QC DOSSIER FOR MECHANICAL

COMPLETION
CLIENT: BP EXPLORATION (EPSILON) LIMITED
CONTRACTOR: BAUER NIMR LLC
SUB-CONTRACTOR: ORBITAL PROJECTS AND SERVICES LLC
PROJECT NUMBER: 4300570319
PROJECT NAME: WASTE MANAGEMENT AREA PHASE-2
SUB-SYSTEM: ADMIN BUILDING

PACKAGE NUMBER: xxxxxxx

VOLUME 1 OF 1

INDEX

1. MECHANICAL COMPLETION CERTIFICATE


2. PUNCH LIST
3. AS-BUILT DRAWING
3.1.

GENERAL ARRANGMENT DRAWING

3.2.

DETAILED DRAWINGS

3.3.

ELECTRICAL DRWINGS

4. METHOD STATEMENTS
4.1.

MS FOR AIRCONDITIONERS INSTALLATION

4.2.

MS FOR CESS TANK INSTALLATION AND SEWER NETWORK

4.3.

MS FOR FIRE ALARM SYSTEMS INSTALLATION

4.4.

MS FOR WATER NETWORK

4.5.

MS FOR SMALL POWER AND LIGHTING FIXTURES

5. INSPECTION AND TEST PLANS


5.1.

ITP FOR AIRCONDITIONERS INSTALLATION

5.2.

ITP FOR CESS TANK INSTALLATION AND SEWER NETWORK

5.3.

ITP FOR FIRE ALARM SYSTEMS INSTALLATION

5.4.

ITP FOR WATER NETWORK

5.5.

ITP FOR SMALL POWER AND LIGHTING FIXTURES

6. VENDOR PACKAGES AND DATA SHEETS


6.1.

CESS TANK

6.2.

AIR CONDITIONERS

6.3.

ELCB

6.4.

FIRE ALARM PANEL

6.5.

DISTRIBUTION BOARD

6.6.

SUB-MAIN DISTRIBUTION BOARD

7. INSPECTION TEST REPORTS


7.1.

MATERIAL RECEIPT AND INSPECTION REPORTS

7.2.

MATERIAL TEST CERTIFICATES

7.3.

MATERIAL CONFORMITY REPORTS

7.4.

CABLE GLANDING AND TERMINATION REPORTS

7.5.

INSULATION AND MEGGER REPORTS

7.6.

CONTINUITY CHECK REPORTS

7.7.

PIPE LEAKAGE TEST REPORTS

7.8.

MANUFACTURER/VENDOR INSPECTION TEST REPORTS

8. OPERATION AND MAINTENANCE MANUALS


8.1.

AIRCONDITIONERS

8.2.

FIRE ALARM PANEL

9. MANAGEMENT OF CHANGE

9.1. TECHNICAL QUERIES


9.2. ENGINEERING DEVIATION REQUESTS
10. NON-CONFORMANCE REPORTS
11. SPARE PARTS