Professional Documents
Culture Documents
Bangalore Builder Tracker 2010
Bangalore Builder Tracker 2010
BUILDER NAME
DAN STATUS
BUILDER CODE
104A
VIJAI RAGHAVAN
Un Approved
NA
105B
BSR Developers
Un Approved
NA
108A
Un Approved
NA
109A
Un Approved
NA
109B
Un Approved
NA
10A
Pavani Builder
Deactivated
Deactivated
10B
Pavani Builder
Deactivated
Deactivated
110A
Victoria Builders
Un Approved
NA
111A
URS Constructions
Deactivated
Deactivated
113A
Un Approved
NA
118A
Un Approved
NA
118B
Un Approved
NA
118C
Un Approved
NA
118D
Un Approved
NA
118E
Un Approved
NA
119A
VINYAS CONSTRUCTIONS
Un Approved
NA
121A
Un Approved
NA
122A
SAPTAGIRI ESTATE
Un Approved
NA
122B
SAPTAGIRI ESTATE
Un Approved
NA
122C
SAPTAGIRI ESTATE
Un Approved
NA
122D
SAPTAGIRI ESTATE
Un Approved
NA
125A
J S J CONSTRUCTIONS
Un Approved
NA
126A
PIONEER SHELTORS
Un Approved
NA
126B
PIONEER SHELTERS
Un Approved
NA
127A
Un Approved
NA
127B
Un Approved
NA
128A
JAYA BUILDERS
Un Approved
NA
12A
OM SAI CONSTRUCTIONS
Un Approved
NA
12B
OM SAI CONSTRUCTIONS
Un Approved
NA
131A
ENGINEERS ASSOCIATES
Un Approved
NA
132A
JAY CONSTRUCTIONS
Un Approved
NA
132B
JAY CONSTRUCTIONS
Un Approved
NA
135A
MANA CONSTRUCTIONS
Un Approved
NA
136A
M J DEVELOPERS
Deactivated
Deactivated
136B
M J DEVELOPERS
Deactivated
Deactivated
137A
KOHINOOR DEVELOPERS
Un Approved
NA
137B
KOHINOOR DEVELOPERS
Un Approved
NA
138A
M H T CONSTRUCTIONS
Un Approved
NA
13 A
R S RAM PROPERTIES
Un Approved
NA
13B
R S RAM PROPERTIES
Un Approved
NA
140A
BALAJI CONSTRUCTIONS
Un Approved
NA
140B
BALAJI CONSTRUCTIONS
Un Approved
NA
140C
BALAJI CONSTRUCTIONS
Un Approved
NA
141A
HOME LAND
Un Approved
NA
142A
VAASTU DEVELOPERS
Un Approved
NA
142B
VAASTU DEVELOPERS
143A
Un Approved
NA
145A
RAM MURTHY
Un Approved
NA
147A
MIMS BUILDERS
Un Approved
NA
147B
MIMS BUILDERS
Un Approved
NA
148A
Un Approved
NA
148B
Un Approved
NA
149A
ACHAR ASSOCIATES
Un Approved
NA
14A
ALPS DEVELOPERS
Un Approved
NA
152A
SHABNAM DEVELOPERS
Un Approved
NA
153A
ACS DEVELOPERS
Un Approved
NA
153B
ACS DEVELOPERS
Un Approved
NA
155A
HARSHITHA DEVELOPERS
Deactivated
Deactivated
155B
ASHRITHA BUILDERS
Deactivated
Deactivated
155C
SHREE J M SWAMY
Un Approved
NA
155D
POOJA DEVELOPERS
Un Approved
NA
156A
ROCK BUILDERS
Un Approved
NA
157A
DASARI BUILDERS
Un Approved
NA
158A
ASHWINI GROUP
Deactivated
Deactivated
159A
MPN CONSTRUCTIONS
Deactivated
Deactivated
15A
Un Approved
NA
15B
Un Approved
NA
160A
PAVAMANA RESIDENCY
Un Approved
NA
160B
PAVAMANA RESIDENCY
Un Approved
NA
161A
GAGAN CONSTRUCTIONS
Un Approved
NA
162A
Un Approved
NA
162B
Un Approved
NA
163A
Deactivated
Deactivated
164A
Deactivated
Deactivated
166A
Deactivated
Deactivated
167A
NA
Un Approved
NA
169A
S V ASSOCIATES
Un Approved
NA
170A
CELEBRITY HOUSING
Un Approved
NA
170B
CELEBRITY HOUSING
Un Approved
Un Approved
170C
CELEBRITY HOUSING
Un Approved
Un Approved
171A
Un Approved
NA
171B
Un Approved
NA
172A
Mahavir Builders
Un Approved
NA
173A
Deactivated
Deactivated
173B
Deactivated
Deactivated
173C
Deactivated
Deactivated
173D
Deactivated
Deactivated
174A
Un Approved
NA
174B
Un Approved
NA
175A
Vijay Constructions
Deactivated
Deactivated
179A
Deactivated
Deactivated
17A
GANESH BUILDERS
Un Approved
NA
17B
GANESH BUILDERS
Un Approved
NA
17C
GANESH BUILDERS
Un Approved
NA
17D
GANESH BUILDERS
Un Approved
NA
180A
FRAUD BUILDER
Deactivated
180B
FRAUD BUILDER
Deactivated
180C
FRAUD BUILDER
Deactivated
180D
FRAUD BUILDER
Deactivated
180E
FRAUD BUILDER
Deactivated
182A
Leepakshi Builders.
Deactivated
Deactivated
184A
Durgashree Constructions.
Un Approved
NA
184B
Durgashree Constructions.
Un Approved
NA
184C
Durgashree Constructions.
Un Approved
NA
184D
Durgashree Constructions.
Un Approved
NA
186A
Stag Constructions.
Deactivated
Deactivated
186B
Stag Constructions.
Deactivated
Deactivated
188A
Chako Builders.
FRAUD BUILDER
NA
189A
Deactivated
Deactivated
189B
Deactivated
Deactivated
189C
Deactivated
Deactivated
189D
Deactivated
Deactivated
189E
Deactivated
Deactivated
189F
Deactivated
Deactivated
189G
Deactivated
Deactivated
18A
Un Approved
NA
18B
VISAKA NIRMAN
Un Approved
NA
191A
Deactivated
Deactivated
191C
Deactivated
Deactivated
195A
Krishna Gardens
Un Approved
NA
196A
Un Approved
NA
197A
Nest Links
Un Approved
NA
197B
Nest Links
Un Approved
NA
198A
CHARTERED HOUSING
Deactivated
NA
199A
FORTUNE PROJECTS
Un Approved
NA
199B
TEAM FORTUNE
Un Approved
NA
19A
BANGALORE REALITY
Un Approved
NA
200A
Deactivated
Deactivated
200B
CREATIVE DEVELOPERS
Un Approved
NA
201A
Un Approved
NA
203A
Un Approved
NA
206A
S G GROUP
Un Approved
NA
207A
PRAJA DEVELOPERS
Un Approved
NA
207B
PRAJA DEVELOPERS
Un Approved
NA
208A
NA
Un Approved
NA
209A
Un Approved
NA
20A
Un Approved
NA
20B
Un Approved
NA
20C
Un Approved
NA
210A
NA
Un Approved
NA
211B
Deactivated
Deactivated
212A
NA
Un Approved
NA
213A
AKANKASHA CONSTRUCTIONS
PVT LTD.
Un Approved
NA
214A
PRAJA DEVELOPERS
Un Approved
NA
215A
PRAJA DEVELOPERS
Un Approved
NA
216A
NA
Un Approved
NA
218A
VANSHEE BUILDERS
AND DEVELOPERS
Un Approved
NA
219A
DKG COMPANY
Deactivated
Deactivated
219B
DKG COMPANY
Deactivated
Deactivated
219C
DKG COMPANY
Deactivated
Deactivated
219D
DKG COMPANY
Deactivated
Deactivated
21A
C RAMACHANDRAN
Un Approved
NA
220A
KAPOOR CONSTRUCTIONS
Un Approved
NA
221A
BSR Developers
Un Approved
NA
221B
PASCHIM DEVELOPERS
Un Approved
NA
221C
BSR Developers
Un Approved
NA
222A
Trinity Estates.
Un Approved
NA
222B
Trinity Estates.
Un Approved
NA
222C
Trinity Estates.
Un Approved
NA
222D
Trinity Estates.
Un Approved
NA
223A
Deactivated
Deactivated
223B
VIJAYASHREE CONSTRUCTIONS
Un Approved
NA
225A
Un Approved
NA
225B
Un Approved
NA
225C
Un Approved
NA
226D
Un Approved
NA
226E
Un Approved
NA
226A
Un Approved
NA
227A
SYSCOM CONSTRUCTIONS
Un Approved
NA
229A
PEARL GARDEN
Deactivated
Deactivated
230A
Un Approved
NA
232A
Deactivated
Deactivated
233A
VAISHNAVI CONSTRUCTIONS
Un Approved
NA
233B
Un Approved
NA
233C
Un Approved
NA
234A
AKSHAYA DEVELOPERS
Un Approved
NA
234B
AKSHAYA DEVELOPERS
Un Approved
NA
234C
AKSHAYA DEVELOPERS
Un Approved
NA
234D
AKSHAYA DEVELOPERS
Un Approved
NA
236A
Un Approved
NA
237A
NEERJA BUILDERS
Un Approved
NA
239A
EXPRESS BUILDERS
Deactivated
Deactivated
239B
EXPRESS BUILDERS
Deactivated
Deactivated
23A
Deactivated
Deactivated
23B
Deactivated
Deactivated
23C
Deactivated
Deactivated
241A
NOT MENTIONED
Un Approved
NA
243C
VINAYAKA CONSTRUCTIONS
Un Approved
NA
555E
VINAYAKA CONSTRUCTIONS
Un Approved
NA
555D
VINAYAKA CONSTRUCTIONS
Un Approved
NA
555B
VINAYAKA CONSTRUCTIONS
Un Approved
NA
244A
Un Approved
NA
245A
NOT MENTIONED
Un Approved
NA
246A
NOT MENTIONED
Un Approved
NA
247A
Un Approved
NA
248A
Un Approved
NA
249A
Un Approved
NA
24A
Deactivated
Deactivated
24B
Deactivated
Deactivated
24C
Deactivated
Deactivated
24E
Deactivated
Deactivated
24F
Deactivated
Deactivated
24G
Deactivated
Deactivated
250A
M P N CONSTRUCTION
Un Approved
NA
252A
Un Approved
NA
NA
253A
255A
Deactivated
Deactivated
255B
Deactivated
Deactivated
257A
PANKAJ BHARDWAJ
Un Approved
NA
25A
INTEGRAL CONSTRUCTION
Un Approved
NA
260A
GOLD ENTERPRISES
Deactivated
Deactivated
262A
Deactivated
Deactivated
263A
NIRANJAN DEVELOPERS
Un Approved
NA
263B
NIRANJAN DEVELOPERS
Un Approved
NA
264A
Un Approved
NA
264B
Un Approved
NA
264C
Un Approved
NA
265A
Un Approved
NA
265B
Un Approved
NA
266A
Un Approved
NA
269A
MRC SHELTERS
Un Approved
NA
269B
MRC SHELTERS
Un Approved
NA
269C
Un Approved
NA
26A
Un Approved
NA
26B
Un Approved
NA
271A
NA
Un Approved
NA
272A
Un Approved
NA
274A
Un Approved
NA
275A
Un Approved
NA
275B
Un Approved
NA
276A
PRAJA DEVELOPERS
Un Approved
NA
276b
RAASI DEVELOPERS
Un Approved
NA
277A
Deactivated
Deactivated
277B
Un Approved
278A
NEELADRI BUILDERS
Un Approved
NA
279A
HEMANTH HOMES
Un Approved
NA
279B
HEMANTH HOMES
Un Approved
NA
27A
KUSHANTH BUILDERS
Un Approved
NA
280A
Un Approved
NA
283A
VAISHNAVI CONSTRUCTIONS
Un Approved
NA
283B
VAISHNAVI CONSTRUCTIONS
Un Approved
NA
283C
VAISHNAVI CONSTRUCTIONS
Un Approved
NA
283D
VAISHNAVI CONSTRUCTIONS
Un Approved
NA
283E
VAISHNAVI CONSTRUCTIONS
Un Approved
NA
284A
V R REDDY BUILDERS
Deactivated
Deactivated
284B
V R REDDY BUILDERS
Deactivated
Deactivated
285A
V R REDDY BUILDERS
Un Approved
NA
285B
ANUGRAHA CONSTRUCTIONS
Un Approved
NA
285C
ANUGRAHA DEVELOPERS
Un Approved
NA
286A
PRADEEP CONSTRUCTIONS
Un Approved
NA
287A
Un Approved
NA
287B
Un Approved
NA
288A
NOT MENTIONED
Un Approved
NA
NA
289A
28A
MAJESTIC DEVELOPERS
Deactivated
Deactivated
28A
MAJESTIC DEVELOPERS
Deactivated
Deactivated
290A
Un Approved
NA
291A
Un Approved
NA
291B
Un Approved
NA
292A
Deactivated
Deactivated
293A
VINTAGE BUILDERS
Un Approved
NA
294A
NIGAM DEVELOPERS
Un Approved
NA
295A
NIKHL CONSTRUCTIONS
Un Approved
NA
296A
Deactivated
Deactivated
297A
Un Approved
NA
297B
Un Approved
NA
298A
RAMANJANAPPA
Un Approved
NA
298B
Un Approved
NA
299A
Un Approved
NA
29A
Un Approved
NA
2A
MANISH CONSTRUCTIONS
Deactivated
Deactivated
2B
MANISH CONSTRUCTIONS
Deactivated
Deactivated
2C
MANISH CONSTRUCTIONS
Deactivated
Deactivated
300A
Deactivated
Deactivated
301A
NOT MENTIONED
Un Approved
NA
302A
Un Approved
NA
303A
MEENAKSHI DEVELOPERS
Un Approved
NA
304A
Un Approved
NA
304B
Un Approved
NA
304C
SREELAKSHMI HOMES
Un Approved
NA
305A
BHAGYASHREE DEVELOPERS
Un Approved
NA
306A
SELF DEVELOPING
Un Approved
NA
Un Approved
NA
307B
Un Approved
NA
307A
LAXMI DEVELOPERS
Un Approved
NA
309A
NOT MENTIONED
Un Approved
NA
310A
Deactivated
Deactivated
310B
Deactivated
Deactivated
311A
M MUNIYAPPA
Un Approved
NA
313A
HARAPRIYA INVESTMENTS
Un Approved
NA
314A
Un Approved
NA
314A
Un Approved
NA
315A
V M ENTERPRISES
Un Approved
NA
315B
V M ENTERPRISES
Un Approved
NA
316A
Un Approved
NA
317A
S R K DEVELOPERS
Un Approved
NA
318A
Un Approved
NA
319A
R A CONSTRUCTION
Un Approved
NA
322A
SUNNY BROOKS
Un Approved
NA
322B
NOT MENTIONED
Un Approved
NA
324A
Un Approved
NA
324B
Un Approved
NA
326A
B G PRAKASH
Un Approved
NA
327A
NARAYAN REDDY
Un Approved
NA
32A
M C Builders.
Un Approved
NA
32B
M C Builders.
Un Approved
NA
32C
M C Builders.
Un Approved
NA
32D
M C Builders.
Un Approved
NA
32E
M C Builders.
Un Approved
NA
555A
VINAYAKA CONSTRUCTIONS
Un Approved
NA
330B
SVV CONSTRUCTION
Un Approved
NA
331A
SAI DEVELOPERS
Un Approved
NA
331B
SAI DEVELOPERS
Un Approved
NA
332A
Un Approved
NA
334A
NOT MENTIONED
Un Approved
NA
336A
Un Approved
NA
336B
Un Approved
NA
337A
NOT MENTIONED
Un Approved
NA
337B
Un Approved
NA
338A
Sreelan Developers
Deactivated
Deactivated
339A
Deactivated
Deactivated
343A
Un Approved
NA
Deactivated
Deactivated
Un Approved
NA
34A
351A
LOKESH CONSTRUCTIONS
Un Approved
NA
352A
TEAM BUILDERS
Un Approved
NA
352B
TEAM BUILDERS
Un Approved
NA
352C
TEAM BUILDERS
Un Approved
NA
352D
TEAM BUILDERS
Un Approved
NA
352E
TEAM BUILDERS
Un Approved
NA
353A
TIRUMALA CONSTRUCTIONS
Un Approved
NA
355A
Un Approved
NA
356A
Un Approved
NA
357A
RJB ASSOCIATES
Un Approved
NA
358A
JAYARAM REDDY
Un Approved
NA
35A
ARADHANA PROJECTS
Un Approved
NA
360A
KRITHI CONSTRUCTIONS
Un Approved
NA
361A
NEELADRI BUILDERS
Un Approved
NA
362A
MANA CONSTRUCTIONS
Un Approved
NA
363A
CITI DEVELOPERS
Un Approved
NA
364A
M R ASSOCIATES
Deactivated
Deactivated
365A
Deactivated
Deactivated
367A
NOT MENTIONED
Un Approved
NA
368A
NOT MENTIONED
Un Approved
NA
36A
Pavithra Constructions
Un Approved
NA
36B
Pavithra Constructions
Un Approved
NA
371A
BALAJI BUILDERS
Un Approved
NA
371B
BALAJI BUILDERS
Un Approved
NA
371C
BALAJI BUILDERS
Un Approved
NA
372A
S V BUILDERS
Un Approved
NA
373A
S V BUILDERS
Un Approved
NA
373B
S V CONSTRUCTIONS
Un Approved
NA
375A
Deactivated
Deactivated
375B
Deactivated
Deactivated
376A
SUBBAIAH REDDY
Un Approved
NA
378A
NOT MENTIONED
Un Approved
NA
379A
VANSHEE BUILDERS
AND DEVELOPERS
Un Approved
NA
379B
S S K PROJECTS
Un Approved
NA
379C
S S K PROJECTS
Un Approved
NA
37A
Deactivated
Deactivated
37B
Deactivated
Deactivated
380A
NOT MENTIONED
Un Approved
NA
381A
BALAJI BUILDERS
Un Approved
NA
381B
BALAJI BUILDERS
Un Approved
NA
381C
BALAJI BUILDERS
Un Approved
NA
383A
SPECTRA CONSTRCTIONS
Un Approved
NA
384A
DIWAKAR BUILDERS
Un Approved
NA
385A
NOT MENTIONED
Un Approved
NA
389A
NOT MENTIONED
Un Approved
NA
390A
NOT MENTIONED
Un Approved
NA
391A
NOT MENTIONED
Un Approved
NA
392A
NOT MENTIONED
Un Approved
NA
394A
NOT MENTIONED
Un Approved
NA
395A
NOT MENTIONED
Un Approved
NA
396A
NOT MENTIONED
Un Approved
NA
399A
NOT MENTIONED
Un Approved
NA
39A
BALAJI DEVELOPERS
Un Approved
NA
39B
BALAJI DEVELOPERS
Un Approved
NA
39C
BALAJI DEVELOPERS
Un Approved
NA
39G
BALAJI DEVELOPERS
Un Approved
NA
3A
TEJA CONSTRUCTIONS
Un Approved
NA
401A
NOT MENTIONED
Un Approved
NA
402A
Un Approved
NA
403A
Un Approved
NA
406A
GAYATHRI DEVELOPERS
Un Approved
NA
406B
GAYATHRI DEVELOPERS
Un Approved
NA
406C
GAYATHRI DEVELOPERS
Un Approved
NA
407A
NOT MENTIONED
Un Approved
NA
409A
NOT MENTIONED
Un Approved
NA
40A
Deactivated
Deactivated
410A
S L V BUILDER
Un Approved
NA
410B
S L V BUILDER
Un Approved
NA
410C
S L V BUILDER
Un Approved
NA
410D
S L V CONSTRUCTIONS
Un Approved
NA
411A
Un Approved
NA
412A
Un Approved
NA
413A
SURAKSHA PROPERTIES
Un Approved
NA
413B
SURAKSHA PROPERTIES
Un Approved
NA
415A
NOT MENTIONED
Un Approved
NA
417A
NOT MENTIONED
Un Approved
NA
418A
NOT MENTIONED
Un Approved
NA
419A
R R CONSTRUCTION
Un Approved
NA
419B
R R CONSTRUCTION
Un Approved
NA
419C
R R CONSTRUCTION
Un Approved
NA
41A
Golden Developers/Bagyashree
Developers
Un Approved
NA
41B
Golden Developers/Bagyashree
Developers
Un Approved
NA
41C
Golden Developers/Bagyashree
Developers
Un Approved
NA
41D
Golden Developers/Bagyashree
Developers
Un Approved
NA
421A
Un Approved
NA
422A
Un Approved
NA
422B
Un Approved
NA
423A
NOT MENTIONED
Un Approved
NA
424A
BALAKRISHNAMMA NAIDU
PROMOTERS, BUILDERS AND
DEVELOPERS
Un Approved
NA
426A
KALPANA PROMOTERS
Un Approved
NA
427A
UNIVERSAL BUILDERS
Un Approved
NA
428A
CANARA BUILDERS
Un Approved
NA
430A
C & D CONSTUCTIONS
Un Approved
NA
431A
A R DEVELOPERS
Un Approved
NA
432A
S P BUILDERS
Un Approved
NA
433A
ASSET DEVELOPERS
Un Approved
NA
434A
NOT MENTIONED
Un Approved
NA
435A
MANPHO DEVELOPERS
Deactivated
Deactivated
435B
MANPHO DEVELOPERS
Deactivated
Deactivated
436A
SUDARSHAN ENTERPRISE
Un Approved
NA
437A
NOT MENTIONED
Un Approved
NA
438A
MAGRATH PROPERTY
Un Approved
NA
439A
RASHMI CONSTUCTIONS
Un Approved
NA
43A
Un Approved
NA
440A
NOT MENTIONED
Un Approved
NA
441A
NOT MENTIONED
Un Approved
NA
442A
NOT MENTIONED
Un Approved
NA
443A
CHOWDESHWARI CONSTRCTIONS
Un Approved
NA
444A
NA
444B
NA
446A
VIJAYA DEVELOPERS/BUILDERS
Un Approved
NA
446B
VIJAYA DEVELOPERS/BUILDERS
Un Approved
NA
447A
NOT MENTIONED
Un Approved
NA
448A
Un Approved
NA
449A
MANAR DEVELOPERS
Un Approved
NA
449B
MANAR DEVELOPERS
Un Approved
NA
44A
S A Properties Ltd.
Deactivated
Deactivated
44B
S A Properties Ltd.
Deactivated
Deactivated
44C
S A Properties Ltd.
Deactivated
Deactivated
450A
RASHMI CONSTUCTIONS
Un Approved
NA
451A
PRADEEP CONSTRUCTIONS
Un Approved
NA
452A
Un Approved
NA
453A
RMP BUILDERS
Un Approved
NA
454A
NOT MENTIONED
Un Approved
NA
455A
PUJA BUILDERS
Un Approved
NA
456A
ADITHYA DEVELOPERS
Un Approved
NA
458A
NOT MENTIONED
Un Approved
NA
459A
K V R HOUSONG
Un Approved
NA
45A
Un Approved
NA
460A
Un Approved
NA
460B
Un Approved
NA
462A
KSHITIJA DEVELOPERS
Un Approved
NA
464A
Un Approved
NA
464B
NOT MENTIONED
Un Approved
NA
467A
NOT MENTIONED
Un Approved
NA
468A
NAVYA BUILDERS
Un Approved
NA
468B
NAVYA BUILDERS
Un Approved
NA
469A
Un Approved
NA
471A
Un Approved
NA
471B
Un Approved
NA
474A
Un Approved
NA
474B
Un Approved
NA
474C
Un Approved
NA
475A
RAGHAVAN
Un Approved
NA
476A
NOT MENTIONED
Un Approved
NA
478A
VINTAGE BUILDERS
Un Approved
NA
480A
Un Approved
NA
481A
DREAM SOURCE
Un Approved
NA
481B
DREAM SOURCE
Un Approved
NA
482A
Deactivated
Deactivated
482B
Deactivated
Deactivated
482C
Deactivated
Deactivated
483A
FORTUNA CONSTRUCTIONS
& DEVELOPERS
Un Approved
NA
483B
FORTUNA CONSTRUCTIONS
& DEVELOPERS
Un Approved
NA
483C
FORTUNA CONSTRUCTIONS
& DEVELOPERS
Un Approved
NA
484A
Un Approved
NA
484D
Un Approved
NA
822A
Un Approved
NA
822B
Un Approved
NA
822C
Un Approved
NA
822D
Un Approved
NA
487A
PANDURANGA GROUPS
Un Approved
NA
489A
ARIEN CONSTUCTIONS
Un Approved
NA
491A
SKANDA DEVELOPERS
Un Approved
NA
491B
SKANDA DEVELOPERS
Un Approved
NA
495A
Un Approved
NA
496A
SWASTHIK DEVELOPERS
Un Approved
NA
496B
SWASTHIK DEVELOPERS
Un Approved
NA
497A
MARS SHELTERS
Un Approved
NA
498A
AMBIKA BUILDERS
Un Approved
NA
499A
Un Approved
NA
500A
JAGATH HOMES
Un Approved
NA
501A
Un Approved
NA
502A
Un Approved
NA
503A
MPN CONSTRUCTIONS
Deactivated
Deactivated
505A
ABM BUILDTECH
Deactivated
Deactivated
505B
ABM BUILDTECH
Deactivated
Deactivated
506A
SHRESTA DEVELOPERS
Un Approved
NA
509A
ABHIRAM BUILDERS
Un Approved
NA
510A
S S BUILDERS
Un Approved
NA
511A
OASIS CONSTRUCTIONS
Deactivated
Deactivated
511E
OASIS CONSTRUCTIONS
Deactivated
Deactivated
512A
NARASIMHA MURTHY
Un Approved
NA
515B
Deactivated
Deactivated
516A
Un Approved
NA
519A
VINTAGE BUILDERS
Un Approved
NA
521A
NANDINI BUILDERS
Deactivated
Deactivated
522A
A R DEVELOPERS
Un Approved
NA
523A
CELEBRITY HOUSING
Un Approved
NA
523B
CELEBRITY HOUSING
Un Approved
NA
523C
CELEBRITY HOUSING
Un Approved
NA
525A
ROSE ENCLAVE
Un Approved
NA
526A
PUJA DEVELOPERS
Un Approved
NA
527A
Un Approved
NA
527B
Un Approved
NA
527C
Un Approved
NA
527D
Un Approved
NA
527E
Un Approved
NA
529A
Deactivated
Deactivated
530A
Un Approved
NA
530B
Un Approved
NA
531A
M S DEVELOPERS
Un Approved
NA
531B
M S DEVELOPERS
Un Approved
NA
532A
Un Approved
NA
533A
VERSOVA ESTATES
Un Approved
NA
534A
NOT MENTIONED
Un Approved
NA
535A
Un Approved
NA
536A
SREENIDHI REALTORS
Un Approved
NA
536B
SREENIDHI REALTORS
Un Approved
NA
536C
SREENIDHI REALTORS
Un Approved
NA
536D
SREENIDHI REALTORS
Un Approved
NA
537A
VINTAGE BUILDERS
Un Approved
NA
537B
VINTAGE BUILDERS
Un Approved
NA
538A
Un Approved
NA
539A
ESHWAR CONSTRUCTIONS
Un Approved
NA
540A
TIRUMALA CONSTRUCTIONS
Un Approved
NA
540B
TIRUMALA CONSTRUCTIONS
Un Approved
NA
540C
TIRUMALA CONSTRUCTIONS
Un Approved
NA
541A
HEMAVATHI BUILDERS
Un Approved
NA
542A
MITHRA ASSOCIATES
Un Approved
NA
543A
AKRUTHI DEVELOPERS
Un Approved
NA
545A
SREEJI DEVELOPERS
Un Approved
NA
546A
MAHIMA BUILDERS
Un Approved
NA
547A
BHEL ASSOCIATION
Un Approved
NA
548A
SUDARSHAN ENTERPRISE
Un Approved
NA
549A
MITHRA ASSOCIATES
Un Approved
NA
549B
MITHRA ASSOCIATES
Un Approved
NA
550A
Un Approved
NA
551A
GURUSHREE ASSOCIATES
Un Approved
NA
552A
SOUTHERN COMFORTS
ENGINEERS AND BUILDERS
Un Approved
NA
554A
SILVERLINE INVESTMENT
Un Approved
NA
555C
VINAYAKA CONSTRUCTIONS
Un Approved
NA
330A
VINAYAKA CONSTRUCTIONS
Un Approved
NA
243B
VINAYAKA CONSTRUCTIONS
Un Approved
NA
244D
VINAYAKA CONSTRUCTIONS
Un Approved
NA
243A
VINAYAKA CONSTRUCTIONS
Un Approved
NA
556A
RAJ DEVELOPERS
Un Approved
NA
557A
Un Approved
NA
559A
PRADHAN DEVELOPERS
Un Approved
NA
560A
Un Approved
NA
560B
Un Approved
NA
562A
SHREE R S DEVELOPERS
Un Approved
NA
563A
ASIAN BUILDERS
Un Approved
NA
564A
V B SHELTERS PVT.LTD
Un Approved
NA
565A
BEST CONSTRUCTIONS
Un Approved
NA
566A
K K BUILDERS
Un Approved
NA
567A
VARSHITHA CONSYTRUCTIONS
Un Approved
NA
568A
JOCK BUILDERS
Un Approved
NA
569A
SRINIDHI ENTERPRISES
Un Approved
NA
569B
SRINIDHI ENTERPRISES
Un Approved
NA
569C
SRINIDHI ENTERPRISES
Un Approved
NA
56A
CHAITANYA PROJECTS
Un Approved
NA
56B
CHAITANYA PROJECTS
Un Approved
NA
56C
CHAITANYA PROJECTS
Un Approved
NA
56D
CHAITANYA PROJECTS
Un Approved
NA
570A
EQQUS PROPERTIES
Un Approved
NA
570B
EQQUS PROPERTIES
Un Approved
NA
571A
PROFFESSIONAL BUILDERS
Un Approved
NA
571B
PROFFESSIONAL BUILDERS
Un Approved
NA
571C
PROFFESSIONAL BUILDERS
Un Approved
NA
571D
PROFFESSIONAL BUILDERS
Un Approved
NA
572A
MOUNICA BUILDERS
Deactivated
Deactivated
572B
MOUNICA BUILDERS
Deactivated
Deactivated
572D
MOUNICA BUILDERS
Deactivated
Deactivated
572E
MOUNICA BUILDERS
Deactivated
Deactivated
573A
Un Approved
NA
574A
SRIVEN SHELTERS
Un Approved
NA
575A
Un Approved
NA
578A
Un Approved
NA
579A
SRINIDHI CONSTRUCTIONS
Un Approved
NA
579B
SRINIDHI CONSTRUCTIONS
Un Approved
NA
579C
SRINIDHI CONSTRUCTIONS
Un Approved
NA
597d
SRINIDHI CONSTRUCTIONS
Un Approved
NA
580A
ARUNODAYA BUILDERS
Un Approved
NA
580B
ARUNODAYA BUILDERS
Un Approved
NA
NA
581A
582A
Un Approved
NA
58A
Diamond Apartmants
Un Approved
NA
5A
Un Approved
NA
60A
Deactivated
Deactivated
60A
Deactivated
Deactivated
60C
Deactivated
Deactivated
60D
Deactivated
Deactivated
60E
Deactivated
Deactivated
156B
ROCK BUILDERS
Un Approved
NA
64A
Vars Associates
Un Approved
NA
64B
Vars Associates
Un Approved
NA
64C
VARS ASSOCIATES
Un Approved
NA
65A
Prime Developers
Un Approved
NA
67A
Deactivated
Deactivated
67B
Deactivated
Deactivated
67E
Deactivated
Deactivated
67G
Deactivated
Deactivated
6A
PRAJNAN DEVELOPERS
Un Approved
NA
70A
Un Approved
NA
72A
Un Approved
NA
74A
Krishvi Projects
Un Approved
NA
74B
Krishvi Projects
Un Approved
NA
74c
Krishvi Projects
Un Approved
NA
77A
Poes Associates.
Un Approved
NA
83A
Deactivated
Deactivated
84A
Surya Developers
Un Approved
NA
84B
Surya Developers
Un Approved
NA
85A
Sreelan Developers
Deactivated
Deactivated
85B
Sreelan Developers
Deactivated
Deactivated
85C
Sreelan Developers
Deactivated
Deactivated
86A
Deactivated
Deactivated
87A
Deactivated
Deactivated
88A
Deactivated
Deactivated
88B
Deactivated
Deactivated
8A
PARVATH DEVELOPERS
Un Approved
NA
8B
PARVATH DEVELOPERS
Un Approved
NA
90A
Konark Builders
Deactivated
Deactivated
91A
MARUTHI SHELTERS
Deactivated
Deactivated
91B
MARUTHI BUILDERS
Un Approved
NA
91C
MARUTHI BUILDERS
Un Approved
NA
91D
MARUTHI BUILDERS
Un Approved
NA
91E
MOHAN BABU
Un Approved
NA
93A
Deactivated
Deactivated
93B
Deactivated
Deactivated
93C
Deactivated
Deactivated
95A
Pavani Builder
Deactivated
Deactivated
97A
ENGINEERS ASSOCIATES
Un Approved
NA
98A
Eagle Ridge
Un Approved
NA
994A
Aakrithi Builders.
