Daily Site Report

Site
: HAYDARIA
Report No. : 7
Date
18/01/2012

Man power

Admin.
1

Engineer
5

Surveyor
1

Admin.

Engineer

Surveyor

Sub Contractor

Eng.
in

power

charge

Min: 5

Pr

en
t

Job Description & Comment

Man

Eq
ui
pm

Section

No.

Weather: Cloudy Max: 16

Civil works
Mobilization
1
2

wetting & compacting for storage area


supplying and spreading sub base for camp ( today have supplied
230 cubic meters of sub base to the site loaded on 9 vehicles ) .
to be total amount of supplied sub base about 307 cubic meters .

Eng.Wissam
surveyor. Karar

soil investigation

1
2
3

electrical work (11 kv feeding line )


Eng.Shawkat
receive materials for installing 11KV feeding line to site ( isolated ceramic ,columns ,terminals)
Eng.Shawkat with civil Eng.Wissam and surveyor Karar had measured and had
made preparations as primary location and marking the route of feeding
line columns from tires factory to site area .
the contactor send 3 transformers ( two 400KV,one 250KV ) to the electricity
distribution department in Najaf city for condition and technical test by it.
( these transformers are used in feeding line )

5
60

documents

Visits and Meetings

Eng.Ali Hanoon

Site Manager Comment

technician
1

worker
0

Total
8

Foreman

technician

worker

Total
0
0

Min: 5

Progress

en
t

16

Foreman
0

Plan

Actual

start

finish

start

12/28/2011
1/18/2012

1/20/2012
1/18/2012

12/28/2011
1/2/2012

12/9/2011

2/15/2012

12/9/2011

1/4/2012

1/4/2012

1/18/2012
1/18/2012

1/18/2012
1/18/2012

finish

Site Manager Comments