Project
Sub Project
Location project
Drawing Reference

.c

Member Name

No
Column

to
k

Bar Mark

1250

dia (mm)
Cover

Bar Qty

Title
: Heap Leach Switch Room Foundation Plan & Details

Shape

50

mm

C-1

400

300

Long bar

D16

16

C-1

400

300

Stirrups

200

D10

10

C-2

400

300

Long bar

D16

16

C-2

400

300

Stirrups

200

D10

10

Dept

300

1000

Perimeter
rebar

1000

Perimeter
rebar

.d o

RF

c u -tr a c k

Internal Rev.
Internal Rev.
Internal Rev.
2016-10-08

Length of
Each Bar
(mm)

Total Length (mm)

1.367

5.468

0,46

1,58

8,63

1.120

6.440

0,54

0,62

3,97

1.367

5.468

0,46

1,58

8,63

1.120

6.440

0,54

0,62

3,97

200

534

6.942

0,58

1,04

7,23

134

200

534

4.806

0,40

1,04

5,01

850

850

NA

NA

NA

NA

mm

mm

mm

mm

75

mm

1.117

250

200

300

1.117

250

200

300

134

E
mm

UoM

/12
m

Weight Kg/m

Total Weight
(Kg)

Page
Prepared
Checked
Rev.
Rev.
Rev.
Date Prepared

lic

Tujuh Bukit Copper and Gold Project


Additional Foundation Footing - Switch Room
Heap Leach
BSI-HPL-DWG-CS-100

lic

to

BAR BENDING SCHEDULE & QUANTITY

c u -tr a c k

.d o

60,00

B
A

Underground PAD

60,00

B
7

Pad dir.
X

Pad dir.
Y

1000

200

D13

13

13

A
B

1000

200

D13

13

A
27

WR

1000

1000

NA

150

M8

Sub Total :
D10
D13
D16
D25
#M8-150

Lgh@12m

5400x2100mm

1
1
1
0
1,0

NA

Kg
7,94
12,24
17,26
0,00
62