Un Approved
NA
na
Un Approved
NA
na
GAYATHRI LAYOUT
Un Approved
NA
na
Un Approved
NA
na
AR DEVELOPERS
Deactivated
Deactivated
na
RATHNAMAHAL GROUP
Deactivated
Deactivated
na
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
na
UNIQUE DEVELOPERS
Un Approved
NA
na
Un Approved
NA
na
Un Approved
NA
na
Un Approved
NA
na
KEERTHANA PROPERTIES
Un Approved
NA
584A
Un Approved
NA
584B
Un Approved
NA
584B
Un Approved
NA
585B
C B R CONSTRUCTIONS
Deactivated
Deactivated
586A
Deactivated
Deactivated
587A
MRC SHELTERS
Un Approved
NA
588A
TRISHUL DEVELOPERS
Un Approved
NA
588B
TRISHUL DEVELOPERS
Un Approved
NA
589A
DAMDEN PROPERTIES
Un Approved
NA
589B
DAMDEN PROPERTIES
Un Approved
NA
589C
DAMDEN PROPERTIES
Un Approved
NA
590C
SRINIVASA DEVELOPERS
Deactivated
Deactivated
590D
SRINIVASA DEVELOPERS
Deactivated
Deactivated
590E
SRINIVASA DEVELOPERS
Deactivated
Deactivated
590F
SRINIVASA DEVELOPERS
Deactivated
Deactivated
590G
SRINIVASA DEVELOPERS
Deactivated
Deactivated
591A
SHIVAJYOTHI
Un Approved
NA
593A
KRISHNAJA CONSTRUCTIONS
Un Approved
NA
594A
SHARADA DEVELOPERS
Un Approved
NA
596A
MALLI REDDY
Un Approved
NA
598A
BALAJI BUILDERS
Un Approved
NA
599A
SAMRUDHI BUILDERS
Un Approved
NA
600A
Un Approved
NA
601A
V S CONSTRCTIONS
Un Approved
NA
602A
Un Approved
NA
602B
Un Approved
NA
602C
Un Approved
NA
602D
Un Approved
NA
603A
RAMESH BUILDERS
Un Approved
NA
604A
S G R R DEVELOPERS
Un Approved
NA
604B
S G R R DEVELOPERS
Un Approved
NA
605A
RAMESH BUILDERS
Un Approved
NA
606A
Un Approved
NA
607A
Un Approved
NA
607B
Un Approved
NA
608A
G A G BUILDERS
Un Approved
NA
609A
DEVINA PROPERTIES
Un Approved
NA
610A
MANASA ENTERPRISES
Un Approved
NA
611A
C K SATHYAPRIYA
Un Approved
NA
611B
C K SATHYAPRIYA
Un Approved
NA
613A
UPKAR ESTATES
Un Approved
NA
613B
UPKAR ASSOCIATES
Un Approved
NA
614A
Un Approved
NA
615A
NOT MENTIONED
Un Approved
NA
616A
NOT MENTIONED
Un Approved
NA
617A
NOT MENTIONED
Un Approved
NA
618A
Un Approved
NA
619A
NOT MENTIONED
Un Approved
NA
620A
MANITO BUILDER
Un Approved
NA
620B
MANITO BUILDER
Un Approved
NA
621A
NOT MENTIONED
Un Approved
NA
622A
CONSOLIDATED CONSTRUCTIONS
Un Approved
NA
623A
BALAJI BUILDERS
Un Approved
NA
625A
A B M BUILDERS
Un Approved
NA
626B
Deactivated
Deactivated
626C
Deactivated
Deactivated
627A
Un Approved
NA
628A
TAMARIND BUILDERS
Un Approved
NA
629A
BEARY'S PROPERTIES
Un Approved
NA
630A
C D P DEVELOPERS
Un Approved
NA
631A
SHASHIR DEVELOPERS
Un Approved
NA
632A
Un Approved
NA
632B
Un Approved
NA
634A
RAYON BUILDERS
Un Approved
NA
634B
RAYON BUILDERS
Un Approved
NA
635A
SHAKTHI BUILDERS
Un Approved
NA
635B
SHAKTHI BUILDERS
Un Approved
NA
635C
SHAKTHI BUILDERS
636A
Un Approved
NA
Un Approved
NA
637A
RASHI DEVELOPERS
Deactivated
Deactivated
637B
RASHI DEVELOPERS
Deactivated
Deactivated
639A
RAM PROPERTIES
Un Approved
NA
641A
SRUSTI DEVELOPERS
Un Approved
NA
642A
Un Approved
NA
643A
RAJANI
Un Approved
NA
645A
ADHVIKA CONSTRUCTIONS
Un Approved
NA
646A
SHRUTHI BUILDERS
Un Approved
NA
647A
Un Approved
NA
648A
G R CONSTRUCTIONS
Un Approved
NA
649A
RAYON BUILDERS
Un Approved
NA
649b
RAYON BUILDERS
Un Approved
NA
650A
Un Approved
NA
650B
Un Approved
NA
651A
KANVA DEVELOPERS
Un Approved
NA
652A
MARUTHI BUILDERS
Un Approved
NA
653A
VSR CONSTRUCTION
Un Approved
NA
654A
NOT MENTIONED
Un Approved
NA
655A
NOT MENTIONED
Un Approved
NA
657A
NAGA CONSTRUCTIONS
Deactivated
Deactivated
659A
Un Approved
NA
660A
Un Approved
NA
661A
SAI BUILDERS
Un Approved
NA
661B
SAI BUILDERS
Un Approved
NA
662A
663A
ARJUN PROPERTY
NA
Un Approved
NA
NA
NA
665A
ASHRAYA BUILDERS
Un Approved
NA
665B
ASHRAYA BUILDERS
Un Approved
NA
666A
AMULYA ENCLAVE
Un Approved
NA
667A
KOSERO DEVELOPERS
Un Approved
NA
668A
Un Approved
NA
669A
BUILDAFINA PROMOTERS
Un Approved
NA
670A
Un Approved
NA
671A
Un Approved
NA
672A
Un Approved
NA
673A
NARAYAN ENTERPRISES
Un Approved
NA
673B
NARAYAN ENTERPRISES
Un Approved
NA
637C
NARAYAN ENTERPRISES
Un Approved
NA
637D
NARAYAN ENTERPRISES
Un Approved
NA
NA
677A
HARSHA HOMES
Un Approved
NA
678A
VYALIKAVAL HBCS
Un Approved
NA
679A
ALPHA CONSTRUSTIONS
Un Approved
NA
680A
ARYAN BUILDERS
Un Approved
NA
680B
ARYAN BUILDERS
Un Approved
NA
681A
UDAYA SHELTERS
Un Approved
NA
682A
ARUNA BUILDERS
Un Approved
NA
683A
HOYSALA BUILDERS
Un Approved
NA
684A
V R GROUP
Un Approved
NA
684B
V R GROUP
Un Approved
NA
684C
V R GROUP
Un Approved
NA
684D
V R GROUP
Un Approved
NA
684E
V R GROUP
Un Approved
NA
684F
V R GROUP
Un Approved
NA
686A
Un Approved
NA
686B
Un Approved
NA
686C
Un Approved
NA
686D
Un Approved
NA
686E
Un Approved
NA
689A
PRIYANKA BUILDERS
Un Approved
NA
690A
ELEGANCE GROUP
Un Approved
NA
691A
Un Approved
NA
693A
SAI PROPERTIES LAND PROMOTERS & DEVELOPERS
Un Approved
NA
694A
Un Approved
NA
695A
Un Approved
NA
696A
Un Approved
NA
698A
NANDA CONSTRUCTION
Un Approved
NA
700A
RANKA DEVELOPERS
Un Approved
NA
701A
GOMATI CONSTRUCTIONS
Un Approved
NA
702A
S V DEVELOPERS
Un Approved
NA
703B
Deactivated
Deactivated
703C
Deactivated
Deactivated
704A
Un Approved
NA
705A
Un Approved
NA
706A
Un Approved
NA
707A
Un Approved
NA
708A
VASAVI DEVELOPERS
Un Approved
NA
710A
PARAMOUNT DEVELOPERS
Un Approved
NA
711A
NOT MENTIONED
Un Approved
NA
712A
AMULYA BUILDERS
Un Approved
NA
713A
KAYALI CONSTRUCTIONS
Un Approved
NA
713B
KAYALI CONSTRUCTIONS
Un Approved
NA
714B
Un Approved
NA
714C
Un Approved
NA
715A
MARVEL BUILDERS
Un Approved
NA
716A
Un Approved
NA
717A
DEVI DEVELOPERS
Un Approved
NA
718A
JAVER DHAN
Un Approved
NA
719A
Un Approved
NA
720A
JAIHIND HOMES
Un Approved
NA
721A
Un Approved
NA
722A
Un Approved
NA
722B
Un Approved
NA
722C
Un Approved
NA
722D
Un Approved
NA
726A
NOT MENTIONED
Un Approved
NA
NA
727A
728A
Un Approved
NA
729A
THIRUMALA CONSTRUCTIONS
Un Approved
NA
730A
K SREEDHAR
Un Approved
NA
731A
Un Approved
NA
732A
Un Approved
NA
733A
Un Approved
NA
734A
FOYER DEVELOPERS
Un Approved
NA
735A
K S ASSOCIATES
Un Approved
NA
NA
736A
737A
LABHITHA ESTATES
Un Approved
NA
739A
Un Approved
NA
740A
LORVEN ESTATES
Un Approved
NA
741A
J R HOUSING DEVELOPERS
Un Approved
NA
Un Approved
NA
741B
742A
PREM KUTIR
Un Approved
NA
743A
RECUBE DEVELOPERS
Un Approved
NA
744A
GPK CONSTRUCTION
Un Approved
NA
745A
ENVIRON DEVELOPERS
Un Approved
NA
746A
JAGAUAR PROPERTY
Un Approved
NA
747A
P S R CONSTRUCTIONS
Un Approved
NA
748A
GAYATRI CONSTRUCTIONS
Un Approved
NA
749A
Un Approved
NA
750A
Un Approved
NA
751A
KETHANA ENTERPRISES
Un Approved
NA
752A
VISHNUPRIYA BUILDERS
Un Approved
NA
753A
MANGAM CONSTRUCTION
Un Approved
NA
754A
Un Approved
NA
754B
Un Approved
NA
NA
755A
756A
Un Approved
NA
756B
Un Approved
NA
757A
Un Approved
NA
758A
SHIVA BUILDERS
Un Approved
NA
759A
Y S BUILDERS
Un Approved
NA
760A
Un Approved
NA
761A
ROYALE HOMES
Un Approved
NA
762A
AAKAR DEVELOPERS
Un Approved
NA
763A
ASSETS BUILDERS
Un Approved
NA
764A
RAKESH BUILDERS
Un Approved
NA
765A
BHOOMIKA CONSTRUCTIONS
Un Approved
NA
766A
SRINIVAS CONSTRUCTION
Un Approved
NA
767A
VENKATA RAJU
Un Approved
NA
768A
CITY SQUARE
Un Approved
NA
768B
CITY SQUARE
Un Approved
NA
769A
MAYA VENTURES
Un Approved
NA
NA
770A
771A
Un Approved
NA
772A
GALAXY DEVELOPERS
Un Approved
NA
773A
Un Approved
NA
774A
TNT BUILDERS
Un Approved
NA
775A
GREEN HOME
Un Approved
NA
776A
Un Approved
NA
777A
SHILPI CONSTRUCTION
Un Approved
NA
778A
R R CONSTRUCTION
Un Approved
NA
Un Approved
NA
779A
780A
Un Approved
NA
781A
KATARIA BUILTECK
Un Approved
NA
782A
Un Approved
NA
783A
S R CONSTRUCTION
Un Approved
NA
784A
Un Approved
NA
785A
Un Approved
NA
Un Approved
NA
786A
787A
Un Approved
NA
788A
Un Approved
NA
788B
P KAVEERAPPA / K ASHWATH
Un Approved
NA
789A
Un Approved
NA
790A
NA
791A
Un Approved
NA
792A
Un Approved
NA
793A
DHAMANAGI PROPERTIES
Un Approved
NA
794A
ALLIANCE HOUSING
Un Approved
NA
794B
Un Approved
NA
Un Approved
NA
795A
796A
SWASTHIK DEVELOPERS
Un Approved
NA
797A
PRANAV BUILDERS
Un Approved
NA
798A
Un Approved
NA
Un Approved
NA
799A
800A
Un Approved
NA
801A
SAIDEEP CONSTRUCTION
Un Approved
NA
801B
SAIDEEP CONSTRUCTION
Un Approved
NA
802A
SIDDHANTH ASSOCIATES
Un Approved
NA
803A
SOWPARNIKA PROJECTS
Un Approved
NA
803B
SOWPARNIKA PROJECTS
Un Approved
NA
804A
MAYFLOWER CONSTRUCTION
Un Approved
NA
805A
Un Approved
NA
806A
Un Approved
NA
807A
Un Approved
NA
808A
PERODY BUILDERS
Un Approved
NA
808B
PERODY BUILDERS
Un Approved
NA
810A
Un Approved
NA
811A
V R V ENTERPRISES
Un Approved
NA
Un Approved
NA
Un Approved
NA
Un Approved
NA
812A
813A
814A
815A
Un Approved
NA
816A
SUMANA BUILDERS
Un Approved
NA
817A
SHANTI GROUP
Un Approved
NA
818A
SNEHA SINDHU
Un Approved
NA
819A
APURVA ESTATES
Un Approved
NA
820A
Un Approved
NA
820B
Un Approved
NA
821A
NANDI CONSTRUCTION
Un Approved
NA
823A
M N K LAND DEVELOPERS
Un Approved
NA
824A
GOKULA ESTATES
Un Approved
NA
824B
GOKULA ESTATES
Un Approved
NA
824C
GOKULA ESTATES
Un Approved
NA
825A
SRAVAN CONSTRUCTION
Un Approved
NA
826A
BEST SELLERS
Un Approved
NA
827A
Un Approved
NA
828A
Un Approved
NA
829A
SHREE HOMES
Un Approved
NA
830A
Un Approved
NA
Un Approved
NA
831A
832A
Un Approved
NA
833A
Un Approved
NA
834A
VISHWAMBA DEVELOPERS
Un Approved
NA
835A
S K BUILDER
Un Approved
NA
Un Approved
NA
Un Approved
NA
Un Approved
NA
836A
837A
838A
GAG BUILDERS
839A
AUGUST VENTURES
Un Approved
NA
839B
AUGUST VENTURES
Un Approved
NA
840A
MANGALYA DEVELOPERS
Un Approved
NA
841A
MAHAVEER PROPERTIES
Un Approved
NA
841B
MAHAVEER PROPERTIES
Un Approved
NA
841C
MAHAVEER PROPERTIES
Un Approved
NA
842A
RAION BUILDERS
Un Approved
NA
843A
G H BUILDERS
Un Approved
NA
844A
LASYA DEVELOPERS
Un Approved
NA
845A
S A DEVELOPERS
Un Approved
NA
846A
Un Approved
NA
847A
MMR DEVELOPERS
Un Approved
NA
848A
EMERALD DEVELOPERS
Un Approved
NA
849A
BYSANI DEVELOPERS
Un Approved
NA
850A
Un Approved
NA
851A
CAUVERY BUILDERS
Un Approved
NA
851B
CAUVERY BUILDERS
Un Approved
NA
852A
SYNAPSE CONSTRUCTION
Un Approved
NA
Un Approved
NA
853A
854A
SHRAVANTHI BUILDERS
Un Approved
NA
855A
Un Approved
NA
Un Approved
NA
856A
857A
INDU BUILDERS
Un Approved
NA
858A
Un Approved
NA
859A
GAYATRI CONSTRUCTIONS
Un Approved
NA
860A
CAUVERY BUILDERS
Un Approved
NA
861A
VASTUSHILPA CONSULTANTS
Un Approved
NA
862A
Un Approved
NA
863A
AHAD BUILDERS
Un Approved
NA
865A
Un Approved
NA
866A
Un Approved
NA
867A
SRINIDHI SHELTERS
Un Approved
NA
868A
AAKRUTHI PROJECTS
Un Approved
NA
868B
AAKRUTHI PROJECTS
Un Approved
NA
869A
NAYAAB'S CONSTRUCTIONS
Un Approved
NA
870A
SRINIDHI ASSOCIATES
Un Approved
NA
870B
SRINIDHI ASSOCIATES
Un Approved
NA
871A
ASSET HANDLERS
Un Approved
NA
872A
RAGHAVENDRA CONSTRUCTIONS
Un Approved
NA
873A
PUJITHA HOMES
Un Approved
NA
874A
RAGHAVA BUILDERS
Un Approved
NA
875A
FORTUNE BUILDERS
Un Approved
NA
876A
Un Approved
NA
877A
SRIVEN CONSTRUCTIONS
Un Approved
NA
878A
DEEPIKA CONSTRUCTIONS
Un Approved
NA
879A
SURAJ CONDOMINIUMS
Un Approved
NA
880A
NOT MENTIONED
Un Approved
NA
881A
Un Approved
NA
881B
Un Approved
NA
882A
Un Approved
NA
NA
883A
884A
SARAVANA PROMOTORS
Un Approved
NA
884B
SARAVANA PROMOTORS
Un Approved
NA
885A
DE PRADIGM
Un Approved
NA
886A
Un Approved
NA
888A
VR ECO PROPERTIES
Un Approved
NA
NA
889A
890A
IMPERIAL CONSTRUCTIONS
Un Approved
NA
710B
PARAMOUNT CONSTRUCTIONS
Un Approved
NA
892A
ELEGANCE NIRMAN
Un Approved
NA
NA
893A
894A
V2 HOLDINGS
Un Approved
NA
894B
V2 HOLDINGS
Un Approved
NA
895A
NOT MENTIONED
Un Approved
NA
896A
TUSKAN PROPERTIES
Un Approved
NA
897A
PRATHISHTANA BUILDERS
Un Approved
NA
898a
Un Approved
NA
899A
Un Approved
NA
900a
Un Approved
NA
901A
ANUSHU BUILDERS
Un Approved
NA
902A
VISWAS BUILDERS
Un Approved
NA
903a
SAGAR CONSTRUCTIONS
Un Approved
NA
904A
V M CONSTRUCTIONS
Un Approved
NA
905A
PRISM PROPERTIES
Un Approved
NA
906A
NUTEK BUILDERS
Un Approved
NA
907A
NOT MENTIONED
Un Approved
NA
908A
NOT MENTIONED
Un Approved
NA
909A
SIROYA CONSTRUCTIONS
Un Approved
NA
910A
S S CONSTRUCTIONS
Un Approved
NA
910B
S S CONSTRUCTIONS
Un Approved
NA
911A
PRIME DEVELOPERS
Un Approved
NA
911B
PRIME DEVELOPERS
Un Approved
NA
912a
Un Approved
NA
914A
Un Approved
NA
915A
NOT MENTIONED
Un Approved
NA
916A
SURYA BUILDERS
Un Approved
NA
918A
Un Approved
NA
919a
Un Approved
NA
920a
VAIBHAV DEVELOPERS
Un Approved
NA
921a
Un Approved
NA
923a
N K CONSTRUCTIONS
Un Approved
NA
923B
N K CONSTRUCTIONS
Un Approved
NA
924a
PROCESS ARCHITECTS
Un Approved
NA
328A
Deactivated
Deactivated
514A
ASTRO BUILDERS
Deactivated
Deactivated
205B
MADHURA DEVELOPERS
Deactivated
Deactivated
387A
Deactivated
Deactivated
387B
Deactivated
Deactivated
387C
Deactivated
Deactivated
585A
C B R CONSTRUCTIONS
Deactivated
Deactivated
553A
Deactivated
Deactivated
572C
MOUNICA BUILDERS
Deactivated
Deactivated
590B
SRINIVASA DEVELOPERS
Deactivated
Deactivated
511D
OASIS CONSTRUCTIONS
Deactivated
Deactivated
511B
OASIS CONSTRUCTIONS
Deactivated
Deactivated
511C
OASIS CONSTRUCTIONS
Deactivated
Deactivated
657B
NAGA CONSTRUCTIONS
Deactivated
Deactivated
675A
PEARL ESTATE
Deactivated
Deactivated
703A
Deactivated
Deactivated
514B
ASTRO BUILDERS
Deactivated
Deactivated
215B
PIONEER DEVELOPERS
Deactivated
Deactivated
215C
PIONEER DEVELOPERS
Deactivated
Deactivated
215E
PIONEER DEVELOPERS
Deactivated
Deactivated
215F
PIONEER DEVELOPERS
Deactivated
Deactivated
215G
PIONEER DEVELOPERS
Deactivated
Deactivated
7A
S S ASSOCISTES BUILDERS
& DEVELOPERS
Deactivated
Deactivated
7B
S S ASSOCISTES BUILDERS
& DEVELOPERS
Deactivated
Deactivated
7C
S S ASSOCISTES BUILDERS
& DEVELOPERS
Deactivated
Deactivated
7D
S S ASSOCISTES BUILDERS
& DEVELOPERS
Deactivated
Deactivated
7E
S S ASSOCISTES BUILDERS
& DEVELOPERS
Deactivated
Deactivated
82A
Deactivated
Deactivated
11A
S N CONSTRUCTION
Deactivated
Deactivated
11B
S N CONSTRUCTION
Deactivated
Deactivated
11C
S N CONSTRUCTION
Deactivated
Deactivated
205A
MADHURA DEVELOPERS
Deactivated
Deactivated
205C
MADHURA DEVELOPERS
Deactivated
Deactivated
205E
MADHURA DEVELOPERS
Deactivated
Deactivated
205D
MADHURA DEVELOPERS
Deactivated
Deactivated
205F
MADHURA DEVELOPERS
Deactivated
Deactivated
215D
PIONEER DEVELOPERS
Deactivated
Deactivated
723A
ITTINA PROPERTIES
Deactivated
Deactivated
723A
ITTINA PROPERTIES
Deactivated
Deactivated
723E
ITTINA PROPERTIES
Deactivated
Deactivated
723D
ITTINA PROPERTIES
Deactivated
Deactivated
723C
ITTINA PROPERTIES
Deactivated
Deactivated
67I
AISHWARYA GROUP
Deactivated
Deactivated
231A
AISHWARYA GROUP
Deactivated
Deactivated
508A
AISHWARYA GROUP
Deactivated
Deactivated
204A
AISHWARYA GROUP
Deactivated
Deactivated
204B
AISHWARYA GROUP
Deactivated
Deactivated
477A
AISHWARYA GROUP
Deactivated
Deactivated
477B
AISHWARYA GROUP
Deactivated
Deactivated
67H
AISHWARYA GROUP
Deactivated
Deactivated
492A
AISHWARYA GROUP
Deactivated
Deactivated
67D
AISHWARYA GROUP
Deactivated
Deactivated
67F
AISHWARYA GROUP
Deactivated
Deactivated
71A
Deactivated
Deactivated
71B
Deactivated
Deactivated
71C
Deactivated
Deactivated
71D
Deactivated
Deactivated
24D
Deactivated
Deactivated
922A
Un Approved
NA
640D
DIVYA BUILDERS
NOT APPROVED
NOT APPROVED
640E
DIVYA BUILDERS
NOT APPROVED
NOT APPROVED
640F
NOT APPROVED
NOT APPROVED
925a
PARANJAPE SCHEMES
Un Approved
NA
924A
BALAJI CONSTRUCTIONS
Un Approved
NA
925B
PRIDE HOSUING
Un Approved
NA
31A
Deactivated
Deactivated
31A
Deactivated
Deactivated
31A
Deactivated
Deactivated
31A
Deactivated
Deactivated
31A
Deactivated
Deactivated
31B
Deactivated
Deactivated
31C
Deactivated
Deactivated
31D
Deactivated
Deactivated
31D
Deactivated
Deactivated
31D
Deactivated
Deactivated
31E
Deactivated
Deactivated
31F
Deactivated
Deactivated
31H
Deactivated
Deactivated
31H
Deactivated
Deactivated
31H
Deactivated
Deactivated
31H
Deactivated
Deactivated
31I
Deactivated
Deactivated
31I
Deactivated
Deactivated
31I
Deactivated
Deactivated
31I
Deactivated
Deactivated
31I
Deactivated
Deactivated
31I
Deactivated
Deactivated
31J
Deactivated
Deactivated
31K
Deactivated
Deactivated
55A
Deactivated
Deactivated
55B
Deactivated
Deactivated
55C
Deactivated
Deactivated
55E
Deactivated
Deactivated
55F
Deactivated
Deactivated
59A
Deactivated
Deactivated
633B
Deactivated
Deactivated
54A
Embassy Group
Deactivated
Deactivated
54D
EMBASSY GROUP
Deactivated
Deactivated
54B
EMBASSY GROUP
Deactivated
Deactivated
54C
EMBASSY GROUP
Deactivated
Deactivated
92A
EMBASSY GROUP
Deactivated
Deactivated
185A
UNITECH
Deactivated
Deactivated
185B
UNITECH
Deactivated
Deactivated
185C
UNITECH
Deactivated
Deactivated
42B
Deactivated
Deactivated
42A
Deactivated
Deactivated
267C
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
267D
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
267B
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
267A
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
267E
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
267F
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
267G
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
267H
SAMHITHA CONSTRUCTION
Deactivated
Deactivated
267I
SAMHITHA CONSTRUCTION
78A
Deactivated
Deactivated
78A
Deactivated
Deactivated
228A
Deactivated
Deactivated
228B
Deactivated
Deactivated
228C
Deactivated
Deactivated
228D
Deactivated
Deactivated
261A
JAYARAJ GROUP
Deactivated
Deactivated
470A
JAYARAJ GROUP
Deactivated
Deactivated
633A
Deactivated
Deactivated
224A
Deactivated
Deactivated
254A
Deactivated
Deactivated
4A
Deactivated
Deactivated
187A
Deactivated
Deactivated
187B
Deactivated
Deactivated
714A
Deactivated
Deactivated
699A
D K G COMPANY
Deactivated
Deactivated
699B
D K G COMPANY
Deactivated
Deactivated
699C
D K G COMPANY
Deactivated
Deactivated
699D
D K G COMPANY
Deactivated
Deactivated
16C
CRESENT CONSTRUCTION
Deactivated
Deactivated
16D
CRESENT CONSTRUCTION
Deactivated
Deactivated
16E
CRESENT CONSTRUCTION
Deactivated
Deactivated
169B
CRESENT CONSTRUCTION
Deactivated
Deactivated
16B
CRESENT CONSTRUCTION
Deactivated
Deactivated
38B
Deactivated
Deactivated
38C
Deactivated
1115b
38A
Deactivated
Deactivated
457A
LANDMARK PROPERTIES
Deactivated
Deactivated
445A
SHRADDHA BUILDERS
Deactivated
Deactivated
445B
SHRADDHA BUILDERS
Deactivated
Deactivated
445C
SHRADDHA BUILDERS
Deactivated
Deactivated
445D
SHRADDHA BUILDERS
Deactivated
Deactivated
445E
SHRADDHA BUILDERS
Deactivated
Deactivated
445F
SHRADDHA BUILDERS
Deactivated
Deactivated
242A
Deactivated
Deactivated
513B
SHREYAS DEVELOPERS
Deactivated
Deactivated
513C
SHREYAS DEVELOPERS
Deactivated
Deactivated
513A
SHREYAS DEVELOPERS
Deactivated
Deactivated
176A
Deactivated
Deactivated
176B
Deactivated
Deactivated
12B
SAPTHAGIRI DEVELOPERS
Deactivated
Deactivated
12C
SAPTHAGIRI DEVELOPERS
Deactivated
Deactivated
12D
SAPTHAGIRI DEVELOPERS
Deactivated
Deactivated
12E
SAPTHAGIRI DEVELOPERS
Deactivated
Deactivated
12F
SAPTHAGIRI DEVELOPERS
Deactivated
Deactivated
12G
SAPTHAGIRI DEVELOPERS
Deactivated
Deactivated
12H
SAPTHAGIRI DEVELOPERS
Deactivated
Deactivated
12I
SAPTHAGIRI DEVELOPERS
Deactivated
Deactivated
393A
SAPTHAGIRI MAHARSHI
DEVELOPERS
Deactivated
Deactivated
393B
SAPTHAGIRI MAHARSHI
DEVELOPERS
Deactivated
Deactivated
393C
SAPTHAGIRI MAHARSHI
DEVELOPERS
Deactivated
Deactivated
133A
JANAJEEVA CONSTRUCTIONS
Deactivated
Deactivated
133B
JANAJEEVA BUILDERS
Deactivated
Deactivated
133C
JANAJEEVA PROPERTIES
Deactivated
Deactivated
133D
JANAJEEVA PROPERTIES
Deactivated
Deactivated
133F
JANAJEEVA PROPERTIES
Deactivated
Deactivated
133G
JANAJEEVA PROPERTIES
Deactivated
Deactivated
133E
JANAJEEVA PROPERTIES
Deactivated
Deactivated
312C
SCION CONSTRUCTIONS
Deactivated
Deactivated
408B
SCION CONSTRUCTIONS
Deactivated
Deactivated
312A
SCION CONSTRUCTIONS
Deactivated
Deactivated
312B
SCION CONSTRUCTIONS
Deactivated
Deactivated
312D
SCION CONSTRUCTIONS
Deactivated
Deactivated
312E
SCION CONSTRUCTIONS
Deactivated
Deactivated
408A
SCION CONSTRUCTIONS
Deactivated
Deactivated
408C
SCION CONSTRUCTIONS
Deactivated
Deactivated
408D
SCION CONSTRUCTIONS
Deactivated
Deactivated
408E
SCION CONSTRUCTIONS
Deactivated
Deactivated
361B
NEELADRI BUILDERS
Deactivated
Deactivated
361C
NEELADRI BUILDERS
Deactivated
Deactivated
129A
DECCAN GROUP
Deactivated
Deactivated
129B
DECCAN GROUP
Deactivated
Deactivated
129C
DECCAN GROUP
Deactivated
Deactivated
129D
DECCAN GROUP
Deactivated
Deactivated
129E
DECCAN GROUP
Deactivated
Deactivated
129F
DECCAN GROUP
Deactivated
Deactivated
129G
DECCAN GROUP
Deactivated
Deactivated
592A
Deactivated
Deactivated
590A
560C
Deactivated
Deactivated
Deactivated
688B
Deactivated
Deactivated
688C
Deactivated
Deactivated
688D
Deactivated
Deactivated
688A
Deactivated
Deactivated
270C
Deactivated
Deactivated
270A
Deactivated
Deactivated
270B
Deactivated
Deactivated
595A
Deactivated
Deactivated
920A
METROCORP NIRVANA
Deactivated
Deactivated
925A
KUMAR BUILDERS
Un Approved
NA
926A
JANAVI BUILDERS
Un Approved
NA
927A
ROYAL CONSTRUCTIONS
Un Approved
CORPORATE
928A
LEISURE & PROPERTY DEVELOPMENTS PVT
Approved
LTD
NA
1068b
929A
Un Approved
NA
930A
Un Approved
NA
930B
Un Approved
NA
930C
Un Approved
NA
931A
Un Approved
NA
Un Approved
NOT APPROVED
933A
8C
PARVATH DEVELOPERS
Un Approved
NOT APPROVED
934A
Un Approved
NOT APPROVED
936A
Un Approved
NOT APPROVED
937A
DONATA DEVELOPER
Un Approved
NOT APPROVED
80A
Un Approved
NA
938A
Un Approved
NA
939A
Un Approved
NA
940A
Un Approved
NA
267K
SAMHITHA CONSTRUCTIONS
ASRTO BUILDERS
DEACTIVATED
1145c
198B
CHARTERED HOUSING
DEACTIVATED
1179b
94B
Esteem Group
DEACTIVATED
1069b
117C
DEACTIVATED
1174c
MADURA DEVELOPERS
DEACTIVATED
1083c
687A
MOTATI MEADOWS
DEACTIVATED
1163c
79D
N D Developers.
DEACTIVATED
1116b
425C
PARIWAR PROPERTIES
DEACTIVATED
1146C
425D
PARIWAR PROPERTIES
DEACTIVATED
1146C
DEACTIVATED
1146C
725A
R K DEVELOPERS
DEACTIVATED
1189c
725B
R K DEVELOPERS
DEACTIVATED
1189c
725C
R K DEVELOPERS
DEACTIVATED
1189c
68A
R S DEVELOPERS
DEACTIVATED
1064b
68C
R S DEVELOPERS
DEACTIVATED
1064b
68C
R S DEVELOPERS
DEACTIVATED
1064b
68D
R S DEVELOPERS
DEACTIVATED
1064b
68E
R S DEVELOPERS
DEACTIVATED
1064b
68F
R S DEVELOPERS
DEACTIVATED
1064b
68G
R S DEVELOPERS
DEACTIVATED
1064b
68H
R S DEVELOPERS
DEACTIVATED
1064b
68I
R S DEVELOPERS
DEACTIVATED
1064b
68J
R S DEVELOPERS
DEACTIVATED
1064b
68L
R S DEVELOPERS
DEACTIVATED
1064b
68M
R S DEVELOPERS
DEACTIVATED
1064b
68N
R S DEVELOPERS
DEACTIVATED
1064b
325B
DEACTIVATED
1143a
488A
DEACTIVATED
1022b
488A
DEACTIVATED
1022b
488C
DEACTIVATED
1022b
89A
DEACTIVATED
1022b
89B
DEACTIVATED
1022b
89C
DEACTIVATED
1022b
89D
DEACTIVATED
1022b
89E
DEACTIVATED
1022b
89E
DEACTIVATED
1022b
89F
DEACTIVATED
1022b
89G
DEACTIVATED
1022b
941A
Un Approved
942A
SRK BUILDERS
Un Approved
NA
943A
TRINETRA CONSTRUCTION
Un Approved
NA
944A
ETA GARDENS
Un Approved
NA
Un Approved
Un Approved
950A
Un Approved
Un Approved
42C
Un Approved
Un Approved
952A
Un Approved
Un Approved
954A
Un Approved
Un Approved
954B
Un Approved
Un Approved
955A
Un Approved
Un Approved
Un Approved
957A
Un Approved
957B
Un Approved
958A
959A
Un Approved
Un Approved
Un Approved
94E
Un Approved
Un Approved
94F
Un Approved
Un Approved
960A
M/s N R DEVELOPERS
Un Approved
Un Approved
961A
Un Approved
Un Approved
962A
Un Approved
Un Approved
963A
Un Approved
Un Approved
964A
Un Approved
Un Approved
964B
Un Approved
Un Approved
965A
M/S VENUGOPAL
Un Approved
Un Approved
966A
Un Approved
Un Approved
967A
C K NAROTHAM
Un Approved
Un Approved
968A
Un Approved
Un Approved
969A
Un Approved
Un Approved
Un Approved
970A
971A
Un Approved
Un Approved
973A
Un Approved
Un Approved
973B
Un Approved
Un Approved
974A
Un Approved
Un Approved
975A
Un Approved
Un Approved
976A
Un Approved
Un Approved
977A
Un Approved
Un Approved
977B
Un Approved
Un Approved
978A
Un Approved
Un Approved
978B
Un Approved
Un Approved
979A
Un Approved
Un Approved
980A
Un Approved
Un Approved
981A
Un Approved
Un Approved
Un Approved
982A
983A
Un Approved
Un Approved
780A
Un Approved
Un Approved
781A
Un Approved
Un Approved
782A
Un Approved
Un Approved
984A
Un Approved
Un Approved
985A
Un Approved
Un Approved
986A
Un Approved
Un Approved
987A
Un Approved
Un Approved
988A
Un Approved
Un Approved
989A
Un Approved
Un Approved
990A
Un Approved
Un Approved
991A
Un Approved
Un Approved
993A
M/S BCIL
Un Approved
Un Approved
994A
M/s BCIL RED EARTH DEVELOPERS INDIAN PVT Un
LTDApproved
Un Approved
995A
Un Approved
Un Approved
996A
Un Approved
Un Approved
997A
Un Approved
Un Approved
998A
Un Approved
Un Approved
999A
Un Approved
Un Approved
Un Approved
1000A
1001A
Un Approved
Un Approved
Un Approved
1004A
Un Approved
Un Approved
1005A
M/s KRISHNA ENTERPRISES HOUSING & INFRASTRUCTURE
Un Approved
Un Approved
1006A
M/s SOVEREIGN DEVELOPERS & INFRASTRUCTURE
Un Approved
Un Approved
1007A
Un Approved
Un Approved
1008A
T S HOLDING
Un Approved
Un Approved
1010A
Un Approved
Un Approved
1011A
Un Approved
Un Approved
1012A
Un Approved
Un Approved
1013A
Un Approved
Un Approved
BUILDER
EXPOSURE
APPROVED
PROJECT NAME
PROJECT CODE
PROJECT
EXPOSURE
SANCTIONED
VIJAI MANSIONS
Not Approved
Un Approved
Not Approved
Un Approved
BROOKES HEAVEN
Not Approved
Un Approved
GEN REGENCY
Not Approved
Un Approved
GEM REGENCY
Not Approved
Un Approved
7,500,000
PAVANI RESIDENCY
Not Approved
Un Approved
7,500,000
NOT MENTIONED
Not Approved
Un Approved
VICTORIA HEAVENS.
Not Approved
Un Approved
1040KUML
GULMOHAR NEST
Not required
Un Approved
R K CITY
Not Approved
Un Approved
R K CITY
Not Approved
Un Approved
7,500,000
R K LAKE VIEW
Not Approved
Un Approved
R K HEIGHTS
Not Approved
Un Approved
AKANKSHA
Not Approved
Un Approved
GOLDEN HOMES
Not Approved
Un Approved
BILDEN RESIDENCY
Not Approved
Un Approved
SAPTHAGIRI MANSION
Not Approved
Un Approved
SAPTHAGIRI MANSION - II
Not Approved
Un Approved
Not Approved
Un Approved
SAPTHAGIRI HEIGHTS
Not Approved
Un Approved
PARADISE RESIDENCY
Not required
Un Approved
TRANQUILITY
Not Approved
Un Approved
PIONEER CLASSIC
Not Approved
Un Approved
Not Approved
Un Approved
SUBURBIA
Not Approved
Un Approved
JAYA EMERALD
Not Approved
Un Approved
SAPTHAGIRI RESIDENCY-II
Not Approved
Un Approved
SAPTHAGIRI RESIDENCY-I
Not Approved
Un Approved
THIRUMALA COMFORTS
Not Approved
Un Approved
JAI VILLA
Not Approved
Un Approved
JAY PARADISE
Not Approved
Un Approved
SHARADA RESIDENCY
Not Approved
Un Approved
DREAM PARADISE
1104DRPA
1 crore
WELLINGTON PARADISE
1089WEPA
10,000,000
VASTU BHOOMI
Not Approved
Un Approved
KOHINOOR
Not Approved
Un Approved
RESIDENCY MANOR
Not Approved
Un Approved
ANUGRAHA LAYOUT
Not Approved
Un Approved
ANUGRAHA MEADOWS
Not Approved
Un Approved
Not required
Un Approved
BALAJI GREENS
NOT APPROVED
Un Approved
BALAJI ENCLAVE
NOT APPROVED
Un Approved
ORCHID PARK
Not Approved
Un Approved
VAASTHU HERITAGE
Not Approved
Un Approved
Not Approved
Un Approved
MANJUNATH DEVELOPERS
Not Approved
Un Approved
ROSE DALE
Not Approved
Un Approved
MIMS GULMOHAR
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
AMOGH AMETHYST
Not Approved
Un Approved
ALPS ESTATE
Not Approved
Un Approved
Not Approved
Un Approved
VASUNDHARA
Not Approved
Un Approved
ACS-II
Not Approved
Un Approved
HARSHITHA MERIDIAN
1086MRDN
POOJA RESIDENCY
1107POOJ
1 CRORE
POOJA APARTMENTS
Not Approved
Un Approved
POOJA HABITAT
Not Approved
Un Approved
ROCK RESIDENCY
Not Approved
Un Approved
VIASHNAVI PARADISE
Not Approved
Un Approved
NAYAK RESIDENCY
Not Approved
10,000,000
2 crores
5 Crore
TRANQUIL CITY
Not Approved
Un Approved
BAIRAVI DHRUPAD
Not Approved
Un Approved
ANAND BAIRAVI
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
GAGAN VILLA
Not Approved
Un Approved
BEST TOWNSHIP
Not Approved
Un Approved
BEST APARTMENTS
Not Approved
Un Approved
Not Approved
Un Approved
Not required
Un Approved
1142HPVY
2 CRORE
Not Approved
Un Approved
Not Approved
Un Approved
CELEBRITY HOUSING
Not required
Un Approved
CELEBRITY SIGNATURE
Not required
Un Approved
CELEBRITY CLASSIC
Not required
Un Approved
PLATINUM CITY
Not Approved
Un Approved
Not Approved
Un Approved
MAHAVIR WOODS
1076MVWD
Un Approved
FRAUD BUILDER
GOLDEN VILLAGE
Not Approved
Un Approved
FRAUD BUILDER
Not Approved
Un Approved
FRAUD BUILDER
SIVAJYOTHI NIVAS
Not Approved
Un Approved
FRAUD BUILDER
GREEN CASTLE
Not Approved
Un Approved
Not Approved
Un Approved
ADITI MANSION
Not Approved
Un Approved
THE ROSARY
1062RUSA
NA
40,000,000
PRIDE ORCHID
1012PRORO
5,000,000
VINAYAKA LAYOUT
Not Approved
Un Approved
ANNAPOORNESHWARI LAYOUT
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
VICTORIA AVENUE
Not Approved
VICTORIA HEAVEN
1006VCTH
Not Approved
VICTORIAN ENCLAVE
Not Approved
Un Approved
VICTORIA - II
Not Approved
Un Approved
SAI SOUDHA
Not required
B D S NAGAR
Not Approved
Un Approved
VIJAYALAKSHMI LAYOUT
Not Approved
Un Approved
KEMPEGOWDA NAGAR
NOT APPROVED
Un Approved
G RAMAIAH LAYOUT
Not Approved
Un Approved
ADITYA APPARTMENTS
Not Approved
SAPTHAGIRI APARTMENT
Not Approved
Un Approved
CROWN PLAZA
Not Approved
Un Approved
20,000,000
IBBANI RESIDENCY
1096IBNI
1 CRORE
20,000,000
AISHWARYA CLISTAL
1096ACRT
2 CRORE
20,000,000
AISHWARYA RESIDENCY
1096ASHR
2 CRORE
20,000,000
AISHWARYA RESIDENCY
1096ASHR
2 CRORE
20,000,000
Not Approved
20,000,000
AISHWARYA AMULYA
Not Approved
Un Approved
20,000,000
AISHWARYA GARDENS
Not Approved
Un Approved
Not Approved
Un Approved
ADITI
Not Approved
Un Approved
1004RSCY
Not Approved
KRISHNA GARDENS
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
ELEMENTS LAYOUT.
Not Approved
Un Approved
THE NEST
Not Approved
Un Approved
CHARTERED GRUHA
Not Approved
Un Approved
FORTUNE CITY - II
Not Approved
Un Approved
FORTUNE CITY
Not Approved
Un Approved
GREEN FIELDS
Not required
Un Approved
TROPICAL PARADISE.
1078TRPS
BYRESHWARA LAYOUT
Not Approved
5,000,000
20,000,000
Un Approved
ESSEL GARDEN
Not Approved
Un Approved
MOUDGAL HOMES
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
GREEN WOOD II
Not Approved
Un Approved
ANISHA MEADOES
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
GREEN COURT
Not Approved
Un Approved
Not Approved
Un Approved
NOT MENTIONED
Not Approved
VILLA DELMAR
Not Approved
Un Approved
4 crore
R K APARTMENTS
Not Approved
Un Approved
PRASTHINA ENCLAVE
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
OASIS
Not Approved
Un Approved
RICH FIELDS
Not Approved
Un Approved
GEETHANJALI RESIDENCY
Not Approved
GEETHANJALI PARADISE
1112PRDS
90 Lacs
GEETHANJALI ELEGANCY
1112ELEG
1.5 cro
GITANJALI PRIDE II
Not Approved
Un Approved
SAI ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
B S R ELYSIUM
Not required
Un Approved
VISHWESHWARAIAH ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
TRINITY PARK
Not Approved
Un Approved
TRINITY HABITAT
Not Approved
Un Approved
TRINITY PARK
Not Approved
Un Approved
TRINITY FORTUNE
Not Approved
Un Approved
White City
1082WTCT
1 CRORE
NOT MENTIONED
Not Approved
Un Approved
Not Approved
Un Approved
WOOD RIDGE
Not Approved
Un Approved
AASHIANA
Not Approved
Un Approved
Not Approved
Un Approved
DHRUVI APARTMENTS
Not Approved
Un Approved
HARIHARA ENCLAVE.
Not Approved
Un Approved
SUNIL SHARATH
Not Approved
Un Approved
PEARL GARDEN
1054PRLG
Not Approved
AISHWARYA MAGNUS
1091AMAG
VAISHNAVI PARADISE
Not Approved
Un Approved
VAISHNAVI SPLENDOUR
Not Approved
Un Approved
VAISHNAVI RATHNAM
Not Approved
Un Approved
AKSHAYA NAGAR
Not Approved
Un Approved
Not Approved
Un Approved
AKSHAYA RESIDENCY
Not Approved
Un Approved
UDAY RESIDENCY
Not Approved
Un Approved
LIBERO APARTMENTS
Not Approved
Un Approved
Not Approved
Un Approved
5,000,000
Un Approved
10,000,000
Not Approved
Un Approved
10,000,000
GITANJALI ELEGENCY
Not Approved
Un Approved
12,000,000
BRINDAVAN LAYOUT
Not Approved
12,000,000
1109LKCT
70 Lacs
12,000,000
LAKE PARADISE
Not Approved
Un Approved
ESHWARI LAYOUT
Not Approved
Un Approved
YET TO BE TITLED
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SPRINGLEAF GARDEN
Not Approved
Un Approved
Not Approved
Un Approved
PRAMOTHA APARTMENT
Not Approved
Un Approved
Not Approved
Un Approved
BEST TOWNSHIP
Not Approved
Un Approved
UMIYA LABURNUM
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
LAA RESIDENCY
1110RESI
1 CRORE
LAA GALAXY
Not Approved
Un Approved
LAA LAVENDER
Not Approved
Un Approved
Not Approved
Un Approved
TRANQUILNE CITY
Not Approved
Un Approved
SHREYA VILLAMENTS
Not Approved
Un Approved
VISHAL HOMES
Not Approved
Un Approved
CLASSIC SAPHIRE
1095CLSP
20 Lacs
10,000,000
10,000,000
1.5 crore
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
1108HGTS
1 crore
1001GRDN
AMARA CANOPY
Not Approved
Un Approved
NECTAR
Not Approved
Un Approved
BHOOMIKA PARADISE
Not Approved
Un Approved
BHOOMIKA MEADOWS
Not Approved
Un Approved
VISHWOTHAMA ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
VIGNESWARA LAYOUT
Not Approved
Un Approved
Not Approved
Un Approved
5,000,000
Not Approved
Un Approved
MSE PROJECT
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
YASHILA
Not Approved
Un Approved
PARIWAR APARTMENTS
Not Approved
Un Approved
CHARITA RESIDENCY
Not Approved
Un Approved
VRINDAVAN GARDEN
Not Approved
Un Approved
INDUS VOGUE
Not Approved
Un Approved
INDUS VARNA
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SPRINGFIELDS APPARTMANT
COMPLEX.
1036SPNF
INR 40 Mio
METTA
INR 50 mio
RESIDENCY
ESPERANZA
NEELADRI MAHAL
Not Approved
Un Approved
Not Approved
Un Approved
HEMANTH ORANGE
Not Approved
Un Approved
MANJUNATH RESIDENCY
Not required
Un Approved
ASHA TOWNSHIP
Not Approved
Un Approved
Not Approved
Un Approved
PRAKASH HERITAGE
Not Approved
Un Approved
VAISHNAVI APARTMENT
Not Approved
Un Approved
VAISHNAVI ROYALE
Not Approved
Un Approved
VAISHNAVI ENCLAVE
Not Approved
Un Approved
VRR RESIDENCY
Not Approved
Un Approved
VRR HERITAGE
Not Approved
Un Approved
AANUGRAHA FLATS
Not Approved
Un Approved
PINION RESIDENCY
Not Approved
Un Approved
ANUGRAHA ENCLAVE
Not Approved
Un Approved
PRADEEP PARADISE
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
LANDMARK REGENCY
Not Approved
Un Approved
N.K.SWATHI HOMES
Not Approved
Un Approved
15,000,000
MAJESTIC GARDEN
1079MJG1
75 LAKHS
15,000,000
MAJESTIC GARDEN
1079MJG2
75 LAKHS
Un Approved
ROSE GARDEN
Not Approved
Un Approved
GREEN VIEW
( PAVITHRA GREEN VIEW)
Not Approved
Un Approved
SAPTHAGIRI NAGAR
1091ABSN
1.5 Cr
VINTAGE PARADISE
Not Approved
Un Approved
NIGAM HOMES
Not Approved
Un Approved
NIKHIL NIVAS
Not Approved
Un Approved
TRINITY OVERLOOK
1063TRNT
GRACE HEAVEN
Not Approved
Un Approved
THE HARMONY
Not Approved
Un Approved
RAMANJANEYA LAYOUT
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
VASUNDHARA ENCLAVE
Not Approved
Un Approved
MANISH RATHNA
1085MNRT
MANISH CLASSIC
1085MNCL
5,000,000
15,000,000
MANISHS PRIYAMVADA
1004RSCY
Not Approved
Un Approved
SHAKTHI REGENCY
Not Approved
Un Approved
MEENAKSHI ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
Not Approved
Un Approved
B D S GARDEN
Not Approved
Un Approved
KARUNANAGAR PROJECT
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
LAXMI HOMES
Not Approved
Un Approved
KK RESIDENCY
Not Approved
Un Approved
1.5 crore
ROYAL MERIDIAN
Not Approved
Un Approved
1.5 crore
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
GREEN FIELDS
Not Approved
Un Approved
GREEN VIEW
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
PARADISE ISLAND
Not Approved
Un Approved
S R K SAMRUDDHI
Not Approved
Un Approved
PEARL PARADISE
Not Approved
Un Approved
R A RESIDENCY
Not Approved
Un Approved
SUNNY BROOKS
Not Approved
Un Approved
Not Approved
Un Approved
VIJAYALAKSHMI APARTMENT
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
VASAVI LAYOUT
Not Approved
Un Approved
Not Approved
Un Approved
JYOTHI MEADOWS
Not required
Un Approved
ANISHA ENCLAVE
Not Approved
Un Approved
K.K.RESIDENCY
Not Approved
Un Approved
ANISHA GRANGE
Not Approved
Un Approved
JYOTHI CLIQUE
Not Approved
Un Approved
VINEYARD GARDENS
Not Approved
Un Approved
VINAYAKA NILAYA
Not Approved
Un Approved
12,000,000
30,000,000
SAI HOMES
Not Approved
Un Approved
Not Approved
Un Approved
PRAKRUTHI NAGAR
Not Approved
Un Approved
BTR GARDENS
Not Approved
Un Approved
R K MANSION
Not Approved
Un Approved
R K CONSTRUCTIONS
Not Approved
Un Approved
PRAGATHI LAYOUT
Not Approved
Un Approved
PRAGATHI ONYX
Not Approved
Un Approved
1099NALY
LAKE CITY
NOT MENTIONED
Not Approved
Un Approved
PRASIDDHI ASPIRATIONS
1133ASPT
1.5crore
GOBINDPARK
Not Approved
Un Approved
LOKESH MANOR
Not Approved
Un Approved
SERENE GROOVE
Not Approved
Un Approved
VBF PLAZA
Not Approved
Un Approved
TEAM HERITAGE
Not Approved
Un Approved
Not Approved
Un Approved
TEAM
Not Approved
Un Approved
Not Approved
Un Approved
CENTURY PARK
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SUBRAMANYESHWARA NAGAR
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
PRAKRUTHI PARADISE
Not Approved
Un Approved
50,000,000
150,000,000
NEELADRI MAHAL
Not Approved
Un Approved
MANA REGENCY
Not Approved
Un Approved
GALAXY GARDEN
Not Approved
Un Approved
AKSHAY GARDEN
1132AKGD
2 CRORE
SOBHA AMBER
1009AMBR
2 CRORE TO
START WITH
APPLE CASTLE
Not Approved
Un Approved
LEE CASTLE
Not Approved
Un Approved
VIJAY MANOR
Not Approved
Un Approved
PAVITHRA GARDEN
Not Approved
Un Approved
BALAJI LAYOUT
Not Approved
Un Approved
BALAJI NIVAS
Not Approved
Un Approved
NIRVANA
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
S V PRIDE
Not Approved
Un Approved
S V SMART
Not Approved
Un Approved
10,000,000
KRISHNANAGAR APTS
1055KRSN
10,000,000
PRANAAM ENCLAVE
Not Approved
Un Approved
BALAJI LAYOUT
Not Approved
Un Approved
MSR LAYOUT
Not Approved
Un Approved
VANSHEE ELDORADO
Not Approved
Un Approved
VANSHEE RESIDENCY
Not Approved
Un Approved
VAMSEE RESIDENCY
Not Approved
Un Approved
JANAPRIYA HEAVENS.
1046HVNS
NOT MENTIONED
Not Approved
Un Approved
KARUNA NAGAR
Not Approved
Un Approved
BALAJI RESIDENCY
Not Approved
Un Approved
5,000,000
5,000,000
BALAJI RESIDENCY
Not Approved
Un Approved
BALAJI RESIDENCY-II
Not Approved
Un Approved
SPECTRA SYLVON
Not Approved
Un Approved
DIWAKAR CELESTIAL
Not Approved
Un Approved
BASAPURA PROJECTS
Not Approved
Un Approved
SINGAPUR PARADISE
Not Approved
Un Approved
SHILPA RESIDENCY
Not Approved
Un Approved
SHANTHINIKETHAN LAYOUT
Not Approved
Un Approved
GREEN BANKS
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
DURGA NAGAR
Not Approved
Un Approved
Not Approved
Un Approved
BALAJI KRUPA
Not Approved
Un Approved
PARVATH NIVAS
Not Approved
Un Approved
BALAJI HIEGHTS
Not Approved
Un Approved
BALAJI PRISTINE
Not Approved
Un Approved
TEJA SUNSHINE
Not Approved
Un Approved
FAIR HEAVENS
Not Approved
Un Approved
PINE WOODS
Not Approved
Un Approved
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
GAYATHRI PEARL
Not Approved
Un Approved
GAYATHRI MANOR
Not Approved
Un Approved
KRISHNA RESIDENCY
Not Approved
Un Approved
J C R HERITAGE
Not Approved
Un Approved
5,000,000
ASHOK HEIGHTS
1041ASHT
5,000,000
S V PARADISE
Not Approved
Un Approved
S L V PARADISE
Not Approved
Un Approved
SOLITAIRE
Not Approved
Un Approved
SLV HOMES
Not Approved
Un Approved
SAPNA LAYOUT
Not Approved
Un Approved
YERTHA RESIDENCY
Not Approved
Un Approved
SURAKSHA COMFORT
Not Approved
Un Approved
SURAKSHA RESIDENCY
Not Approved
Un Approved
GAYATHRI ENCLAVE
Not Approved
Un Approved
JRR LAYOUT
Not Approved
Un Approved
SESHADRI NAGAR
Not Approved
Un Approved
R R CASTLE
Not Approved
Un Approved
NA
DONE NEST
Not Approved
Un Approved
R R ESTATES
Not Approved
Un Approved
BDS LAYOUT.
Not Approved
Un Approved
BDS GARDENS
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
THE GREENS
Not Approved
Un Approved
VISALAKSHI LAYOUT
Not Approved
Un Approved
SHRAVANTHI WOODS
Not Approved
Un Approved
KALPANA PARADISE
Not Approved
Un Approved
MAGNOLIA ENCLAVE
Not Approved
Un Approved
CANARA RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
S P SUPREME
Not Approved
Un Approved
ASSET GARDENIA
Not Approved
Un Approved
SRI ANNAPOORNESHWARI
SHELTERS
Not Approved
Un Approved
120,000,000
PAVILION
1013PALN
120,000,000
SHAREWOOD GREENS
Not Approved
Un Approved
Not Approved
Un Approved
SHIVA JYOTHI
Not Approved
Un Approved
EMBASSY HABITAT
Not Approved
Un Approved
Not Approved
Un Approved
ABHINAV HERMITAGE
Not required
Un Approved
1.5 crore
SRINIVASA LAYOUT
Not Approved
Un Approved
GOLDEN VALLEY
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
ARCON MULADHAR
Not Approved
Un Approved
Not Approved
Un Approved
THE OPEN
Not Approved
Un Approved
VIJAYA RESIDENCY
Not Approved
Un Approved
AIRPORT AVENUE
Not Approved
Un Approved
SOUNDARYA NEST
Not Approved
Un Approved
MANAR MANSION
Not Approved
Un Approved
Not Approved
Un Approved
BANDHAN
Not Approved
Un Approved
1.5 crore
Aradhana Residency
1077ARDH
1.5 crore
1.5 crore
MALIBU ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SILICON TOWERS
Not Approved
Un Approved
MAPLE GREENS
Not Approved
Un Approved
POOJA COMFORTS
Not Approved
Un Approved
ADITHYA HOMES
Not Approved
Un Approved
JCN MERILIAN
Not Approved
Un Approved
NAIDU LAYOUT
Not Approved
Un Approved
ANSALS FORTE
Not required
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
KSHITY CARNATION
Not Approved
Un Approved
MEENAKSHI RESIDENCY
Not Approved
Un Approved
MEENAKSHI LAYOUT
Not Approved
Un Approved
Not Approved
Un Approved
NAVYA DELIGHTS
Not Approved
Un Approved
NAVYA ELITE
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SHARADA RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
GREEN AVENUE
Not Approved
Un Approved
LAKELAND APARTMENTS
Not Approved
Un Approved
VINTAHE AVENUE
Not Approved
Un Approved
VISHWEASHWARA LAYOUT
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
12,000,000
Not Approved
Un Approved
12,000,000
CAMBRIDGE LAYOUT
Not Approved
Un Approved
12,000,000
Not Approved
Un Approved
FORTUNA RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
FORTUNA SIRI
Not Approved
Un Approved
Not Approved
Un Approved
SREEJA SRIVARU
Not Approved
Un Approved
Not Approved
Un Approved
SREEJA ANNEX
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
ARIEN ADIFACE
Not Approved
Un Approved
SKANDA
Not Approved
Un Approved
Not Approved
Un Approved
CHANDRAKANTHA ENCLAVE
Not Approved
Un Approved
VAISHNAVI RESIDENCY
Not Approved
Un Approved
VAISHALI RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
ANUGRAHA TOWNSHIP
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
30,000,000
1119ABSN
1.5 CRORES
30,000,000
ABM RESIDENCY
SHRESTA HOMES
Not Approved
Un Approved
ABI HORIZON
Not Approved
Un Approved
S S CASTLE
Not Approved
Un Approved
2 Cr to start with
OASIS PEARL
Not Approved
Un Approved
2 Cr to start with
OASIS BREEZE
Not Approved
Un Approved
2 crores
50,000,000
30,000,000
KANAKA NAGAR
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
VINTAGE PARADISE
Not Approved
Un Approved
NANDINI CREST
1134CRST
45 LAKS
Not Approved
Un Approved
GREEN HOUSE
Not Approved
Un Approved
CELEBRITY PARADISE
Not Approved
Un Approved
Not Approved
Un Approved
ROSE ENCLAVE
Not Approved
Un Approved
PUJA NEST
Not Approved
Un Approved
Not Approved
Un Approved
SAROJ RESIDENCY
Not Approved
Un Approved
LAKEMONT MANSION
Not Approved
Un Approved
LAKEMONT ARCADE
Not Approved
Un Approved
LAKEMONT ENCLAVE
Not Approved
Un Approved
FERNS RESIDENCY
1001RSDN
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
M S R NAGAR
Not Approved
Un Approved
M S GEETHANJALI
Not Approved
Un Approved
ANAND ENCLAVE
Not Approved
Un Approved
VERSOVA EARTH
Not Approved
Un Approved
Not Approved
Un Approved
ESTHER ENCLAVE
Not Approved
Un Approved
JEEVANADI HAMLET
Not Approved
Un Approved
NA
JEEVANADI PRESIDENCY
Not Approved
Un Approved
SREENIDHI ENCLAVE
Not Approved
Un Approved
JEEVANADI PORT
Not Approved
Un Approved
VINTAGE ELITE
Not Approved
Un Approved
VINTAGE VILLA'S
Not Approved
Un Approved
Not Approved
Un Approved
Un Approved
TIRUMALA NAGAR
Not Approved
Un Approved
THIRUMALA NAGAR
Not Approved
Un Approved
S S RESIDENCY
Not Approved
Un Approved
HEMAVATHI SHELTERS
Not Approved
Un Approved
MITHRA ENCLAVE
Not Approved
Un Approved
AKRUTHI SUNSHINE
Not Approved
Un Approved
SREEJI LAYOUT
Not Approved
Un Approved
HOYSALA NANDAVANAN
Not Approved
Un Approved
BHEL LAYOUT
Not Approved
Un Approved
Not Approved
Un Approved
NISARGA PARADISE
Not Approved
Un Approved
MITHRA ENCLAVE -2
Not Approved
Un Approved
Not Approved
Un Approved
A & M RESIDENCY
Not Approved
Un Approved
AJANTHA APRTMENTS
Not Approved
Un Approved
NEHA SESENITY
Not Approved
Un Approved
VINEYARD FANTASY
Not Approved
Un Approved
VINAYAKA LAYOUT
Not Approved
Un Approved
VINAYAKA CONSTRUCTIONS
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SHABARINAGAR PHASE-2
Not Approved
Un Approved
PRADHAN WREN
Not Approved
Un Approved
SAI HABITAT
Not Approved
Un Approved
HABITAT SERENITY
Not Approved
Un Approved
SHALOME
Not Approved
Un Approved
VRUNDAVAN
Not Approved
Un Approved
U-BEST SHELTERS
Not Approved
Un Approved
PEARL CITY
Not Approved
Un Approved
SAI'S NEST
Not Approved
Un Approved
SHIVA MEADOWS
Not Approved
Un Approved
JOCKA STUNS
Not Approved
Un Approved
SRINIDHI MANSION
Not Approved
Un Approved
ANJANADRI LAYOUT
Not Approved
Un Approved
SRINIDHI RESIDENCY
Not Approved
Un Approved
ANANYA
Not Approved
Un Approved
ARMADALE
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
EMERLD RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
RAJARAJESHWARI RESIDENCY
Not Approved
Un Approved
THIRUMALA CONSTRUCTIONS
Not Approved
Un Approved
PRATHAM RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
PRADAM GARDENIA
Not Approved
Un Approved
PRADHAM GRAND
Not Approved
Un Approved
Not Approved
Un Approved
SRIVEN HEIGHTS
Not Approved
Un Approved
PANCHAMUKHI SHELTERS
Not Approved
Un Approved
TROPICAL DWELLINGS
Not Approved
Un Approved
SRI NILAYA
Not Approved
Un Approved
SRI CHAITHANYA
Not Approved
Un Approved
Not Approved
Un Approved
SRI PARADISE
Not Approved
Un Approved
ARUNODAYA NEST
Not Approved
Un Approved
D S MAX ARUNODAYA
Not Approved
Un Approved
ARCONS SWADISTONS
Not Approved
Un Approved
KESAR RESIDENCY
Not Approved
Un Approved
SUN CITY
Not Approved
Un Approved
BRINDAVANA ENCLAVE
Not Approved
Un Approved
1.5 crore
ROYAL REFLEX
1066RFLX
1 CRORE
1.5 crore
Not Approved
Un Approved
1.5 crore
ROYAL REFLEX
1066RFLX
1.5 crore
REFLEX HOUSING
Not Approved
Un Approved
1.5 crore
ROYAL RETREAT
Not Approved
Un Approved
ROCK PARADISE
NOT APPROVED
Un Approved
VARS REGENCY
Not required
1 crore
Not required
TRANQUIL
Not Approved
Un Approved
PRIME CLASSIC
Not Approved
Un Approved
G P R ROYALE.
Not required
SAPTHAGIRI VALLEY
1091STVL
Not required
Not Approved
NOBLE RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
M S R CITY
Not Approved
Un Approved
RIDGE WOOD
Not Approved
Un Approved
WILLOW HERBS
Not Approved
Un Approved
ORANGE TREES
Not Approved
Un Approved
1 CRORE
NAVARATHAN GARDEN.
Not Approved
CLASSIC ORCHARDS
1015CLSO
AISHWARYA APARTMENTS
Not Approved
Un Approved
SURYA KIRAN
Not Approved
Un Approved
V V NAGAR I BLOCK.
Not Approved
Un Approved
V V NAGAR II BLOCK.
Not Approved
Un Approved
BALAJI GARDENS
Not Approved
Un Approved
DREAM MEADOWS
1025DMDW
5,000,000
REMA SKYVIEW
1057REMS
5,000,000
2,500,000
NOT MENTIONED
Not Approved
2,500,000
WOODSWALE
Not Approved
PARVATH NIVAS
Not Approved
Un Approved
MONREPOS
Not Approved
Un Approved
20,000,000
10,000,000
Un Approved
5,000,000
7,500,000
PALM SPRINGS
Not Approved
WASHLEIGH MANOR
1016WSMN
MARUTHI VAIBHAV
Not Approved
Un Approved
MARUTHI ANNEXE
Not Approved
Un Approved
Not Approved
Un Approved
MARUTHI HOMES
Not Approved
Un Approved
CLASSIC PARADISE.1 to 6
1095PARA
1 crore
1095PARA
2 crore
CLASSIC PARADISE
1095PARA
3 crore
1053PRDS
HIMAGIRI ENCLAVE-2
Not Approved
Un Approved
EAGLE RIDGE
Not required
Un Approved
AAKRUTHI APARTMENTS.
Not required
Un Approved
5,000,000
5,000,000
Not Approved
Un Approved
GAYATHRI RESIDENTIAL
Not Approved
Un Approved
Not Approved
Un Approved
1 crore
1 crore
1100SDLA
3 crores
White House
Not Approved
SAMHITHA HOME
1061SMHM
UNIQUE APT
Not Approved
Un Approved
Not Approved
Un Approved
TRINITY PARK
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SAMRUDDHI ROYALE
Not Approved
Un Approved
SAMRUDDHI REGAL
Not Approved
Un Approved
10,000,000
5,000,000
SAMRUDDHI GRACE
Not Approved
Not Approved
K K TOWERS
Not Approved
Un Approved
JADE GARDEN
Not Approved
Un Approved
SAPTHAGIRI COUNTY
Not Approved
Un Approved
MITTAL BERLIE
Not Approved
Un Approved
Not Approved
Un Approved
DAMDEN NEPTUNIA
Not Approved
Un Approved
DAMDEN COLONIA
Not Approved
Un Approved
DAMDEN ZEPHAR
Not Approved
Un Approved
2 Cr to start with
MANJUNATH ARCADE
Not Approved
Un Approved
2 Cr to start with
Not Approved
Un Approved
Not Approved
Un Approved
3 Cr to start with
Not Approved
Un Approved
20,000,001
MANJUNATH ARCADE
Not Approved
Un Approved
GEETHANJALI ENCLAVE
Not Approved
Un Approved
KRISHNAJA AVENUE
Not Approved
Un Approved
SHARADA ENCLAVE
Not Approved
Un Approved
RAGHAV RESIDENCY
Not Approved
Un Approved
BALAJI PARADISE -3
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
ROCK HOMES
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
VISHAL HOMES
Not Approved
Un Approved
FCU IS NEGATIVE
FCU IS NEGATIVE
Not Approved
Un Approved
PALLAVI ENCLAVE
Not Approved
Un Approved
PALLAVI ENCLAVE
Not Approved
Un Approved
KRISHNA GRAND
Not Approved
Un Approved
GOLDEN WOODS
Not Approved
Un Approved
SONA-SUSHEEL
Not Approved
Un Approved
SRINIDHI APARTMENTS
Not Approved
Un Approved
PRUTHVI PARADISE
Not Approved
Un Approved
DEVINA FRAGRANCE
Not Approved
Un Approved
ANANDA NAGAR
Not Approved
Un Approved
C D P SHELTERS
Not Approved
Un Approved
C D P SHELTERS 2
Not Approved
Un Approved
UPKAR RESIDENCY
Not Approved
Un Approved
UPKAR PARADISE
Not Approved
Un Approved
UTOPIA
Not Approved
Un Approved
KARTHIK SAPTHARISHI
Not Approved
Un Approved
C G P ENCLAVE
Not Approved
Un Approved
SIMHADRI LAYOUT
Not Approved
Un Approved
UDAYA RESIDENCY
Not Approved
Un Approved
LAKE OF PARADISE
Not Approved
Un Approved
HERITAGE RESIDENCY
Not Approved
Un Approved
HERITAGE RESIDENCY 2
Not Approved
Un Approved
PRANAM ENCLAVE
Not Approved
Un Approved
NORTH PARK
Not Approved
Un Approved
BALAJI LAYOUT
Not Approved
Un Approved
A B M RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
SAI BALAJI
Not Approved
Un Approved
NAYAAB REGENCY
Not Approved
Un Approved
TAMARIND ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
C D P ENCLAVE
Not Approved
Un Approved
MEENAKSHI RESIDENCY
Not Approved
Un Approved
BROCK WOOD
Not Approved
Un Approved
Not Approved
Un Approved
RAYCON ORCHARDS
Not Approved
Un Approved
RAYCON LOTUS
Not Approved
Un Approved
SHAKTHI REGENCY
Not Approved
Un Approved
SHAKTI APARTMENTS
Not Approved
Un Approved
SHAKTHI CORNER
Not Approved
Un Approved
PRAMBIL REGENCY
Not Approved
Un Approved
RASHI RESIDENCY
1064RARE
INR 30 mio
RASHI PRIDE
1064 RAPR
INR 30 mio
RAM PADMAJA
Not Approved
Un Approved
INDIRA TOWERS
Not Approved
Un Approved
Not Approved
Un Approved
RAJANI FARMS
Not Approved
Un Approved
ADHVIKA FANTASIA
Not Approved
Un Approved
SHRUTHI RESIDENCY
Not Approved
Un Approved
KRISHNA DHAM
Not Approved
Un Approved
G R VISTAS
Not Approved
Un Approved
OHANA GARDENS
Not Approved
Un Approved
FCU IS NEGATIVE
OHANA GARDENS PH II
Not Approved
Un Approved
MOOKAMBIKANAGAR PHASE II
Not Approved
Un Approved
OLIVE NEST
Not Approved
Un Approved
KANVA NAGAR
Not Approved
Un Approved
MARUTHI ENCLAVE
Not Approved
Un Approved
V S PARADISE
Not Approved
Un Approved
UDAY RESIDENCY
Not Approved
Un Approved
UDAY RESIDENCY
Not Approved
Un Approved
GURU CONSTRUCTION
Not Approved
Un Approved
MULTI MERIDIAN
Not Approved
Un Approved
MULTI CORNER
Not Approved
Un Approved
SAI SAROVAR
Not Approved
Un Approved
SAI CHAITRA
Not Approved
Un Approved
NARAYANA ENCLAVE
Not Approved
Un Approved
ANTARA
Not Approved
Un Approved
SINGAPURA PARADISE
Not Approved
Un Approved
Not Approved
Un Approved
FCU IS NEGATIVE
MOHAN ENCLAVE
Not Approved
Un Approved
FCU IS NEGATIVE
ASHRAYA ENCLAVE
Not Approved
Un Approved
AMULYA ENCLAVE
Not Approved
Un Approved
ARCADIA
Not Approved
Un Approved
J J REGENCY
Not Approved
Un Approved
BUILDAFINA VISTA
Not Approved
Un Approved
Not Approved
Un Approved
PRISTINE PROPERTY
Not Approved
Un Approved
PEARL REGAL
Not Approved
Un Approved
FCU IS NEGATIVE
SRIKANTESHWAR NAGAR
Not Approved
Un Approved
NE CAPRICORN
Not Approved
Un Approved
NE VIRGO
Not Approved
Un Approved
RAGHURAM RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
HIMAVAT HOMES
Not Approved
Un Approved
Not Approved
Un Approved
ALPHA MANOHAR
Not Approved
Un Approved
AKSHAY RESIDENCY
Not Approved
Un Approved
ARYAN RESIDENCY
Not Approved
Un Approved
UDAYA NAGAR
Not Approved
Un Approved
ARUNA EXCELLENCY
Not Approved
Un Approved
Not Approved
Un Approved
V R HOMES
Not Approved
Un Approved
V R APARTMENTS
Not Approved
Un Approved
V R SHELTERS / V R RESIDENCY
Not Approved
Un Approved
V R CLASSIC
Not Approved
Un Approved
V R RESIDENCY
Not Approved
Un Approved
V R TERRACE
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
PRIYANKA HOMES
Not Approved
Un Approved
ELEGANCE OPAL
Not Approved
Un Approved
Not Approved
Un Approved
GREEN MEADOWS
Not Approved
Un Approved
Not Approved
Un Approved
SUNDHER GOVIND
Not Approved
Un Approved
RESIDENCE 9
Not Approved
Un Approved
KANAKA ECSTASY
Not Approved
Un Approved
RANKA NAGAR
Not Approved
Un Approved
SHANTINIKETAN
Not Approved
Un Approved
MAPLE AVENUE
Not Approved
Un Approved
INR 40 Mio
COMFORT PLANET
Not Approved
Un Approved
INR 40 Mio
COMFORT SHANTHI
Not Approved
Un Approved
Not Approved
Un Approved
SAMRADH ENCLAVE
Not Approved
Un Approved
FCU IS NEGATIVE
RUSSET
Not Approved
Un Approved
Not Approved
Un Approved
VASAVI NAGAR
Not Approved
Un Approved
PARAMOUNT ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
AMULYA ROYALE
Not Approved
Un Approved
SAI PARADISE
Not Approved
Un Approved
Not Approved
Un Approved
VASUNDHARA APARTMENTS
Not Approved
Un Approved
WINTER SUN
Not Approved
Un Approved
MARVEL RESIDENCY
Not Approved
Un Approved
PRESTIGE RICHMOND
Not Approved
Un Approved
KOUSTUBHAM
Not Approved
Un Approved
J D GARDEN
Not Approved
Un Approved
GOLD CITY
Not Approved
Un Approved
S R RESIDENCY APARTMENTS
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
CLASSIC COMFORTS
Not Approved
Un Approved
SAPTHAGIRI - IV
Not Approved
Un Approved
SAPTHAGIRI RESIDENCY-III
Not Approved
Un Approved
KRISHNA NEST
Not Approved
Un Approved
ELITE CITY
Not Approved
Un Approved
PRAKASH PRIDE
Not Approved
Un Approved
BALAJI PARADISE
Not Approved
Un Approved
BALAJI REGENCY
Not Approved
Un Approved
KRISHNEE NEST
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
CASA DIMODA
Not Approved
Un Approved
K S RESIDENCY
Not Approved
Un Approved
OM SAI S V CROWN
Not Approved
Un Approved
LABHITHA ENCLAVE
Not Approved
Un Approved
WIND CHIMES
Not Approved
Un Approved
LORVEN HOMES
Not Approved
Un Approved
J R GARDENS
Not Approved
Un Approved
Not Approved
Un Approved
PREM KUTIR
Not Approved
Un Approved
EURO VALLEY
Not Approved
Un Approved
Not Approved
Un Approved
ENVIRON CAUVERY
Not Approved
Un Approved
JAGAUAR MITRA
Not Approved
Un Approved
P S R GARDENS
Not Approved
Un Approved
GAYATRI PEARL
Not Approved
Un Approved
SAI SMRUTHI
Not Approved
Un Approved
VASAVI SHELTERS
Not Approved
Un Approved
KETHANA RESIDENCY
Not Approved
Un Approved
PARIMALA RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
KAILASH TOWERS
Not Approved
Un Approved
SANDHYA MANSION
Not Approved
Un Approved
THE RETREAT
Not Approved
Un Approved
THE RETREAT
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Y S APARTMENT
Not Approved
Un Approved
GREEN GARDEN
Not Approved
Un Approved
BLOOMING DALE
Not Approved
Un Approved
AAKAR RESIDENCY
Not Approved
Un Approved
KESHAB RESIDENCY
Not Approved
Un Approved
FANTASY GARDEN
Not Approved
Un Approved
Not Approved
Un Approved
SRINIDHI RESIDENCY
Not Approved
Un Approved
SHANKARSHA PARADISE
Not Approved
Un Approved
BTM RESIDENCY
Not Approved
Un Approved
BTM RESIDENCY
Not Approved
Un Approved
MAYA INDRAPRASTA
Not Approved
Un Approved
MONISHA MANSION
Not Approved
Un Approved
Not Approved
Un Approved
GALAXY
Not Approved
Un Approved
OBEL RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
NET CITY
Not Approved
Un Approved
Not Approved
Un Approved
OM SAI RESIDENCY
Not Approved
Un Approved
DOVE NEST
Not Approved
Un Approved
NIRMAL RESIDENCY
Not Approved
Un Approved
ANANDLOK
Not Approved
Un Approved
K B VILLAS APARTMENTS
Not Approved
Un Approved
TRINAY ENCLAVE
Not Approved
Un Approved
S R BLUE DIAMOND
Not Approved
Un Approved
SIMRAN ECSTASY
Not Approved
Un Approved
GREEN PARADISE
Not Approved
Un Approved
INDRA PRASTA
Not Approved
Un Approved
DASHARATH RAJ
Not Approved
Un Approved
VENKATADRI LAYOUT
Not Approved
Un Approved
VENKATADRI LAYOUT
Not Approved
Un Approved
CASSINA APARTMENTS
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
DREAM VIEW
Not Approved
Un Approved
Not Approved
Un Approved
10 DOWNING
Not Approved
Un Approved
EL DORADO PARK
Not Approved
Un Approved
POOJA APARTMENTS
Not Approved
Un Approved
SWASTIK DIAMOND
Not Approved
Un Approved
Not Approved
Un Approved
HARSHA PRIDE
Not Approved
Un Approved
SPRING VALLEY 2
Not Approved
Un Approved
Not Approved
Un Approved
SAIDEEP HARIZON
Not Approved
Un Approved
SAIDEEP HELICON
Not Approved
Un Approved
SIDDHANTH
Not Approved
Un Approved
SOWPARNIKA ADOBE
Not Approved
Un Approved
SAI SOWPARNIKA
Not Approved
Un Approved
SILVER FALLS
Not Approved
Un Approved
FANTASY GARDEN
Not Approved
Un Approved
Not Approved
Un Approved
DEEPIKAS RESIDENCY
Not Approved
Un Approved
PERODY NEST
Not Approved
Un Approved
PERODY PARADISE
Not Approved
Un Approved
VIJAYA KLENN
Not Approved
Un Approved
C K GARDEN LAYOUT
Not Approved
Un Approved
SHANKARASHANA PARASIDE
Not Approved
Un Approved
DOXADO ENCLAVE
Not Approved
Un Approved
BINNY CRESENT
Not Approved
Un Approved
VARSHA RESIDENCY
Not Approved
Un Approved
SUMANA RESIDENCY
Not Approved
Un Approved
ALSA ARBOUR
Not Approved
Un Approved
SNEHA SINDHU
Not Approved
Un Approved
APURVA EXQUISITE
Not Approved
Un Approved
Not Approved
Un Approved
WILSON VINTAGE
Not Approved
Un Approved
NANDI SUNRISE
Not Approved
Un Approved
M N K RESIDENCY
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SRAVAN ESTATES
Not Approved
Un Approved
AADHITHYA CITY
Not Approved
Un Approved
E-SPRING SEASONS
Not Approved
Un Approved
GREEK TOWN
Not Approved
Un Approved
SHREE HOMES
Not Approved
Un Approved
POLARYK ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
NATASHA GOLFVIEW
Not Approved
Un Approved
KRISHNAGIRI
Not required
Un Approved
S K TULIP
Not required
Un Approved
Not required
Un Approved
PRUTTHVI PARADISE
Not required
Un Approved
VISWHOTHAM ENCLAVE
Not required
Un Approved
AUGUST VENTURES
Not required
Un Approved
AUGUST PARK
Not required
Un Approved
MAANGALYA SURYODAYA
Not required
Un Approved
MAHAVEER BOWER
Not required
Un Approved
MAHAVEER SEASONS
Not required
Un Approved
MAHAVEER KONARK
Un Approved
MOTHER LAND
Not required
Un Approved
G H PARADISE
Not required
Un Approved
MAGNOLIA LASYA
Not required
Un Approved
S A SERENITY
Not required
Un Approved
VIMAL CLASSIC
Not required
Un Approved
NIRMALA VIHAR
Not required
Un Approved
LE ORCHID
Not required
Un Approved
BYSANI SKYWAY
Not required
Un Approved
TIMES SQUARE
Not required
Un Approved
CAUVERY COMFORTS
Not required
Un Approved
Not required
Un Approved
SYNAPSE NEST
Not required
Un Approved
CHAMUNDESHWARI SHELTERS
Not required
Un Approved
DEEPTI APARTMENTS
Not required
Un Approved
Not required
Un Approved
KRISHNA RESIDENCY
Not required
Un Approved
INDU RESIDENCY
Not required
Un Approved
L S NIVAS
Not required
Un Approved
GAYATHRI CUTE
Not required
Un Approved
KRISTAL CITRINE
Not required
Un Approved
R R NEST
Not required
Un Approved
SAFFRON SQUARE
Not required
Un Approved
ROOPEN COMFORTS
Not required
Un Approved
Not required
Un Approved
S V SPRING FIELDS
Not required
Un Approved
Not required
Un Approved
Not required
Un Approved
AAKRUTHI SOLITAIRE
Not required
Un Approved
Not required
Un Approved
SRINIDHI VINTAGE
Not required
Un Approved
SRINIDHI SIGNATURE
Not Approved
Un Approved
ASSET GARDENIA
Not required
Un Approved
RAGHAVENDRA ARISHT
Not required
Un Approved
PUJITHA HOMES
Not required
Un Approved
RAGHAVA RESIDENCY
Not required
Un Approved
SWANCLOSE ANNEX
Not required
Un Approved
Not required
Un Approved
SRIVEN TOWERS
Not required
Un Approved
S M ARCADE
Not required
Un Approved
TRINITY SUNRISE
Not required
Un Approved
Un Approved
PRIDE VATIKA
Not required
Un Approved
PRIDE VATIKA
Not required
Un Approved
Not required
Un Approved
FORTUNE SANTACLARA
Not required
Un Approved
SARAVANA AKSHAYA
Not Approved
Un Approved
NANDISH PARK
Not Approved
Un Approved
DE PRADIGM HEIGHTS
Not Approved
Un Approved
ROMA PEARL
Not Approved
Un Approved
CORONET
Not Approved
Un Approved
OXFORD SPIRES
Not Approved
Un Approved
IMPERIAL RESIDENCY
Not Approved
Un Approved
PARAMOUNT REGENCY
Not Approved
Un Approved
Not Approved
Un Approved
VINEYARD JASMINE
Not Approved
Un Approved
NITHYASHREE SANKALP
NOT APPROVED
Un Approved
V2 VASUNDHARA
NOT APPROVED
Un Approved
SANIA RETREAT
NOT APPROVED
Un Approved
DECCAN PALMS
Not Approved
Un Approved
SHREE APARTMENTS
Not Approved
Un Approved
GREEN PALMS
Not Approved
Un Approved
PARAGON RESIDENCY
Not Approved
Un Approved
TAJ RESIDENCY
Not Approved
Un Approved
CHRYSALIS PROJECTS
Not Approved
Un Approved
VISWAS RESIDENCY
Not Approved
Un Approved
SAGAR ELANTRA
Not Approved
Un Approved
V M MEADOWS
Not Approved
Un Approved
PRISM SOVEREIGN
Not Approved
Un Approved
CORAL NEST
Not Approved
Un Approved
CHARMING HEIGHTS
Not Approved
Un Approved
ABHISHEK RESIDENCY
Not Approved
Un Approved
THE ENVIRON
Not Approved
Un Approved
THE WILLIOWS
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
PRIME CITY
Not Approved
Un Approved
GANGA CHELSTON
Not Approved
Un Approved
VISHNU NILAYA
Not Approved
Un Approved
ANNAM RESIDENCY
Not Approved
Un Approved
SURYA RESIDENCY
Not Approved
Un Approved
PARAGON MEADOWS
Not Approved
Un Approved
LAKSHMI RHYTHM
Not Approved
Un Approved
Not Approved
Un Approved
BRINDAVAN RESIDENCY
Not Approved
Un Approved
HUTCHINS APARTMENT
Not Approved
Un Approved
RICHARDS APARTMENTS
Not Approved
Un Approved
CORAL COVE
Not Approved
Un Approved
1118RGMR
40,000,000
1145GRWD
4 crore
30,000,000
1083GUKL
20,000,000
1095CLPL
8,000,000
1095CLPL
8,000,000
1095CLPL
8,000,000
20,000,000
ASHOK RESIDENCY
1153ASHK
1 Cr
20,000,000
NAKSHATRA
1155NAKS
75 Lacs
2 Cr to start with
PRADHAN REGENCY
1156PRTH
Un Approved
2 Cr to start with
1160SAPH
1 Cr
2 Cr to start with
OASIS CHANDRA
1161OACA.
60 lacs
7,500,000
2 Cr to start with
OASIS DEW
1161OADE
40 lacs
2 Cr to start with
OASIS RESIDENCY
1161SSRS
1 Cr
FCU IS NEGATIVE
1164SRGU
FLUSHING MEADOWS
1172FLME
Un Approved
COMFORT PALACE
1181COPA
INR 20 Mio
Not Approved
Un Approved
20,000,000
SAMPURNA VI
Not Approved
Un Approved
20,000,000
PIONEER PARADISE
1149PNPR
INR 25 Mio to
start with
20,000,000
PIONEER PLANET
Not Approved
Un Approved
20,000,000
SAMPOORNA FIVE
Not Approved
Un Approved
20,000,000
SAMPOORNA 8
Not Approved
Un Approved
30 MIO
S S PARADISE
Not Approved
Un Approved
30 MIO
Not Approved
Un Approved
INR 40 Mio
40,000,001
10,000,000
30 MIO
S S LEGENDS CHOICE
Not Approved
Un Approved
30 MIO
SAI GREENS
Not Approved
Un Approved
30 MIO
S S GOVINDA VILLA
1186 SSGV
INR 10 Mio
1.5 crore
KRISHNA LILAC
1081KRLC
1.5 CRORE
10,000,000
RAJ OPAL
1075RJOP
10,000,000
RAJ MERIDIAN
Not required
Un Approved
10,000,001
RAJ PARADISE
Not required
Un Approved
30,000,000
NOT MENTIONED
Not Approved
30,000,000
Not Approved
Un Approved
30,000,000
Not Approved
Un Approved
30,000,000
Not Approved
Un Approved
30,000,000
Not Approved
Un Approved
PIONEER PRIDE
1149PRDE
1 crore
2 crore
10,000,000
NEGATIVE
BUILDER
ITTINA AKKALA
1094AKLA
15,00,000
6 Cr NEGATIVE
BUILDER
ITTINA SHIVAS
1094SHVS
25 Lacs
NEGATIVE
BUILDER
ITTINA ABBY
1094ABBY
INR 20,000,000
ITTINA ANU
1094IANU
NR 50 Lacs
NEGATIVE
BUILDER
ITTINA NEELA
1094NEEL
10,000,000
NEGATIVE BUILDER
AISHWARYA BLISS
1097AIBL
10,000,000
NEGATIVE BUILDER
AISHWARYA OPULENCE
1096AOPL
NEGATIVE BUILDER
AISHWARYA SIGNUM
1096SING
NEGATIVE BUILDER
AISHWARYA ORNATE
Not Approved
Un Approved
NEGATIVE BUILDER
AISHWARYA LOTUS
Not Approved
Un Approved
NEGATIVE BUILDER
AISHWARYA EXCELLENCY
1096EXLC
NEGATIVE BUILDER
AISHWARYA SPLENDOUR
Not Approved
Un Approved
NEGATIVE BUILDER
Not Approved
Un Approved
65 Lacs
NEGATIVE BUILDER
AISHWARYA
Not Approved
Un Approved
NEGATIVE BUILDER
AISHWARYA MAGNUS
1096AMAG
1 CRORE
NEGATIVE BUILDER
AISHWARYA SERENITY
Not Approved
Un Approved
NEGATIVE BUILDER
SURABHI APPARTMENTS.
1047SURB
NEGATIVE BUILDER
FLORIANA ESTATES
Not required
Un Approved
NEGATIVE BUILDER
Whispering Meadows
Not Approved
Un Approved
NEGATIVE BUILDER
SHUBHA
Not Approved
Un Approved
LAA HERITAGE
1110LAHE
1 crore
VIVEK PARADISE
Not Approved
Un Approved
DIVYA SAPTHAMI
Not Approved
Un Approved
DIVYA SPENCER
Not Approved
NA
DIVYA PARADISE
Not Approved
NA
ATHASHRI
Not Approved
Un Approved
20,000,000
BALAJI RESIDENCY
Not Approved
Un Approved
PRIDE PRISTINE
Not Approved
Un Approved
50,000,000
FERNS PARADISE
1001PRDS
5,000,000
50,000,000
FERNS PARADISE
1001PRDS
5,000,000
50,000,000
FERNS PARADISE
1001PRDS
5,000,000
50,000,000
FERNS PARADISE
1001PRDS
5,000,000
50,000,000
FERNS PARADISE
1001PRDS
5,000,000
50,000,000
FERNS ENCLAVE
1001ENCL
50,000,000
FERNS NEST
1001NEST
5,000,000
50,000,000
FERNS CITY
1001CITY
5,000,000
50,000,000
FERNS CITY
1001CITY
5,000,000
50,000,000
FERNS CITY
1001CITY
5,000,000
50,000,000
FERNS MEADOWS
1001MDWS
5,000,000
50,000,000
1001LKHM
5,000,000
50,000,000
FERNS RESIDENCY
1001RSDN
5,000,000
50,000,000
FERNS RESIDENCY
1001RSDN
5,000,000
50,000,000
FERNS RESIDENCY
1001RSDN
5,000,000
50,000,000
FERNS RESIDENCY
1001RSDN
5,000,000
50,000,000
RAINBOW DRIVE
Not required
50,000,000
RAINBOW DRIVE
Not required
50,000,000
RAINBOW DRIVE
Not required
50,000,000
RAINBOW DRIVE
Not required
50,000,000
RAINBOW DRIVE
Not required
50,000,000
RAINBOW DRIVE
Not required
50,000,000
FERNS PARADISE -2
Not required
Un Approved
50,000,000
ASPEN HEIGHTS
Not required
Un Approved
50,000,000
RAINBOW RESIDENCY
Not required
50,000,000
1001HABT
5,000,000
50,000,000
1001CSCM
5,000,000
50,000,000
1001RNBD
50,000,000
1001CITY
Not Approved
40,000,000
HYDE PARK
50,000,000
EMBASSY MEADOWS
Not Approved
EMBASSY TRANQUIL
Not Approved
Un Approved
EMBASSY HERITAGE
1027EMHR
5 crore
EMBASSY HABITAT
Not Approved
Un Approved
NOT MENTIONED
Not Approved
Un Approved
NOT MENTIONED
Not Approved
50,000,000
HERITAGE ESTATES
Not Approved
Un Approved
1035HRES
INR 40 Mio
40,000,000
JAIN CAMBRIGDE
1045CMBR
1 crore
40,000,000
1045PRKT
2.5 crore
10,000,000
SAMHITA CREEK
1061CREK
25 lacs
10,000,000
SAMHITA CRESCENT
1061CSCT
35 Lacs
10,000,000
SAMHITA RITZ
1061RITZ
10,000,000
Not Approved
10,000,000
SAMHITHA ORCHID
1061SOCH
INR 10 Mio
10,000,000
1061SSWD
INR 10 Mio
10,000,000
SAMHITA ENCALVE
NOT APPROVED
Un Approved
10,000,000
NOT APPROVED
Un Approved
SAMHITA SQUARE
40 Lacs
40,000,000
OAK YARD
1070OKYD
1 CRORE
40,000,001
Not Approved
Un Approved
MANYATHA RESIDENCY
1071MRES
1.5 CRORE
MANYATHA RESIDENCY
1071MRES
1.5 CRORE
MANYATHA RESIDENCY
1071MRES
1.5 CRORE
MANYATHA RESIDENCY
1071MRES
1.5 CRORE
10,000,000
AMOGH AMETHYST
1074AMGH
60 LAKHS
10,000,000
AMOGHA RESIDENCY
1074AMGH
40,000,000
PRIDE REGALIA
1175PRRE
INR 40 Mio
SAIBABA PROJECTS
Not Approved
Un Approved
PARADISE NEST
1087PRNS
2.5 CRORE
ARIANA
1090ARNA
2.5 crore
20,000,000
5,000,000
3.5CRORE, ( 10%
of the project
size)
35,000,000
VITHOLA
1101VITH
35,000,001
MYTRI RESIDENCY
Not Approved
Un Approved
25,000,000
AILSWORTH MEADOWS
Not Approved
Un Approved
INR 24 MIO
GEETHANJALI CLASSIC
1112CLSA
INR 10 Mio
INR 24 MIO
Not Approved
Un Approved
INR 24 MIO
GITHANJALI ICON
Not Approved
Un Approved
INR 24 MIO
GITHANJALI PRIDE
Not Approved
Un Approved
25,000,000
CRESCENT CEDAR
1114CEDR
75 lacs
25,000,000
CRESCENT CLASSIC
1114CLSC
75 lacs
25,000,000
CRESCENT OPULENT
1114OPLN
INR 20 Mio
25,000,000
CRESCENT MAGNA
1114MGNA
1 crore
25,000,000
CRESCENT CALIBRE
15,000,000
HINDUJA PARK
15,000,000
Not Approved
No upfront disbursals, disbursal to be stagewise
1115HPRK
1115LKFR
1.5 Crore
Un Approved
15,000,000
PALM GROOVE
Not Approved
VRINDA APARTMENT
1120Vrnd
30,000,000
SHRADDHA HEIGHTS
1123SRHT
75 lakhs
30,000,000
Not Approved
Un Approved
30,000,000
SHRADDHA RESIDENCY
Not Approved
Un Approved
30,000,000
Not Approved
Un Approved
30,000,000
Not Approved
Un Approved
30,000,000
Not Approved
Un Approved
Not Approved
Un Approved
50,000,000
Not Approved
Un Approved
50,000,000
SHREYAS RESIDENCY
Not Approved
Un Approved
7,500,000
50,000,000
SURAKSHA NIVAS
1125SKNV
I CRORE TO
START
WITH
50,000,000
MEGHANA HOMES
1129MGDM
2 CRORE
50,000,000
GOVINDAM
1129MGDM
2 CRORE
10,000,000
SAPTHAGIRI RESIDENCY
1130SPRS
75 LAKS
10,000,000
Not Approved
Un Approved
10,000,000
SAPTHAGIRI NIVAS
1130NVAS
INR 10 Mio
10,000,000
SAPTHAGIRI MEADOWS
Not Approved
Un Approved
10,000,000
Not Approved
Un Approved
10,000,000
SAI KUTEERA
Not Approved
Un Approved
10,000,000
SAPTHAGIRI ELITE
Not Approved
Un Approved
10,000,000
SAPTHAGIRI ENCLAVE
Not Approved
Un Approved
1 crore
1130SANI
2.40 crores
1 crore
Not Approved
Un Approved
2 crore
Not Approved
Un Approved
JANAJEEVA PARADISE
Not required
Un Approved
50,000,000
50,000,000
JANAJEEVA ENCLAVES
Not required
Un Approved
50,000,000
JANAJEEVA REGENCY
Not Approved
Un Approved
50,000,000
1136JJCL
50 LACS
50,000,000
Not Approved
Un Approved
50,000,000
Not Approved
Un Approved
50,000,000
1136JJNV
1.5 Cr
50,000,000
SCION REGENCY
1137REGY
60 LAKS
50,000,000
SCION VISTA
1137VIST
80 LAKS
50,000,000
SCION GOKUL
Not Approved
Un Approved
50,000,000
SCION COURT
Not Approved
Un Approved
50,000,000
SCION AVENUE
50,000,000
Not Approved
Un Approved
50,000,000
SCION NEST
Not Approved
Un Approved
50,000,000
SCION VILLE
Not Approved
Un Approved
SCION GLADE
Not Approved
Un Approved
SCION LAVENDULLA
Not Approved
Un Approved
NEELADRI RESIDENCY
20,000,000
DECCAN FIELDS
Not Approved
Un Approved
20,000,000
DECCAN MANOR
1150MANR
50LACS
20,000,000
DECCAN COMFORT
Not Approved
Un Approved
20,000,000
DECCAN TERRACE
Not Approved
Un Approved
20,000,000
DECCAN PRIDE
Not Approved
Un Approved
20,000,000
DECCAN SHELTERS
Not Approved
Un Approved
20,000,000
DECCAN PRIDE-II
Not Approved
Un Approved
TEMPLE MEADOWS
1152TPMS
10,000,000
1165SRSR
INR 50 MIO
2.5 crore
1166SARA
1 CRORE
INR 30 Mio
VISHAL RESIDENCY
Not Approved
Un Approved
INR 30 Mio
VISHAL ENCLAVE
Not Approved
Un Approved
INR 30 Mio
VISHAL MANOR
Not Approved
Un Approved
INR 30 Mio
VISHAL NEST
1170VINE
INR 15 Mio
INR 40 Mio
RAMKY SAMRUDDHI
1182RASA
INR 15 Mio
INR 40 Mio
Not Approved
Un Approved
INR 40 Mio
NOT MENTIONED
Not Approved
Un Approved
30,000,000
KRISHNA DIAMOND
1183DAMD
30,000,000
INR 80 MIO
NIRVANA
1188NRVA
INR 50 MIO
I LIFE
Not Approved
Un Approved
OM SAI BRINDAVAN
Not Approved
Un Approved
50,000,000
GULMOHAR RESIDENCY
Not Approved
Un Approved
EUPHORIA
Not Approved
Un Approved
AKME ENCORE
Not Approved
Un Approved
N D SEPAL
Not Approved
Un Approved
N D PASSION
Not Approved
Un Approved
N D ASCENT
Not Approved
Un Approved
KALYAN KALSEY
Not Approved
Un Approved
MEENAKSHI MANGALAM
Not Approved
Un Approved
NIRMAL JYOTHI
Not Approved
Un Approved
NAUTILUS CUGNET
Not Approved
Un Approved
Not Approved
Un Approved
DONATA ECSTASY
Not Approved
Un Approved
KARISHMA PARADISE
Not Approved
Un Approved
SRIVARI ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
SAMHITHA CASTLE
DEACTIVATED
DEACTIVATED
DEACTIVATED
CHARTERED CORONET
1179CHCO
Un Approved
ESTEEM GARDENIA
1069ESGN
2 Cr
MATHRUSREE RESIDENCY
1174MASH
MOTATI MEADOWS
1163MOME
INR 1 crores
20,000,000
N D GIPFEL
1116GPFL
50lacks
30,000,000
PARIWAR PEARL
Not Approved
Un Approved
30,000,000
PARIWAR PRINCE
Not Approved
Un Approved
40,000,000
INR 25 Mio
INR 8 MIO
ARCHITHA HOMES
Not Approved
Un Approved
INR 8 MIO
HOME ARCHITHA-II
1189ARC2
INR 8 MIO
INR 8 MIO
Not Approved
Un Approved
1crore
ROYAL HERMITAGE
1064HERM
2 crore
1082WTCT
2 crore
2 crore
1082WTCT
2 crore
4 Crore
ROYAL RESIDENCY
Not Approved
4 Crore
Not Approved
Un Approved
4 Crore
PEACE CORNER
Not Approved
Un Approved
4 Crore
1064RLK3
3 Crore
4 Crore
Not Approved
Un Approved
4 Crore
Not Approved
Un Approved
4 Crore
Not Approved
Un Approved
4 Crore
SIGMA
Not Approved
Un Approved
5 Crore
R S GREEN WOODS
Not Approved
Un Approved
5 Crore
Royal Heights
Not Approved
Un Approved
70,000,001
SKYLARK ENCLAVE
Not Approved
Un Approved
40,000,000
1022WHWD
40,000,000
40,000,000
1022WHWD
40,000,000
40,000,000
1022WHWD
40,000,000
40,000,000
Not Approved
40,000,000
VAKIL MARINA
Not Approved
40,000,000
1022GRDN
INR 70 MIO
40,000,000
1022CLBC
75 LAKS TO
START WITH
40,000,000
VAKIL HAMLET
1022HMLT
INR 40 Mio
40,000,000
NOT MENTIONED
Not Approved
Un Approved
Not Approved
Not Approved
Un Approved
Not Approved
Un Approved
NA
SRK ENCLAVE
Not Approved
Un Approved
NA
ATULYA
Not Approved
Un Approved
NA
ETA GARDENS
Not Approved
Un Approved
Un Approved
Not Approved
Un Approved
Un Approved
MOON MIST
Not Approved
Not APPROVED
JAINS SANKALP
NA
NANDA GLORY
Not Approved
Not Approved
LISHA VISTARA
Not Approved
Not Approved
LISHA PARADISE
Not Approved
Not Approved
GURUPRIYA KIRAN
Not Approved
Not Approved
RAGHAVENDRA HILLS
Not Approved
Un Approved
ALTURA
Not Approved
Un Approved
SORINA
Not Approved
Un Approved
BRUNDAVAN PRESIDENCY
Not Approved
Un Approved
SANNIDHI PARADISE
Not Approved
Un Approved
ESTEEM CLASSIC
Not Approved
Un Approved
ESTEEM ENCLAVE
Not Approved
Un Approved
ROYAL MANNAR
Not Approved
Un Approved
SUNDARA RESIDENCY
Not Approved
Un Approved
SREE PRIDE
Not Approved
Un Approved
SALARPURIA SERENITY
Not Approved
Un Approved
PARAS MANE
Not Approved
Un Approved
Not Approved
Un Approved
BYARAPPA RESIDENCY
Not Approved
Un Approved
S R ENCLAVE
Not Approved
Un Approved
Not Approved
Un Approved
Not Approved
Un Approved
LAKE VIHAR II
Not Approved
Un Approved
Not Approved
Un Approved
SAMRUDDHI EASTLYNNE
Not Approved
Un Approved
ALMOND TREE
Not Approved
Un Approved
Not Approved
Un Approved
CLASSIC DIBOOR
Not Approved
Un Approved
SURAKSHA JASMINE
Not Approved
Un Approved
Not Approved
Un Approved
SNEHA GRADEUR
Not Approved
Un Approved
SNEHA SPLENDOR
Not Approved
Un Approved
ALTHENA
Not Approved
Un Approved
ANTILA
Not Approved
Un Approved
SRK GARDEN
Not Approved
Un Approved
ROHAN MIHIRA
Not Approved
Un Approved
SALVIA REVERIE
Not Approved
Un Approved
SAI SATYAM
Not Approved
Un Approved
ORANGE VILLA
Not Approved
Un Approved
THE VILLA
Not Approved
Un Approved
REGENCY DILLOZE
Not Approved
Un Approved
NANDI ELITE
Not Approved
Un Approved
MYTHRI MAIDEN
Not Approved
Un Approved
PAVANI MARVEL
Not Approved
Un Approved
INNOVATIVE FLORA
Not Approved
Un Approved
RATHNA NEST
Not Approved
Un Approved
G R LAVENDER
Not Approved
Un Approved
NA
SLS SYMPHONY
Not Approved
Un Approved
NA
SURAKSHA FAIRVIEW
Not Approved
Un Approved
NA
KNS SAMARPAN
Not Approved
Un Approved
NA
Not Approved
Un Approved
NA
Not Approved
Un Approved
NA
Not Approved
Un Approved
NA
Not Approved
Un Approved
NA
COMFORT ARIZONA
Not Approved
Un Approved
NA
K B APARTMENTS
Not Approved
Un Approved
NA
AJMERA INFINITY
Not Approved
Un Approved
NA
Not Approved
Un Approved
NA
HERITAGE 7
Not Approved
Un Approved
NA
CENTURY CELESTE
Not Approved
Un Approved
NA
PROVIDENT WELWORTHCITY
Not Approved
Un Approved
NA
Not Approved
Un Approved
NA
SOVEREIGN UNNATHI
Not Approved
Un Approved
NA
Not Approved
Un Approved
NA
SIMS MANOR
Not Approved
Un Approved
NA
NAGARAJUNA MEADOWS
Not Approved
Un Approved
NA
PARAMOUNT PILATUS
Not Approved
Un Approved
NA
SUGUNA OPAL
Not Approved
Un Approved
NA
SAI RESIDENCY
Not Approved
Un Approved
COMMENTS
PROJECT ADDRESS
SENT DATE
SY NO62/1
katha 103 9old no 260 ) vignana nagar kaggadasapura village k r puram hobli bangalore
1) Nocmc
upfront
disbursals,
disbursal to be
stagewise,
parallel funding
Vinyas Nagar,Vinayak Nagar ph1 & 2,Jigani Hobli,Anekal taluk,Bangalore-06
6) Retain 10% of
loan and the
Katha No. 762 Flat No.307, II CROSS, 5TH MAIN,
Stamp duty/
regn cost till
JAGADEESH NAGAR, VIBHUTHIPURA, BANGLORE EAST
registration
TALUK.
khata No 178/3 and 178/2 16TH D MAIN ROAD, KODIHALLI, VARTHUR HOBLI, BANGALORE
11.08.2004
NO 509/1 & 561/1 KONENA AGRAHARA VARTHUR HOBLI BANGALORE EAST TALUK
Sy No - 18/1,Kaikondanahalli,off.Sarjapur road,
Varthur Hobli,Bangalore
disbursal to be
stagewise/custo
mer
equity upfront.
LTV to Market
value to be 75%
Sy No 341,Begur village,Bangalore .
Sy no-222/1,222/1,Bommasandra,anekal taluk,Bangalore
Sy No-13/3,Kembathanahalli Road,Pilaganahalli,Gottigere,
Off.Banneraghatta Road,Bangalore-83
Sy No 7/1A,KembathahalliRoad,Pillaganahalli,Gottigere,
Off.Banneraghatta Road,Bangalore-83
No-256/2,kaggadaspura Village,Bangalore.
No-314/8,Domlur Layout,Bangalore.
Sy No./(9/2),6/4,6/3,7/3,6/1,6/4,K.Narayanapura
Village,K.R.Puram Hobli,Bangalore South Talih.
stage wise
disbu/cust
equity
upfront/Loan to
Market Value is
80%
Sy No.21/22/42/52,Jakkasandra,Koramangala 4th
Block,Begur Hobli,Bangalore South Taluk.
Sy No.3/1,Kaikondanahalli,Sarjapur Road,Varthur
Hobli,Bangalore South Tq.
Sy No - 137,kammanahalli village,Bangalore
Sy No-13,Ejipura village,Begur,Hobli,Bangalore
No - 3,Doresanipalya,Bilekahalli,Dhakle,Begur,Hobli,Bangalore.
Sy No-428/1,430/1,436/1/2,Kempapura Agrahara
stage wise disbu/cust equity upfront
Village,9th Cross,Prashanth nagar,Bangalore
Sy. No.8/2A&9, Pilaganahalli Village,J P Nagar9th Phase extension, Uttarahalli Hobli, Bangalore South Taluk
19.04.05 / 27.0
SY.No. 57, 57/27, 17th cross, and 18th cross, N S Palya, Bangalore
PARALLEL
FUNDING
ALLOWED/DISB
STAGEWISE
Sy.No.343/2 and 343/3, begur village, begur hobli, bangalore south taluk
Site No.2, Khata No.268, 30/2 and site No.1
, BNP Khata No.1, 268/2 - 1, 6th Cross,
Kaggadasapura,village, K R Puram Hobli, Bangalore south
taluk
Sy.342/1, and 342/5, Begur Village, Begur Hobli, Bangalore east Taluk
Sy.No. 23/1, Golla Halli Village, Kanaka Pura Raod, Bangalore 560062
KATHA No.(new No.)- 32, Old No.8, Sy.No32, Sheenappa Layout, Dyavasandra, Kasaba Hobli, Bangalore North Taluk
Sy.No.99/1, 99/2 & 100/1B, Horamavu Village, K R Puram Hobli, Bangalore Est Taluk
FCU REFER
1. No upfront
FCU REFER
disbursals,
stagewise
disbursal,
customer equity
upfront. No
FCU REFER
parallel
funding.6.
Retain 10% till
registration
.FCU REFER
FCU REFER
FCU REFER
Composite No.2/A, Geddalahalli , Devansandra Seenappa Layout, New BEL Road, Corpn Ward No.100, B'lore
KACHARAKANAHALLI, KAMANNAHALLI,
BANGALORE NORTH TALUK - 84
Sy No-117/12,Koramangala,Begur Hobli,Bangalore
1. No upfront
disbursals, but
parallel
funding.6.
Retain 10% till
registration .
stage wise
disbu/cust
equity upfront
No.312 (P-1), Kenchanahalli/Halagevoderahalli, Kengeri
Hobli,
Bangalore South Taluk, Rajarajeshwari Nagar, Bangalore
SY.No.85/1,90/2,Kammanahalli Village,Begur
Hobli,Bangalore
Site No.14,Khata No. 171/B, bangalore South taluk,
and sy.No. 49/2, Abbaiah reddy layout kagadasapura, K R
puram Bangalore
No.8,11th Main,Malleshwaram,Bangalore-560003.
FCU NEGATIVE
FCU NEGATIVE
FCU NEGATIVE
Site bearing 48,49,50, Katha No.351,241 & 353, Sy No.131/2 Horaqmavu Village, K R Puram Hobli, Bangalore East
SITE NO.48,49 AND 50 KATHA NO.351,352,353
SY NO.131/2, HORAMAU VILLAGE, K R PURAM HOBLI
BANGALORE
FCU REFER
FCU REFER
FCU REFER
No upfront
disbursals,
disbursal to be
stagewise,
customer equity
upfront
SY NO.104/1,104/2,104/3,104/4,104/5,104/6,104/7,
GOTTIGERE VILLAGE, UTTARAHALLI HOBLI BANGALORE
FCU NEGATIVE
NO 141 SARAKKIKERE VILLAGE UTTARAHALLI HOBLI BANGALORE SOUTH TALUK
FCU NEGATIVE
FCU NEGATIVE
FCU NEGATIVE
MALATHAHALLI YESHWANTHAPURA
HOBLI BANGALORE
06.09.2004
FCU NEGATIVE
FCU NEGATIVE
07.08.2004
13.08.2004
NOS 18, 1 8/1, 19,20, 21, 22, 23, 24, &25 OLD NO.174
KATHA NO.637
VIBHUTHIPURA VILLAGE, K R PURAM HOBLI BANGALORE
SITE NO.2,3,4,5 NEW NO.22, CHURCH STREET,
MURGESHPALYA
MAIN ROAD, VARTHUR HOBLI BANGALORE
101/2-5 101/2-4
101/2-3 101/2-2
& 101/2-1
PATTANDUR
AGRAHARA
VILLAGE K R
PURAM HOBLI
BANGALORE
EAST TALUK
Sales to give
data to Initiate
FCU
Sales to give
data to Initiate
FCU
No.7,Sy No.164/1-7,Doresandrapalya,Bilekahalli
village,Begur Hobli,Bangalore.
Huskur Gate,Opp APMC Yard,Electroniic City,Bangalore560068.(Sy No.60/9,60/10,60/11,60/13 & 60/14,Hebbagodi
Village,Attibele Hobli,Anekal Taluk).
Sy No 61,Yadavanahalli,Attibele,KIADB Industrial
Area,Anekal Taluk,Bangalore
Sy No.68,Doddakallasandra Village,Uttarahalli
Hobli,Bangalore South Taluk.
DISB
STAGEWISE/
CUST EQUITY
UPFRONT
Sy No.81/20,82/1,83/3,86/2 &
178/2,175/1,173,174/3,174/1B,80/2B,83/2 and
81/2B,Kothanur Village,Uttarahalli Hobli,Bangalore South.
Katha No.4,Mestripalya,ward
no.68,Koramangala,Bangalore.
Site No.24, 25 and 26, 80' Main Raod, Kodi halli village,
Bangalore 560017
FCU NEGATIVE
Sales to give
data to Initiate
Customer equity
FCU
up front/disb
stage wise
Sales to give
data to Initiate
FCU
Customer equity
up front/disb
stage wise Sales
to give data to
Initiate FCU.
Sy No.373/1,375/5,6,7,8,376/1,2,3,4,377/1,Begur
Village,Begur Hobli,Bangalore South Taluk.
No upfront
disbursals,
disbursal to be
stagewise,
customer equity
upfront .
PARALLEL
FUNDING AND
STAGEWISE
DISBU
No upfront
disbursals,
disbursal to be
stagewise,
customer equity
upfront
Flat No. 2, ff, Unique Apts. #10, Erappa Garden, Adj.SBI Austin town, Ward No.71, Bangalore-47
ALL THE
RELEVANT
ORIGINAL
DOCUMENT OF
TITLE HAVE
BEEN VERIFIED
BY MS. VANILLA
ADVOCATE THE
SAME ARE IN
ORDER.
FCU NEGATIVE
FCU NEGATIVE
FCU NEGATIVE
FCU NEGATIVE
SY NOS. 11, 12/1, & 20 SITUATED AT KYLASANAHALLI VILLAGE, JIGANI HOBLI, ANEKAL TALUK, BANGALORE DISTRICT
Sy.nos.50/1, 47/4, 51, 46/2, Kyalasanahalli Village, Jigani Hobli, Anekal Taluk, Bangalore District. (BMRDA APPROVED).
12.01.05/ 21.01
SY.NOS.89,90&100 SITUATED IN SINGAPURA VILLAGE, YELAHANKA, HOBLI, BANGALORE NORTH TALUK, BANGALORE
NO.8/3 KEMPAPURA VILLAGE, YELHANKA, HOBLI, BANGALORE NORTH TALUK, NEW NO.20&21
23.09.2004
no 1174 municipal no 11-a 1 main road ambedkar colony kaval byrasandra kasaba hobli
23.09.2004
bang north taluk
SY NO 51/2 & 51/3 KAVALBYRASANDRA VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
23.09.2004
FCU REFER
Customer OCR
upfront. 6) Sale
deed to be
tracked within
90 days of the
completion of
the property
and SKR to be
tracked
accordingly.
O,450&451(OLD NO.308/139/1B&142/1A3)PATTANDUR AGRAHARA VILLAGE, KR PURAM HOBLI, BANGALORE EAST TALUK
NO 7 PROP NO 33/1 MUNICIPAL NO 33/1-3 & 33/1-4 NEW COMPOSITE NO 33/1-4 BANASWEADI ROAD EXTENSION
NO, 25,26,27,78,79,&80 SITUATED AT CHINNAPPANAHALLI VILLAGE KR PURAM HOBLI BANGALORE EAST TALUK
SY.NO18, KODIGENAHALLI VILLAGE YELHANKA HOBLI, BANGALORE NORTH TALUK BYATARAYANAPURA, BANGALORE
SY NO 3/1,3/2 CHOODENA PURA VILLAGE KENGERI HOBLI ADJ TO BSK 6 PHASE BANGALORE 560060
SY NO.4/4 SARAKKIKERE VILLAGE, UTTARAHALLI HOBLI, BANGALORE SOUTH TALUK BOMANAHALLI, BANGALORE
O 1 OLD KHARA NO 666/10 HL 364/20 CMC 364/20 NEW 232 AREKERE VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
NOS 3,4,5 & 6 OLD NO 261 /1A PROP NO 92/1 KAGGADASAPURA DHAKALE K R PURAM HOBLI BANGALORE EAST TALUK
NO 146 MALLESHPALYA VILLAGE KAGGASADAPURA DHAKLE K R PURAM HOBLI BANGALORE EAST TALUK
SY NO.51&52,CMC KATHA NO.230, KAGGADASAPURA VILLAGE KR PURAM HOBLI BANGALORE EAST TALUK
SYNO.19/1&19/2, 19/4 (OLD NO. 19/1) KADABAGERE VILLAGE DASASNAPURA HOBLI BANGALORE NORTH TALUK
LD MUNICIPAL NO 441/11 NEW MUNICIPAL NO 11 VIII CROSS ROAD MAHALAKSHMI LAYOUT CORPOR WARD NO 10 BANGALO
2. Sale deed
1,2,13
to be&tracked
14 KHATHA
within
NO90
188/3
daysHORAMAVU
of the completion
VILLAGE
ofKthe
R PURAM
property
HOBLI
and SKR
BANGALORE
to be tracked
EAST accordingly.
TALUK
SY NOS 40/1 & 40/2 RAYASANDRA VILLAGE KASABA HOBLI DEVANAHALLI TALUK BANGALORE DISTRICT
NO 3,4,5 OUTER RING ROAD MARATH HALLI VARTHUR HOBLI BANGALORE SOUTH TALUK BANGALORE 37
NO.36(OLD NO.13/27/1), KADIRENAHALLI MAIN ROAD (SUBRAMANYAPURA MAIN ROAD), KANAKA HSBC, BANGALORE
SY NO 50 CMC KATHA NOS 1726 & 1906, MYLASANDRA VILLAGE KENGERI HOBLI BANGALORE SOUTH TALUK
NO 94/7, 94/4A, 95/1A, 94/4B, 95/1B 93/6, 94/6, 94/5, 94/8, ARSHINAKUNTE VILLAGE KASABA HOBLI NELAMANGALA TALUK
NO 3 & 4 VP KATHA NO 709 CHOLANAYAKANAHALLI VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
NOS 4 4A & 4B GEDDALAHALLI VILLAGE BHOOPASANDRA VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
EMPLOYEES HOUSE BUILDING SOCIETY LTD VISHVESHWARAIAHNAGAR ( GANGENAHALLI ) NO 687 HMT LAYOUT V V NAGA
NO 1 KATHA NO 192 SY NO 8/3 NAGASETTYHALLI VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
NO 22, 23, 24 & 25 KATHA NO 30/2B NAYANAPPASHETTYPALYA VILLAGE BEGUR HOBLI BANGALORE
& 3 CMC KATHA NO 205 ( OLS NO 11) SITUATE AT PUTTENAHALLI VILLAGE UTTARAHALLI HOBLI BANGALORE SOUTH TALUK
O 9, 1ST CRS, SREE LAKSHMI VENKATESHWARA LYT, MUNNEKOLALA, NEAR LAKSHMI NARAYANASWAMY TEMPLE, B'LORE
SY NO 12/4 12/5 DODDAKANNELLI VILLAGE VARTHUR HOBLI BANGALORE EAST TALUK BANGALORE
SY NO 139/1P-4 SARVABHOUMA NAGAR BILEKAHALLI VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
AJA MAHAL LAYOUT, PRESENTLY BEARING MUNICIPAL NO. 29, OLD TUMKUR ROAD, RAJ MAHAL VILAS, RAMANE NAGAR, WA
MPOSITE MUNICIPAL NO .30(OLD NOS 30,25,26,29& 113) M S RAMAIAH ROAD GOKULA,IN CORPORATION WARD NO 2,BAN
26 JATAPPA LAYOUT YELACHANAHALLI VILLAGE KANAKAPURA MAIN ROAD UTTARAHALLI HOBLI BANGALORE SOUTH TALUK
2292/2 V P KATHA NO 3625 CMC KATHA NO 91 KACHARAKANAHALLI VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
NO 5 & 6 CARVE OUT OF SY NO 1/2B & 1/5 HEBBAL VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
ATHA NO 549 552,555 NEW CMC KATHA NOS 312, 314 & 361 AREKERE VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
O 119 & SITE BEARING NO 8A,ASSIGNED PROPERTY NO 85/8A,CMC KHATHA NO 120,CARVED OUT OF LAND BEARING SY NO
NO 182, 7TH CRS, NOBO NGR, OFF KAMMANAHALLI MN, BANNERGHATTA, B'LORE
upfront
IER NO. and
137 stage
OF PROPERTY
wise disbursal
NO. 65),
asCMC
per stage
KATHAofNO.
construction.
804/161/65-770,
6. Retain
CHIKKALASANDRA
10% till registration
VILLAGE,
.FCUUTTARAHALLI
NEGATIVE
HOBLI, BA
SITE BEARING NOS. 25 & 26 PANDURANGA LAYOUT, NEAR HSBC,BANNERGHATTA ROAD BANGALORE-79
ING NOS. 29 & 29/1(OLD NO 30.OLD CMC KH NO.541), TANK BUND ROAD N.S.PALYA,IN CORPORATION WARD NO.65,BANGA
SY NO 207/1 208/1 & 207/2 MARASUR VILLAGE KASABA HOBLI ANEKAL TALUK BANGALORE
89 & 90 KATHA NOS 1284/89 & 1284/90 KAVALBYRASANDRA VILLAE KASABA HOBLI BANGALORE NORTH TALUK
Penetrate
NO 6 NEW: NO
10 %
15 PID NO 70 -9-6 ANDREE ROAD SHANTINAGAR IN CORPORTION WARD NO 70
0/1 75/1 76 70/2B 75/7 76 78/2 70/2 78/1 78/3 78/5 47 52/2 78/4 HAROHALLI VILLAGE YELAHANKA HOBLI BANGALORE NOR
FCU IS NEGATIVE
NO 1201 BILEKAHALLI VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
FCU IS NEGATIVE
64/1 & 64/2 AGRAHARA VILLAGE YELHANKA HOBLI BANGALORE NORTH TALUK
NO 55/9 & 55/15 KATHA NO 1060 THINDLU VILLAGE YELAHANKA HOBLI BANGALORE NORTH TALUK
ewise disbursal,
SY NOcustomer
51 NADAGONDANA
equity upfront.
GOLLA
NoHALLI
parallel
BIDARA
funding.
HALLI
6. Retai
HOBLI BANGALORE EAST TALUK BLORE 49
SY NO 204 & 55 HALAGEVADERAHALLI VILLAGE 7 PATTANAGERE VILLAGE KENGERI HOBLI BANGALORE SOUTH TALUK
SY NO 51/1, 52, 57/1 & 75, KADATHANAMALE VLG, HESARAGHATA YELAHANKA TALUK, B'LORE
NO 3 LALBAGH ROAD
SY NO 60/4 & 61/1 NAGASETTIHALLI VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
NO 50/1A KATHA NO 512 NAGAVARA VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
NEW MUNICIPAL NO. 17/7-130, YELLAPPA GARDEN, BSK III STAGE, WARD NO. 56, BANGALORE
SY NO 68/1-2 3-4 69/1-2-3 OF NAGARABHAVI VILLAGE YESHWANTHPURA HOBLI BANGALORE NORTH TALUK
Y NO 19/3 NEW SY NO 19/3 19/13A1 19/3A2 & 19/3B MUNNEKOLALU VILLAGE VARTHUR GHOBLI BANGALORE EAST TALUK
CMC KATHA NO 929 MUNNEKOLALA VILLAGE VARTHUR HOBLI BANGALORE EAST TALUK
NO 1/A ( OLD NO 183 KATHA NO 183/A-3 KAGGADASAPURA VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
4,15,18,19,20,13
FCU IS
&NEGATIVE
17 121/3 & 120/3 KATHA NO 845 KAGGADASAPURA VILLAGE K R PURAM HOBLI BANGALORE EAST TALU
SY NO 66/1 73/1 & 73/4 IGLOOR VILLAGE ATTIBELE HOBLI ANEKAL TALUK BANGALORE
NO 19,20,21,22,23, 32 & 36 KHATHA NO 1978 BANNETGHATTA ROAD BILEKAHALLI VILLAGE BEHIND HSBC BEGUR HOBLI
SY NO 93 CMC KATHA NO 1721 KOWDENAHALLI VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
SY NO 55/7A CMC KATHA NO 233 HARALUKUNTE VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
THA NO 470/9 TO 10 GARUKAMANTHANA PALYA BYRASANDRA DAKHLE HASB AREA K R PURAM HOBLI BANGALORE EAST T
119/2 120/1 120/2 117/1 117/2 117/3 A B C 117/4 117/5 & 117/6 TARABANAHALLI VILLAGE JALA HOBLI BANGALORE NORTH
SY NOS 56 63/3 63/1 63/2 64 100 & 65 NAVARTHNA AGRAHARA VILLAGE JALA HOBLI BANGALORE NORTH TALUK
SY NO 163/2 CMC KATHA NO 963 VIBHUTHIPURA VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
CMC KATHA NO 350/26/31 PUTTENAHALLI VILLAGE UTTARAHALLI HOBLI BANGALORE SOUTH TALUK
SY NO 54/3A 54/2 56/1 YELHANAHALLI VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
02.02.05 /02.05
1317 ( OLD KATHA NO 538/538/682) KHANESHUMARI NO 22 MALAGALU VILLAGE YESHWANTHAPURA HOBLI BANGALORE N
SY NO 276/3 KATHA NO 261 KADUGODI VILLAGE BIDARAHALLI HOBLI BANGALORE EAST TALUK
364/20 CMC PROPERTY NO 364/20 NEW CMC KATHA NO 232 ARAKERE VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
NO 149/2 CMC KATHA NO 1124 VIBHUTHIPURA VILLAGE K R PURAM HOBLI BANGLORE EAST TALUK
NO 884/742/11886/742/13 887/742/14 & 888/742/15 R K LAKE VIEW BOMMASANDRA VILLAGE ATTIBELE HOBLI ANEKAL TA
SY NO 10/11E CMC KATHA NO 300 301/10/11E LOTTEGOLLAHALLI VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
49 112/33A 112/33 112/31 & 112/32 KATHA NOS 306A 306/B 306/C & 306/D SY NO 112 SINGASANDRA VILLAGE BEGUR HOB
LAKE VIEW STREET VISHWAJEETH LAYOUT KAGGADASAPURA VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
SY NO 198 & 199 KANNAMANGALA VILLAGE BIDARAHALLI HOBLI BANGALORE SOUTH TALUK BANGALORE
SY NO 33/1, 35(P), 39/3, 40/1, 41, 42, TO 51, 159, SHIDIHOSAKOTE VLG, SURAGAJAKANATH VLG,
8/1 30/1 & 31/1 SITE BERING 6 5 4 3 7 & 2 SY NO 186/1 EARLER NO 38/1A 34/1A 33/1 32/1 & 27/1A NO 186/1-1 C V RAMAN
NO 15 16 17 OLD HASB KATHA NO 42/1 MALLESHPALYA K R PURAM HOBLI BANGALORE SOUTH TALUK
3 4 & 5 NO 46/38/2 46/38/3-4 CMC KATHA NMO 9 10 11 MUNNEKOLALU VILLAGE VARTHUR HOBLI BANGALORE EAST TALUK
SY NO 45/3B B CHANNASANDRA VILLAE RAMAMURTHY NAGAR K R PURAM HOBLUI BANGALORE EAST TALUK
Sy.no.116/1, CMC katha no.466, Bilekahalli village, Begur hobli, Bangalore South Taluk, Bangalore
103 10TH CROSS BELLARY ROAD OPPOSITE TO CBI OFFICE GANGANAGAR BANGALORE
SY NO. 26/1, 26/2, 26/3, 26/6, 26/7, & 26/8, SUNKAL FARM RD, ADUGODI VLG, BEGUR HOBLI, B'LORE
SY NO 14/1A 14/1B & 329 MARASUR VILLAGE KASABA HOBLI ANEKAL TALUK
EGARNAHALLI VILLAGE ATTIBELE ANEKAL TALUK BANGALORE SY NO 103 & 106 NERALUR VILLAGE ATTIBELE HOBLI ANEKA
OS 1183/912 & 757/913 THE VIJAYA BANK EMPLOYEES HOUSING CO-OPERATIVE SOCIETY BILEKAHALLI VILLAGE BEGUR HOB
SY NO 42/1 SHANTHI LAYOUT KOWDENAHALLI VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
-2 2ND FLOOR SAI CHARAN APARTMENTS GREEN PARK AVENUE 10TH CROSS OFF RAMURTHY NAGAR MAIN ROAD BANGALO
FCU
SY
REFER
NO 113/1B KUNDALAHALLI VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
NO 154/4 CMC KH NO 726 BILEKAHALLI VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
NO 3 & 4 KHATHA NO 8/2/3 & 8/2/4 WARD NO 19 BOMMANAHALLI CMC AREKERE VILLAGE BEGUR HOBLI BANGALORE
NO 139/28 & 139/30 DOMLUR VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
NO 3, 1ST B CRS,KAGGADASAPURA MN, SY # 35, 36, 37 38 & 39, B NARAYANAPURA VLG, K R PURAM, B'LORE
SYNO17 NEW 17/2 NO1/99 MUNNEKOLALU VILLAGE VARTHUR HOBLI BANGALORE EAST TALUK
LIKUNTE VILLAGE BEGUR HOBLI,BANGALORE SOUTH TALUK,WITHIN THE REVENUE JURISDICTION OF CMC,BOMMANAHALLI
FCU NEGATIVE
NO 88/4 /156/8A1 HULIMAVU VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
FCU NEGATIVE
34/2 KAMMANAHALLI VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
NO 7/3/1 B& 7/3/2 KATHA NO 246 SY NO 7/3 THUBARAHALLI VILLAGE VARTHUR HOBLI BANGALORE EAST TALUK
SY NO 73/2 KATHA NO 810 CHIKKAKALLASANDRA VILLAGE UTTARAHALLI HOBLI BANGALORE SOUTH TALUK
adasapura village, K R Puram Hobli, Bangalore East Taluk, Presently bearing new Municipal no.57/1-156, kaggadasapura,
MUNICIPAL NO. 112/1 & 112/2-1, C V RAMAN NAGAR, KAGGADASAPURA, WARD NO. 83, BANGALORE.
LORE. PRESENTLY BEARING MUNICIPAL NO. 37/1, KODIHALLI MN RD, WARD NO. 74, BANGALORE. AND SOURTHERN HALF P
SY NO. 97 & 98, HOODI VILLAGE, K R PURAM, HOBLI, BANGALORE EAST TALUK, BANGALORE,
48, CARVED OUT OF LAND BERING SY NO. 58/2, NAGASHETTYHALLI VILLAGE, KASABA HOBLI, BANGALORE NORTH TALUK,
LAND BEARING SY NO. 56, DEVARABISANAHALLI VILLAGE, VARTHUR HOBLI, BANGALORE EAST TALUK, BANGALORE.
LAND BEARING SY NO. 3, ROOPENA AGRAHARA VILLAGE, BEGUR HOBLI, BANGALORE SOUTH TALUK, BANGALORE.
NO.38/1P, KATHA NO. 691, CARVED OUT OF SY NO. 38/1, BELATHUR VILLAGE, BIDARAHALLI HOBLI, BANGALORE EAST TALU
KATHA NOS. 154/111 & 155/112, NEW NO. 78, GARUKAMANTHAPALY, BYRASANDRA DHAKLE, K R PURAM HOBLI, BET, BANG
MUNICIPAL NO.24 (OLD NO. 7), RUSTUM BAGH MAIN RD, KODIHALLI, CMC WARD NO.73, BANGALORE
SY NO. 36/4, HARALUKUNTE VILLAGE, BEGUR HOBLI, BANGALORE SOUTH TALUK, CMC BOMMANAHALLI, BANGALORE.
SY NO 59, NEW NO 59/1, ADDEVISHWANATHAPURA VLG, RAJANKUNTE VLG, HESSARAHATTA HOBLI, B'LORE
PROPERTY BEARING NO. 13/1, KUMARASWAMY NAIDU ROAD, FRAZER TOWN, WARD NO. 91, BANGALORE
97/1A, OLD NO. 149/2, NEW CMC KATHA NO. 1128, CARVED OUT OF LAND BEARING SY NO. 149/2, VIBHUTHIPURA VILLAGE
7/1A, OLD NO. 149/2, NEW CMC KATHA NO. 1128, CARVED OUT OF LAND BEARING SY NO. 149/2, VIBHUTHIPURA VILLAGE, K
EARING SY NO. 42/6, MUNNEKOLALU VILLAGE, VARTHUR HOBLI, BANGALORE EAST TALUK, CMC MAHADEVAPURA, BANGAL
EARING SY NO. 151/2B, VIBHUTHIPURA VILLAGE, K R PURAM HOBLI, BANGALORE EAST TALUK, CMC K R PURAM, BANGALO
LD NOS. 205 & 206) KIRLOSKAR COLONY, LAGGERE VILLAGE, YESHWANTHAPURA HOBLI, BANGALORE NORTH TALUK, MUN
UT OF LAND BEARING SY NO. 48/4, MADIVALA VILLAGE, BEGUR HOBLI, BST, PRESENTLY BEARING COMPOSITE MUNICIPAL N
NEW MUNICIPAL NO. 4, 3 RD CROSS, NEW THIPPASANDRA, C V RAMAN NAGAR, WARD NO. 83, BANGALORE
SY NO. 10/1, MUNNEKOLALU VILLAGE, VARTHUR HOBLI, BANGALORE EAST TALUK, CMC MAHADEVAPURA, BANGALORE
HA NO. 123, CARVED OUT OF SY. NO. 67/2A, B. NARAYANAPURA VILLAGE, K R PURAM HOBLI, BANGALORE EAST TALUK, CM
LAND BEARING SY NOS. 37/1C & 37/1B, SOMPURA VILLAGE, SARJAPURA HOBLI, ANEKAL TALUK, BANGALORE
LAND BEARING SY NO. 19, KALLAGOPAHALLI VILLAGE, BIDADI HOBLI, RAMNAGAR TALUK, BANGALORE DISTRICT
LAND BEARING SY NO. 179, BUKKASAGARA VILLAGE, JIGANI HOBLI, ANEKAL TALUK, BANGALORE DISTRICT
LAND BEARING SY NOS. 107 & 108, BUKKASAGARA VILLAGE, JIGANI HOBLI, ANEKAL TALUK, BANGALORE DISTRICT
PROPERTY BEARING SY NO. 56, BYRASANDRA GRAMATANA, K R PURAM HOBLI, BET, WARD NO. 83, BANGALORE
MUNICIPAL NO. 5/4 & 5/6), FORMED IN LAND BEARING SY NO. 42/1, MARENAHALLI TANK BED, PRESENTLY 3RD CROSS,18TH
ORTION OF LAND BEARING SY NO. 75/5, NEW MUNICIPAL NO. 11, 4TH CROSS, SBM COLONY, BRINDAVAN NAGAR, MATHIKE
ARING SY NO. 31/2, JALAHALLI VILLAGE, YESHWANTHAPURA HOBLI, BNT, PRESENTLY BEARING MUNICIPAL NO. 18, MUTHY
S HOUSE BUILDING CO-OPERATIVE SOCIETY LIMITED AT BTM LAYOUT 2ND STAGE, PRESENTLY BEARING NEW COMPOSITE M
FCULAND
NEGATIVE
BEARING SY NO. 9/2, AMBALIPURA VILLAGE, VARTHUR HOBLI, BET, BANGALORE
& 786/B, KODIHALLI VILLAGE, VARTHUR HOBLI, BST, PRESENTLY BEARING MUNICIPAL NO. 1, 1ST CROSS, RUSTAM BAGH, K
ING NO. 444/3/2, KATHA NO. 448, CARVED OUT OF SY NO. 3/2, AGARA VILLAGE, BEGUR HOBLI, BST, CMC BOMMANAHALLI,
COMPOSITE MUNICIPAL NO. 173 (OLD NOS. 173, 174, 175 & 176), LALBAGH SIDDAPURA, JAYANAGAR I ST BLOCK, WARD NO
IALLY CONVERTED LAND BEARING SY NO 120/1,KATHA NO 638,HORAMAVU VILLAGE,K R PURAM HOBLI,BANGALORE EAST T
GE,KASABA HOBLI,BANGALORE NORTH TALUK PRESENTLY BEARING MUNICIPAL NO 18,3RD CROSS ROAD,SULTHANPALYA IN
BEARING MUNICIPAL NO 44.OLD NO 41,DA COSTA LAYOUT,COOKE TOWN,IN CORPORATION WARD NO 86.
8) & 38 (OLD NO 6 & 70COMPRISED IN SY NO 30/2A,MUNICIPAL NO 38,12TH CROSS ROAD,N S PALYA,BTM LAYOUT,IN CORPO
1/280/214/3 ( OLD NO 280/214/3,SERIAL NO 281)CARVED OUT OF LAND BEARING SY NO 34,IBBLUR VILLAGE,BEGUR HOBLI
HOBLI,BANGALORE SOUTH TALUK,PRESENTLY BEARING NEW MUNICIPAL NO 29 & 30,NEW COMPOSITE NO 30.22 MAIN,REV
NOW BEARING NO 11,HUTCHINS ROAD(FORMERLY KNOWN AS POTTERY ROAD 3RD CROSS) COOKE TOWN IN CORPORATION
107,KUNDALAHALLI VILLAGE,K R PURAM HOLBI,BANGALORE EAST TALUK,WITHIN THE REVENUE JURISDICTION OF CMC,MA
15 & 189/1,BILEKAHALLI VILLAGE,BEGUR HOBLI,BANGALORE SOUTH TALUK,WITHIN THE REVENUE JURISDICTION OF CMC,B
AWADI VILLAGE,K R PURAM HOBLI,BANGALORE EAST TALUK,PRESENTLY BEARING MUNICIPAL NO 23,II CROSS,ANNAIAH RE
SRI VARI SHELTORS 2ND MAIN ROAD ITTAMADU B S K 3RD STAGE BANGALORE
NO 96/1, PRIME NESTOR BLK A, BETTADASAPURA RD, BEHIND ELECTRONIC CITY DODDATHOGUR, B'LORE
BEARING SY NO 124 (OLD NO 45) & 125,MUNNEKOLALU VILLAGE VARTHUE HOBLI,MAHADEVAPURA CMC,BANGALORE
NEW CMC KHATHA NO 1380,KODIGEHALLI VILLAGE,YELAHANKA HOBLI BANGALORE NORTH TALUK WITHIN THE REVENUE JU
YT FORMED BY M/S VIJAYA BANK EMPLOYEES HOUSING CO-OPERATIVE SOCIETY LTD AT SEVERAL SY NOS OF BILEKAHALLI V
FCU IS NEGATIVE
SY NO.62/1, DODDAKANNENAHALLI
VILLAGE, VARTHUR HOBLI BANGALORE
SY NO.696/53 -2, 697/53-2, 695/53-2, COMPOSITE KATHA
NO. 697 CHIKKALASANDRA VILLAGE,
Sales to give data to Initiate FCU
UTTARAHALLI HOBLI BANGALORE
SY NOS.68/3,87/1, 90,88/2,66/1,67/1, 89/2, 91, 67/1,
68/1,89/1, 87/2,KEMBATHAHALLI VILLAGE, UTTARAHALLI
EQUITY. Sales to give data to Initiate FCU
HOBLI BANGALORE
FCU NEGATIVE
FCU NEGATIVE
25.02.05 / 18.0
20.08.2004
FCU NEGATIVE
FCU NEGATIVE
FCU NEGATIVE
FCU NEGATIVE
FCU NEGATIVE
FCU NEGATIVE
NO.116/1, SITE NO.509, HORAMAVU VILLAGE, BANGALORE - 560 043
FCU NEGATIVE
Sales to give
NO data
99/G,99/H
to Initiate
& 99/I,2nd
FCU B Cross,17th Main,KHB Colony,V Block,Koramangala,Bangalore-95
CM EQUITY
CM EQUITY
CM EQUITY
CM EQUITY
CM EQUITY
CM EQUITY
CM EQUITY
CM EQUITY
CM EQUITY
AR GOVERNMENT
FCU NEGATIVE
SCHOOL CHOWDESHWARI TEMPLE STREET 2ND CROSS,BYRASANDRA, C V RAMAN NAGAR BANGALORE 5
NO 83, PID NO 55-536-83, NEW K # 26, ITTAMADU VLG, BANASHANKARI IIIRD STG, B'LORE
Sy No-17/2,Halanayakanahalli village,Varthur
Hobli,Bangalore.
Sy No.33,34/2, Margonadanahalli,Halahalli
Village,Bidarahalli Hobli,Bangalore East Tq.
Sy No.20/1,Rainbow Drive Layout,Off Sharjapur Mn
Road,Carmelaram P O,Bangalore South Tq. & Sy
No.18,Halanayakanahalli Village,Varthur Hobli,Bangalore
South Taluk,Bangalore.
CM EQUITY
SY NO 10/2 WHITEFIELD VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
stagewise
disbursal,
customer equity
upfront,
PARALLEL
FUNDING
ALLOWED/DISB
STAGEWISE
PARALLEL
FUNDING
ALLOWED/DISB
STAGEWISE
PARALLEL DISBURSAL.
SY NO.80/3, HULIMAVU VILLAGE, BEGUR HOBLI, BANGALORE SOUTH TALUK
CM EQUITY
SY NO 126/P1 126/P2 7 126/2 ILLATHORE VILLAGE KUNDANA HOBLI DEVANAHALLI TALUK BANGALORE
CM EQUITY
CM EQUITY No.20 and 21, Sy no. 30/2B, 13th Main road, N S Palya, Bangalore
rsals, customer
NO 13/30/2B-13
equity upfront,
& 13/30/2B-14
2. All disbursal
NAYANAPPA
conditions
SETTYas
PALYA
per PPG
BEGUR
to be
HOBLI
met.BANGALORE SOUTH TALUK
CUSTOMER EQUITY
CUSTOMER EQUITY
SY NO 27,SITE NO 27/01,HARALUKUNTE,BOMMANAHALLI
BEGUR HOBLI,BANGALORE
SITE NO 24 TO 31 SY NO 138/5 & 138/6 BILEKAHALLI VILLAGE HOBLI BANGALORE SOUTH TALUK BANGALORE
NEW KHATHA NO 7 & 1,B NARAYANAPURA VILLAGE,K R PURAM HOBLI,BANGALORE EAST TALUK,WITHIN THE JURISDICTION
CUSTOMER NO
EQUITY
138/5 & 6 3RD CROSS SRI BHOOMANAGARA OFF BANNERGHATTA ROAD
CUSTOMER
EQUITY
CUSTOMER
EQUITY
CUSTOMER EQUITY
CUSTOMER EQUITY
CUSTOMER EQUITY
CUSTOMER EQUITY
CLEAR
CUSTOMER EQUITY
1. No upfront
disbursals,
stagewise
disbursals,
parallel funding.
2. All legal and
technical
approvals to be
in place for the
project.
KATHA NO.151/3-5, JOGUPALYA SUDDHAGUNTTAPALYA
3. Final
CUSTOMER
EQUITY
BYRASANDRA BANGALORE
disbursal
of
minimum 10%
only at 90 %
completion
SUY NO.43, KOWDENAHALLI VILLAGE,
stage.
CUSTOMER
EQUITY
K R PURAM HOBLI BANGALORE
4. LOU/ MOU/
Tripartite
agreement to be
taken in every
NO 5 BELLARY ROAS GANGANAGAR BANGALORE
loan for under
construction.
5. Sale deed to
be tracked
within 90 days
of the
completion of
the property
and SKR to be
SY NO 1/2 LOTTEGOLLAHALLI VILLAGE KASABA HOBLI BANGALORE NORTH TALUK
tracked
accordingly.
6. RSM and RCM
to have signed
off the
DAN
and
CUSTOMER
Katha
EQUITY
No.448-170-4/2,
Amrutha Halli Village, Yelahanka Hobli bangalore North Taluk
to be in files
with CAU.
7. Development
agreement and # 37/2, 2nd main, Thimmena Halli, Vijay Nagar, Bangalore
CUSTOMER
560040
POA to EQUITY
be
checked in legal
and technical
No.1, Seenapa Layout, New BEL road Opp to
clearances .
M S Ramaiah Hospital, Dollars Colony, RMV 2nd Stage,
8. All disbursal
Banglore 94
conditions as
per PPG to be
met.
SY NO.37/1, 50/3, 43/2, VAZARAHALLI VILLAGE,
9. Disbursal to
KASABA HOBLI BANGALORE
be done in Self
construction
mode, however
to mntion under
SY NO.47/2, AND 48/1BYTARAYANAPURA VILLAGE,
construction as
CUSTOMER EQUITY
YELAHANKKA HOBLI BANGALORE
the construction
status in
disbursal check
list.
SI # 1A SY # 50/1 KH # 1370 SI # 1 & 2 KH # 1371 SY # 50/2 KODIGEHALLI VILLAGE YELHANKA HOBLI B'LORE
SY 3 3/B & 16/A IBBALUR VILLAGE BEGUR HOBLI BANGALORE SOUTH TALUK
SY NO 86/1, 86/2, 88/1, 88/2, 88/3, KUDLU VLG, SARJAPUR HOBLI, ANEKAL TALUK, B'LORE
KATHA # 964,OLD PROPERTY NO.18,B.NARAYANAPURA VILLAGE ,K RPURAM HOBLI ,BANGALORE EAST TALUK, MAHADEVAP
PERTY BEARING MUNCIPAL NO.35(OLD NO.30/G)DAVIS ROAD RICHARDS TOWN IN CORPORATION WARD NO. 85 BANGALOR
LAND BEARING SY.NO.48/1, TURAHALLI VILLAGE, UTTARAHALLI HOBLI, BANGALORE SOUTH TALUK
SY.NO.60, 61/2 AND 63, BILEKAHALLI VILLAGE, BEGUR HOBLI, BANGALORE SOUTH TALUK
ONVERTED LAND BEARING SY NO 50 CHELKERE VILLAGE KR PURAM HOBLI BANGALORE EAST TALUK HORAMAVU AGARA VI
140/3 VARTHUR ROAD NAGAWARAPALYA RAHATH BAGH CV RAMANNAGAR POST CORPORATION WARD NO 83 BANGALORE
DEACTIVATED
DEACTIVATED
CUSTOMER
EQUITY
CM EQUITY
DEACTIVATED
SY NO
CUSTOMER
131/2 JAYARAMA
EQUITYREDDY LAYOUT KUNDALAHALLI VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
SY NOCUSTOMER
84/1B KATHA
EQUITY
NO. 51/2 TO 51/7 BENNIGANAHALLI VILLAGE K R PURAM HOBLI BANGALORE EAST TALUK
CUSTOMER EQUITY
1. No upfront
SITE BEARING NOS. 333-A (P-1) & 333-B (P-1), IN THE
Ideal homes township kenchena halli halagevadera halli raja rajeshwari nagar bangalore
disbursals,
LAYOUT FORMED BY M/S THE IDEAL HOMES CO-OPERATIVE
stagewise
BUILDING SOCIETY LTD., IN SECTOR NO. B, IDEAL
disbursals,
TOWNSHIP, KENCHANAHALLI / HALAGEVADERAHALLI
customer equity
VILLAGE, BANGALORE SOUTH TALUK, CMC,
upfront
RAJARAJESHWARI NAGAR, BANGALORE
Sy No 7/3,18/1,18/2,126/1-3,17,18/1(p),20/1,19,20/3.Phase
II- sy no 19,20/3,7/2,8/1,8/2,7/4, Kothnur,J P Nagar,8th
phase<uttarahalli,Bangalore.
stage wise
disbu/cust
equity upfront
Sy No 7/3,18/1,18/2,126/1-3,17,18/1(p),20/1,19,20/3.Phase
II- sy no 19,20/3,7/2,8/1,8/2,7/4, Kothnur,J P Nagar,8th
phase<uttarahalli,Bangalore.
OLD NO 207/3 NEW # 240, M N 207/3 240 VARSHA RUTU ROAD, HANUMANTH NGR, B'LORE
NO 165, K # 658 & 166, K # 686, SY # 86/4, 86/2, 86/2 & 86/3, BELLANDUR VLG, VARTHUR HOBLI, B'LORE
SY NO 35/3, NYANAPPANAHALLI VLG, NO 601/35/3, 20TH MN, BTM 4TH STAGE, B'LORE
SITE NO 29 & 30, COMBINED K # 222, SY NO 43/5, HILL SIDE LYT, K R PURAM HOBLI, MAHADEVAPURA, BBMP B'LORE
SY NO . 55/1, 19TH MN, 24TH CRS, HSR LYT 2, HARALAKUNTE VLG, BEGUR HOBLI, B'LORE.
SITE NO 43 & 45, K # 561, SY NO 87/5, BELLANDUR VLG, VARTHUR HOBLI, B'LORE
SY NO 38/1-B, 39/1, 39/2, & 39/3, AREKERE VLG, BEGUR HOBLI, B'LORE
SITE NO 88/1 & SITE NO 1 & 762, K # 762, SY NO 70, RACHENAHALLI VLG, K R PURAM, B'LORE
SY NO 41/1B, 41/1C, 41/1D, & 41/1F VENKOJI RAO KHANE VLG, BEGUR HOBLI, B'LORE
O 547, 548 & NO 549, SITE NO 58, 59, 60, 61, 62 & 63 NGEF LYT, BENNIGANAHALLI VLG, SADANANDA NGR, K R PURAM, B'L
NO 78, 79 & 80, K # 490, & 747, SY # 18/1A, 18/1A, 18/1B, 18/2 18/5, KODICHIKANAHALLI VLG, BEGUR HOBLI, B'LORE
SY NO 99P, OLD NO 112, NEW NO 113, DIVYA UUNATHI LYT, HORAMANU AGARA VLG, K R PURAM, B'LORE
SY NOS 22/1, 28/1, 28/2, 29/1, 29/3, 31/1, PRASANNAHALLI VLG, KASABA HOBLI, DEVANAHALLI, B'LORE
KH NO 3531(87/8), 3RD BLK, KOTHNUR, OFF BANNERGHATTA RD, NEAR L&T SOUTH CITY APTS, B'LORE.
APTS, 1 B CRS, SAMPIGE LYT, OFF AMARJYOTHI NGR, 6TH CRS, MALAGALU, PRASHANTH NGR, & SOBHA HOSPITAL, VIJAYA
Y NO 113/1, 113/2, 117, 118, 119/1, 119/2, 119/3, KADATNAMALE VLG, HESARGATTA HOBLI, BANGALORE NORTH TALUK.
SITE NO 630, K NO 446/630, SY NO 98/1 & 2, R K TOWNSHIP YARANDAHALLI, JIGANI HOBLI, B'LORE
90/1, DODDATHOGUR, ELECTRONIC CITY PHASE I, NEAR WIPRO 5TH GATE, OPP ITTINA MAHAVEER APTS, HOSUR RD, B'LORE
356/1, 356/2, 356/3, 356/4A, 356/4B, 356/5, 356/6, 357/4P, 357/5, 357/5, 357/8, 358/1, 358/2,358/3, 358/4P, 359P, 360/1P,
SY NO 30, 31, 32, 33 & 161 OF KADATANAMALE VLG, DODDABALLAPUR RD, B'LORE
SY NO 176, 177 & 178 OF SANNA AMANIKERE VLG, KASABA HOBLI, DEVANAHALLI TALUK, B'LORE
NO 366, OLD NO. 366 & 367, NO 128/128/366, 1ST STAGE, 2ND BLK, HENNUR BELLARY RD, B'LORE
SY NO 64/3, NEW PROPERTY NO 64/4, KAVAL BYRASANDRA VLG, KASABA HOBLI, B'LORE
SAI RESIDENCY SY NO 63/1, HOODI VILLAGE, KR PURAM, BANGALORE EAST TALUK, B'LORE
DATE OF LEGAL
REPORT
LAWYER NAME
EC AVAILABLE
DATE
LEGAL QUERIES
Not received
Not received
25.07.2003
C S VISHWANATH
13.01.2003
CLEAR
02.12.2003
SHAMMANA
31.5.2001
CLEAR
24/03/04
C S VISHWANATH
28/07/01
CLEAR
12.11.2003
J PRAKASH
11.5.2003
CLEAR
01.07.2003
SHAMMANA
25.2.2003
CLEAR
NOT RECEIVED
18.7.2003
C S VISHWANATH
9.12.2003
CLEAR
23.10.2004
C S VISHWANATH
31.12.1988
CLEAR
O.S.no.408/1995 and
O.S.no.436/1995 and
O.S.no.255/1995 in respect of
Sy.no.44.
2
/2/
10. copy
Partition
deed
dated
Draft
of sale
agreement
14.01.1990
executed
amongst
2. Draft copy of construction
Smt.Savitramma
02.07.2004
C S VISHWANATH
20.03.2004
CLEARand others.
agreement.
11. copy
Sale deed
3. Draft
of thedated
proposed
04.08.1964
executed
sale deed. in favour
of Sri.Kurappa
4. Agreement
entered into
(doc.no.1490/1964-1965).
between the land owners and
10.03.05
C S VISHWANATH
CLEAR
12. Orders passed
builder.by the Court
of
Assistant
Commissioner,
in
5. GPA executed
by the land
LNDSR
3/351/1960-1961
and
owner in favour of the builder.
ASLRDPRD
125/1973-74
6. E.C
from 26.12.2004
till date
LRP:8/1972-73 LRP 3/1963-64.
19.04.05
C S VISHWANATH
13. Sale deed dated
28.07.1994 executed in favour
of Smt.Gayathri Prasad
(doc.no.6/1994-1995)Not received
Sy.no.118/2.
14. Tax paid receipt for the
period 2004-2005.
15. Katha extract issued by the
jurisdictional
22.10.03
SHAMMANA
24.06.03
CLEARrevenue
authority (for all portions).
16. Copy of sanction plan
approved by BIAPPA.
1. Draft copy of sale
17. Encumbrance certificates
agreement.
2. Draft copy of
19.11.2003 RAGHAVENDRA RAO
22.8.2002
CLEAR
from :
construction agreement.
a. 01.04.1991 till date (in
3. Draft copy of the proposed
respect ofSy.nos.118/2, 118/1,
sale deed.
44 & 45).
4. Why is certified copy of sale
b. 01.04.1991 to 20.09.2004 (in
1) Sale
05.10.04
deed dated
C S20.09.89
VISHWANATH
executed
01.04.89
in favour
to 02.09.04
of arunachala
enterprises
( doc no 1638/89-90) 2) tax paid re
deed dated
20.09.1989
respect of Sy.no.46).
executed in favour of M/s
c. 30.04.2004 till date (in
Arunachala Enterprises (doc
respect of Sy.no.46).
no.1638/89-90) given and not
the photo-copy of original. The
19.01.05
C S VISHWANATH
1.04.91
same requires clarification.
5. E.C from 02.09.2004 till
date.
18.03.05
C S VISHWANATH
02.09.04
Not received
Not received
02/08/05
C S VISHWANATH
05.01.04
SHAMMANA
22/02/05
PLS SEND THE BUILDER FOR ORIGINAL VERIFICATION
07.06.03
CLEAR
05/29/04
C S VISHWANATH
05.05.2004
02.01.04
CLEAR
Not received
24.08.2004
C S VISHWANATH
Not received
Not received
C S VISHWANATH
Not received
11.03.04
not received
24.10.2003
PRAKASH
CLEAR
11/08/05
C S VISHWANATH
30.01.2006
C S VISHWANATH
CLEAR
Not received
Not received
1.10.2003
SHAMMANA
11.02.04
D P SHIVAPRASAD
8.11.2003
C S VISHWANATH
29.01.05
C S VISHWANATH
Not received
23.6.2003
CLEAR
27.10.1996
02.08.2005
C S VISHWANATH
CLEAR
Not received
01.04.05
C S VISHWANATH
09.07.02
CLEAR
Not received
22/10/03
C S VISHWANATH
21/08/03
05/09/05
C S VISHWANATH
2/1/2005
PLEASE SEND THE BUILDER FOR ORIGINAL VERIFICATION
Not received
Not received
20.10.04
C S VISHWANATH
N/A
Not received
Not received
Report by
22.10.03
Subject site
C.S.Vishwanath
to be included in l/o
07.08.03
out, katha extract, tax paid receipt for subjcet site should be produ
Not received
19.9.2003
SHAMMANA
07.02.2006
C S VISHWANATH
01.08.03
CLEAR
CLEAR
Not received
Not received
06.11.03
C S VISHWANATH
21.05.03
CLEAR
23.04.04
CLEAR
Not received
11.01.05
C S VISHWANATH
Not received
14.11.03
SHAMMANA
25.05.03
CLEAR
26.07.2004
C S VISHWANATH
26.07.2004
CLEAR
Not received
Not received
1. GPA executed by the
land owners in favour of the
builder.2. Draft copy of
agreement to sell.
3. Draft copy of construction
agreement.
4. Draft copy of proposed sale
CLEARED
deed.
5. Copy of sanction plan for O
Block (plan given pertains to
other blocks).
6. Encumbrance certificates
CLEAR
from:
a. 29.04.2002 till date.
b. 13.08.1996 to 31.03.1998.
14.11.2009
VISHWANATH
03.12.2001
SHAMMANA
26.02.01
29.11.04
C S VISHWANATH
29.04.04
26.06.2003
SHAMMANA
12.06.2003
CLEAR
24/7/03
C S VISHWANATH
21/04/03
Not received
10.04.2003
MR
SHASHIKANTH
3.4.2003
CLEAR
8.8.2002
SHAMMANA
12.4.2002
CLEAR
31/07/2003
Not received
12.09.2005
C S VISHWANATH
17.04.04
CLEAR
11.07.2000
SHAMMANA
CLEAR
11.01.2003
SHAMMANA
31.03.1981
18.11.03
SHAMMANA
14.07.94
20.05.2004
SHIVAPRASAD
02.02.05
C S VISHWANATH
23.07.04
19.03.05
C S VISHWANATH
13.01.05
24.10.2001
SHAMMANA
12.12.2001
SHAMMANA
11.9.2000
CLEAR
Not received
23.8.2000
SHAMMANA
CLEAR
26.05.2000
SHAMMANA
24.6.1995
CLEAR
17.05.2000
SHAMMANA
27.7.1999
CLEAR
12.02.2003
SHAMMANA
6.12.2002
CLEAR
29.09.2004
C S VISHWANATH
CLEAR
ermission issued
24.07.2004
by the DC for
C Ssalw
VISHWANATH
of property 4)19.09.2003
Land conversion certificate 5) NOC for non acquisition issued by the B
of sy no 26 of vaderahalli
04.08.2004 village
C S VISHWANATH
5) Endorsement for
11.10.1976
non-acquisition issued by the BDa 6) Copy of gpa executed by the la
07.11.1998
SHAMMANA
CLEAR
Not received
11.12.2003
SHAMMANA
8.10.2003
CLEAR
15.07.04
C S VISHWANATH
12.11.2003
09.11.04
C S VISHWANATH
09.11.2004
14.06.2004
Report by
C.S.Vishwanath
01.04.1991
14.12.04
C S VISHWANATH
02.08.2003
CLEAR
nd bearing sy no
30.08.2004
76/5 76/6 4)Land
C S VISHWANATH
conversion certificate
01.08.1988
( for all portions) 5) Tax paid receipt for the period 04-05 6) Kath
02.05.05
C S VISHWANATH
07.06.03
SHAMMANA
21.04.03
CLEAR
30/07/05
C S VISHWANATH
30/06/04
13.10.2000
SHAMMANA
25.04.1994
28.11.03
C S VISHWANATH
30.05.02
02/24/04
C S VISHWANATH
20/11/03
CLEAR
02.05.2000
SHAMMANA
16.10.2002
SHAMMANA
CLEAR
10.04.2003
MR
SHASHIKANTH
CLEAR
Not received
7.8.2003
C S VISHWANATH
17.4.2003
Yet to receive
CLEAR
yet to receive
not received
12.09.03
MR
SHASHIKANTH
N/A
9.7.2003
CLEAR
29.04.2003
SHAMMANA
CLEAR
Not received
10.11.2003
SHAMMANA
20.10.2003
CLEAR
1.01.2003
RAGHAVENDRA RAO
18.03.2003
CLEAR
7.03.02
SHAMANNA
6.03.2003
SHAMMANA
31.01.2002
CLEAR
7.8.2002
M R SHASHIKANTH
5.7.2001
CLEAR
31.03.04
CLEAR
not received
Not received
29.12.04
C S VISHWANATH
Not received
15.7.2003
SHAMMANA
28.07.1997
CLEAR
16.12.2003
SHAMMANA
1.04.1999
CLEAR
29.9.2003
SHAMMANA
4.7.2003
CLEAR
18.9.2003
SHAMMANA
16.9.2003
CLEAR
31.10.2003
SHAMMANA
24.8.2003
CLEAR
30.9.2002
SHAMMANA
31.8.2002
CLEAR
31.7.2002
M R SHASHIKANTH
5.5.2001
CLEAR
19.10.2002
SHAMMANA
19.2.2002
CLEAR
02.2007 TO 22.01.2008,
15.02.2008
DATED 09.02.2007
VISHWANATH
FOR THE PERIOD 01.04.2004 TO 08.02.2007,
CLEAR
DATED 22.04.2006 FOR THE PERIO
12.11.2003
23.01.2002
SHAMMANA
M R SHASHIKANTH
Not received
1.12.2003
C S VISHWANATH
CLEAR
23.11.2001
Not received
16.07.2004
QUERIES
18.10.03
SHAMMANA
29.03.03
CLEAR
04.08.2004
C S VISHWANATH
24.11.2002
nd conversion 13.08.2004
fee or recipt issued
C S VISHWANATH
by the office of CMC
18.04.2002
k r puram to words the paym,ent of betterment charges 3) Katha e
1. AGREEMENT ENTERED INTO
BETWEEN THE LAND OWNER
AND THE BUILDER
2. KATHA EXTRACT ISSUED BY
1.12.1997
SHAMMANA
17.7.1997
CLEAR
THE JURISDICTIONAL REVENUE
AUTHORITY 3. TAX PAID
RECIEPT FOR THE PERIOD
2003-04 4. E C FROM
28.06.2004
C S VISHWANATH
05.06.1996
02.12.2001 TILL DATE.
2) GPA executed
07.08.2004
by the landCowner
S VISHWANATH
in favour of the
18.06.2004
builder 3) Tax paid recipt for the period 03-04 4) Katha extract / dem
ND THE BUILDER
07.08.2004
2) GPA ececuted
C S VISHWANATH
by the land owner
17.06.2003
in favour of builder 3) katha extract issued by the juridictional reven
06.09.04
CLEAR/add
23.02.05
C S VISHWANATH
31.04.03
CLEAR
31.05.03
05.05.03
CLEAR
18.12.03
SHAMMANA
18.02.03
CLEAR
Not received
18.10.03
C S VISHWANATH
04.06.03
CLEAR
17.11.03
SHAMMANA
15.03.02
CLEAR
31.12.2009
VISHWANATH
CLEAR
VISHWANATH
CLEAR
20.11.03
SHAMMANA
25.03.05
VISHWANATH
CLEAR
Not received
yet to receive
22.12.03
SHAMMANA
02.11.03
25.07.03
CLEAR
CLEAR
Not received
04.03.04
C S VISHWANATH
12.11.2003
18.02.03
SHAMMANA
13.01.03
Layout Plan,Assessment
CLEAR
Registers & Demand Resisters
to be verified.In the power af
Attorney Site Nos not given
and is also not stamped-all
these to be rectified.
