Daily Site Report

Site
: HAYDARIA
Report No. : 22
Date
: Mon 07/02/2012

Man power

Sub Contractor

Admin.
2

Engineer
7

Surveyor
1

Admin.

Engineer

Surveyor

FBC
MO

Eng.
in

power

charge

Max:16 Min:6

Pr

en
t

Job Description & Comment

Man

Eq
ui
pm

Section

No.

Weather: cloudy - dusty

Civil works
Mobilization
1
2
3
4
5

Eng.Wissam
supplying sub base for storage area
Eng.Ali Omran
spreading and leveling sub base for storage area
surveyor Karar
wetting & compacting for storage area
continue civil work for building toilets in camp area ( compacting for toilet building base)
starting caravans installation by prefabricated building company , preparation works for
installation ( check materials, arrange the work site and storage container )

grader
shovel
water tank
compactor
crane 50 ton

50
50
47
7
2

soil investigation
site manager ENG.Riyadh send the soil investigation report to head office in Amman
and to TBC consultant civil engineers ( Dr.Saffa & abdulhusain ) to be studied before sending it
to Enka Teknik Engineering company .

1
2

electrical work (11 kv feeding line )


Eng.Shawkat
receiving materials for installing 11KV feeding line to site ( remaining only from underground cable )
continue civil works for installing 11KV line ( determine and excavation work for poles basement ) on the route from

95
8

tire planet to site area .


starting procedure poles and cable test by inspector engineer from Najaf electricity distribution
directorate to check and take samples from 11KV line materials for test in Baghdad.

receiving materials
16 containers had arrived to site from ALQudis site on18 trucks ,then they unloaded
to the storage area .

admin. Hamza

30

documents

Eng.Ali Hanoon

Visits and Meetings

Next day works


1
2
3
4
5

civil works
continue supplying sub base for storage area.
spreading and leveling sub base for storage area .
continue building works for toilets foundation (wooden frame work ).
excavation work for sub tank foundation .
continue caravans installation works in site.

1
2
3

electrical works
waiting for receiving remaining materials of 11KV feeding line from contractor( underground cable)
continue civil works for installing 11KV line from tire plant to site area by contractor
continue inspection procedure for 11KV line poles and cable .

Site Manager Comment

Foreman
0

technician
1

worker
1

Total
12

Foreman
1
1

technician
5
1

worker
4
4

Total
10
6
16

Max:16 Min:6

en
t

Progress

Plan

Actual

start

finish

start

1/23/2012
1/25/2012
12/28/2011
1/28/2012
2/7/2012

2/4/2012
2/6/2012
1/20/2012
2/12/2012
3/29/2012

1/23/2012
1/25/2012
12/28/2012
2/4/2012
2/7/2012

12/9/2011

2/15/2012

12/9/2011

1/3/2012
1/26/2012

1/25/2012
2/18/2012

1/4/2012
2/4/2012

finish

1/23/2012

1/30/2012

2/7/2012

Site Manager Comments