PLUMBING TANKS
SECTION PB-421
Page 1
1.0
GENERAL
1.1
DESCRIPTION
.1
1.2
WORK INCLUDED
.1
1.3
1.4
Water Tanks.
SUBMITTALS
.1
Tank construction.
.2
.3
.4
QUALITY ASSURANCE
.1
Applicable Standards
.1
BS 1564
.2
SYABAS / SPAN
.3
Local Authority
.4
J.K.R Guidelines
.5
.6
JIS
.7
2.0
PRODUCTS
2.1
KENCANA SQUARE
PLUMBING TANKS
SECTION PB-421
Page 2
.2
.3
.4
.2
Tank shall be made using automatic press. Handmade or semihandmade tank is not acceptable.
.3
PANEL MATERIAL
.1
.2
.3
.
METHOD OF MANUFACTURING
.1
.2
.2
The width of the flanges shall be not less than 45mm holes for the
bolts shall have a clearance of 1.5 to 2.0mm in diameter. The
number of bolt holes drilled on the flanges shall be 8 - 15 per
meter length of flanges. The panel flanges shall be designed to
have the appropriate thickness and strength to withstand the
hydrostatic test as set forth in SS 245: 1995.
KENCANA SQUARE
PLUMBING TANKS
SECTION PB-421
Page 3
.5
.6
.7
.8
All internal bolts, nuts and washers in contact with water shall be
in stainless steel to JIS G4315 (SS304) or Rubberlined/PlasticCoated to JIS G3539 or equal.
.2
All external bolts, nuts and washers shall be hot dipped galvanised
in accordance to JIS H8641 (HDZ 35) or electrically galvanised
with coat of 0.008mm or more in accordance to JIS H8641 or
equal. The diameter of all bolts shall not be less than 10mm.
SEALING MATERIALS
.1
.2
Tests on the materials for the effects on water shall be carried out
and a certificate of approval complying with the sanitary standards
required by SYABAS shall be submitted with tender.
.3
.2
.3
a.
Floor Panels
.1
KENCANA SQUARE
PLUMBING TANKS
SECTION PB-421
Page 4
b.
Air Vents
.1
c.
d.
Anchors
.1
g.
f.
e.
KENCANA SQUARE
PLUMBING TANKS
SECTION PB-421
Page 5
.1
.9
h.
i.
j.
Incoming pipes complete with copper dual ball float valves brass
lever and heavy duty washer.
k.
SANITATION REQUIREMENTS
.1
.10
.11
.2
The panel shall be manufactured with a shield layer of black nonwoven fabric in the panels. The screen layer shall not in any way,
effect the strength and durability of the panels.
.3
.4
PANEL COLOUR
.1
.12
Steel base (skid) shall be of the crossed girder type and it shall be
designed to provide continuous support to all flanges to the floor
panels of the tank. Provisions shall be made to anchor the tank to
the supporting structures.
KENCANA SQUARE
PLUMBING TANKS
SECTION PB-421
Page 6
.2
.13
.14
2.2
All steel members used for fabricating the steel foundation shall
comply with either JIS G3101 or BS 7668, 1994 and coated with
corrosion resistant paint.
WATERTIGHTNESS
.1
.2
.3
.2
R.C. TANK
.1
GENERAL
.1
The R.C. structured work shall be carried out by the builders. The
plumbing scope of work shall comprise of but not limited to the
following :a.
KENCANA SQUARE
PLUMBING TANKS
SECTION PB-421
Page 7
.2
b.
c.
d.
e.
INSTALLATION OF PIPES
.1
b.
c.
d.
e.
interconnecting pipes
.3
In each case, the pipes shall terminate at the face or tank bottom
with flanged ends to BS10 Table E.
.2
All bolting done on the internal walls of the water tank shall not
penetrate through the reinforced concrete or in any way cause
any leakage at the bolt position.
.3
.4
All aluminium sections and bars shall comply with BS 1474 and
BS 1161.
KENCANA SQUARE
PLUMBING TANKS
SECTION PB-421
Page 8
.5
2.3
For normal operation, the starting and stopping of pumps shall be initiated
by level controllers unless otherwise specified. The level control units
shall be operated by suspended electrodes and shall be of "No Float"
type.
.2