Not received
25-09-04
QUERIES
Not received
12.05.05
VISHWANATH
26/09/2005
C S VISHWANATH
15.01.05
C S VISHWANATH
13.01.05
C S VISHWANATH
Not received
Not received
Not received
26/07/05
C S VISHWANATH
26/07/06
C S VISHWANATH
5/5/2005
Not received
02.04.04
C S VISHWANATH
26.11.02
CLEAR
05.04.2004
C S VISHWANATH
30.04.03
CLEAR
17.11.04
C S VISHWANATH
20.02.2004
not received
not received
19.02.04
18.08.03
11.02.04
09.05.05
08/03/04
05/29/04
C S VISHWANATH
25/06/05
C S VISHWANATH
23.05.03
09.07.2004
C S VISHWANATH
12.12.2003
25.01.05
C S VISHWANATH
2.12.03
03.11.03
C S VISHWANATH
24.09.03
8. Encumbrance Certificates
from:
CLEAR
a. 10.04.2003
till date ( in
respect of Sy no.115 to an
extent of 1 acre 24 guntas).
1. COPY OF APPROVED LAYOUT
b. 01.04.1991 till date (in
PLAN 2. E C FROM 10.04.2003
respect of Sy no.115 to an
TILL DATE
extent of 1 acre 26 guntas).
c. 02.12.2003 till date (in
respect of Sy no.116).
CLEAR
C S VISHWANATH
30.08.04
C S VISHWANATH
06.03.04
not received
2.12.2003
C S VISHWANATH
21.12.2002
Not received
CLEAR
24.08.2004
C S VISHWANATH
04.08.2003
CLEAR
27/11/2005
C S VISHWANATH
01.04.1992
Not Received
28.05.2004
C S VISHWANATH
24.02.04
SHAMMANA
CLEAR
24.02.03
CLEAR
18.12.2010
C S VISHWANATH
CLEAR
28.07.2004
C S VISHWANATH
11.06.02
03.05.2004
SHAMMANA
16.12.03
CLEAR
06/08/05
C S VISHWANATH
27.07.2005
CLEAR
14.03.05
C S VISHWANATH
31.03.04
CLEAR
05.04.2004
C S VISHWANATH
28.08.03
02.08.2004
C S VISHWANATH
03.04.04
C S VISHWANATH
02.08.2004
QUERIES
24.01.05
C S VISHWANATH
01.04.05
C S VISHWANATH
CLEAR
09.12.2003
02.04.05
C S VISHWANATH
11.08.04
CLEAR
01.03.04
C S VISHWANATH
18.09.01
18.08.05
C S VISHWANATH
29.12.2005
C S VISHWANATH
01.04.2004
C S VISHWANATH
22.06.2004
C S VISHWANATH
19.01.05
C S VISHWANATH
12.03.01
26.03.04
C S VISHWANATH
28/01/04
31/07/2003
Report by
C.S.Vishwanath
01.04.90
Not received
04.03.04
C S VISHWANATH
01.04.90
23.07.2004
C S VISHWANATH
20.05.2004
22.06.2004
C S VISHWANATH
26.12.1997
20.03.04
C S VISHWANATH
28.07.1998
Report by
Mr.N.C.S.Raghav
an
27.05.05
C S VISHWANATH
27.05.05
C S VISHWANATH
13.02.04
26.09.04
HE BUILDER 2.29.03.2004
GPA EXECXUTED
C SBY
VISHWANATH
THE LAND OWNER
21.04.1998
IN FAVOUR OF THE BUILDER 3. TAX PAID RECIEPT FOR THE PERIOD 2
21.04.2004
C S VISHWANATH
23.01.2004
C S VISHWANATH
CLEAR
10.03.2003
CLEAR
22.10.03
EC AVAILABLE
C S VISHWANATH
DATE TO BE CHECKED FOR DIFFERENNT SURVEY
CLEAR Nos.
04.06.03
SHAMMANA
25.05.05
C S VISHWANATH
04.07.02
CLEAR
25.05.05
C S VISHWANATH
19.03.04
C S VISHWANATH
31.05.89
21.06.2004
C S VISHWANATH
13.12.2002
05/29/04
C S VISHWANATH
26.02.2004
09.04.2004
C S VISHWANATH
15.03.2004
13.01.04
SHAMMANA
25.11.04
C S VISHWANATH
30.03.04
C S VISHWANATH
22.10.04
clear
21.01.04
SHAMMANA
26.9.2003
SHAMMANA
16.01.02
not received
t of sy no 308 &15.10.04
309 req nos C
1S
& VISHWANATH
3 2) in respect of23.06.2003
sy no 306 & 307 req nos 2 & 3 3) in request of sy no 305 req no 1 & 2 &
14.04.04
C S VISHWANATH
14.12.00
Not received
29.03.04
C S VISHWANATH
03.02.05
C S VISHWANATH
25.04.2004
C S VISHWANATH
23.11.04
03.10.2003
12.02.04
C S VISHWANATH
21.08.03
08.04.2004
C S VISHWANATH
29.02.2004
30.06.2004
C S VISHWANATH
30.06.2004
C S VISHWANATH
28.08.2003
CLEAR
30.06.2004
C S VISHWANATH
27.02.2004
CLEAR
CLEAR
N/A
01.04.2003
09/27/04
Yet to receive
SHAMMANA
7.9.2002
CLEAR
C S VISHWANATH
Nil Ec form
04.12.03 till
date
CLEAR
25.08.04
CLEAR
Not Received
14/11/2005
C S VISHWANATH
29.09.2008
C S VISHWANATH
05.08.2004
C S VISHWANATH
CLEAR
09.03.2004
CLEAR
22.07.2004
RAGHAVENDRA RAO
04.03.05
C S VISHWANATH
CLEAR
21.01.04
30.07.2004
C S VISHWANATH
24.03.2004
28.05.04
C S VISHWANATH
28.08.1998
05/28/04
C S VISHWANATH
05.01.1998
C S VISHWANATH
11.01.1996
23.12.2005
C S VISHWANATH
01.03.2005
29.05.2004
Report by
C.S.Vishwanath
27.09.2003
18.08.2004
C S VISHWANATH
1) the original
27.12.2004
doc are
05/31/04
C S VISHWANATH
10.05.2004
28.07.2004
C S VISHWANATH
31.11.2002
CLEAR
4.09.2003
DP
SHIVAPRASAD
31.12.2002
CLEAR
05/26/04
C S VISHWANATH
18.04.2004
05/26/04
C S VISHWANATH
14.08.2002
25.10.04
C S VISHWANATH
23.01.00
CLEAR
02.11.04
C S VISHWANATH
26.07.04
CLEAR
08/11/05
C S VISHWANATH
21.12.2004
ADDITIONAL DOCUMENTS
REQUIRED.
07/09/06
C S VISHWANATH
24.7.2006
05/26/04
C S VISHWANATH
17.09.1996
13.04.2004
SHAMMANA
CLEAR
7.8.2003
DP
SHIVAPRASAD
20.05.2004
C S VISHWANATH
4.5.2003
CLEAR
CLEAR
28.07.2004
C S VISHWANATH
30.08.2003
CLEAR
19.06.2004
C S VISHWANATH
26.10.2003
CLEAR
years in respect
20.08.2004
of sy no 7/1b
C 2)
S VISHWANATH
katha extract / demand
31.05.1989
register forAgreement
the period entered
03-04 issued
into by the office of anjanapura
between land owner and the
builder. 2. GPA executed by
the
land owner in
favour of
the
1. AGREEMENT
ENTERED
INTO
builder.
22.06.2004
C S VISHWANATH
25.02.2003
CLEAR
BETWEEN
THE LAND
3.OWNER
Sale deed
20.12.1955
ANDdated
THE BUILDER
2.
executed
in
favour
of BY
COPY OF GPA EXECUTED
COPY
OF SANCTION
PLAN(doc
FOR
Sri.Kulkeri
Muniswamy
THE
LAND OWNERS
IN FAVOUR
THE
BUILDING ISSUED
BY
THE
1. AGREEMENT
ENTERD
INTO
no.5851/1955-1956)
OR
OF THE BUILDER 3. LAND
08.06.2007
C S VISHWANATH
31.05.1989
BDA.
BETWEEN
LAND
OWNER
mutation
register
CONVERSION
CERTIFICATE
AND THE BUILDER
2. GPA
corroborating
the
same.
/RECIEPT TOWARDS
THE
EXECUTED
BY THE
LAND
4.
Endorsement
for
nonPAYMENTS OF LAND
OWNER IN
FAVOUR
OF
acquisition
issued
theTHE
BDA.
CONVERSION
FEEby
/RECIEPT
BUILDER
3.
LAND
CONVERSION
5.
Copy
of
approved
layout
24.05.2004
C S VISHWANATH
01.04.1991
ISSUED BY THE OFFICE OF CMC,
CERTIFICATE
4. by
ENDORSEMENT
plan issued
the BDA.
FOR
NONcopy
AQUISION
ISSUED BY
6. Draft
of agreement
to
THE BDA 5. TAX
sell.PAID RECIEPT
FOR
THEcopy
PERIOPD
2003-04 6.
7. Draft
of construction
24.05.2004
C S VISHWANATH
10.07.2000
KATHA E
agreement.
8. Draft copy of the proposed
sale deed.
9. Encumbrance Certificates
1. TITLE DEEDS AT LEAST FOR
from 01.04.1991 till date in
N/A
Not received
N/A
Yet to receive
THE PRECEEDING
13 YEARS
respect of Sy nos.1/1 & 1/2
INCLUDING THR DEEDS
(E.C. given are for split
THROUGH WHICH SRI V P
periods).
NARAYANAPPA ACQUIRED THE
PROPERTY. 2. AGREEMENT
12.03.05
C S VISHWANATH
01.04.91
ENTERED INTO BETWEEN THE
LAND OWNER AND THE
BUILDER 3. GPA EXECUTED BY
THE LAND OWNER IN FAVOUR
AWAITING REPORT FROM C S VISHWANATH
31.03.2004
OF THE BUILDER 4
13.06.05
C S VISHWANATH
24.05.2005
C S VISHWANATH
26.05.05
C S VISHWANATH
16.04.2004
08/08/05
C S VISHWANATH
31.03.2005
CLEAR
20.02.2006
C S VISHWANATH
23.11.2005
13/05/2004
C S VISHWANATH
18.06.03
14.05.2003
13.05.2004
C S VISHWANATH
26.04.2004
SHAMMANA
CLEAR
SHAMMANA
CLEAR
SHAMMANA
CLEAR
06.01.05
C S VISHWANATHKINDLY
29.06.04
SEND THE BLUE PRINT COPY OF THE APPROVED LAYOUT PLAN
Not received
08.03.2004
C S VISHWANATH
25.10.2003
30.04.2004
C S VISHWANATH
09.10.1996
13.04.2004
C S VISHWANATH
CLEAR
08.09.2004
C S VISHWANATH
13.03.2004
CLEAR
02.08.2005
C S VISHWANATH
10.05.2005
29.04.2004
C S VISHWANATH
12.04.2004
C S VISHWANATH
18.01.2004
28.01.2004
C S VISHWANATH
01.03.2004
11.05.2004
C S VISHWANATH
20.05.2003
05.05.2004
C S VISHWANATH
07.05.2004
C S VISHWANATH
25.03.2004
07.05.2004
C S VISHWANATH
01.04.1991
04.05.2003
SHAMMANA
31.10.2003
11.05.2004
C S VISHWANATH
15.05.2003
11.06.2004
C S VISHWANATH
09.02.2004
CLEAR
22.04.2004
C S VISHWANATH
CLEAR
Not received
15.11.03
04.09.03
RAGHAVENDRA RAO
22.09.03
C S VISHWANATH
19/01/2004
C S VISHWANATH
01.09.03
CLEAR
14.05.2004
C S VISHWANATH
09.10.2003
10.04.2004
C S VISHWANATH
17.02.2004
24.02.05
C S VISHWANATH
05.10.04
22.12.2005
C S VISHWANATH
27.07.2005
12.04.2004
C S VISHWANATH
30.07.2003
27.08.1999
Not received
24.01.05
C S VISHWANATH
31.06.01
09.10.04
C S VISHWANATH
04.08.04
03.01.05
C S VISHWANATH
15.10.03
21.09.2005
C S VISHWANATH
17/01/05
C S VISHWANATH
18.02.05
C S VISHWANATH
19.05.2003
05.06.2004
C S VISHWANATH
27.03.2003
16.10.04
C S VISHWANATH
10.09.04
05.06.2004
D P SHIVAPRASAD
ed copy of gpa04.06.2004
dated 28.01.04
C executed
S VISHWANATH
by t ramakrishnappa
22.09.2003 and others in favour of sachidananda 2) endorsement for n
16 EC from 30.09.02
20.07.2004
till date C
Common
S VISHWANATH
documents 30.09.2002
1) agreement entered in to between the land owner and the builder 2)
24.06.2004
C S VISHWANATH
01.12.1992
CLEAR
acquisition of title by
Sri.Lakshminarayana Sastry as
through a deed dated
06.06.1971. The same requires
clarification.
..2
/2/
01.04.91
27.01.05
C S VISHWANATH
19.04.05
C S VISHWANATH
20.01.2003
SHAMMANA
03.12.2003
CLEAR
17.08.2002
MR
SHASHIKANTH
23.03.02
CLEAR
Not received
3.4.2003
SHAMMANA
3.11.2002
CLEAR
09.06.2004
C S VISHWANATH
30.09.2003
CLEAR
22.01.2008
DATED
CS
08.01.2008
VISHWANATH
FOR THE PERIOD 01.04.2007 TO 07.01.2008.
31.05.04
C S VISHWANATH
08.10.02
CLEAR
12.08.2004
C S VISHWANATH
24.09.2003
CLEAR
30.04.2004
09.06.2004
C S VISHWANATH
09.06.2004
C S VISHWANATH
10.012.2003
31.03.2004
C S VISHWANATH
27.11.2002
01.04.2004
C S VISHWANATH
01.04.1990
31.03.2004
C S VISHWANATH
23.05.2003
27/06/05
C S VISHWANATH
03.11.2003
in to between 05.06.2004
the land ownerCand
S VISHWANATH
builder 3) GPA executed
25.01.2004
by the land owner in favour of the builder 5) Katha extract iss
05.06.2004
29.06.2004
30.08.2004
Report by
C.S.Vishwanath
CLEAR
toCcomply
S VISHWANATH
the following
17.05.2000
requirments of certificate datd 29.06.04 1,2,3,4,7,8,11,12,13,14,15,16
C S VISHWANATH
17.12.2003
1) judgement
25.06.2004
/ order & decree
C S VISHWANATH
ion hrc no 10321
22.06.2000
& 10137 of 19892) orders passed in hrc no 781/2000 3) e c from 22.
Not received
01.06.2004
C S VISHWANATH
C S VISHWANATH
17.06.2004
C S VISHWANATH
18.06.2004
C S VISHWANATH
30.06.2003
18.06.2004
C S VISHWANATH
07.01.2004
03.07.2004
C S VISHWANATH
11.04.2002
CLEAR
28.02.05
C S VISHWANATH
Not received
Not received
12.05.05
C S VISHWANATH
08.09.04
18.06.2004
C S VISHWANATH
14.06.2002
19.06.2004
C S VISHWANATH
01.05.2003
CLEAR
17.08.04
C S VISHWANATH
22.08.1996
CLEAR
Gpa executed by
30.07.2004
the land owner
C S in
VISHWANATH
favour of builder
23.03.2004
2) land conversion certificate 6) genealogical tree of the family of sri
19.06.2004
C S VISHWANATH
12.05.2004
CLEAR
ed 20.09.72 1)09.07.23004
Title deed at least
C S VISHWANATH
for the preceding
19.09.2003
13 years 9 in respect of sy no 30) 2) Copy of gift deed dated 20.09.72
Not received
19.04.05
C S VISHWANATH
17.11.2002
CLEAR
20.01.2006
C S VISHWANATH
01.07.2004
C S VISHWANATH
20.06.2003
23.06.2004
C S VISHWANATH
23.12.2003
27.09.04
C S VISHWANATH
29.08.03
09.07.2004
C S VISHWANATH
17.05.2004
agreement.
3. Draft copy of the proposed
sale deed.
4. Permission for change of
land use from green belt to
residential use issued by the
HUD.
5. land conversion certificate
or receipt towards the
payment
of landENTERED
conversion
fee
1. AGREEMENT
INTO
or
receipt issued
by the
office
CLEAR
BETWEEN
THE
LAND
OWNER
of CMC, Bangalore
AND towards the
payment
THE BUILDER of
2. betterment
GPA EXECUTED
1. AGREEMENT
ENTERED INTO
charges.
BY THE LAND
OWNER AND THE
BETWEEN
THE LAND OWNER
6. Agreement
into
BUILDER
3. TAX entered
PAID RECIEPT
AND
THE
BUILDER
between
the
land
owner/s
and
FOR THE PERIOD 2003-04, AND
builder.EXTRACT
2004-04 the
4. KATHA
7.
Copy of
byCMC
the
ISSUED
BYGPA
THE executed
OFFICE OF
land
owner/s
in
favour
of
the
RAJARAJESHWARI NAGAR CMC
Builder.
BANGALORE
8. Katha extract issued bythe
office of jurisdictional revenue
authority.
9. Tax paid receipt for the
ADDITIONAL
DOC REQUIRED
period 2004-2005.
10. Copy of approved layout
plan issued by BDA.
11. Encumbrance certificates
from :
CLEAR
a. 01.04.1991 to 25.09.1994 (in
respect of Sy.no.24/2).
b. 04.07.2004 till date (for all
portions).
NOTE: SEEGEHALLI VILLAGE IS
INCLUDED IN THE GREEN BELT
AS PER CDP.
25.11.04
C S VISHWANATH
29.01.05
C S VISHWANATH
20.02.04
ed in to between
08.10.04
land owner and
C S VISHWANATH
the builder 2) GPA01.04.04
executed by the land owner in favour of the buuilder 3) Copy of appro
e / receipt towards
6.11.04
the payment
C S of
VISHWANATH
land conversion 03.07.04
fee / receipt towards the payment of land conversion fee receipt issue
7.11.95 executed
01.10.04
by shanaz begum
C S VISHWANATH
in favour of y venkatesh
12.05.2004
3) copy of sale deed dated 19.01.68 executed in favour of kem
..2ENTERED INTO
1. AGREEMENT
/2/LAND OWNER
BETWEEN THE
1. Draft
AND copy of sale
8.
Katha
extract
issued
by the
agreement.
2. GPA
Draft
copy
of
THE BUILDER 2.
EXECUTED
BMP.
construction
agreement.
BY THE LAND
OWNER IN
9. Endorsement
for
non-3.
3.FAVOUR
Draft
copy
of the
proposed
0F THE
BUILDER
acquisition
issued
by
the
sale
deed.
KATHA EXTRACT ISSUEDBDA.
BY
10.
Genealogical
tree ofinto
the
4. OFFICE
Agreement
entered
THE
OF JURISDICTIONAL
family of
Sri.M.A.Khaleel.
between
the
land owners
and
REVENUE
AUTHORITY
4. TAX
11.
Death
certificate
of
the
builder.
PAID RECIEPT FOR THE PERIOD
Sri.M.A.Khaleel.
5. GPA
executed
by the land
03.08.2004
C S VISHWANATH
10.01.2000
2003-04
AND 2004-05
12.owners
Permission
for change
in favour
of the of
land use from
green belt to
builder.
residential
use
issued which
by the
6. Title deed
through
HUD.
Sri.Munishamappa
acquired
25.05.05
C S VISHWANATH
14.06.2002
CLEAR
13.
E.C from
01.04.1991
the
property
(in
respect of till
land
date
(for all
portions).
bearing
Sy.no.54).
14.
Copy of
of sale
approved
layout
8. Copy
deed dated
issuedexecuted
by the BDA.
05.02.1996
in favour
15. non
Draft
copy of agreement
of-acquisition
Smt.Padma
(doc byto
1 executed by 02.07.2004
hanumakka in C
favour
S VISHWANATH
of motappa 3)21.02.2003
endorsement for
issued
the bda 4 Copy of gpa exe
sell.
no.12653/1995-96).
16.
copy
ofexecuted
construction
9. Draft
Copy of
GPA
by
agreement.
Smt.Padma
in favour of
17. Draft
copy ofBabu.K.
proposed sale
Sri.Ravi
ion certificate 02.07.2004
3) endorsement
C for
S VISHWANATH
non acquisition 07.11.2003
issued by the bda
40 katha
extract
issued
deed.
10. Katha
extract
issued
by by
thethe jurisdictional revenue
office of CMC, Mahadevapura,
NOTE:
Bangalore (for
both portions).
I) HOW
CAN BMP
APPROVE
11.
Tax paid
receipt
for the
LAYOUT
PLANS?.
period
2004-2005
(for both
II) CHOKKANAHALLI
portions).VILLAGE IS
INCLUDED
IN THE GREEN
12. Genealogical
tree of BELT
the
PER CDP.
family ofAS
Sri.Munishamappa.
13. Genealogical tree of the
21.12.04
C S VISHWANATH
01.04.91
family of Sri.Kempanna.
14. Original blue print plan
issued by the BDA (copy given
is from CMC, Mahadevapura,
Bangalore).
15. E.C from 01.04.2004 till
date (in respect of Sy.no.54).
1.02.05
C S VISHWANATH
01.04.04
27.05.05
C S VISHWANATH
09.10.03
05.07.2004
C S VISHWANATH
24.03.2000
CLEAR
19.05.05
C S VISHWANATH
29.08.2008
VISHWANATH
CLEAR
06.07.2004
C S VISHWANATH
04.03.2004
CLEAR
7. Encumbrance Certificates
ADDITIONAL DOCS REQUIRED.
from:
a. 01.04.1991 to 31.03.2004.
b. 05.06.2004 till date.
15.09.2005
C S VISHWANATH
17.03.05
C S VISHWANATH
30-08-2005
C S VISHWANATH
CLEAR
18/07/2006
C S VISHWANATH
01.04.2005 to 02.06.2006
CLEAR
17.10.2008
C S VISHWANATH
CLEAR
05.08.2004
C S VISHWANATH
17.12.2000
CLEAR
recept towards08.07.2004
the land conversion
C S VISHWANATH
fee or receipt 11.06.2004
issued by the office of cmc bommanahalli bangalore towards the payme
29.03.05
C S VISHWANATH
25.11.03
07.08.2004
C S VISHWANATH
19.05.2004
15/06/05
C S VISHWANATH
27.06.03
CLEAR
17.12.04
C S VISHWANATH
CLEAR
F PARTITIONM DEED
26.07.2004
DATED 16.06.01
C S VISHWANATH
EXECUTED AMONGST
31.03.1991
SRI H JAI SHANKAR AND OTHERS 4) RELEASE DEED EXECUTED B
MT MUNITHAYAMMA
11.08.2004
& OTHERS
C (SDOC
VISHWANATH
NO 20500/03-04)
02.07.2004
IN RESPECT OF SY NO 51 2) Sale deed dated 19.01.04 executed by
10.07.2004
C S VISHWANATH
05.07.2004
CLEAR
27.07.2004
C S VISHWANATH
01.06.2004
CLEAR
12.07.2004
C S VISHWANATH
03.06.2004
13.07.2004
C S VISHWANATH
03.01.2004
01.01.2004
C S VISHWANATH
19.02.05
C S VISHWANATH
15.07.2004
C S VISHWANATH
26.05.2004
17.07.2004
C S VISHWANATH
16.04.2004
CLEAR
17.07.2004
C S VISHWANATH
02.04.2004 & 21.09.2004
17.07.2004
C S VISHWANATH
03.04.1997
1.10.2005
C S VISHWANATH
01.04.2003
CLEAR
CLEAR
CLEAR
16.07.2004
C S VISHWANATH
23.04.2004
30.07.2004
QUERIES
02.06.2001
20.08.2004
C S VISHWANATH
23.01.2004
29.07.2004
C S VISHWANATH
03.06.2004
29.09.04
C S VISHWANATH
18.06.2004
02.08.2004
C S VISHWANATH
CLEAR
1. Prior Title deeds in
respect Sy nos.56,72, 73/2 &
74/1 (only copies of IHC/s of
1995-1996 are given). 2.
NOT AVAILABLE
Registered
loan discharge
certificate issued by the K.G.B.
Hennagara (in respect of Sy
no.74/1).
3.
Tax
paid
for the
ADDITIONAL receipt
DOC REQUIRED
period 2004-2005.
4. Judgement and decree dated
09.09.196 passed in O.S. no.
602/1996.
ADDITIONAL
DOC
REQUIRED
5.
Draft copy of
agreement
to
sell.
6. Draft copy of construction
agreement.
7. Draft copy of the proposed
sale deed.
8. Encumbrance Certificate
from 12.12.2004 till date.
14.03.05
C S VISHWANATH
12.12.04
15/07/2004
C S VISHWANATH
17/6/04
CLEAR
31.05.05
C S VISHWANATH
25.03.2004
CLEAR
24.02.05
C S VISHWANATH
01.04.91
31.05.05
C S VISHWANATH
13/07/05
C S VISHWANATH
27/04/04
CLEAR
02.06.05
C S VISHWANATH
1.04.91
CLEAR
05.08.2004
C S VISHWANATH
CLEAR
21.04.2002
Subject to production of tax paid receipt for the period 2003-04
29.06.04
C S VISHWANATH
27.11.03
06.08.2004
C S VISHWANATH
27.12.2004
26.09.2005
C S VISHWANATH
31.03.2004
29.12.04
C S VISHWANATH
25.08.2004
C S VISHWANATH
17.06.2004
CLEAR
26.07.2004
C S VISHWANATH
28.10.1999
26.07.2004
C S VISHWANATH
31.08.1989
7.01.05
C S VISHWANATH
23.12.2003
CLEAR
CLEAR
27.11.04
C S VISHWANATH
22.09.2005
C S VISHWANATH
30.11.04
C S VISHWANATH
26.07.2004
C S VISHWANATH
25.10.04
C S VISHWANATH
1. Agreement
entered
into VERIFICATION
04.06.04
PLEASE SEND THE
BUILDER FOR
ORIGINAL
between the land owner and
the builder.2. GPA executed by
the land owner in favour of the
builder.3. Land conversion
23.11.04
CLEAR
certificate.4.
Draft copy of
agreement to sell.5. Draft copy
of construction agreement.6.
Draft copy of the proposed sale
deed.7. Permission for change
15.03.2000
CLEAR
of land use from green belt to
residential use issued by the
HUD.8. E.C from 21.08.2004 till
date.
21.08.04
28.07.2004
C S VISHWANATH
03.05.2004
CLEAR
29.07.2004
C S VISHWANATH
07.07.2004
03.08.2004
QUERIES
18.08.2004
22.07.04
CLEAR
31.05.1989
28.10.04 FURNISH
C S VISHWANATH
THE SURVEY NUMBER
31.07.1986
EXTENT AND BOUNDRIED OF THE PROPERTY FOR WHICH OPINION
11.09.2004
C S VISHWANATH
16.08.2004
QUERIES
30.07.2004
QUERIES
04.10.2002
30.07.2004
QUERIES
21.12.2001
04.08.2004
QUERIES
01.08.2004
C S VISHWANATH
20.09.2004
C S VISHWANATH
16.08.2004
QUERIES
04.08.2004
C S VISHWANATH
4/4/2004
04.08.2004
C S VISHWANATH
23.10.2002
CLEAR
21.03.05
C S VISHWANATH
26.04.2004
C S VISHWANATH
30.12.1994
CLEAR
1. AGREEMENT ENTERED INTO
BETWEEN LAND
OWNER AND THE BUILDER 2.
GPA EXECUTED BY THE LAND
OWNER AND THE BUILDER
17.05.05
C S VISHWANATH
Not received
07.08.2004
QUERIES
26.07.2004
05.08.2004
C S VISHWANATH
07.08.2004
C S VISHWANATH
11.09.2004
C S VISHWANATH
10.01.05
C S VISHWANATH
06.08.2004
C S VISHWANATH
06.08.2004
C S VISHWANATH
07.08.2004
C S VISHWANATH
CLEAR
29.09.2004
C S VISHWANATH
07.08.2004
C S VISHWANATH
07.08.2004
C S VISHWANATH
21/6/04
CLEAR
16.01.2004
1. Will dated 2/1/1981 executed by Mary Matthan
21.05.04
1. Genealogical tree of the family of G V Krupanidhi.
12.09.03
12.08.2004
C S VISHWANATH
19.11.2002
14 08.2004
C S VISHWANATH
21.08.2004
05.03.05
C S VISHWANATH
18.04.04
27.04.05
C S VISHWANATH
12.03.03
SHAMMANA
31.05.89
CLEAR
Not received
06.09.2004
C S VISHWANATH
31.07.1986
14.08.2004
C S VISHWANATH
23.08.2004
CLEAR
24/06/05
C S VISHWANATH
21/04/05
27.08.2004
C S VISHWANATH
18.07.2004
CLEAR
21.12.04
C S VISHWANATH
31.03.1989
CLEAR
04.08.04
C S VISHWANATH
22.12.01
CLEAR
11.03.2004
17.08.2004
C S VISHWANATH
25/10/2005
C S VISHWANATH
01.10.2005
C S VISHWANATH
10.11.2010
C S VISHWANATH
08.10.04
C S VISHWANATH
1/7/2004
22.09.2004
C S VISHWANATH
09.12.1999
14 .08.2004
C S VISHWANATH
01.04.1992
ADDITIONAL DOCUMENTS
REQUIRED
CLEARED
CLEAR
16.09.04 1. E C S
from
VISHWANATH
1/4/1991
22/06/04
to 31/3/03for
but old dated
siterequired
no18/1,22,20 &21. 2. EC from 1/4/1991 to 31/3/2001for 2
19.08.2004
C S VISHWANATH
28.07.2004
CLEAR
02.03.05
C S VISHWANATH
25.04.00
CLEAR
15/07/05
C S VISHWANATH
23/06/05
CLEAR
03/05/06
C S VISHWANATH
CLEAR
20.08.2004
C S VISHWANATH
21.04.2004
CLEAR
15.05.2006
C S VISHWANATH
17.04.2006
13.08.2004
C S VISHWANATH
16.11.04
C S VISHWANATH
CLEAR
1. Complete set of palupatti
dated 19.8.73 executed
amongst kalappa and others 2)
Why is the name of b k ramesh
CLEAR
kumar omitted as co vendor in
the sale deed dated 2.04.92
the same requires clarification
3) genealogical tree of the
family of buchappa
12.07.2004
Not received
16/10/2003
not received
CLEAR
05/03/04
C S VISHWANATH
30/03/01
03.12.04
C S VISHWANATH
1/4/1991
04.02.05
C S VISHWANATH
27.09.04
CLEAR
Not received
15.05.2004
C S VISHWANATH
15.03.2003
25.4.2003
C S VISHWANATH
1.11.2002
E C to be updated.
19.06.2003
SHAMMANA
14.4.2002
CLEAR
10.09.03
C S VISHWANATH
04.07.03
CLEAR
Not received
Not received
11.02.05
C S VISHWANATH
5.07.03
12.09.03
SHAMMANA
08.12.02
05.07.2003
MR
SHASHIKANTH
2.03.2003
SHAMMANA
1. CLEAR
Land conversion
certificate / Receipt towards
the land conversion fee OR
Receipt issued by the office of
CMC, Mahadevapura,
CLEAR
Bangalore towards the
payment of betterment
charges. 2. Copy of sanction
plan for the building.
CLEAR
3. Draft copy
of agreement to
sell.
4. Draft copy of construction
agreement.
5. Draft copy of proposed sale
deed.
6. E.C from 01.06.2003 till
date.
11.10.2001
Not received
20.01.05
C S VISHWANATH
28/11/2005
C S VISHWANATH
01.06.03
CLEAR
06.08.2002
SHAMMANA
29.11.1998
SHAMMANA
Not received
29.01.05
C S VISHWANATH
01.04.91
Not received
Not received
20.01.04
SHAMMANA
09.03.2001
SHAMMANA
29.05.2000
SHAMMANA
04.04.2003
SHAMMANA
25.11.03
5.7.1997
CLEAR
CLEAR
Not received
10.02.05
C S VISHWANATH
CLEAR
16.06.2004
C S VISHWANATH
CLEAR
12.11.1997
Clear-Report by
Mr.N.C.S.Raghav
an.
CLEAR
20.04.1999
Clear-Report by
Smt.Gayathri.S.A
charya.
CLEAR
N/A
21.08.2004
C S VISHWANATH
09.07.2004
CLEAR
25.12.04
C S VISHWANATH
18.05.04
05.10.04
C S VISHWANATH
17.08.04
CLEAR
02.09.2004
C S VISHWANATH
30.4.2003
CLEAR
9.9.2003
SHAMMANA
30.4.2003
CLEAR
20.11.03
SHAMMANA
31.07.03
CLEAR
Not received
Not received
10.07.2004
C S VISHWANATH
Yet to be
cleared.
12.02.2004
01.07.02
SHAMMANA
9.4.2002
23.08.03
SHAMMANA
30.08.03
21.07.1999
SHAMMANA
CLEAR
CLEAR
Not received
28.07.2001
SHAMMANA
12.11.03
SHAMMANA
10/05/03
C S VISHWANATH
CLEAR
27.09.03
CLEAR
CLEAR
Not received
11.08.03
SHAMMANA
08.07.03
CLEAR
23.08.2004
C S VISHWANATH
31.01.2004
CLEAR
08.09.2004
C S VISHWANATH
CLEAR
2002).
7. Title deed at least for the
preceding 13 years including
the deed through which
Sri.Ashok and another acquired
the property (in respect of land
bearing Sy.no.60).
8. Title deed at least for the
preceding 13 years (in respect
of land bearing Sy nos.60/2,
61, 62, 70,
71 & 72/2).
CLEAR
Tripartite agreement
executed
..2
amongst the/2/
land owners,
promoters and builder 2. Tax
paid
receipt dated
for the
9.
Permission
for change
of
ADDITIONAL
DOC
REQUIRED
2004-2005.
land period
use from
green
belt to
3.
Katha extract
issuedby
bythe
the
residential
use issued
office
of CMC,
HUD.
Rajarajeshwarinagar,
10. Encumbrance
certificates
Bangalore.
from:
ADDITIONAL DOC REQUIRED
Genealogical
tree of the in
a. 4.
01.04.1991
to 31.03.2000
family
of Sri.T.N.
Balakrishna.
respect
of Sy.no.60).
5.
from 03.03.2004
till
b. E.C
01.04.2004
till date (in
respect date.
of Sy.no.60).
c. 01.01991 till date (in respect
of Sy.nos.60/2, 61, 62, 70, 71
and 72/2)
23.04.2008
CS
VISHWANTHA
23.09.2005
C S VISHWANATH
16/03/04
31.08.2004
C S VISHWANATH
22.12.1994
20.11.04
C S VISHWANATH
03.03.04
27.08.2004
C S VISHWANATH
07.01.05
C S VISHWANATH
01.04.04
26.08.2004
C S VISHWANATH
23.06.1995
06/10/05
C S VISHWANATH
23.04.2008
C S VISHWANATH
CLEAR
29.12.04
C S VISHWANATH
15.02.05
C S VISHWANATH
22-08-2005
C S VISHWANATH
CLEAR
03.09.04
12.11.2005
C S VISHWANATH
26.08.2004
C S VISHWANATH
29.10.1997
11.09.2004
C S VISHWANATH
15.04.1993
09.09.2004
C S VISHWANATH
04.07.2004
CLEAR
04.09.2004
C S VISHWANATH
19.11.2003
07.09.2004
C S VISHWANATH
06.03.2004
11.09.2004
C S VISHWANATH
26.08.2004
04.09.2004
C S VISHWANATH
06.12.2003
CLEAR
09.09.2004
C S VISHWANATH
23.11.04
C S VISHWANATH
CLEAR
09.02.05
C S VISHWANATH
09.02.05
C S VISHWANATH
CLEAR
23.02.05
C S VISHWANATH
03.12.04
CLEAR
10.09.2004
C S VISHWANATH
c no 2096/1999-2000
30.09.04
2096/99-00
C S VISHWANATH
& 2097/99-00
11.09.2004
C S VISHWANATH
17.02.05
C S VISHWANATH
13.09.2004
C S VISHWANATH
18.11.04
C S VISHWANATH
07.10.04
C S VISHWANATH
16.09.04
11.09.2004
C S VISHWANATH
28.07.2004
28.12.04
C S VISHWANATH
28.01.2003
22.01.05
C S VISHWANATH
19.04.2004
17.03.05
C S VISHWANATH
1.05.02
07.02.2002
CLEAR/ADD
03.06.05
C S VISHWANATH
06.02.2004
27-09-04
20.04.04
27.10.04
C S VISHWANATH
5/5/2004
06.01.05
C S VISHWANATH
31.3.04
C S VISHWANATH
27.09.2004
C S VISHWANATH
29.04.05
C S VISHWANATH
10.06.2004
C S VISHWANATH
04.01.05
C S VISHWANATH
29.12.04
C S VISHWANATH
C S VISHWANATH
17.03.04
CLEAR
CLEAR
12.11.04
08.04.05
28-09-04
15.10.04
Sri.B.Kishore Kumar.
4. Copy of GPA executed by
Sri.C.K.Satyapriya in favour of
Sri.C.K.Narothan for sale of
subject property (The GPA
dated 13.06.1972 does not
mention the schedule of the
property). If there is no
specific GPA, then an affidavit
of ratification executed by
Smt.C.K. Satyapriya
ratifying,
C S VISHWANATH
16.06.04
CLEAR
validating and confirming the
sale effected in favour of
Sri.B.Jyothi Prasad &
Sri.B.Kishore Kumar is
C S VISHWANATH
ADDITIONAL
DOC REQ
required.
5. Endorsement for nonacquisition issued by the BDA.
6. Copy of approved layout
plan
by owner
the BMRDA.
landCowner
S VISHWANATH
and the builder.
26-02-04
2. Gpa executed byissued
the land
in favour of the builder. 3. Tax pa
7. Draft copy of agreement to
sell.
8. Draft copy of construction
agreement.
C S VISHWANATH
27-12-03
DOC
REQUIRED
9.ADDITIONAL
Draft copy of
proposed
sale
deed.
10. Encumbrance Certificates :
a. 20.09.2004 till date.
b. 01.10.2004 to 30.10.2004
C S VISHWANATH
23-08-04
CLEAR
(depicting the transaction of
sale deed dated 15.10.2004
(doc no.14000/2004-05)).
