Professional Documents
Culture Documents
BQ Laboratory Fix
BQ Laboratory Fix
BQ Laboratory Fix
Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA
LOCATION :
MAKALE, TANA TORAJA
TITLE
BILL OF QUANTITY
:
:
FACILITY
SUMMARY BILL OF QUANTITY
Drawing
SUMMARY
LABORATORY
NO
ITEM WORK
01
02
A
Preperation Work
1. Clearing area
B
Volume
03
04
Unit Price
05
m2
50.00
m3
m3
m3
m3
m2
12.19
6.38
0.19
1.39
11.40
Kg
Kg
nos
39.95
221.33
24.00
m3
m3
m3
m3
m2
Kg
Kg
Kg
2.52
1.08
0.24
1.44
14.40
29.80
150.04
m2
m3
m2
Kg
32.00
3.84
32.00
307.20
Foundation Work
1.
2.
3.
4.
5.
6.
7
C
Foundation Laboratory
Excavation for Foundation
Backfill
Lean Concrete K-100
Concrete K-225
Formwork
Rebar
-D10
-D16
Anchor M16
9
1,1
2
Sloof Work
1.
2.
3.
4.
5.
6.
Sloof Laboratory
Excavation
Backfill
Compacted Sand
Concrete K-225
Formwork
Rebar
-D10
-D13
2
1,1
2
Floor Work
1.
2.
3.
4.
E
Unit
Floor Laboratory
Cramics
Concrete K-225
Formwork
Rebar
Steel Work
Steel Laboratory
1
1,1
2
1. Steel Laboratory
F
Kg
264
m2
m2
m2
m2
72.00
144.00
144.00
144.00
Wall Work
Laboratory
1. Wall First Floor
- Brick Wall
- Plestering
- Acian
- Painting
DESIGNED BY :
WD
SIGNATURE
:
REVIEWED BY :
KMZ
SIGNATURE
:
APPROVED BY :
YSS
SIGNATURE
:
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
FACILITY
SUMMARY BILL OF QUANTITY
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
BILL OF QUANTITY
Drawing
SUMMARY
LABORATORY
NO
ITEM WORK
Unit
Volume
02
03
04
01
G
Roof Work
1. Cladding Roof
Cladding Nok
H
Unit Price
05
m
m
21.12
8
nos
nos
4.00
3.92
65,0
65,0
Mechanical Work
1. Mechanical Work
Ls
1.00
300,0
Electrical Work
1. Electrical Work
Ls
1.00
150,0
Total
Total Area (m2)
Price/m2
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
122,700.00
12,500.00
900,400.00
1,141,600.00
221,270.00
10,209,149.93
1,495,406.25
79,687.50
172,876.80
1,583,970.00
2,522,478.00
13,675.00
13,675.00
32,569.20
546,338.59
3,026,731.99
781,660.80
7,661,319.69
122,700.00
12,500.00
204,755.10
1,141,600.00
221,270.00
7,661,319.69
309,204.00
13,500.00
49,141.22
1,643,904.00
3,186,288.00
13,675.00
13,675.00
407,477.53
2,051,804.93
20,831,424.00
161,440.00
1,141,600.00
221,270.00
13,675.00
20,831,424.00
5,166,080.00
4,383,744.00
7,080,640.00
4,200,960.00
4,884,000.00
4,884,000.00
18,500.00
4,884,000.00
30,486,744.00
30,486,744.00
220,855.00
46,300.00
34,575.00
20,411.00
15,901,560.00
6,667,200.00
4,978,800.00
2,939,184.00
DATE :
DATE :
DATE :
93,180.00
28,330.00
06
2,194,601.60
1,967,961.60
226,640.00
65,000,000.00
65,000,000.00
514,800,000.00
260,000,000.00
254,800,000.00
300,000,000.00
300,000,000.00
300,000,000.00
150,000,000.00
150,000,000.00
150,000,000.00
1,041,491,432.72
32.00
32,546,607.27
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
No.
Item Work
1.
