Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Project:

Due Date:

*Nylon Wire
Sculpture*

Name:

9/8/16

Major Project Rubric


Criteria

Work Habits &


Development

Block:
Advance Strong Proficie
d
nt
Participation/Effort Grade

Mrs. Moreno
Novice

75

70

65

60

25

20
(1-2
days
late)

15
(3-4 days
late)

10
(5 or
more)

Stude
nt

Teache
r

Student shows consistent


concern with quality, depth of
focus and concentration, and
uses time and space efficiently.
Student completes project with
care from beginning to end, is
prepared to work, on time for
class, and cleans up.

Project Finished on time

Student has fulfilled the


assignment requirements by the
due date.

Total Participation Grade

(to be averaged into class participation)

Artwork Grade
Required Components

25

24-20

19- 15

14- 10

Drawing Technique &


Craftsmanship

25

24- 20

19- 15

14- 10

25

24-20

19- 15

14-10

25

24-20

19-15

14-10

Student included all of the


specific requirements outlined
on the project information sheet.
Students created a sketch to
plan the design of sculpture.
Student created an interesting
abstract sculpture with
meaningful designs.

Student demonstrates ability to


draw from reference. Evidence
of superior craftsmanship is
apparent. Project is neat, clean
and complete.

Originality, Creativity
The work reveals a consistent
and imaginative approach.

Use of Form
Student created an interesting
sculpture using the DESIGN IN
THE ROUND thought process.
Sculpture is able to be viewed
from each angle in an
interesting way. Student
thought about the form to create
an interesting outcome.

/ 100

Teacher Comments:

Final Artwork
Grade:
/100

You might also like