Professional Documents
Culture Documents
Transmittal To PPS - 004 17okt2016
Transmittal To PPS - 004 17okt2016
To
Attention
Date
: 004/TR/LAM-ENG/PPS_SNO-XVI/X.2016
: PT. LINTANG ANDALAN MAKMUR
: SHELTER - EPC FASILITAS PENGUKURAN GAS SENORO PAU (PHASE-2)
: 17 Oktober 2016
Prepared by
: ENGINEERING PT-LAM
No. Doc.
From
Project
Address
: Jl.
No
Status
Rev
No
Sheet
Title/Description
Size
Media
No
Type
Copies
SNO-S-718-WB-001_06 1of1.pdf
IFA
A3
SOFTFILE PDF
IFA
A3
SOFTFILE PDF
IFA
A3
SOFTFILE PDF
IFA
A3
SOFTFILE PDF
SNO-S-718-WB-002_10 1of1.pdf
SNO-S-718-WB-003_10 1of1.pdf
4. METERING SHELTER
1
SNO-S-718-WB-004_07 1of1.pdf
Information
Construction
Quotation
Comment
Fabrication
Tendering
Review
First Issue
As-Requested
Approval
Revision
Comments :
Sent by :
Approved by,
Hand
Coureir
Submited by,
Andik Suprianto
PT. Pratiwi Putri Sulung
After being signed and stamped, the original copy of this transmittal shall returned to Lintang Andalan Makmur PT.
Fax
SNO-S-718-WB-001_01 1of2.pdf
SNO-S-718-WB-001_01 2of2.pdf
SNO-S-718-WB-001_02 1of1.pdf
SNO-S-718-WB-001_03 1of1.pdf
SNO-S-718-WB-001_04 1of1.pdf
SNO-S-718-WB-001_05 1of1.pdf
SNO-S-718-WB-002_01 1of4.pdf
SNO-S-718-WB-002_01 2of4.pdf
SNO-S-718-WB-002_01 3of4.pdf
SNO-S-718-WB-002_01 4of4.pdf
SNO-S-718-WB-002_02 1of1.pdf
SNO-S-718-WB-002_03 1of1.pdf
SNO-S-718-WB-002_04 1of1.pdf
SNO-S-718-WB-002_05 1of1.pdf
SNO-S-718-WB-002_06 1of1.pdf
SNO-S-718-WB-004_01 1of5 (rev1).pdf
SNO-S-718-WB-004_01 2of5 (rev1).pdf
SNO-S-718-WB-004_01 3of5 (rev1).pdf
SNO-S-718-WB-004_01 4of5 (rev1).pdf
SNO-S-718-WB-004_01 5of5 (rev1).pdf
SNO-S-718-WB-004_06 1of1.pdf
SNO-S-718-WB-004A_00 GA 4of4 (rev. elevas
SNO-S-718-WB-004A_001 2of3 (rev. L100).pd
SNO-S-718-WB-004_01 1of5 (rev1).pdf
SNO-S-718-WB-004_01 2of5 (rev1).pdf
SNO-S-718-WB-004_01 3of5 (rev1).pdf
SNO-S-718-WB-004_01 4of5 (rev1).pdf
SNO-S-718-WB-004_01 5of5 (rev1).pdf
SNO-S-718-WB-004_06 1of1.pdf