Clearing Area
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
ION SHEET
PT.Bukaka Teknik Utama
Item Work
Clearing Area
Widht
Length
Volume
(m)
(m)
(m2)
10
Total
50
50
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
1.
750 mm
Excavation
No.
1.
Item Work
Foundation
750 mm
2.
Backfill
No.
1.
250 mm
Backfill
Area: 0.850
3.
Item Work
Foundation
Lean Concrete
No.
1.
Item Work
750 mm
Foundation
750 m
1000 mm
Concrete K-225
No.
1.
Item Work
Foundation
750 mm
5.
Formwork
No.
Item Work
1.
Foundation
2.
Pedestal
6.
Rebar
No.
1.
7.
No.
1.
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
Item Work
Foundation
Anchor Bolt
Item Work
Anchor M16
ION SHEET
PT.Bukaka Teknik Utama
Item Work
Foundation
Area
(m2)
1.63
Qty =
Length
(m)
6
nos
Volume
(m3)
1.25
2.03
12.19
Item Work
Foundation
Area
Qty =
6
nos
Length
Volume
(m2)
(m)
0.85
1.25
(m3)
1.06
6.38
Lean Concrete
Item Work
Foundation
Area
(m2)
0.64
Qty =
Thick
(m)
6
nos
Volume
(m3)
0.05
0.03
0.19
Concrete K-225
Item Work
Foundation
Volume
(m3)
0.23
Qty =
Thick
(nos)
6
nos
Volume
(m3)
0.23
1.39
Item Work
Area
(m2)
Qty =
Thick
(m)
6
nos
Volume
(m2)
Foundation
3.00
0.3
0.90
Pedestal
1.00
1.00
11.40
Item Work
Foundation
Item Work
Anchor M16
Volume
(Kg)
(Kg)
(Kg)
221
39.95
261
Length
Widht
Thick
Qty
(mm)
(m)
(mm)
(nos)
500
50
12
24
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
1.
1
Excavation
No.
Item Work
1.
Sloof
2.
Sloof
2.
8m
6
11
13
4m
Backfill
No.
Item Work
1.
Sloof
2.
Sloof
3.
Compacted Sand
No.
Item Work
1.
Sloof
2.
Sloof
0.35 m
4.
0.3 m
Concrete K-225
No.
Item Work
1.
Sloof
2.
Sloof
5.
No.
Formwork
Item Work
1.
Sloof
Sloof
6.
Rebar
No.
1.
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
Item Work
Sloof
ION SHEET
PT.Bukaka Teknik Utama
Item Work
Area
Length
Qty
Volume
(m2)
(m)
(nos)
(m3)
Sloof
0.11
1.68
Sloof
0.11
0.84
2.52
Area
Length
Qty
Volume
(m2)
(m)
(nos)
(m3)
Sloof
0.05
0.72
Sloof
0.05
0.36
Item Work
1.08
Compacted Sand
Area
Length
Qty
Volume
(m2)
(m)
(nos)
(m3)
Sloof
0.01
0.16
Sloof
0.01
0.08
Item Work
0.24
Concrete K-225
Area
Length
Qty
Volume
(m2)
(m)
(nos)
(m3)
Sloof
0.06
0.96
Sloof
0.06
0.48
Item Work
1.44
Item Work
Widht
Length
Qty
Volume
(m2)
(m)
(nos)
(m2)
Sloof
0.6
9.6
Sloof
0.6
4.8
14.4
Item Work
Sloof
Volume
(Kg)
(Kg)
(Kg)
150
30
179.84
179.84
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
First Floor
1.
Concrete K-225
No.
Item Work
1.
Concrete K-225
2.
No.
1.
3.
No.
1.
4.
No.
1.
