Inspection Record
for Blockwork
Client:
Subcontractor:
Project No.:
Project Name:
Building:
Reference Document:
Subcontractor
Items to inspect
inspected
initials/date
1.0
Supports
1.1
Type of support
1.2
Acceptance of support
2.0
Materials
2.1
2.2
3.0
Workmanship
3.1
Alignment/vertically
3.2
Joints; width/finish
3.3
General appearance
Company
Hold
Point
Remarks
inspected*
initials/date
Wall reinforcement
4.1
Positions/locations
4.2
Rebar, quantity/diameter
4.3
Concrete filling
5.0
Finished wall
5.1
Position
5.2
Dimensions
5.3
Openings
Signature: