Name of Project Location Client Date: Item Cmi/Pmi/Si/Cvi Ref No Date Issued

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 31

Name of Project

Location
Client
Date:
________________________________
Item
CMI/PMI/SI/CVI Ref No

DATE ISSUED

RUNNING TOTAL

OTAL

VARIATION MONITORING LOG

SCOPE OF WORK

PROPOSAL COST

DATE SUBMITTED

RECONCILED COST

REMARKS/STATUS

Name of Project
Location
Clinet
Date:
________________________________
Item

NAME OF PROJECT

LOCATION

PROGRESS BILLING MONITORING

OWNER/CLIENT
ORIGINAL

VARIATION/CHANGE ORDER

PROGRESS BILLING AMOUNT

CONTRACT AMOUNT

PHYSICAL %
ACCOMPLISHMENT

PROGRESS BILLING
AMOUNT

DATE SUBMITTED

DUE FOR RELEASE

REMARKS/STATUS

Name of Project
Location
Client
Date:
________________________________
Item

NAME OF PROJECT

LOCATION

SUB-CONTRACTOR BILLING MONITORING

OWNER/CLIENT

SCOPE OF WORK

NAME OF SUB-CONTRACTOR

WORK ORDER NO

WO AMOUNT

REPORTED
ACCOMPLISHMENT
(CLAIMED)

EVALUATED
ACCOMPLISHMENT

DATE SUBMITTED

REMARKS/STATUS

Name of Project
Location
Client
Date

Item No

MATERIALS/SCOPE OF WORK NAME OF SUPPLIER/SUB-CONTRACTOR

PRICE QUOTATION MONITORING

ADDRESS

CONTACT DETAILS

COMMITMENT DATE

LOCAL/INDENT

TYPE of SERVICES
(SUPPLY ONLY or SUPPLY
& INSTALLATION or FIX
ONLY

STATUS/REMARKS

Item No

NAME OF PROJECT

LOCATION

BID MONITORING LOG


as of _________________________
CLIENT

CONTACT DETAILS

SUBMISSION DATE

REVISED SUBMISSION
(if applicable)

ASSIGNED QS

STATUS/REMARKS

Item No

NAME OF PROJECT

LOCATION

PRE-QUALIFICATION MONITORING LOG


as of _________________________
CLIENT

CONTACT DETAILS

SUBMISSION DATE

REVISED SUBMISSION
(if applicable)

STATUS/REMARKS

QUANTITY SURVEYOR MAT

As of Octobe
ITEM

NAME OF PROJECT

LOCATION

CLIENT/OWNER

DATE OF
SUBMISSION

REV. SUBMISSION
DATE

Proscenium Fixed
Dcor Package
Phase 1

Makati City

Rockwell Land
Corporation

19-Aug-16

Proscenium Phase 1
Medicine Cabinet
Pakage

Makati City

Rockwell Land
Corporation

23-Sep-16

17-Oct-2016
Tentative

Supply and
Installation of
Wardrobe Closets
and Kitchen
Cabinets

Makati City

The Rise / LSPI

12-Oct-16

19-Oct-16

1st Rev: 26-Sep-16


2nd Rev: TBA

As of Octobe
Supply and
LOCATION

CLIENT/OWNER

DATE OF
SUBMISSION

Supply and
Installation of
Wooden Doors

Makati City

The Rise / LSPI

14-Oct-16

Seda CITP

Cebu City

MDC / Ayala

8-Jul-16

ITEM

Installation
of
NAME
OF PROJECT

Wardrobe Closets
and Kitchen
Cabinets

Makati City

The Rise / LSPI

12-Oct-16

REV. SUBMISSION
DATE

19-Oct-16

TBA

As of Octobe
ITEM

NAME OF PROJECT

LOCATION

CLIENT/OWNER

DATE OF
SUBMISSION

Proscenium Phase 1
- Supply and
Installation of Vanity
Counters and
Bedroom Closets

Makati City

Rockwell Land
Corporation

Submitted

Prepared By:

GIAN CARLO BENITEZ


QS - ESTIMATOR

REV. SUBMISSION
DATE

TITY SURVEYOR MATRIX OF RESPONSIBILITY


As of October 17, 2016
REMARKS
RED FLAGS

STATUS AS OF 10/17/2016

1) RLC will issue Revised B

Quantity Take Off:

52% Ongoing (with Arnold)

2) Awaiting addedum draw

Line Item to Price:

1,226 Items / Prelims & Dayworks Not Counted

Pricing:

304 Nos / 25%

Total Queries Sumitted

88 Nos

Answered Queries:

46 Nos / 52.27%

Quantity Take Off:

58.05% Ongoing

Line Item to Price:

348 Items / Prelims & Dayworks Not Counted

Pricing:

Total Queries Sumitted

Answered

1)Queries until Oct/5/2016 Quantity Take Off:

100% Complete

2)Awaiting Quotation

48 Items / Prelims Not Counted

Line Item to Price:

3)Awaiting Reply on Query Pricing:


Total Queries Sumitted

Measured Works and Prelims 100%


15 Nos

As of October 17, 2016


REMARKS
RED FLAGS

STATUS AS OF 10/17/2016

Answered Queries:

2 Nos

1)Queries until Oct/10/2016 Quantity Take Off:

100% Complete

2)Awaiting Quotation

Line Item to Price:

147 Items / Prelims Not Counted

3)Awaiting Specification f

Pricing:

Total Queries Sumitted

7 Nos

Answered Queries:

2 Nos

1) 25 Queries Unanswered Quantity Take Off:

100% Complete

Line Item to Price:

250 Nos / Prelims Not Counted

Pricing:

65 Nos / 26.0%

Total Queries Sumitted

66 Nos

Answered Queries:

41 Nos / 62%

Unsatisfactory Response 9 Nos / 14%

As of October 17, 2016


REMARKS
RED FLAGS

STATUS AS OF 10/17/2016

Final Requirements for the Bid:


1. Check Cost Implication due to change in design - No Cost Implication

2. To Submit Revised Shop Drawings


3. To Submit Material Sample

PREVIOUS REPORT AS OF 9/19/2016


52% Ongoing (with Arnold)
1,226 Items / Prelims & Dayworks Not Counted
304 Nos / 25%
88 Nos
46 Nos / 52.27%

Ongoing
348 Items / Prelims & Dayworks Not Counted
-

Ongoing
48 Items / Prelims Not Counted
-

PREVIOUS REPORT AS OF 9/19/2016


-

Drawings to be issued on 10/03/2016


BOQ to be issued on 10/03/2016
-

100%
250 Nos / Prelims Not Counted
65 Nos / 26.0%
66 Nos
41 Nos / 62%
9 Nos / 14%

PREVIOUS REPORT AS OF 9/19/2016