Formwork
Item Work
Formwork
Rebar
Item Work
Rebar
Cramics
Item Work
Cramics
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
ION SHEET
PT.Bukaka Teknik Utama
Concrete K-225
Item Work
Qty =
Thick
Widht
Lenght
(m2)
(m)
(m)
8.00
0.12
Concrete K-225
4.00
1
Volume
(m3)
3.84
3.84
Item Work
Widht
Lenght
(m2)
(m)
Formwork
4.00
Qty =
Thick
(m)
8.00
1
Volume
(m2)
32.00
32.00
Item Work
Volume Concrete
Qty =
Weight/m3
1
Volume
(m3)
(kg)
(Kg)
Rebar
3.84
80
307.20
307.20
Item Work
Cramics
Widht
Lenght
Qty
Volume
(m2)
(m)
(nos)
(m2)
32.00
32.00
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
FACILITY
SUMMARY
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
ION SHEET
PT.Bukaka Teknik Utama
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
3m
4m
No.
Item Work
1.
Hebel wall
No.
Item Work
1.
Hebel wall
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
ION SHEET
PT.Bukaka Teknik Utama
Item Work
Hebel wall
Item Work
Hebel wall
(Hebel)
Lenght
Height
Qty
Volume
(m)
4
(m)
3
(nos)
6
(m2)
72
72
Lenght
Height
Qty
Volume
(m)
4
(m)
3
(nos)
1
(m2)
64.08
64.08
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
2.04 m
1.
Roof Warehouse
No.
Item Work
1.
Roof Warehouse
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
ION SHEET
PT.Bukaka Teknik Utama
Roof Warehouse
Item Work
Roof Warehouse
Lenght
Height
Qty
Volume
(m)
(m)
(nos)
(m2)
2.64
8.00
21.12
21.12
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
1.
No.
1.
2.
No.
1.
Door
Item Work
Door 1
Windows
Item Work
Windows
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
ION SHEET
PT.Bukaka Teknik Utama
Item Work
Door 1
Height
Widht
Qty
Volume
(m)
(m)
(nos)
(m2)
4
4
Item Work
Windows
Height
Widht
Qty
Volume
(m)
(m)
(nos)
(m2)
1.4
1.4
3.92
3.92
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :
Drawing
1.
No.
1.
Anchor Foundation
Item Work
Anchor M16
DESIGNED BY :
REVIEWED BY :
APPROVED BY :
WD
KMZ
YSS
SIGNATURE
SIGNATURE
SIGNATURE
:
:
:
ION SHEET
PT.Bukaka Teknik Utama
Anchor Foundation
Item Work
Anchor M16
Length
Widht
Thick
Qty
(mm)
(m)
(mm)
(nos)
500
50
12
24
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
PROJECT
:
:
LOCATION :
FACILITY
TITTLE :
REBAR
Drawing
Mark
Qty
Length
Reinforcemen
10
13
Foundation
LABORATORY
Date
114
16
2
3
24
60
Length
Weight
Total Weight
16
10
1000
1093
1080
(mm)
(Kg)
(Kg)
64800
64800
39.951634
261.28
Sloof
4
6
44.75
Length
Weight
Total Weight
13
10
24000
1080
(mm)
(Kg)
(Kg)
144000
48330
48330
144000
29.79726 150.04058
179.84
DESIGNED BY :
WD
SIGNATURE
REVIEWED BY :
KMZ
SIGNATURE
APPROVED BY :
YSS
SIGNATURE
ION SHEET
PT.Bukaka Teknik Utama
DOC.NO :
REV :
Calculation
Reinforcement
13
16
undation
114000
26232
140232
221.33
261.28
Sloof
144000
144000
150.04058
179.84
CAL LH16-C15-D04-RX-003
PAGE :
OF
DATE :
DATE :
DATE :
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
PROJECT
BILL OF QUANTITY
:
:
LOCATION :
AREA
TITTLE :
FACILITY
Drawing
ITEM WORK
NO
Unit
Laboratory
1 Concrete K-225
m3
2 Rebar ( 10)
kg
3 Rebar ( 13)
kg
3 Rebar (D 16)
kg
DESIGNED BY :
WD
SIGNATURE
REVIEWED BY :
KMZ
SIGNATURE
APPROVED BY :
YSS
SIGNATURE
DOC.NO :
REV :
Calculation
Unit
Volume
m3
6.67
kg
69.75
kg
150.04
kg
221.33
441.12
BOQ LH16-C15-D04-BQ-003
PAGE :
OF
DATE :
DATE :
DATE :