QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
PROJECT:
Page 1 of 12
INKA
PT. Industri Kereta Api (Persero)
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
Preface
Page No.
.
.....
.....
...
......................................................................................
4
4
4
4
4
4
4
..
II.
.. ...........................
III.
..
..............
................................
...
....
IV.
Project Management
.....
V.
...
12
VI.
Related Documents
.......................................................................
12
Page 2 of 12
INKA
PT. Industri Kereta Api (Persero)
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
APPROVAL
Prepared by
Bambang Ramadhiarto
Reviewed By
Sarmiatun
Responsibility
Responsibility
Internal Audit
Date
10 / 03 / 2014
Environment
Date
10 / 03 / 2014
Signature
Signature
Approved By
Edi Winarno
Approved By
Customer
Responsibility
Management Representative
Responsibility
Customer representative
Date
10/03/2014
Date
Signature
Signature
I. INTRODUCTION
Form No. : IV - 01.008 Rev. 0
Page 3 of 12
INKA
PT. Industri Kereta Api (Persero)
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
EURO II Standards
Page 4 of 12
INKA
PT. Industri Kereta Api (Persero)
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
Page 5 of 12
INKA
PT. Industri Kereta Api (Persero)
Quality Manual ( MM )
Quality Procedure( PM )
Quality Instruction ( IM )
Quality Records ( RM )
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
Page 6 of 12
INKA
PT. Industri Kereta Api (Persero)
Interested
parties
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
Interested
parties
Satisfaction
Output
Requirements
Page 7 of 12
INKA
PT. Industri Kereta Api (Persero)
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
Page 8 of 12
INKA
PT. Industri Kereta Api (Persero)
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
President Director
President Director has highest responsibility and authority for planning, applying and
improving the quality to meet customer satisfaction as well as determining
responsibility and authority for overall alignment.
3.2.
3.3.
Production Director
Production Director has the high level of responsibility and authority for planning
and realization of products, such as among others, production technology and
production.
3.4.
3.5.
All Management
Board of Directors, Head of Division, and Senior Manager has responsibility and
authority to implement the quality plan that is set in accordance with the Quality
System INKA.
Page 9 of 12
INKA
PT. Industri Kereta Api (Persero)
4.1.
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
4.2.
Quality Plan
Senior Manager of Quality Management & Environment responsible for issued the
Quality Plan and must monitor the realization of products and ensure that the process
is conducted in accordance with the requirements of quality management system ISO
9001:2008.
4.3.
Resources
a. Both Chief of Fabrication Division and Chief of Finishing Division responsible
for identifying the competency of personnel in accordance with the requirements
for the realization of the product.
b. Chief of Division of Human Resources must be responsible to manage, plan,
implement, monitor and evaluate training activities.
c. Senior Manager of Human Resources responsible for managing and preparing
qualified personnel according to the needs of the project.
d. Senior Manager of Facility& Maintenance responsible for the availability of
machinery, equipment and supporting facilities for product realization.
4.4.
Page 10 of 12
INKA
PT. Industri Kereta Api (Persero)
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
b. Prepare the Basic Design and approval process with the Client.
c. Basic design deployment, acquire the input and output for the basic design
processed, basic design review, basic design verification and validation, design
changes related to the basic design input & output.
4.5.
4.6.
4.7.
Purchasing
Both Senior Manager of Purchasing and Senior Manager of Material Plan & Control
shall responsible to issue the procurement plan and ensure the product purchased
conforms to specified requirements. INKA established the type and extend of control
applied to the supplier and the purchased product depend upon the effect of the
purchased product on subsequent realization process or final product.
INKA has evaluates and selects supplier based on their ability to supply product in
accordance with the requirements.
4.8.
Product Manufacturing
Project Manager or Chief of Division shall responsible to ensure that the
International Standard ISO 9001:2008 implemented at the manufacturing process;
the product specification overwhelming with the contract requirement; the
measurement and testing equipment had been calibrated before used; and the special
process like a painting and welding shall conduct its validation process.
4.9.
Page 11 of 12
INKA
PT. Industri Kereta Api (Persero)
QUALITY PLAN
Document No.
: QP/01/2014
Date
: 10 / 03 / 2014
Revision
: 0
Chief of Divisions shall responsible to ensure that product in process, handling and
storage, packaging, preservation and deliver to Client are identified, protected from
damage or quality degradation, and documented according to the contract
requirement. Prior to delivering, product have been conducted the inspection and
testing by INKA and/or Clients Inspector, and issued the certificate of inspection &
testing as required. Chief of Quality Control & After Sales Division shall responsible
for product warranty for certain period.
4.11. Project Log
Chief of Railway Product Market Division shall responsible for sufficiency of
Project Log. Project Log or Customer Book comprising important note from
Customer, representing historical data of Customer and traceable to contract or side
letters.
4.12. Financial Monitoring
Finance Senior Manager shall responsible to plan and control the finance status and
evaluates the project realization as well as reporting the financial statement.
4.13. End of the Project Review
Senior Manager of Quality Management & Environment
shall responsible to
conduct the project evaluation. The project evaluation includes the Customer
satisfaction level, efficiency and productivity, and opportunity for improvement.
4.14. Documentation
Project Manager or Chief of Division shall responsible to coordinate documentation
and project record according to INKA Quality System requirement.
4.15. Close Out
Project closed as all of activity which required in Quality Plan and INKA Quality
System have been executed with satisfaction result.
Page 12 of 12