Low Pressure Test Form
Low Pressure Test Form
Contract No. :
CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN STESEN PAM KUMBAHAN (19,500 PE) TERMASUK
KERJA-KERJA YANG BERKAITAN DAN 1 UNIT STESEN SUIS UTAMA TNB DIATAS SEBAHAGIAN TANAH PT 17774
(TECHPARK 2), BANDAR BARU ENSTEK, DAERAH SEREMBAN, N.S.D.K
Consultant :
Page :
1
Contractor :
of
2
Date :
From
To
Pipe
Diam.
(mm)
Design
Pipe Working
Length Pressur
(m)
e
(psi)
Test Pressure
(psi)*
Start
Finish
Test
Time
(hr:min)
Remarks
Pass
MH E23
MH E22
525
95.40
MH E22
MH E21
525
38.16
MH E21
MH E20
525
28.37
MH E20
MH E19
525
44.86
MH E19
MH E18
525
35.42
MH E18
MH E17
525
88.30
MH E17
MH E16
525
89.00
MH E16
MH E15
525
89.75
MH E15
MH E14
525
71.61
MH E14
MH E13
525
50.06
Fail
* All pressure pipelines and appurtenances shall be hydrostatically tested for aduration of not less than 2 hours, at the greater of 150% of the design working pressure
or 100-psi hydrostatic pressure.
Consultant Signature
Date
_______________________
________________
Project Name :
Contract No. :
CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN STESEN PAM KUMBAHAN (19,500 PE) TERMASUK
KERJA-KERJA YANG BERKAITAN DAN 1 UNIT STESEN SUIS UTAMA TNB DIATAS SEBAHAGIAN TANAH PT 17774
(TECHPARK 2), BANDAR BARU ENSTEK, DAERAH SEREMBAN, N.S.D.K
Consultant :
Page :
Contractor :
of
2
Date :
From
To
Pipe
Diam.
(mm)
Design
Pipe Working
Length Pressur
(m)
e
(psi)
Test Pressure
(psi)*
Start
Finish
Test
Time
(hr:min)
Remarks
Pass
MH E13
MH E12
525
77.09
MH E12
MH E11
525
77.95
525
49.18
525
6.33
MH E11 MH E10A
MH E10A MH E10
Fail
* All pressure pipelines and appurtenances shall be hydrostatically tested for a duration of not less than 2 hours, at the greater of 150% of the design working pressure
or 100-psi hydrostatic pressure.
Consultant Signature
Date
_______________________
________________