09.12.04
C S VISHWANATH
20.04.04
29.09.04
C S VISHWANATH
29.06.04
21.07.04
C S VISHWANATH
ORE 560060
29.09.04
C S VISHWANATH
09.05.05
C S VISHWANATH
29.09.04
C S VISHWANATH
21.04.05
C S VISHWANATH
CLEAR
12.03.05
C S VISHWANATH
27.12.04
14.12.04
C S VISHWANATH
01.06.04
28.05.05
C S VISHWANATH
18.02.05
C S VISHWANATH
16.02.05
CLEAR
19.10.04
C S VISHWANATH
24.09.04
CLEAR
15.07.04
C S VISHWANATH
CLEAR
t entered in to between
03.12.04the land
C S VISHWANATH
owners and the builder
19.08.04
2) GPA executed by the land owner in favour of the builder 3) ec
03.12.04
C S VISHWANATH
14.08.04
04.10.04
C S VISHWANATHTO COMPLY
01.04.91
WITH ALL REQUIRMENTS OF CERFIFICATED DATED 4/10/04
08.12.04
C S VISHWANATH
08.05.03
CLEAR
21.10.04
C S VISHWANATH
26.04.04
04.10.04
C S VISHWANATH
28.08.04
CLEAR
10/08/05
C S VISHWANATH
07.10.04
C S VISHWANATH
04.02.05
C S VISHWANATH
06.10.04
C S VISHWANATH
22.06.04
07.10.04
C S VISHWANATH
22.09.04
CLEAR
05.03.05
C S VISHWANATH
04.01.04
CLEAR
11.10.04
C S VISHWANATH
01.04.04
11.10.04
C S VISHWANATH
14.06.02
08.10.04
C S VISHWANATH
18.11.03
12.10.04
C S VISHWANATH
05.03.04
17.05.05
C S VISHWANATH
30.01.04
1.04.05
C S VISHWANATH
3.11.04
C S VISHWANATH
23.06.04
26.07.04
CLEAR
26.10.04
C S VISHWANATH
13.08.03
clear expect E C from 13.08.2003to till date
16.08.2005
C S VISHWANATH
07.07.05
16.08.05
C S VISHWANATH
09.03.2005
16.08.2005
C S VISHWANATH
31-03-2005
28.10.04
C S VISHWANATH
31.08.04
CLEAR
Is the property woned by Smt.
Hpramila also included in the
development ? If yes then the
folowing CLEAR
add. Docu. Are
required.1. Title deed through
which sri Jattappa acquired the
property. 2. Khatha certificate
issued by the office of CMC
CLEAR
Pattanagere bangalore in fav.
of smt. Pramila.3. Tax paid
reeipt for the period 04-05 4,.
E C from 3/2/01 to 1/4/2004 and
31/8/04 to till date
19.11.04
C S VISHWANATH
11.12.03
13.11.04
C S VISHWANATH
31.03.04
CLEAR
28.03.05
C S VISHWANATH
7/10/2004
CLEAR
04.11.04
C S VISHWANATH
16.06.04
29.12.04
C S VISHWANATH
01.04.91
05.02.05
C S VISHWANATH
01.04.04
CLEAR
09.02.05
C S VISHWANATH
25.12.03
24.02.05
C S VISHWANATH
02.05.03
19.04.2005
C S VISHWANATH
17.10.03
27-08-2005
C S VISHWANTH
26/07/05
C S VISHWANATH
CLEAR
14/07/05
C S VISHWANATH
15/01/05
C S VISHWANATH
19/9/06
10/1/2005
CLEAR
CTO
S VISHWANATH
SEND THE BUILDER FOR ORIGINAL VERIFICATION
CLEAR
30.12.2006
C S VISHWANATH
08.11.2006
CLEAR
12.11.04
C S VISHWANATH
31.03.04
CLEAR
06.09.04
C S VISHWANATH
24.07.04
CLEAR
13.12.04
Sri.G.M.Gandhi (doc
no.384/2004-05).
5. Copy of IHC no.296/1988-89.
6. Tax paid receipt for the
period 2004-2005.
7. Katha extract issued by the
jurisdictional revenue
authority.
8. Genealogical tree of the
family of Sri.Thippa Reddy.
C S VISHWANATH
11.10.04
ADDITIONAL
REQUIRED
9.
Draft copy DOC
of agreement
to
sell.
10. Draft copy of construction
agreement.
11.
Draft copy
of the
proposed
1.
Tax
paid
receipt
for
C S VISHWANATH
24.03.04
CLEAR
sale
deed.
the period
2004-05.2.
Katha
12. E.C from
17.09.2004
till
certificate
issued
by the BMP
in favourdate.
of M/s Ranka
Developers.
C S VISHWANATH
17.09.04
3. Genealogical tree/s of the
family of Sri.Chikkamayappa
and Sri.C.Krishnappa.
4. GPA dated 02.02.1985
executed by Sri.C.Krishnappa
in favour of Sri.S.M.Ghouse
(doc no.671/1984-85).
5. Sale deed dated 23.07.2003
executed by Sri.Ghouse in
C S VISHWANATH
31.07.04
favourCLEAR
of M/s Ranka
Developers (doc no.872/200304).
6. Draft copy of agreement to
Agreement
entered into
sell.
C S VISHWANATH
02.07.04
CLEAR
between
the
land
owners and
7. 1.
Draft copy Draft
of construction
copy of
the builder
2. GPA executed by
agreement.
construction
agreement. 2.
the
landcopy
ownersproposed
in favoursale
of
8.
Draft
Draft
copy of of
sale agreement.
thedeed.
builder.
3. Draft copy of the proposed
3. Title deeds atleast for the
C S VISHWANATH
sale deed
preceding 13 years.
4. In the sale deed dated
4. Partition deed dated
20.03.1980 executed in favour
20.09.2001 executed amongst
of Sri.Subramani, the property
Sri.Gopala Reddy and others
measurement
is shown as from
C S VISHWANATH
22.08.04
CLEAR
(doc no.3769/2001-02).
East to West : 60 Sq., Ft., and
5. Final decree for partition
North to South : 30 Sq., Ft.,.
towards the share of Sri.Rama
But in the Special notice dated
Reddy in OS no.234/1997.
27.04.1995 issued by the BMP
6.
Land conversion
certificate.
C S VISHWANATH
ADDITIONAL
DOC REQUIRED
& Joint Development
7. Tax paid receipt for the
agreement dated 24.01.2005,
period 2004-2005.
the measurement depicted as
8. Katha extract issued by the
60 ft., X 42 Ft.,. The disparity
jurisdictional revenue
in measurements requires
C1.SCinst.
VISHWANATH
Agreement. 2.
01.04.91
Sale Agreement. 3. Drft
copy of proposed sale deed E C from 1/4/91
authority.
clarification.
9. Copy of approved layout
5. Encumbrance certificate
plan issued by the BMRDA.
from 02.08.2004 till date.
10. Draft copy of construction
agreement.
C S VISHWANATH
02.08.04
11. Draft copy of sale
agreement.
12. Draft copy of proposed sale
deed
C S VISHWANATH
27.06.03
25.12.04
C S VISHWANATH
06.11.04
03.03.05
23.11.04
15.01.05
04.02.05
13.12.04
04.12.04
01.12.04
4.1.05
19.03.05
01.04.91
09.12.04
C S VISHWANATH
13.01.05
C S VISHWANATH
07.12.04
C S VISHWANATH
18.12.04
C S VISHWANATH
K BLORE 49
payment of betterment
charges.2. Copy of sale deed
Agreement
entered
into in
dated
09.02.1993
executed
between
land owner(doc
and
favour ofthe
Sri.Madanlal
the Builder
2. GPA executed by
no.8676/92-93).
the
land ownerentered
in favour
of
3. Agreement
into
Builder.
betweenthe
land
owner and the
3. Katha extract
issued by the
Builder.
jurisdictionalcopy
revenue
4. Adjudicated
of GPA
authority.
dated 25.08.2004
executed by
21.02.04
CLEAR except
nil
E C of
from
21/2/04
4. Draft
copy
agreement
to30/3/04
Sri.Madanlal
in
favour
ofto
sell. Seervi.
Sri.A.Narayanlal
Draft Endorsement
copy of construction
5.5.Latest
for nonagreement.
acquisition
issued by the BDA.
6.6.
Draft
of proposed
sale
Copycopy
ofCLEAR
approved
layout
06.08.04
deed.
plan issued
by the BDA.
E.C copy
from of
15.11.2003
toto
7. 7.
Draft
agreement
31.03.2004.
sell.
8. Draft copy of construction
31.03.04
agreement.
9. Draft copy of proposed sale
deed.
10. Encumbrance Certificates:
a. 01.04.1991 till date (in
respect of Sy no.55).
b. 27.12.1996 till date (in
respect of Sy no.204).
27.12.06
31.03.05
C S VISHWANATH
1.11.03
08.01.04
C S VISHWANATH
11.06.04
25.02.2008
C S VISHWANTH
12.02.05
C S VISHWANATH
12.01.04
27.01.05
C S VISHWANATH
16.11.99
CLEAR
05.01.05
C S VISHWANATH
02.07.02
development
r of the builder.
of 21.12.04
the
3. Regist
shedule
GPA
property
Cexecuted
S VISHWANATH
by by
M?S
the
javer
landdhan
owner
builders
in fav. and
Of
the
developers
builder.
4.
while
Darft
under
copy
mortgage
of agreement
and to
acceptance
sell. 5. Cop
fo
4. Katha
extract
issued
by the
CMC, Mahadevapura,
Bangalore in favour of
Kumari.Deepa and others.
6. Court permission for sale of
25.01.05
C S VISHWANATH
17.06.04
ADDITIONAL DOC REQUIRED
share of Kumari. Deepa in the
property.
12.02.05
C S VISHWANATH
25.11.04
Draft copy of sale agreement
2. Draft copy of construction
agreement.
ADDITIONAL
REQUIRED
3.
Draft copy DOC
of the
proposed
sale deed.
4. Government permission for
sale of property.
5. Encumbrance certificates
ADDITIONAL DOC REQUIRED
from:
a. 01.04.1991 to 31.03.1992.
b. 30.04.2003 till date
25.12.04
C S VISHWANATH
01.04.91
27.01.05
C S VISHWANATH
01.04.91
28.04.05
C S VISHWANATH
30.04.03
28-08-2005
C S VISHWANATH
06/06/05
C S VISHWANATH
21.01.05
C S VISHWANATH
07.06.04
to compley with 4 5 6
29.12.04
C S VISHWANATH
05.07.04
17.01.05
C S VISHWANATH
02.07.03
To comply with rep nos 1 2 & 3 of certificate
30.12.04
C S VISHWANATH
27.06.03
15.01.05
C S VISHWANATH
31.07.04
25.05.05
C S VISHWANATH
31.03.04
09.05.05
C S VISHWANATH
25.05.05
14.02.05
C S VISHWANATH
10.02.04
17.01.05
C S VISHWANATH
01.04.91
06.01.05
C S VISHWANATH
08.03.04
06.01.05
C S VISHWANATH
01.05.04
07.01.05
C S VISHWANATH
29.10.02
15/07/05
C S VISHWANATH
17/06/05
10.03.05
C S VISHWANATH
01.04.90
07.01.05
C S VISHWANATH
01.04.91
22.01.05
C S VISHWANATH
20.10.04
4.02.05
C S VISHWANATH
09.01.04
guntas).
3. Draft copy of the proposed
salecopy
deed.
4. Draft
of sale
8. Title
deed/s
through
which
sale deed.
agreement.
Sri.Periyanna
acquired
the
4. Tax paid receipt for the
5.
Draft copy
of construction
property
in
respect
of
land
period 2004-2005.
agreement.
bearing
Sy.no.88:
34 guntas
5. E.C from
08.03.2004
till
6. Draft
the
proposed
and copy
90/2date.
:of11
guntas.
sale deed.
9. Title deed/s
through which
7.Smt.Sakamma
Copy of sanction
plan for
the
acquired
the
building.
property
in respect of
8. E.C from
01.05.2004
till :
Sy.nos.88:
34 guntas
and 90/2
21 date.
guntas.
10. Copy of mutation register
bearing MR no.6/2000-01.
11. Copy of mutation register
bearing MR no.14/1990-91.
12. Copy of mutation register
bearing MR DOC
no.6/1995-96.
ADDITIONAL
REQUIRED
13. Tax paid receipt for the
period 2004-2005.
..2
/2/
CLEAR
14. Katha extract issued by the
jurisdictional revenue
authority (for all portions).
15. Original blue print plan
CLEAR
issued by BMRDA.
16. E.C/s from:
a. 01.04.1991 to 31.03.1992.
b. 10.02.2004 till dated.
2. Draft copy of construction
agreement.
7. Original blue print plan
issued by BIAAPA.
CLEAR
8. Encumbrance certificates
from :
a. 09.01.2004 to 31.03.2004.
b. 16.10.2004 till date.
Tax paid
for the
In6.respect
ofreceipt
Sy.no.45/1
and
period 2004-2005.
47.
7. Sale
Landdeed
conversion
certificate
1.
dated 14.09.1967
or
receipt towards
executed
in favourthe
of
paymentSri.Muthappa
of land conversion fee
or(doc.no.2228/1967-1968)receipt issued by the office
of CMC,
Bommanahalli,
Sy.no.45/1.
Bangalore
2. Titletowards
deed of the
payment of betterment
Smt.Yashodamma
and others.
charges.
3. Title deed
at least for the
31.03.05
C S VISHWANATH
ADDITIONAL
REQUIRED
8.preceding
Copy of sanction
plan
for the
13DOC
years
including
building.
the deed
through which
9. Encumbrance certificates
Sri.Venkateshappa
acquired
from:Sy.no.47.
land bearing
a.Land
01.04.1990
to 20.02.2003
conversion
certificate.
2 Family18.02.05
partition deed
CS
executed
VISHWANATH
amongst sri
13.09.04
guttaiah and4.others
6 draft copy
of construction agreement 7 Draft
(depicting the
transaction of
4
sale deed dated
/4/ 23.03.2001
(doc no.11043/2000-01)).
21.02.2003 tree
till date.
5.b.
Genealogical
of the
13.01.05
C S VISHWANATH
21.02.03
Family of Sri.Muthappa.
6. Genealogical tree of the
family of Sri.Ramaiah.
Common
documents
Draft copy
1.02.05
of sale agreement
C S VISHWANATH
2 draft copy of29.01.04
construction agreement
3 draft
copy of: the proposed sale deed Copy
C S VISHWANATH
11.02.05
C S VISHWANATH
19.03.04
18.01.05
C S VISHWANATH
24.01.05
C S VISHWANATH
24.01.05
C S VISHWANATH
16.07.04
22.01.05
C S VISHWANATH
18.07.04
02.03.05
C S VISHWANATH
20.09.04
25.01.05
C S VISHWANATH
01.04.91
CLEAR
03.03.05
C S VISHWANATH
12.02.05
C S VISHWANATH
09.02.05
C S VISHWANATH
16.11.04
30.04.05
C S VISHWANATH
05.06.04
27.01.05
C S VISHWANATH
plan
iss0ued
by the BIAAPA.
favour
of Sri.Ramaswamy.
Encumbrance
certificate
8.9.
Katha
extract issued
by the
from
01.04.1991
till date.
jurisdictional
revenue
authority.
1.
Draft
copy ofOF
NOTE
: ONLY
ON
PERUSAL
9. Tax
paid receipt
for the
agreement
to
sell.
2. Draft
AFORESAID
DOCUMENTS,
period 2004-2005.
copy
of construction
OTHER
DOCUMENTS
REQUIRED
10. Genealogical
tree
of the
agreement.
IF
ANY, WOULD
BE SOUGHT
family
of Sri.Hanumappa.
3. Draft
of the proposed
FORcopy
SUBSEQUENTLY.
11. Draft
copy
of agreement to
sale deed
sell.
4. Please provide the Page
12. Draft copy of construction
No.4 of sale deed dated
agreement.
16.04.1974 depicting the
13. Draft copy of the proposed
property schedule [refer sale
sale deed.
deed dated 16.04.1974 (doc
14. Copy of approved layout
ADDITIONAL DOC REQUIRED
no.1653/74-75)].
plan issued by the BDA.
15. E.C from 16.11.2004 till
5. Tax paid receipt for the
date.
period 2004-2005.
6. Copy of sanction plan for the
building.
7. E.C from 05.06.2004 till
date.
12.02.05
C S VISHWANATH
23.07.02
CLEAR
27.01.05
C S VISHWANATH
01.04.91
27.01.05
C S VISHWANATH
26.01.02
27.03.2007
C S VISHWANATH
20.09.04
28.01.05
C S VISHWANATH
01.04.91
16.03.05
C S VISHWANATH
21.09.04
CLEAR
1. Draft copy of
agreement to sell.2. Draft copy
of construction agreement.
3. Draft copy of the proposed
ADDITIONAL
REQUIRED
saleDOC
deed.
4. Encumbrance certificates
from :
a. 31.03.2003 ( site no.31).
b. 20.07.2003 till date (in
CLEAR
respect of site.no.31).
c. 01.04.1991 till date (in
respect of site no.30).
29.01.05
C S VISHWANATH
01.04.91
16.11.04
08.02.05
C S VISHWANATH
01.04.91
29/06/05
C S VISHWANATH
31/03/05
10.03.05
C S VISHWANATH
06.12.03
04.03.05
C S VISHWANATH
09.08.04
08.02.05
C S VISHWANATH
01.04.91
08.02.05
C S VISHWANATH
01.04.04
18.02.05
C S VISHWANATH
01.04.91
07.02.05
C S VISHWANATH
07.03.05
C S VISHWANATH
09.02.05
C S VISHWANATH
12.02.05
C S VISHWANATH
08.02.05
C S VISHWANATH
date. Jain.
Sri.Ranjan
period 2004-2005.
20. Land..16
conversion
9. Katha extract
issue by the
/16/
certificates.
Draft
copy
of
sale
agreement
jurisdictional
revenue
In
respect
Sy.no.161/1.
21.
Tax copy
paidofreceipt
for the
2.
Draft
of
construction
authority.
period
2004-2005.
agreement.
10.
Copy of approved
layout
1.Draft
Genealogical
tree
of
the
22.
Katha
extract
/ proposed
Demand
3.
copy
ofplan
the
plan
/ Sanction
issued by
family
of
Sri.Muniyappa.
register
issued
by
the
sale
deed.
the10.12.2004
BDA.
2.
E.C
from
till
revenue
4. jurisdictional
Tax
receipt
for the
11.
E.C paid
from
16.11.2004
till
date.
authority.(in respect
period 2004-2005
date.
23. Copy
of approved
of Site
no.4/A). layout
Common
documents:
issued
by
the issued
BIAAPA.
5.plan
Katha
certificate
by
24.
from
01.04.1991
till
the E.C
BMP
(in respect
of Site
1. Draft
copy of sale
date.
no.4A).
agreement.
6. Affidavit dated 29.01.1996
2. Draft copy
of construction
executed
by Sri.K.Mune
Gowda
agreement.
and his sisters
(refer page no.5
3. sale
Draft
copydated
of the08.02.1996
proposed
of
deed
sale
deed.
(doc no.9989/1995-96)).
Agreement
entered
intothe
7. 4.
Copy
of sanction
plan for
between the
land
owners
and
building.
theCLEAR
builder.
5. GPA executed
..2 by the land
1.
Draft copy of
owners
in favour
/2/ of the builder.
to sell.
2. Draft
6.agreement
Katha extract
issued
by the
copy ofCLEAR
construction
jurisdictional
revenue
8. Encumbrance Certificates
agreement.
authority.
from :
3.7.
Draft
copy receipt
of the proposed
Tax
paid
for the (in
a. 01.04.1991 to 31.03.1195
sale2004-2005.
deed.
period
respect of site no.4/A).
4. GPA executed
8. Endorsement
forby
non- (in
b. 01.04.1991
to 17.10.1995
ADDITIONAL
DOC
REQUIRED
Sri.Ramaiah
@
Ramappa
and
acquisition
issued
by
the
respect of Site no.4).BDA.
others in favour
of the
9.
Genealogical
tree
c. 03.11.2004 till date (in
Sri.A.Krishnappa
and
family
of of
Smt.K.Vanaja.
respect
Site no.4).
Sri.K.M.Nanjappa.
10. Work
order in respect of
5.Sy.nos.73/1,
Copy of sanction
issued
77/1, plan
72, 77/16,
by the
BDA.
176/3B,
183/1
& 18.
6.
Encumbrance
certificate
11.
Approved layout
plan
from
01.04.2004
till date.
issued
by BMRDA.
Note: Survey numbers for the
properties are not mentioned
in the sale deed/s executed by
Sri.L.Narendra Prasad and
others in favour of M/s Green
CLEAR
Home Farms and Resorts Pvt.,
Ltd.,. The same requires
rectification / clarification.
CLEAR
09.07.04
CLEAR
03.11.04
19.04.05
C S VISHWANATH
18.02.95
29.03.05
C S VISHWANATH
25.10.04
15.02.05
C S VISHWANATH
01.04.04
27.05.05
C S VISHWANATH
04.12.04
08.04.05
C S VISHWANATH
01.06.96
19.02.05
C S VISHWANATH
22.10.04
19.02.05
C S VISHWANATH
01.04.91
18.02.05
C S VISHWANATH
10.06.03
02.03.05
C S VISHWANATH
19.11.04
18.02.05
C S VISHWANATH
19.11.05
22.02.05
C S VISHWANATH
24.02.05
C S VISHWANATH
9.agreement.
Copy of sanction
plan
issued
2. Draft
copy
of
by the agreement.
BDA.
construction
3. Draft copy of the proposed
sale..2
deed.
/2/entered into
4. Agreement
between the land owners and
10. E.C from
21.03.2004 to
the
Draft copy
ofbuilder.
sale agreement
25.10.2004.
5.
GPA
executed
by the land
2. Draft copy of construction
owners
in
favour
agreement.of the
Only on perusal
of aforesaid
builder.
3. Draft copy
of the proposed
documents,
additional
6.
Copy
of
GPA
executed
by
ADDITIONAL
REQUIRED
saleDOC
deed.
documents
required ifand
any,
Bishop
Pithroliman
4. Title
deed/s
atleast
for the
Draft
copy
of
agreement
would
besale
sought
for
another
favour
of
preceding
13in
years
including
2. Draftsubsequently.
copy
of construction
Rt.Rev.Thomas
Jabamalai.
the deed
through
which
agreement.
7. Tax paid receipt
for the
the
acquired
3. Sri.Shabeer
Draft copy of
the proposed
period
2004-2005.
property.
sale
deed.
8. Katha
extract
issued bytill
the
E.C from
01.04.2004
4. 5.
Endorsement
issued by the
office of CMC,
KR
Puram,
date.
BMP confirming
that property
Bangalore in favour of
bearing no.126 at Banaswadi,
Sri.M.S.Santhosh Reddy and
KR Puram Hobli, Bangalore is
Sri.M.S.Venkatesh.
assigned municipal no.45 and
9. Land conversion certificate
identified as B.Channasandra
or receipt towards the
Main Road, Chikka
payment of land conversion fee
Banasawadi,
Bangalore.
ADDITIONAL
DOC
REQUIRED
or
receipt issued
by
the office
5. Registered copy of final
of CMC, KR Puram, Bangalore
decree for partition.
towards the payment of
6. Orders passed in O.S
betterment charges.
no.1643/1986 together with
10. Copy of approved layout
plaint copyCLEAR
and compromise
plan issued by the BDA.
petition.
11. E.C from 22.10.2004 till
7. Genealogical tree of the
date.
family of Sri.Papaiah Reddy.
8. Copy of sanction plan for the
building.
9. E.C from 01.04.1991 till
date.
CLEAR
9. Copy of approved layout
plan issued by the BDA.
10. E.C from 19.11.2004 till
date.
26.03.05
C S VISHWANATH
26.05.05
C S VISHWANATH
20/06/05
C S VISHWANATH
12.12.2008
C S VISHWANATH
22.04.05
C S VISHWANATH
10.03.05
C S VISHWANATH
23/07/05
C S VISHWANATH
01.03.05
C S VISHWANATH
25.01.2006
C S VISHWANATH
12.03.05
C S VISHWANATH
10.05.05
C S VISHWANATH
05.03.05
C S VISHWANATH
13.08.04
04.07.04
1. DraftCLEAR
copy of sale
agreement.
2. Draft copy of construction
agreement.
3. Draft copy
of the proposed
CLEAR
sale deed.
4. Agreement entered into the
land owners and the builder.
5. GPA executed by the land
owners in favour of the Builder.
6. Permission for the change of
land use from green belt to
residential purpose issued by
the BDA
/ HUD.
CLEAR
7. Land conversion certificate.
8. Tax paid receipt for the
period 2004-2005.
9. Copy of approved layout
CLEAR
plan issued
by the BDA.
05.04.05
C S VISHWANATH
01.09.04
01.09.2005
C S VISHWANATH
03.05.2005
25.01.05
C S VISHWANATH
C S VISHWANATH
LAND CONVERSION
1.
Affidavit executed
CERTIFIACATE/
LAND by
CLEAR confirming
Smt.Venkatamma
CONVERSION FEE/RECEIPT
the receipt
entireOF
sale
ISSUED
BY THEof
OFFICE
CMC,
consideration
from
MAHADEVAPURA,BANGALORE
Sri.C.H.Lakshmaiah
andOF
TOWARDS
THE PAYMENT
delivery
of
possession
unto
BETTERMENT CHARGES.
him OR affidavit executed by
Smt.Venkatamma confirming
that the GPA dated 30.03.1995
was valid and subsisting at the
ADDITIONAL
DOC REQUIRED
time of registration
of sale
deed dated 05.10.2004 in
favour of Sri.V.Ramesh (doc
no.7942/01-02). 2. Draft copy
of sale agreement.
3. Draft copy of construction
agreement.
4. Draft copy of sale deed.
17.03.05
C S VISHWANATH
22.05.2007
C S VISHWANATH
18.02.02
CLEAR
19.03.05
C S VISHWANATH
20.02.04
CLEAR
18/06/05
C S VISHWANATH
10/7/2004
14.03.05
C S VISHWANATH
14.03.05
C S VISHWANATH
14.03.05
C S VISHWANATH
23.03.05
C S VISHWANATH
18.03.05
C S VISHWANATH
CLEAR
8.property
Draft copy
of agreement
measuring
12,600to
Sq., ft., insell.
land bearing
9.
Draft copy
construction
Sy.no.37.
Theof
same
requires
agreement.
clarification.
/ Title deed for
10.
copyportion
of proposed
theDraft
balance
of landsale
is
deed.
required.
11.
Encumbrance
5. Cancellation
of certificates
agreement
from 01.04.1991
till date (all
entered with
portions). Raju.
Sri.Chandrashekar
6. Copy of sanction plan for the
building.
7. E.C from 19.09.2004 till
date.
15.03.05
C S VISHWANATH
28.04.05
C S VISHWANATH
05.03.05
C S VISHWANATH
22.03.05
C S VISHWANATH
1.04.05
C S VISHWANATH
16.03.05
C S VISHWANATH
28.07.2008
C S VISHWANTH
16.03.05
C S VISHWANATH
19.03.05
C S VISHWANATH
23.03.05
C S VISHWANATH
23.02.05
C S VISHWANATH
23.03.05
C S VISHWANATH
23.03.05
C S VISHWANATH
Why
are ON
Sri.Rajesh
& OF
NOTE:
ONLY
PERUSAL
CLEAR
Sri.Santosh
excluded
as
coAFORESAID DOCUMENTS,
owners
in
the
JDA
dated
OTHER DOCUMENTS REQUIRED
?. BE
The
same
IF10.07.2002
ANY, WOULD
SOUGHT
requires
clarification
FOR SUBSEQUENTLY2.
Genealogical tree of the family
of Sri.K.Srinivasan.
3. Copy of Joint development
agreementDraft
should
beof
1.
copy
1.
Draft copy of sale
notarised.
agreement
to sell. 2. Draft
agreement.
2.
copy of
4.
Draft
copy
of Draft
agreement
to
copy
ofCLEAR
construction
construction
agreement.
sell.
agreement.
3.
sale
5.Draft
Draftcopy
copyof
ofproposed
construction
3.
Draft
copy
of
the
proposed
deed.
agreement.
sale deed.
4.Draft
Agreement
into
6.
copyregister
of entered
the proposed
4.
Mutation
bearing
ADDITIONAL
DOC owners
REQUIRED
between
the
land
and
deed.
MR sale
no.9/1972-73.
the
builder.
7. Copy
of are
sanction
plan forofthe
5. Why
the children
5. GPA executed by the land
Sri.Srinivasbuilding.
Reddy excluded as
owners in favour of the
co-owners in the joint
builder.
development agreement ?. The
6. Katha extract issued by the
same requires clarification.
jurisdictional revenue
6. Genealogical tree of the
authority.
family of Late.Sri.C.Papaiah
7. Tax paid receipt for the
Reddy.
periodCLEAR
2004-2005.
7. Genealogical tree of the
8. Genealogical tree of the
family of Sri.N.Srinivas Reddy.
family of Sri.Muninanjappa.
8. E.C from 06.09.2004 till
9. Copy of approved layout
date.
plan.
10. Endorsement issued by the
BDA.
11. Encumbrance Certificate
from 01.04.1991 till date.
22.03.05
C S VISHWANATH
09/07/05
C S VISHWANATH
26.10.2005
C S VISHWANATH
01.04.05
C S VISHWANATH
22.09.04
C S VISHWANATH
26.04.05
C S VISHWANATH
20.03.2003
MR
SHASHIKANTH
11.04.05
C S VISHWANATH
02/07/05
C S VISHWANATH
12.04.05
C S VISHWANATH
R HOBLI BANGALORE
01.04.04
15/07/04
05/07/05
C S VISHWANATH
15/07/2002
22.09.2008
C S VISHWANATH
19.04.05
C S VISHWANATH
20.04.05
C S VISHWANATH
06/08/05
C S VISHWANATH
05/06/06
C S VISHWANATH
06/07/06
C S VISHWANATH
19.04.05
C S VISHWANATH
20.04.05
C S VISHWANATH
23.08.2005
C S VISHWANATH
CLEAR
13.06.05
C S VISHWANATH
CLEAR
25.04.05
C S VISHWANATH
1/4/1992
26.04.05
C S VISHWANATH
13/3/2007
C S VISHWANATH
CLEAR
26.05.05
C S VISHWANATH
10/08/05
C S VISHWANATH
31.10.2005
C S VISHWANATH
CLEAR
30.04.05
C S VISHWANATH
10.05.05
C S VISHWANATH
13.10.2008
C S VISHWANATH
CLEAR
05.05.05
C S VISHWANATH
14.05.05
C S VISHWANATH
18.05.05
C S VISHWANATH
21.09.2005
C S VISHWANATH
CLEAR
10/09/05
C S VISHWANATH
18.05.05
C S VISHWANATH
20.05.05
C S VISHWANATH
29.05.05
C S VISHWANATH
21/06/05
C S VISHWANATH
25.05.05
C S VISHWANATH
CLEAR
22/07/05
C S VISHWANATH
1.12.2005
C S VISHWANATH
29.12.2008
C S VISHWANATH
CLEAR
27.05.05
C S VISHWANATH
27/05/05
6/4/2005
CLEAR
1.DRAFT
28.05.05
COPY OF
C SAGREEMENT
VISHWANATH
TO SELL. 2. DRAFT COPY OF CONSTRUCTION AGREEMENT. 3. DRAFT COPY OF
13/01/2006
C S VISHWANATH
7/4/2005
PLEASE SEND THE BUILDER FOR ORIGINAL VERIFICATION
20/06/05
C S VISHWANATH
29-09-2005
C S VISHWANATH
09/08/05
C S VISHWANATH
18/06/05
C S VISHWANATH
31.05.05
C S VISHWANATH
24/06/05
C S VISHWANATH
8/6/2005
CLEAR
24/06/05
C S VISHWANATH
16.10.04
CLEAR
08/02/06
C S VISHWANATH
4/5/2005
14/07/05
C S VISHWANATH
28.03.05
17/06/05
C S VISHWANATH
18/01/05
21/06/05
C S VISHWANATH
15/02/05
21/06/05
C S VISHWANATH
11/11/2001
22/06/05
C S VISHWANATH
12/5/2005
10/08/05
C S VISHWANATH
13/07/05
C S VISHWANATH
CLEAR
31/03/04
CLEAR
14/07/05
C S VISHWANATH
16/07/05
C S VISHWANATH
01/07/05
DRAFT COPYCOF
S VISHWANATH
AGREEMENBT
14/07/05
C S VISHWANATH
16/07/05
C S VISHWANATH
21/09/95
04.08.2005
C S VISHWANATH
28/07/04
CLEAR
09/08/05
C S VISHWANATH
1/4/1992
PLEASE SEND THE BUILDER FOR ORIGINAL VERIFICATION
25-09-2005
C S VISHWANATH
9/5/2005
24.01.2006
C S VISHWANATH
25/06/2005
CLEAR
20.10.2005
C S VISHWANATH 1.AGREEMENT
01.04.1992 ENTERED INTO BETWEEN LAND OWNER & BUILDER.
02.08.05
C S VISHWANATH
PARTNERSHIP29.04.2005
DEED OF THE BUILDER FIRM,TAX PAID RECEIPT FOR THE PERIOD 2004-
LAND
29-08-05
CONVERSION
C SCERTIFICATE/RECEIPT
VISHWANATH
31.03.2005
TOWARDS THE PAYMENT OF LAND CONVERSION FEE OR RECEIPT ISS
31-08-2005
C S VISHWANATH
16-11-2004
CLEAR
22.09.2005
C S VISHWANATH
23.04.2004
10/09/05
C S VISHWANATH
CLEAR
24.08.2005
C S VISHWANATH
CLEAR
26-08-2005
C S VISHWANATH
CLEAR
31-08-2005
C S VISHWANATH
08/10/05
C S VISHWANATH
01.04.2004
CLEAR
08/10/05
C S VISHWANATH
12.11.2004
CLEAR
26.11.2005
C S VISHWANATH
01.10.2004
CLEAR
06.09.2005
C S VISHWANATH
01.04.2004
28-10-2005
C S VISHWANATH
15.03.2004
10.09.2005
C S VISHWANATH
13-09-2005
C S VISHWANATH
23.06.1995
HOGUR, B'LORE
07/10/05
C S VISHWANATH
17.01.2005
CLEAR
01.10.2005
C S VISHWANATH
09.12.2005
C S VISHWANATH
01.04.1992
23.09.2005
C S VISHWANATH
02.02.2005
01.10.2005
C S VISHWANATH
CLEAR
03.02.2006
C S VISHWANATH
25/5/2006
C S VISHWANATH
10/6/2005
CLEAR
24/5/2006
C S VISHWANATH
29/12/2005
CLEAR
19/5/06
C S VISHWANATH
18/03/2005
CLEAR
30.06.2008
C S VISHWANATH
CLEAR
08/05/06
C S VISHWANATH
8/11/2005
08.04.2004
C S VISHWANATH
22.03.2004
21.09.2004
C S VISHWANATH
6.09.2004
CLEAR
09.06.2004
C S VISHWANATH
24/10/03
CLEAR subject to nil E C from 24/10/03 to till date
te.SY NO.67/1,88/1,189
05.05.05& 89/1
CE
SC
VISHWANATH
from 17.05.04 till
26.12.2002
date SY.NO.87/1 & 90 a) Title deeds at least for 13 years,b) Copy of G
of the proposed
25.02.05
sale/ deed.4)Tax
18.01.05C Spaid
VISHWANATH
receipt for the01.04.90
period 2004-05.5)Katha extract issued by the jurisdriction revenue a
30.11.04
C S VISHWANATH
19.05.04
CLEAR
17.09.04
C S VISHWANATH
26.08.04
CLEAR subject to NIL EC from 17.03.2004 To 31.03.2004
02.08.2004
C S VISHWANATH
10.05.04
SHAMMANA
30/4/2003
CLEAR
20.10.04
C S VISHWANATH
30.08.04
CLEAR
23.08.2004
C S VISHWANATH
26.06.2004
08.10.04
C S VISHWANATH
20.09.2004
CLEAR
19.10.04
C S VISHWANATH
CLEAR
23.12.04
C S VISHWANATH
04.01.05
C S VISHWANATH
14.12.04
CLEAR
05.08.2005
C S VISHWANATH
01.04.91
CLEAR
d in to between
04.06.2004
p n padma and
C Spioneer
VISHWANATH
development
22.05.2003
2) GPA executed by the land owner in favopur of the builder 3) Endo
10.09.2004
C S VISHWANATH
16.06.04
11.02.05
C S VISHWANATH
26.07.04
20.01.05
C S VISHWANATH
09.12.03
CLEAR
10.05.05
C S VISHWANATH
28.01.04
SHAMMANA
27.03.03
CLEAR
C S VISHWANATH
02.06.04
24.02.05
C S VISHWANATH
07.06.04
CLEAR
29/06/05
C S VISHWANATH
8/6/2005
CLEAR
07.08.03
C S VISHWANATH
25.07.03
CLEAR
17.09.03
DP
SHIVAPRASAD
19.06.03
CLEAR
1.12.2003
C S VISHWANATH
30.12.2003
17.03.05
C S VISHWANATH
01.04.91
CLEAR
9.10.2002
SHAMMANA
30.8.1999
CLEAR
06.11.04
C S VISHWANATH
06/06/05
C S VISHWANATH
10.06.2004
SHAMMANA
28.06.2004
CLEAR EXCEPT E C from 28/06/04 and snaciton plan
22.09.03
CLEAR
CLEAR
16.12.04
C S VISHWANATH
05.04.04
CLEAR
29.09.03
SHAMMANA
16.04.03
CLEAR
17.07.2004
C S VISHWANATH
25.02.2004
CLEAR
1. Agreement
02/07/04
enteredCinto
S VISHWANATH
b/w the land owner
17/12/03
nd the builder 2. GPA executed by land owner and the builder.3. Sa
15/07/05
C S VISHWANATH
1.04.91
CLEAR
25.05.05
C S VISHWANATH
20.03.1998
CLEAR
22.11.04
C S VISHWANATH
E C from 27/9/2004 sanction plan pending both legal and technical not verified
10.04.2004
C S VISHWANATH
CLEAR
09.07.2004
C S VISHWANATH
15.12.1999
18.9.2003
SHAMMANA
20.8.2003
CLEAR
08.02.2003
SHAMMANA
CLEAR
13.02.2003
C S VISHWANATH
CLEAR
27.02.2003
C S VISHWANATH
26.08.2002
1.09.2003
SHAMMANA
13.02.2002
23.11.04
C S VISHWANATH
16/9/04
CLEAR Subject to NIL E C from 16/09/04 To Till date
22-10-2005
C S VISHWANATH
CLEAR
ENTS REQUIRED.
20/11/2006
JOINT AFFIDAVIT
C S VISHWANATH
EXECUTED BY LAND
20.01.1996
OWNER/S AND THE BUILDER REGARDING THE PAYMENT OF EARNEST
17.02.2006
C S VISHWANATH
30.07.2008
C S VISHWANATH
CLEAR
22.10.2005
C S VISHWANATH
29/5/06
C S VISHWANATH
20.04.2004
23.03.02
SHAMMANA
16.03.02
28.8.2002 /
15.12.04SHAMMANA / VISHWANATH
14.03.2001
30.03.01
SHAMMANA
16.11.00
27.07.04
C S VISHWANATH
15.09.02
8.03.2003 /
25.11.04 SHAMMANA/ vishwanath 20.8.2002
30.04.2002
SHAMMANA
clear
17.11.1998
CLEAR
18.8.2000
SHAMMANA
28.5.1997
03.10.00
SHAMMANA
01.04.87
02.08.99
SHAMMANA
12.07.99
22.07.99
SHAMMANA
20.11.96
27.05.2003
SHAMMANA
conditions to be checked
CLEAR Subject to Upto date E C
(Certified) along with latest tax
paid receipt. 2. Permission of
UCL authorities are necessary
for sale.
Up to date EC to be verified.
5. Encumbrance certificate
from 01.04.1991 till date.
..2
/2/
In respect of Sy.No. 32 : 2
acres.
16.12.1994.
Not received
20.05.03
SHAMMANA
18/02/03
03.08.02
SHAMMANA
01/0702
02.08.02
SHAMMANA
13.02.02
30.07.02
SHAMMANA
13.02.02
12.04.01
SHAMMANA
10.08.02
Condition
to be checked
1. Sale
deed dated
12.02.1985
executed in favour of
Sri.Govindappa and others
(doc.no.1520/1984-1985).
