Professional Documents
Culture Documents
Liquid & Plastic Limit Tests - Cone Penetrometer Method
Liquid & Plastic Limit Tests - Cone Penetrometer Method
LIQUID LIMIT
Test No.
Gauge:
First
15.00
17.50
(mm)
Second
15.10
17.80
Mean
15.05
17.65
FM1
FM2
FM3
33.46
38.46
27.12
29.88
9.7
9.9
Mass of tin
(g)
FM4
FM5
9.90
9.90
9.90
14.38 18.32
6.34
8.58
8.78
36.39
42.94
PLASTIC LIMIT
Test No.
Tin or bottle No.
FMPL1 FMPL2
10.67
10.01
9.6
9.2
Mass of tin
6.6
6.9
(g)
143
Mass of water (g)
1.07
0.81
35.7
35.2
APPENDIX B
LABORATORY TEST RESULTS OF ATTERBERG LIMITS
LIQUID LIMIT
Test No.
Gauge:
First
15.9
17.3
19.1
21.7
(mm)
Second
16.2
17.5
19.4
21.9
Mean
16.1
17.4
19.3
21.8
FM1
FM2
FM3
FM4
16.55
19.8
21.25
14.49
13.82
15.447
9.8
9.3
9.8
6.73
2.73
4.353
4.817
3.36
67.9
70.8
72.6
76.4
Mass of tin
(g)
PLASTIC LIMIT
Test No.
Tin or bottle No.
Wet soil + tin (g)
FMPL1 FMPL2
27.2
28.1
16.433 11.13
144
Dry soil + tin (g)
20.9
21.6
Mass of tin
6.7
6.7
6.3
6.5
44.4
43.6
(g)
APPENDIX C
LABORATORY TEST RESULTS OF STANDARD PROCTOR
AND MODIFIED PROCTOR TESTS
C1
Location: KTDI
Soil type: silt
Reference: BS 1377:1990
Test No:
4550
4550
4550
4550
6100
6340
6450
6420
1550
1790
1900
1870
1.550
1.790
1.900
1.870
FCM1
FCM2
FCM3
FCM4
19.08
24.24
31.20
1.503
1.529
1.537
1.425
23.0
145
146
Location: Tapah
Soil type: kaolin
Reference: BS 1377:1990
Test No:
4550
4550
4550
4550
6229
6485
6520
6465
1679
1935
1970
1915
1.679
1.935
1.970
1.915
FCM1
FCM2
FCM3
FCM4
8.8
15.1
20.3
25.44
1.543
1.681
1.637
1.526
147
1.9
Air voids 0%
1.8
5%
1.7
10%
10
15
20
25
30
1.682
16.1
35
148
C2
Location: KTDI
Soil type: silt
Reference: BS 1377:1990
4550
4550
4550
4550
6100
6340
6450
6420
1550
1790
1900
1870
1.550
1.790
1.900
1.870
FCM1
FCM2
FCM3
FCM4
11.79
19.08
24.24
31.20
1.386
1.503
1.529
1.425
Test No:
149
1.537
23.0
150
Location: Tapah
Soil type: kaolin
Reference: BS 1377:1990
4550
4550
4550
4550
6229
6485
6520
6465
1679
1935
1970
1915
1.679
1.935
1.970
1.915
FCM1
FCM2
FCM3
FCM4
8.8
15.1
20.3
25.44
1.543
1.681
1.637
1.526
Test No:
151
1.682
16.1
152
APPENDIX D
PHOTOGRAPHS OF THE PROJECT
Figure D1
Figure D2
153
Figure D3
Figure D4