi MA Umbulan


120
100
Elevasi (m)

Spesifikasi Pipa :
ND-Pipa1 (mm) :
ND-Pipa2 (mm) :
ND-Pipa3 (mm) :
ND-Pipa4 (mm) :
ND-Pipa5 (mm) :
ND-Pipa6 (mm) :
ND-Pipa7 (mm) :
ND-Pipa8 (mm) :
ND-Pipa9 (mm) :
ND-Pipa10 (mm) :
ND-Pipa11 (mm) :
ND-Pipa12 (mm) :
ND-Pipa13 (mm) :
ND-Pipa14 (mm) :
ND-Pipa15 (mm) :
ND-Pipa16 (mm) :
ND-Pipa17 (mm) :

-5
1,5
5,0
???

80
60
40
20
0
0

10

20

Sur (+)
Main Pump:
Kebutuhan Air (L/s) = 3.920
Debit pompa (L/s) = 4.512
Head Pompa (bar) =
8
Kebutuhan Daya (kW) = 4.470
Elevasi pompa (m) = 22,0
Elevasi pipa hisap (m) = 27,0
Statics suction (m) = (5,0)
Discharge Head (bar) = 8,50
Specific Energy (kWh/m3) = 0,317
Biaya Energi (Rp/m3) = 380
Jumlah Pompa (unit) =
9
Pompa beroperasi (unit) =
8
Pompa cadangan (unit) =
1
Kapasitas Pompa (L/s) = 564
Daya Pompa (kW) = 559
Tegangan (Volt) = 3300
Arus Listrik (Amper) = 169
Efisiensi Pompa = 85%
Efisiensi Motor Listrik = 95%
Tarif Energi (Rp/kWh) = 1200
Biaya Energi Pemompaan (Milyar Rp/Th) = 47,0
Max Day Factor (Supply vs Demand) = 1,15

Cal- Min
Kebutuhan Air (L/s) : P (m) P (m) Note
Total Kebutuhan: 3.920
1
Winongan-(1): 125
77,3 46,81
ok
Pohjentrek-(2): 75
78,5 42,06
ok
Pleret-(3): 110
82,2 40,17
ok
PIER-(4): 100
51,8 54,83 not ok
Bangil-(5): 140
54,1 74,24 not ok
Gempol-(6): 70
70,0 69,5
ok
Porong II-(7): 100
71,8 70,46
ok
Porong I-(7): 50
69,6 66,51
ok
Tanggulangin-(8): 150
69,7 65,08
ok
Candi-(9): 200
68,9 58,78
ok
Sidoarjo-(10): 300
64,6 54,37
ok
Buduran-(11): 100
61,4 51,37
ok
Gedangan-(12): 200
58,6 45,13
ok
Waru-(13): 200
59,6 40,18
ok
Alas Malang-(15): 1000 42,7 41,71
ok
Giri-(17): 1000
7,8
7,43
ok
Elevasi Outlet (m) =
Kedalaman Pipa (m) =
Ketinggian suction (m) =
Max positive suction (m) =

3600859

30

40

50

60

70

80

90

100

Jarak (km)

Def (-) Def (-)


BP 1: BP 2:
3.510 2.200
0
0
6
6
0
0
40,0
10,0
40,0
10,0
0,0
0,0
6,00
6,00
0,000 0,000
0
0
0
0
0
0
0
0
550
550
409
409
3300 3300
124
124
85%
85%
95%
95%
1200 1200
0,0
0,0
0,00
0,00

Sur (+)
Material Pipa (Karat) = GRP
Main and Booster Pumps
BP 3:
453
Rp/m3
Biaya Energi Pemompaan
1.000
56,0 M Rp/Th
Biaya Energi Pemompaan
1.150
6
Thrust Block:
Water Hammer:
BP 1: BP 2: BP 3:
854
Diameter pipa (mm) = 1900
MP
V (m/s) = 1,59
40,0
Internal pressure (bar) = 9,5
1,61
1,29
2,03
40,0 Soil Bear Cap (kg/cm2) = 25
L pipe (m) = 92.400 51.000 20.400 1.352
0,0
Change in Direct, (deg) = 90
Material = GRP
GRP
GRP
GRP
6,00
Thrust block area (m2) = 1,52
WH (bar) = 6,6
#N/A #N/A 8,4
0,061
0,377
T-c (min) = 15,2
#N/A #N/A 0,2
73
Cathodic Protections: - None
ND (mm) = 1900 1800 1600 1000
3
Life Time (Tahun) = - None
SN = 2500
2500
2
Mag Consp (Lbs/A-Th) = - None
PN = 10
10
1
Anode Weight (Lbs) = - None
Manual Calculation ! Check-Recheck !
575
Total Biaya (Milyar Rp) = - None
BP 1: BP 2: BP 3:
427
Unit Cost (Rp/m3) = - None Surge Tank: MP
3300
Volume Surge Tank (m3) = 3342 #N/A #N/A 64
129
Tekanan Udara Aktif, Pe (atm) = 8,50
6,00
6,00
6,00
85%
Tekanan Udara Pasif, Pd (atm) = 1,65
0,20
1,95
5,05
95%
Tebal Plat Tangki Baja (mm) => 32,9
#N/A #N/A 8,0
1200
Panjang Silinder/Tinggi Silinder (m) = 20,0
10,0
10,0
5,0
9,0
Diameter Silinder (m) = 14,6
#N/A #N/A 4,0
1,15

You might also like