Professional Documents
Culture Documents
Checklist of Required Documents For Permits
Checklist of Required Documents For Permits
Checklist of Required Documents For Permits
PERMITS
BARANGAY ENDORSEMENT
Checklis
t
REQUIRED DOCUMENTS
Site Development Plan
Letter Request
Others (specify)
REQUIRED DOCUMENTS
Set of Set of Building Plans (Architectural, Structural, Electrical, Mechanical,
Sanitary Plumbing, Fire Protection Plans) (Architectural, Structural, Electrical,
Mechanical, Sanitary Plumbing, Fire Protection Plans)
Water Demand Calculations
Others (specify)
REQUIRED DOCUMENTS
Set of Set of Building Plans (Architectural, Structural, Electrical, Mechanical,
Sanitary Plumbing, Fire Protection Plans) (Architectural, Structural, Electrical,
Mechanical, Sanitary Plumbing, Fire Protection Plans)
Electrical Load Computation
Others (specify)
REQUIRED DOCUMENTS
Set of Set of Building Plans (Architectural, Structural, Electrical, Mechanical,
Sanitary Plumbing, Fire Protection Plans) (Architectural, Structural, Electrical,
Mechanical, Sanitary Plumbing, Fire Protection Plans)
Barangay Endorsement/Resolution
Colored Images of Project (panoramic view with captions)
Letter Request
Others (specify)
DEVELOPMENT PERMIT
Checklist
REQUIRED DOCUMENTS
Vicinity Map (with a minimum of 2 kilometre - radius from the periphery of the
project site showing the relationship of the proposed project to existing
community facilities and utilities)
Site Development Plan (Schematic Plan) showing the proposed lay-out (For
projects in Baguio City and Benguet, plot all existing trees with a diameter of
0.30 meters or more)
Survey plan of the lot/s as described in the Certificates of Titles of lots subject of
the application
Certified True Copy of titles and Tax Declaration (certification should not be more
than three (3) months old upon filing of application)
Permit to Cut Trees (For projects located in Baguio City and Benguet)
Topographic Plan to include existing conditions like boundary lines, streets and
basements / utilities and adjacent to the project ground / spot elevation and
other conditions on the land
For projects with Vertical Development, i.e Condominium / Townhouses (Duly
signed by a licensed Architect / Engineer)
Final Floor and ground plans
Elevation Plans (front, rear, right side and left side)
Section Plans (cross and longitudinal)
Solid Waste Management Plan
Building Specifications, Bill of Materials and Estimated Costs
For Land Development of Projects (Duly signed by a Licensed Architect /
Engineer
Final Site Development / Subdivision Plan
Road Design Plan (Geometric and Structural Design)
Storm Drainage and Sewer System Plans
Water System Layout and Details
Site Grading Plan / Locational / details of slope protection structures
Power Distribution Plan
Site Development Plan / Landscape Design for Parks and Playgrounds
Specifications, Bill of Materials and Cost Estimates
Project Study indicating among others the land development cot, vertical
development cost, amortization schedules, sources of financing, marketing, cash
flow and project time table / completion.
Audited Assets and Liabilities / Income Statement
Income Tax Return (for the last three (3) years)
Certificate of Registration with Securities and Exchange Commission (SEC)
Articles of Incorporation of Partnership
Corporation By-Laws and all implementing Amendments
Certification from the local water franchise on the availability of water supply /
service in the area where the project is to be put up (BAWADI)
Certification from the local power franchise on the availability of electrical power
supply / service in the area where the project is to be put up (BENECO)
Ocular Geological Inspection Report / Risk Zonation Map from Mines and
Geosciences Bureau.
Others (specify)
BUILDING PERMIT
Checklis
t
REQUIRED DOCUMENTS
Zoning
Certified True Copy of Title
Tax Declaration
Certificate of Non-Delinquency
Building/Fencing/Excavation
Building/Fencing Specification
Building/Fencing/Excavation Cost Estimate
Parking Plan
ECC
Application for zoning compliance certificate duly notarized
Duly Notarized Contract of Lease
Duly Notarized Deed of Sale
Duly Notarized Contract to Sell
Duly Notarized copy of the Authorization from Registered
Owner
Approved TSI/MSI order of award issued by DENR
Approved Survey Plan
Fire Safety
Evaluation
Clearance
Set of Building Plans (Architectural, Structural, Electrical,
Mechanical, Sanitary Plumbing, Fire Protection Plans)
Cost Estimates
Technical Specifications
CEPMO
Requirements
Set of Building Plans (Architectural, Structural, Electrical,
Mechanical, Sanitary Plumbing, Fire Protection Plans)
Cost Estimates
Technical Specifications
Mechanical Permit
Updated PTR and PRC
Mechanical Permit Form duly Signed and Sealed
Building Plan
CBAO
Requirements
Certificate of Zoning Compliance
Certificate of Fire Safety Evaluation Clearance
Certificate from CEPMO
Cost Estimates
Building Specifications
Mechanical Permit
Set of Building Plans (Architectural, Structural, Electrical,
Mechanical, Sanitary Plumbing, Fire Protection Plans)
Others (specify)
OCCUPANCY PERMIT
Checklis
t
REQUIRED DOCUMENTS
Zoning
Certified True Copy of Title
Tax Declaration
Certificate of Non-Delinquency
Building/Fencing/Excavation
Building/Fencing Specification
Building/Fencing/Excavation Cost Estimate
Parking Plan
ECC
Application for zoning compliance certificate duly notarized
Duly Notarized Contract of Lease
Duly Notarized Deed of Sale
Duly Notarized Contract to Sell
Duly Notarized copy of the Authorization from Registered
Owner
Approved TSI/MSI order of award issued by DENR
Approved Survey Plan
Fire Safety
Evaluation
Clearance
Set of Building Plans (Architectural, Structural, Electrical,
Mechanical, Sanitary Plumbing, Fire Protection Plans)
Cost Estimates
Technical Specifications
CEPMO
Requirements
Set of Building Plans (Architectural, Structural, Electrical,
Mechanical, Sanitary Plumbing, Fire Protection Plans)
Cost Estimates
Technical Specifications
Mechanical Permit
REQUIRED DOCUMENTS
HLURB Form 001 for
Corporation
HLURB form 003 for
Single Proprietorship
Certifiec True Copy of Transfer Certificate of Title (TCT or Original Certificate of
Title/OCT duly stamped with original marking 'Certified True Copy' by the proper
Register of Deeds and bearing its seal or security marker.
Photocopy of TCT's
Certificate from the register of deeds concerned with its seal or security mark
giving the following information
TCT/OCT numbers
Name of all registered
owner(s) and their sharing, if
any
Area covered by each title
Number of OCT/TCT from
main subdivision
License to Sell of
socialized housing
project offered as
compliance if
location of
compliance is not
within the main
subdivision project
Joint Venture
Agreement with LGU
or other housing
agencies or other
owner / developer
Copy of bond issued
by the Home Mutual
Development Fund /
PAG-IBIG or Home
Guaranty
Corporation (HGC)
where the main
project is located or
by any of the
housing agencies
Others (specify)
REQUIRED DOCUMENTS
Letter request for ETD to HLURB
Duly notarized
Revised program of development
Sales Status Report
Copy of written notices to unit buyers without prejudice to the exercise of the
rights
Affidavito to refund buyers to incomplete development
Others (specify)
REQUIRED DOCUMENTS
Letter request for COC
Subdivision plan showing the area to be donated
Deed of Donation and Board Resolution
Deed of Official Receipt of Real Estate Taxes
Certified true copy of title
Affidavit of Completion
Others (specify)