APPROVAL FOR WALLING & MASONRY WORKS

Project:

Date:

Contractor:

No.:

Building / item(s)
According to Drawing No.

Date:

RHV Inspection Report


Description

Alignment

Time:
Plumb

Dimension

Remark

1. Material (Blocks, Bricks, other materials)


2. Installation
+ Wall laying
+ Curing
+ Ties
+ Lintel Beam
+ Stiffeners
+ Shrinkage joints
+ Jointing
+ Joint Filler
+ Openings
+ Gypsum Board
+ Louvers
+ Glass block
+ P.U Panels
+ Cladding (Alucobond, Stainless Steel)
Your submission for approval is subject to following conditions:


Approved

Approved on condition as noted

 Amend and resubmit

Not approved as noted

Note:

Witnessed by Owner

Name:
Position:
Date:
Date: Jan. 2008
Rev.: 01

Approved by Consultant
Royal HaskoningDHV

Name:
Position:
Date:

Requested by Contractor

Name:
Position:
Date:
Code: TEC-00-16

Date: Jan. 2008


Rev.: 01

Code: TEC-00-16