Vernacular Terms in Site Construction
Vernacular Terms in Site Construction
ENGLISH -- TAGALOG
POST - halige / poste
GIRDER - gililan
JOIST - soleras
FLOORING sahig/suwelo
GIRT - sepo
BEAM biga
TRUSS kilo
BOTTOM CHORD barakilan
TOP CHORD tahilan
PURLINS - reostra
COLAR PLATE - sinturon
FASCIA BOARD senepa
EXTERNAL SIDING tabike
VERTICAL STUD pilarete
HORIZONTAL STUD pabalagbag
CEILING JOIST kostilyahe
WINDOW SILL pasamano
WINDOW HEAD sombrero
WINDOW OR DOOR JAMB hamba
OPEN STRINGER - hardinera
CLOSED STRINGER madre de eskalera
TREAD baytang
RISER takip silipan
HANDRAIL gabay
MOLDING muldora
EAVE sibe
PROJECTION bolada
FRAMEWORK balangkas
GUTTER kanal
CONDUCTOR alulod
WROUGHT IRON STRAP plantsuwela
BOLT pierno
SCAFFOLDING plantsa
STAKE staka
PLASTERED COURSE kusturada
STUCCO or PLASTER - palitada
SCRATCH COAT - rebokada
PICHWORK on MASONRY piketa
VARNISH FINISH monyeka
SPACING or GAP biyento
CONCRETE SLAB larga masa
ALIGNMENT - asintada
PLUMB LINE - hulog
CEMENT TILES baldosa
Sink / prigadero
Sketch plan / krokis
Slab (rough) / larga masa
Slope / bahada
Soler bar / estaniyo
Spacing / biento
FILIPINO CONSTRUCTION TERMS
1. POSTE HALIGE
2. GUILILAN GIRDER
3. SULERAS JOIST
4. SAHIG, SUELO FLOORING
5. SEPO GIRT
6. BIGA BEAM
7. BARAKILAN - BOTTOM CHORD
8. REOSTRA PURLIN
9. SENEPA - FASCIA BOARD
10. KOSTILYAHE - CEILING JOIST
11. TABIKE - SIDING (EXTERNAL)
12. PILARETE - STUD (VERTICAL)
13. PABALAGBAG - STUD (HORIZONTAL)
14. PASAMANO - WINDOW SILL
15. SUMBRERO - WINDOW HEAD
16. HAMBA - WINDOW JAMB / DOOR JAMB
17. SINTURON - COLLAR PLATE
18. HARDINERA - STRINGER (OPEN)
19. MADRE
(de escalera)
- STRINGER (CLOSED)
20. BAYTANG TREAD
21. TAKIP (SILIPAN) - RISER
22. GABAY HANDRAIL
23. MULDURA MOULDING
24. SIBE EAVE
25. BOLADA PROJECTION
26. BALANGKAS - FRAME WORK 27. KANAL
GUTTER
28. ALULOD CONDUCTOR
29. PLANCHUELA - W. I. STRAP
30. PIERNO BOLT
31. PLANCHA SCAFFOLDING
32. ESTAKA STAKE
33. KUSTURADA - PLASTERED COURSE
34. PALITADA - STUCCO OR PLASTER
35. REBOCADA - SCRATCH COAT
36. PIKETA - PICKWORK
(on masonry)
37. MONYEKA - VARNISH FINISH
38. BIENTO - SPACING OF GAP
39. LARGA MASA - CONCRETE SLAB
(rough)
40. ASINTADA ALIGNMENT
41. HULOG - PLUMB LINE
42. BALDOSA - CEMENT TILE