2. Encumbrance
CLEARCertificates
from 10.10.1995 till date.
Common Documents:
6.8.2002
SHAMMANA
15.3.2002
06.08.02
SHAMMANA
13.03.02
01.05.01
SHAMMANA
22.03.01
06.05.02
SHAMMANA
17.07.01
27.04.2002
SHAMMANA
CLEAR
1. Draft
copy of sale
agreement.
2. Draft copy of construction
agreement.
3. Draft
copy to
of be
proposed
sale
Condition
checked
deed.
4. Agreement entered into
between the land owner and
the builder.
CLEARby the land
5. GPA executed
owner in favour of the builder.
6. Tax paid receipt for the
period 2004-2005.
7. Katha extract
issued by the
CLEAR
jurisdictional revenue
authority.
8. Copy of approved layout
plan issued by the BDA.
to date
EC to be collected
9.Up
NOC
for non-acquisition
from
BDA.
C S VISHWANATH
20.12.2003
SHAMMANA
20.5.2002
21.12.2001 &
19.05.2003
SHAMMANA
CLEAR
11.04.03
SHAMMANA
06.05.2002
SHAMMANA
CLEAR
Agreement to be signed by all
Owners(Ref : Agreement dt11.07.2000).Also to check that
this sY no doen not come
under Green Belt atea.
03.10.2000
SHAMMANA
CLEAR
03.07.2001
SHAMMANA
CLEAR
09.05.05
C S VISHWANATH
CLEAR
09.02.2003
SHAMMANA
Updated EC to be produced.
16.03.04
C S VISHWANATH
EC from
20.8.2001
CLEAR
31.05.2004
Report by
C.S.Vishwanath
28/4/04
CLEAR
01.10.2010
VISHWANATH
CLEAR
01.12.2001
SHAMMANA
CLEAR
20.6.2002
SHAMMANA
7.1.2002
CLEAR
CLEAR
Not received
03/05/05
C S VISHWANATH
01.04.04
CLEAR
03.01.2003
SHAMMANA
2.12.2002
CLEAR
12.10.2002
SHAMMANA
14.03.2002
CLEAR
28-09-04
C S VISHWANATH
12.08.04
CLEAR
28-09-04
C S VISHWANATH
28.09.04
24.06.2004
Report by
C.S.Vishwanath
9/7/2003
CLEAR
1. Agreement entere into b/w
the land owner in fav. Of
builder.2, GPA executed by the
land owner in fav. Of builder.3.
E C from 9/7/03 to till date
17.09.03
SHAMMANA
CLEAR
17.06.05
C S VISHWANATH
CLEAR
13.06.05
C S VISHWANATH
CLEAR
30.12.2005
C S VISHWANATH
ADDITIONAL DOCUMENTS
REQUIRED.
31.12.2005
C S VISHWANATH
11/04/07
C S VISHWANATH
28.09.2005
ADDITIONAL DOCUMENTS
REQUIRED.
14.02.2006
01.12.2001
SHAMMANA
17.02.2001
CLEAR
SHAMMANA
18.10.03
14.11.03
19.11.03
C S VISHWANATH
18.10.03
13.11.03
C S VISHWANATH
08.10.03
12.11.03
Not received
13.07.2004
Report by
C.S.Vishwanath
29.09.04
C S VISHWANATH
01.09.04
CLEAR
17.09.03
SHAMMANA
09.06.03
CLEAR
Not received
10.09.03
C S VISHWANATH
24.07.03
CLEAR
26.12.2003
C S VISHWANATH
17.7.2003
CLEAR
03.09.2005
C S VISHWANATH
19.12.2004
17.12.04
C S VISHWANATH
29.07.04
19.02.05
C S VISHWANATH
21.04.04
17-09-2005
C S VISHWANATH
08/09/05
C S VISHWANATH
28.01.2006
C S VISHWANATH
no.1610/1997-98).
f. Sale deed (doc
no.1611/1997-98).
g. Sale deed (doc
no.1612/1997-98).
8. Katha extract issued by the
jurisdictional revenue
authority.
9. Tax paid receipt for the
period 2004-2005.
10. Copy of approved layout
CLEAR
plan issued by the BIAAPA.
11. E.C from 29.07.2004 till
date.
CLEAR
08.03.2005
CLEAR
CLEAR
06.05.2004AGREE.
C S VISHWANATH
ENT. B/W LAND OWNER
20.8.1952
AND BUILDER, gpa FAVG. BUILDER3. KHATHA FVG. Najmunnisa 4
ecuted by smt.29.08.2004
Naveeda Khanum
VISHWANATH
rep by GPA Holder
19.12.2003
Sri. Abdul Wahab in favour of Sri.syed Riyaz ur Rehman (doc.No.1562
24/06/05
C S VISHWANATH
24.04.2004
Report by
C.S.Vishwanath
14/02/05
CLEAR
CLEAR
Not received
23.02.2004
C S VISHWANATH
24.02.2010
C S VISHWANATH
10.02.2004
CLEARED
Not received
19.06.2004
C S VISHWANATH
22.04.2004
CLEAR
30.01.2004
C S VISHWANATH
20.09.2003
CLEAR
22.02.05
C S VISHWANATH
14.03.05
C S VISHWANATH
09/08/05
C S VISHWANATH
08.03.2006
C S VISHWANATH
31.03.2004
CLEAR
CLEAR
Not received
LUK BANGALORE
03/11/05
18.06.2003
C S VISHWANATH
C S VISHWANATH
C S VISHWANATH
C S VISHWANATH
3.6.2002
favour of Sri.M.Muniyappa.
6. GPA executed by the land
owners in favour of the
builder.
7. Tripartite agreement
executed amongst the land
owners, Promoter and builder.
8. Sri.M.Muniyappa acquired
1. Draft copy of sale
property measuring 2 acres
agreement. 2. Draft copy of
12 guntas in Sy.no.21/1 in
construction agreement.
terms of aCLEAR
sale deed dated
3. Draft copy of the proposed
16.05.1974 (doc no.1653/1974sale deed.
75) and Whereas, the said
4. Agreement entered into
Sri.M.Muniyappa conveyed site
between Sri.A.B.DSouza and
bearing nos.13
& 14 in land
CLEAR
Sri.V.Chittibabu
(Builder).
bearing Sy.no.20/1 in favour of
5. GPA executed by the land
Smt.Padmini and Smt.G.Subba
owner in favour of the builder.
Laxmi. The same requires
6. Tax paid receipt for the
clarification.
period 2004-2005.
ADDITIONAL
DOC REQUIRED
..2
7. Katha extract issued by the
/2/
jurisdictional revenue
authority.
9. Encumbrance Certificates
8. Land conversion certificates
from :
CLEAR
(for all
portions).
a. 17.11.2003 till date (in
9. NOC for non-acquisition
respect of site no.13).
issued by the BDA (in respect
b. 17.11.2001 till date (in
of Sy.no.43).
respect of site no.14).
10. Copy of approved layout
plan issued by the BDA.
11. E.C from 01.04.1992 till
date (for all portions).
16.03.2004
C S VISHWANATH
02.07.2004
C S VISHWANATH
19.01.05
C S VISHWANATH
19.07.2004
06.12.04
C S VISHWANATH
16.06.04
17.02.05
C S VISHWANATH
17.11.01
18.04.05
C S VISHWANATH
21.09.2005
C S VISHWANATH
5/5/2004
ADDITIONAL DOCUMENTS
REQUIRED
29.10.2005
C S VISHWANATH
31/03/2004
26/06/2006
C S VISHWANATH
01.04.2003
CLEAR
05.05.2004
SHAMMANA
10/10/05
C S VISHWANATH
Not received
CLEAR
25.07.2005
CLEAR
18.12.02
SHAMMANA
06.11.02
CLEAR
Not received
03.02.2004
CLEAR subject
SHIVAPRASAD
to 1) EC for the year 01.06.89 To 27.09.2001 which shall disclose the HASB Khatha No.
24/08/2006
C S VISHWANATH
14.01.2005 TO 31.03.2005
ADDITIONAL DOC REQUIRED
PRODUCE THE LEGIBLE COPY
OF GENEALOGICAL TREE OF
FAMILY OF CHINNASWAMY.
02/03/06
C S VISHWANATH
07.08.2004
C S VISHWANATH
01.04.1991
CLEAR
20.07.2004
C S VISHWANATH
25.05.2004
CLEAR
09.01.2004
11.06.2004
C S VISHWANATH
30.04.2004
C S VISHWANATH
21.05.2004
C S VISHWANATH
CLEAR
p confirming the
19.01.05
survey numbers
C S VISHWANATH
in which subject05.06.2003
sited of opinion are comprised ( site nos 266/a1 & 266/a-2) 2) genealo
19.01.05
C S VISHWANATH
14.06.2004
C S VISHWANATH
01.08.04
CLEAR
CLEAR
25.09.04
C S VISHWANATH
24.02.1998
CLEAR
15/06/2006
C S VISHWANATH
18.03.2006
28.07.04
C S VISHWANATH
19.06.04
CLEAR
10/10/06
C S VISHWANATH
07.04.2006
CLEAR
18.10.1995
CLEAR
Not received
Not received
11.08.2004
C S VISHWANATH
nd owner in favour
27.08.2004
of the builder
C S VISHWANATH
3) adjudicated copy
14.05.2004
of gpa of april 2004 executed by sri jayanth sri jeevan 7 arathi in fa
05.02.05
C S VISHWANATH
31.05.05
C S VISHWANATH
30.08.2004
C S VISHWANATH
10.06.04
03.02.2004
29-09-04
C S VISHWANATH
20.09.2004
CLEAR
10.09.2004
C S VISHWANATH
31.05.1989
CLEAR
2.12.04
C S VISHWANATH
7.08.04
CLEAR
22.12.04
C S VISHWANATH
06.08.04
25.02.05
C S VISHWANATH
01.04.91
CLEAR
27.11.04
C S VISHWANATH
11.03.04
CLEAR
04.01.05
C S VISHWANATH
16.07.2004
CLEAR
16.12.04
C S VISHWANATH
17.03.04
CLEAR
05/28/04
C S VISHWANATH
28.10.2003
14.02.05
C S VISHWANATH
20.11.2002
CLEAR
01/12/05
C S VISHWANATH
26.11.2008
C S VISHWANATH
05/04/06
C S VISHWANATH
01/07/06
C S VISHWANATH
20.04.2005
CLEAR
24/08/2006
C S VISHWANATH
17.01.2006
CLEAR
24/06/2006
C S PLS
VISHWANATH
SEND THE BUILDER FOR ORIGINAL VERIFICATION ALONG WITH THE COPY OF SANCTIO
24/06/2006
C S VISHWANATH
01.04.2004 TO 31.03.2005ADDITIONAL DOCS REQD
17.09.2008
C S VISHWANATH
29/07/2006
C S VISHWANATH
16.02.2005 TO 31.03.2005
ADDITIONAL DOCS REQUIRED
CLEAR
11/07/06
C S VISHWANATH
22/8/2006
C S VISHWANATH
27.01.2006
CLEAR
10/11/06
C S VISHWANATH
15.05.2004
CLEAR
UIRED - Sri.Sanjeev
03/11/06
Wahi and C
Smt.Sonu
S VISHWANATH
wahi,
14.3.2003
both partners
TO 31.03.2004
of M/s.Donata Developers are required to give a confirmatior
20.01.2007
LATEST
C S VISHWANATH
ENDORSEMENT
21.08.2006
FOR NON-ACQUISITION ISSUED BY THE BDA AND EC FROM 21.08.2006
29.04.2010
C S VISHWANATH
CLEARED
PANCHAYATH BANGALORE
26.01.2007 IN FAVOUR
C S VISHWANATH
OF M/s BRAMHALL
05.04.2005
DEVELOPERS PVT LTD , JOINT AFFIDAVIT EXECUTED BY THE LAND
10.04.2007
C S VISHWANATH
CLEAR
DEACTIVATED
DEACTIVATED
DEACTIVATED
DEACTIVATED
09.02.05
C S VISHWANATH
16.02.2004
CLEAR
CLEAR subject to Licence and
Plan issued by CMC
Bytarayanapura
03.05.2004
SHAMMANA
26.02.05
C S VISHWANATH
20.07.04
CLEAR
9.11.04
C S VISHWANATH
15.11.00
CLEAR
01.03.2004
C S VISHWANATH
23.12.2004
30.04.05
C S VISHWANATH
07.06.05
C S VISHWANATH
03.09.2005
C S VISHWANATH
27.01.2006
C S VISHWANATH
14.04.2003.
SHAMMANA
14.08.03
C S VISHWANATH
14.08.03
C S VISHWANATH
19/09.03
07.07.2005
CLEAR
26.04.2002
CLEAR
SHAMMANA
23.08.03
CLEAR
26.08.2004
QUERIES
31.03.1989
22.03.2004
SHAMMANA
CLEAR
C S VISHWANATH
06.07.2004
21.10.04
C S VISHWANATH
14.03.05
C S VISHWANATH
29.07.2002
16.07.04
CLEAR
02.12.04
C S VISHWANATH
26.07.04
10.06.05
C S VISHWANATH
21.03.02
30.08.2005
C S VISHWANATH
CLEAR
03.04.2006
C S VISHWANATH
ADDITIONAL DOCUMENTS
REQUIRED.
27.01.5
C S VISHWANATH
15.07.2004
C S VISHWANATH
CLEAR
15.07.2004
C S VISHWANATH
CLEAR
17.02.05
C S VISHWANATH
CLEAR
08.05.2004
SHAMMANA
21.06.2002
SHAMMANA
CLEAR
24.04.2003
SHASHIKANTH
CLEAR
31.07.2003
DP
SHIVAPRASAD
14/07/05
C S VISHWANATH
07.06.04
17.12.2000
28.06.03
12.08.96
CLEAR
CLEAR
28.02.04
C S VISHWANATH
21.11.03
09.07.2004
Report by
C.S.Vishwanath
04.06.2003
CLEAR
20.12.04
C S VISHWANATH
29.03.2004
RESENT BUILLDER
23.05.2007
FOR THE SALE
C S VISHWANATH
OF BUILDER'S SHARES.III., IN RESPECT OF SY.NOS. 123/1 AND 123/2: 7. REGISTERED CON
EXECUTED IN 24.03.2007
FAVOUR OF SRI.
C KE.SRINIVASA
S VISHWANATH
REDDY,2. COPY OF SANCTION PLAN FOR THE BUILDING,3. ENCUMBRANCE CE
10.09.2008
C S VISHWANATH
CLEAR
15.02.2008
C S VISHWANATH
CLEAR
09.08.2008
C S VISHWANATH
CLEAR
31.03.2008
C S VISHWANTHA
CLEAR
20.08.2008
VISHWANATH
CLEAR
28.06.2008
VISHWANATH
CLEAR
31.07.2008
VISHWANATH
CLEAR
19.07.2008
VISHWANATH
EC FROM 20.06.2008 TILL DATE
CLEAR
12.08.2008
C S VISHWANATH
CLEAR
19.08.2008
VISHWANATH
EC 26.08.2007 TILL DATE FOR BOTH PORTIONS
CLEAR
26.08.2008
VISHWANATH
26.08.2008
VISHWANATH
01.04.1995 TO 31.03.2005
CLEAR
11.08.2008
VISHWANATH
CLEAR
VISHWANATH
CLEAR
29.11.2005 TO
10.06.2008
CLEAR
PURAM, B'LORE
16.08.2008
12.09.2008
VISHWANATH
CLEAR
30.09.2008
VISHWANATH
CLEAR
14.10.2008
C S VISHWANATH
CLEAR
12.09.2008
C S VISHWANATH
CALEAR
17.10.2008
C S VISHWANATH
CLEAR
CLEAR
30.09.2008
C S VISHWANATH
CLEAR
VISHWANATH
CLEAR
VISHWANATH
CLEAR
26.11.2008
C S VISHWANATH
CLEAR
02.12.2008
VISHWANATH
CLEAR
VISHWANATH
CLEAR
VISHWANATH
CLEAR
PURAM, B'LORE
22.10.2008
26.12.2008
VISHWANATH
CLEAR
VISHWANATH
CLEARED
APTS, B'LORE.
02.07.2009
03.11.2009
VISHWANATH
CLEARED
OBLI, B'LORE
20.11.2010
VISHWANATH
CLEARED
31.05.2010
VISHWANATH
CLEARE
02.08.2010
VISHWANATH
CLEAR
18.10.2010
VISHWANATH
CLEAR
UK, B'LORE
VERIFICATION
OF ORIGINALS
DATE OF
VALUATION
REPORT
ginals
ROADS
to beMETALLED
varified before
AND TARRED,
releasing
4/7/2005
PAVEMENTS,
loan.
RBOX
K MAKHIJA
TYPE DRAINS PROVIDED, ENTRANCE
August-05
ARCH, AVENUE TREES, ALROUN
Original to be
verified before
disbursement.
R K MAKHIJA
I phase completed
and partly
occupied. II phase
- daffodil block
completion by
nov 2003, iris
block completion
by march 2004
daisy block
completion by
july 2004
April-05
VENKAT
EXTERNAL
PLASTERING
UNDER
PROGRESS.
November-05
Not received
Not received
Originals to be
verified before
release.
6/12/2006
R K MAKHIJA
08.11.2003
G SRINIVAS
30.05.2004
G SRINIVAS
3/31/2004
CHANDRAN
FLOORING IS IN
PROGRESS
THE
LAYOUT IS
FULLY DEVELOPED
WITH TAR ROADS,
DRAINAGE AND
Project is
ELECTRICITY, ,
completed.
THE LAYOUT HAS
A PARK,
FORMATION OF
CONSTRUCTION
ROADS,
OF HOUSE HAVE
DRAINAGE
COMMENCED.
FACILITIES,
STORM WATER
DRAIN, WORK IN
LAYOUT IS
COMPLETED
28.10.04
5.12.2003
CHANDRAN
STORM WATER
DRAIN, UNDER GR
SEWERAGE
SYSTEM, PARK
WITH CHILDREN
PLAY EQUIPMENT,
ALL ROUND
COMPOUND WALL
WORK IN THE
LAYOUT IS
COMPLETED.
G SRINIVASResidentila layouts/PLOTS.
Structure
11.11.2003
work andGCC
SRINIVAS
Block masonry is complete.Inside plastering work in progress.
Originals to be
verified before
disbursement.
19.12.2003
07.10.04
VENKAT
CHANDRAN
FOUNDATION WORKS ARE IN PROGRESS
IGINAL VERIFICATION
24.10.2003
Project is inGfinal
SRINIVAS
stage of completion.Expected completion by Jan 2004
28.08.2004
29/06/05
22.11.2003
R K MAKHIJA
COMPLETED
R
SS
K COMPLETE
MAKHIJA FOR BFL & GFL. F FL IN PROGRESS
March-06
9.10.2003 Foundation
G SRINIVAS
is completed.expected to complete by Jun 2004
27.10.04
CHANDRAN
19.12.2003Construction
VENKAT
is in progress.Expected completion by Mar 2004.
10
20.03.04
08.04.04
Venkat
Expected date of completion by aug 2004.
28.12.2003
Superstructure
R Kcompleted
MAKHIJA for B,G and 3 upper floor.Plastering in progress.
9.10.2003Construction
G SRINIVAS
is in final stage.Expected completion by Jan 2004.
10/10/2003
G SRINIVAS
layout formation is yet to commence/ PLOT
YET TO COMMENCE
ORIGINAL VERFICATION
30.04.04
R K MAKHIJA
GINALS TO BE VERIFIED
S S COMPLETE,BLOCK
BEFOR DISBURSAL.
17/01/2006
WALLS INTERIORS
R K MAKHIJA
& EXTERIORS PLASTERED.VITRIFIED
March-06FLOORING MATERIALS IN
18.08.2008
27.10.2003
PROJECT
DHRUVA COMPLETED, 35 FLAT HANDED OVER
G SRINIVASResidentila layouts/PLOTS.
1.10.2003
Centering in
G SRINIVAS
basement roof is cast.targeted completion by Mar 2004.
er has to be given
20.11.2003
11.11.2003
8.11.2003
VENKAT
structure 12.02.04
completed. Water,
G SRINIVAS
sanitary and electrification works are progressing. Flooring in progre
27.10.2003
19.01.05 Appears
CHANDRAN
to be good and all the works are nearing
February-05
completion
ORIGINAL VERIFICATION
20-08-05
R KPILE
MAKHIJA
FOUNDATION STARTED FOR BASEMENT.
July-07
30.07.2005
R K MAKHIJA
9/8/2005
R K MAKHIJA
02.10.04
CHANDRAN
APARTMENT IS
THE BUILDING IS
COMPLETE WITH
COMPLETED &
VITRIFIED/
OCCUPIED.
CREAMED
FLOORING PC
COATED
ALUMINIUM
WINDOW,
August-05
.91 to 31.03.03
14.11.2003
24.11.2003
Originals to be
Verified before
releasing loan.
29.10.2003
July-05
Project
VENKAT
is in progress.Expected completion by Dec 2004
10.05.04
ginals
rnal plastring
to be varified
completed,
before
external
releasing
9/27/2003
plastering
loan.
completed
G SRINIVAS
on 3 sides, rear portion to be done d/w frame are fitted expected
ginals to be varifiedBLK
before
A &releasing
B : SS
30/09/2006
,walls
loan.
complete,interiors
MAKHIJA & exteriors plastering under
December-06
completion.Flooring work in pro
13.11.2003
M M C VALUER
Residentila layouts/PLOTS.
29.12.2003
R K MAKHIJA
Residentila layouts/PLOTS.
13.11.2003
VENKAT
Expected date of completion march 2004
Project is in
D STRUCTURE WITH COLUMNS AND
18.12.04
BEAMS CONCRETE
MAKHIJA
BLOCK WALLS
IN CM PLASTERED SMOOTH
March-05OBD EXTERIORS SPONGE
progress,floor
The project is just
polishing
commenced.Expe
,sanitary,plumbin
cted
g&
completion by
electrical fittings
15.11.2003
VENKAT
Dec 2004
are pending.The
project is
expected to
complte by Dec
14.02.04
G SRINIVAS
2003.
11/10/2005
24.10.2003
20.05.05
MAKHIJA
G SRINIVASResidentila layouts/PLOTS.
THIS
MAKHIJA
PROJECT IS COMPLETE, FINISHING IS PROGRESS
26.02.04
R K MAKHIJA
Residentila layouts/PLOTS.
Originals to be
BLOCK C & G THE
verified before
BUILDING IS
UT FORMED DURING
disbursement.
2005, ALL INFRASTRUCTURE
03.10.2009
RAGHUNANDA
FACILITIES ARE PROVIDED, THE LAYOUT WORK IS COMPLETED IN ALL RE
COMPLETE &
PARTLY
Originals to be
OCCUPIED.BOCK
verified before
D FINISHING IN
disbursement.
2/10/2005
R K MAKHIJA
PROGRESS.
October-05
2.12.04
Originals to be
Verified before
releasing loan.
Originals to be
varified before
releasing loan.
Originals to be
Verified before
releasing loan.
MAKHIJA
RCC framed
sttructure for B +
G + 13 floor
basement parking
December-05
Not received
10.7.2003
G SRINIVAS
Residential
layouts/PLOTS
30.6.2003
M M C VALUER
The formation
work in Progress.
30.6.2003
M M C VALUER
Residential Sites
only/PLOTS
Originals to be
Verified before
releasing loan.
Not received
31.7.2003
Basement
G SRINIVAS
slab is cast.targeted completion by Apr 2004
Not received
Original to be
verified before
disbursement.
Not received
13.11.03
road formation
M /Mstrom
C VALUER
water drain availabe other aminities in progress/ PLOT
Formation of wbm
23.11.04
roads under chandRAN
ground drainage sys storm water drain works are in the layoput is com
Original to be
verified before
releasing.
06.08.2004
Originals
verified by the
Lawyer.
30.6.2003
Originals to be
varified before
releasing loan.
G SRINIVAS
EARTH
EXCAVATION HAS
BEGUN, COLUMNS
ARE BEING
RAISED
R K MAKHIJA
RCC Structure
completed.
M M C VALUER
Constructed 15
years back.
Not received
Not received
Originals to be
verified before
disbursement.
19.1.2003
R K MAKHIJA
Original verified
by ASM Rajesh .
11.07.2004
R K MAKHIJA
Residential Sites
only/PLOTS
22.07.2004
VENKAT
05.08.2004
Originals to be
verified before
disbursement.
Originals to be
varified before
releasing loan.
G SRINIVAS
THE LAYOUT
FORMATION IS IN
PROGRESS, ROAD
FORMATION AND
UGD WORK IN
PROGRESS, ROAD
ASPHALTING ,
DRAINAGE,
ELECTRIFICATION
ARE PROPOSED,
SITE
DEMARCATION
AND NUMBERING
TO BE DONR.
Not received
MAKHIJA
2nd floor
COMPLETE
centering work in
progresscompletion
expected by Sep
2003.
Layout is fully
developed with all
amenities/Reside
the land is
ntial sites
levelled roads
only/PLOTS
formed soling laid
covered with mud
and road roller
FORMATION OF
compacting in
ROADS,
progress
METTALING BOX
TYPE DRAINAGE,
WATERLINES,
BOREWELL
ARE
IN
Roads
formed
box
PROGRESS
type
drains
avenue trees with
guards street
light poles site
marked all round
compound wall
development
work completion
in 3 months june
05
CHANDRAN
READY BUILT
27.08.2004
CHANDRAN
28.2.2003
G Srinivas
19.04.04
VENKAT
29.11.04
makhija
05.05.05
R K MAKHIJA
September-05
Originals to be
verified
11.7.2002
M M C VALUER
Original to be
verified before
releasing.
04.02.05
R K MAKHIJA
R K MAKHIJA
Expected date of
completion
feb2004
Originals to be
Verified before
releasing loan.
09.08.03
Original verified
by the lawyer
Not received
Originals to be
verified before
Disbursement.
R K MAKHIJA
Originals to be
verified before
Disbursement.
Not received
10.01.05
G Srinivas
G Srinivas
08.06.2004
9/26/2003
To be verified
14.03.05
24.02.04
Residential Sites
only
Construction work
in final stage iof
completion
common area
works in progress
lift erected all
flats handed over
Residential Sites
only/Plots/
expected date of
completion by dec
2003
THE
PROJECTOF
IS
FORMATION
FULLY
LAYOUT
WITH
COMPLETED
ON
STORM WATER
VENKAT
JAN 2005
DRAINS,
ROAD
FORMATION,
CONSTRUCTION
OF SEWER LINES
ETC ARE
VENKAT
expected date of completion nov 2003
COMPLETED,
FURTHER
AMENITIES ARE
YET TO BE
CHANDRAN
PROVIDED.
VENKAT
Residential sites
only/ PLOT
Originals to be
Verified before
releasing loan.
Not received
Not received
originals to be
varified before
releasing loan.
Not received
Originals to be
varified before
releasing loan.
Not received
originals to be
varified before
releasing loan.
Not received
19.02.05
GAll
SRINIVAS
works completed and ready for occupation
10.11.2003 Project
MM
is Cjust
VALUER
commenced.earthwork,excavation completed.
4.11.2003
R K MAKHIJA
Residentila layouts/PLOTS.
Originals to be
varified before
releasing loan.
Not received
Originals to be
varified before
releasing loan.
Not received
Not received
Not received
Not received
Originals to be
varified before
releasing loan.
Not received
Not received.
Not received
R K MAKHIJA
25-08-2005
R K MAKHIJA
04.05.05
R K MAKHIJA
21.02.2008
R K MAKHIJA
RCC FRAMED
STRUCTURE,BLOC
Flat was locked.
K
Valuation based
WALLS,VITRIFIED/
on
CERAMIC
assumptions
FLOORING,LIFT,PA
SS complete b
RKING,SECURITY.T
walls complete
HEBUILDING IS
door and window
COMPLETE &
frames fixed
PARTLY OCCPIED.
interiors and
exteriors
plastered
SS COMPLETE,
painting in
INTERIORS AND
progress
EXTERIORS
PLASTERED,
ALUMINIUM
WINDOWS IN
PROGRESS.
January-05
February-05
December-08
28.2.2003
Not received
G Srinivas
Not received
09.01.2010
ANT BE DONE
VECON
BLK A & B: 40% FLATS ARE OCCUPIED
01.04.04
G SRINIVAS
Residential Sites
only/Plots
18.5.2003
G SRINIVAS
Residential Sites
only/Plots
Not received
20.05.05
MAKHIJA
FORMATIO OF
ROADS, BOX TYPE
DRAINS, UNDER
GROUND
SEWRAGE,
COMPOUND WALL
COMPLETE.
Not received
Originals to be
verified before
disbursement.
Not received
period 03-04 4) Katha extract / demand register issued by the jurisdictional revenue authority 5) Copy of approved layput
act issued by the juridictional revenue authority 40 Tax paid recipt fot the period 04-05 5) Encumbrance certificate from 1
12.04.05
MAKHIJA
Roads boxy type drains under formation
SS complete interiors15.02.05
ans exterioors plastered
MAKHIJA door and windowframes fixed kitchen and toiletr rough plaste
Originals
verified by ASM
2/22/2004
R K MAKHIJA
Work is under
progress
22.01.04
R K MAKHIJA
23.08.03
12.12.04
Not received
SRINIVAS
COMPLETED
Not received
PLOT
21.11.08
LEVELLED & CLEANED,
R K MAKHIJA
OFFICE & LABOURS SHEDSDecember-10
CONSTRUCTION IN PROGRESS,
Not received
1/9/2005
THE
RK
BUILDING
MAKHIJAIS COMPLETE,FINISHINGSeptember-05
IN PROGRESS,
27.12.04
Basement
CHANDRAN
floor roof reinforcement worksOctober-05
is in progress
1/31/2004
20.01.04
R K MAKHIJA
15.07.03
Originals to be
verified befor
releasing the
loan
Originals to be
verified before
Disbursement.
R K MAKHIJA
Not received
apartment
complex is
complete and 5
flats are occupied
Present laying of
wbm road under
ground drainage
sys strm water
drain works have
been completede
Residential Sites
power
only/ PLOT
connections to be
laid and 5
building
construction are
in progress
2/22/2003
VENKAT
07.02.05
CHANDRAN
09.07.03
R K MAKHIJA
Residential sites only/PLOTS
15.03.04
June-05
Initial
R K MAKHIJA
Stages with earthwork excavatio in progress
ORIGINAL VERIFICATION
15.09.03
R K MAKHIJA
expected date of completion sep 2004
15.09.03
R K MAKHIJA
expected date of completion dec 2003
01.07.2004
13.11.03
expected
VENKATdate of completion in another 5 months
31.01.04
construction workVENKAT
is at a good progress, expected date of completion sep 2004
Originals to be
verified before
Disbursement.
Completion
expected by
08.09.03
R K MAKHIJA
decem 2003
All works in final
stages of
completion
plastering
flooring
completed
painting
completed lift to
he Land owner in favour of the Builder
10.02.05
4. Katha certificate
G SRINIVAS
issued by
bethe
installed
BMP in favour March-05
of Shri. Manohar B K 5. Tax Paid r
Not received
09.12.04
finishingRofKthe
MAKHIJA
flats is progressing according to customers choice
02.04.04
10.02.05
R K MAKHIJA
Expected date of completion dec2005
Foundation &
super structure
works are
completed uo to
CHANDRAN
lintel level
January-05
5/09/206
R K MAKHIJA
flat is complete and self occupied
June-05
8/18/2003
VENKAT
expected date of completion nov 2003
27.12.04
R K MAKHIJA
8/27/2003
R K MAKHIJA
SS complete for b
g & f fl interiors
and sxteroiors
plastered
ANT BE DONE
10.08.2004
R K MAKHIJA
4/7/2005
MAKHIJA
24.04.04
THE LAYOUT IS
PROVIDED WITH
METTALED
ROADS,
SITES
Residential Sites
NUMBERED, AND
only/PLOTS/ full
MARKED, BOX
completion by
TYPE DRAINAGES,
march 2004
UNDERGR
SEVERAGE
BOREWELLS AND
SS COMPLETE,
WATERLINES TREE
BBM & CEILING
GUARDS
PLASTERED FOR G
FL, BBM UPTO
LINTLAL LEVEL IN
F & S FL. WORK
UNDER PROGRESS
January-06
CHANDRAN
Layout formation of road works are carrying.
28.02.04
G SRINIVAS
Residential Sites
only/PLOTS
IN THIS LAYOUT
ROAD
FORMATION,
WATER
SUPPLY/DRAINAG
E WORK
HAVE
30% OF
BEEN
CONSTRUCTION
alappa 3) copy of approved layout05.10.04
plan issued by the
CHANDRAN
bda 4) e c a 1.04.91
COMPLETED.
toARE
31.03.92 b 26.07.04
NA
till date
WORK
COMPLETED,
GENERALLY
BASEMENT
FLOOR, GR
8/7/2003
VENKAT
expected date of completion MAY 2004
FLOOR, AND 1ST
FLOOR ROOF
CONCRETING
WORKS ARE
Originals to be verified before release.
25.06.2004
CHANDRAN
COMPLETED.
Structure
24.02.04 is completed.
G SRINIVAS
Flooring completed. Expected date of completio june 2004
27.02.04
VENKAT
Expected date of completion by May
15.02.05
R K MAKHIJA
21.02.04
CHANDRAN
20.08.2004
07.08.2004
2/2/2006
Ground floor is
completed, First
completed
floor and
second floor
inside plastering
works are
carrying.
LAYOUT IS
R K MAKHIJA Residential plots only
BOUNDED
ALROUND
COMPOUND
WALL, ROADS ARE
CHANDRAN
IN PROGRESS
R K MAKHIJA
UNDER STAGES
OF
CONSTRUCTION
March-06
20.11.2007
06.04.04
R K MAKHIJA
ALL BLKS
SUPERSTRUCTURE
COMPLETE,
INTERIORS
PLASTRED,
EXTERIORS IN
PROGRESS.
CHANDRAN
Interior woods
works are not yet
done
November-08
Construction
01.10.04work is G
completed
SRINIVAS. Lift and generator to be October-04
installed. 10 flats are occupied .
21.01.05
CHANDRAN
Plastering works yet to be commenced
June-05
Not received
TS REQUIRED.
27.12.2005
RCC FRAMED STRUCTURE
R K MAKHIJABLOCK WALLS.FINISHING February-06
& PAINTING IN PROGRESS.
02.02.05
G SRINIVAS
Project in final
stages of
completion
flooring in
common area to
be done painting
to be done lift
work in progress
20.01.05
CHANDRAN
EARTH WORK IS
IN PROGRESS
22.02.04
R K MAKHIJA
flat is complete and self occupied
Not received
April-05
Not received
13.08.2004
VENKAT
Not received
29.03.04
17.06.2004
NEARING COMPLETIONSeptember-04
THE LAYOUT
FORMATION IS
COMPLETE, ALL
AMENITIES LIKE
Not received
ROADS
ASPHALTING ,
DRAINAGE
ELECTRIFICATION
ARE PROVIDED,
CHANDRAN
Residential sites only / Plots
SITE
DEMARCATION
AND NUBERING
HAS BEEN
G SRINIVAS
COMPLETED.
27.04.04
09.09.2004
30.01.05
Originals to be
verified before
disbursement.
IGINAL VERIFICATION
SUPERSTRUCTURE
Venkat Residential
sites only / Plots
COMPLETE,
DOORS AND
WINDOWS
FRAMES FIXED,
see in file no
SHUTTERS IN
519a
PROGRESS,
EXTERIORS
PLASTERED,
INTERIORS IN
VENKAT
PROGRESS
November-04
R K MAKHIJA
R K MAKHIJA
January-05
Structural Work
Completed.
SF Roof
03.04.04
cast. Electrical
G SRINIVAS
an dplumbing to be done. Expected date of completion dec 2004
12.03.05
CHANDRAN
Apart const work are not yet commenced
June-06
05.04.04
Originals to be
varified before
releasing loan.
27.08.2004
G SRINIVAS
Residential sites only/ PLOTS
CONSTRUCTION
WORK ARE
COMPLETED,
FINISHING WORK
CHANDRAN
ARE IN PROGRESS
ORIGINALS TO BE VERIFIED18.05.05
ROAD FORMED, ENTRANCE
MAKHIJA
ARC, BOX TYPE DRAINS, OH TANK, UNDER GROUND DRAINAGE.
SS COMPLETE,
16-08-05
THE BUILDING
R K MAKHIJA
IS COMPLETE & MOST OF THE FLATS
August-05
ARE OCCUPIED
INTERIORS &
EXTERIORS
PLASTERED.
FINISHING IN
22-10-2005
R K MAKHIJA
PROGRESS
November-05
01.03.04
VENKAT
Fully completed
16.03.04
R K MAKHIJA
Fully completed
SS complete
20.12.04
for b g & 3 Rflors
K MAKHIJA
block walls inprogress door and windows
June-05 frames fixing in progress
29.03.04Layout formation
G SRINIVAS
is under progress. Residential sites only/PLOT
05.06.2004
06.04.04
VENKAT
VENKAT
Fully completed/Residential sites only/PLOT
Originals Should
be verified
before releasing
the Loan
28.12.04
foundation
CHANDRAN
works like plinth beam concrete works
December-05
are in progress
16.03.2004
Not received
04.04.2004
G SRINIVAS
THE LAYOUT
FORMATION IS
UNDER
PROGRESS,
SITES HAVE BEEN
DEMARCATED
AND NUMBERED,
ROADS ARE BEING
ASPHALTED,
DRAINAGE
FACILITY
PROVIDED,
ELECTRICAL
POLES ARE BEING
ERECTED, TREE
GAURDS ARE
FITTED
08.04.04
Layout work is in
VENKAT
progress. Expected date of completion by june 2004/ PLOT
12.07.2004
VARADARAJ
Residentail site only/PLOTS
20.08.2004
11.10.04
CHANDRAN
N/A
29/06/05
RCC FRAMED STRUCTURE,
R K MAKHIJAMARBLE/CERAMIC FLOORING,
COMPLETED
TW/SALWOOD DOORS
Generally ground
03.02.05
floor roof slabCHANDRAN
completed block works are in progress
September-05
and first floor to put roof slab c
06.04.04
06.05.04
29.04.04
R K MAKHIJA
Residentail site only/PLOTS
VENKAT
Project is fully complete with all amenties
Not received
06.10.04
G SRINIVAS
ELECTRICAL
PLUMBING WORK
COMPLETED,
INSIDE
PLASTERING
COMPLETED,
EXTERNAL
PLASTERING IN
PROGRESS,
FLOORING TO BE
DONE, PATTI/
PRIMER DONE
PAINTING IN
PROGRESS LIFT
WORK BEING
DONE FLOORING
IN COMMON
AREAS AND
BASEMENT TO BE
DONE
Originals to be
verified before
disbursing.
15.05.04
VARADARAJ
Expected date of completion by the end of 2005
20/07/05
R K MAKHIJA
THIS PROJECT IS
COMPLETE & THE
FLATS ARE
BLKOCCUPIED
A-INTERNAL
PLASTERING
COMPLETED IN
ALL
28.08.2004
VENKAT
VENKAT
ORIGINALS TO
BE VERIFIED
BEFORE
DISBURSAL.
5/11/2005
R K MAKHIJA
26.09.2008
R K MAKHIJA
12.08.2004
VENKAT
FLATS, EXTERNAL
PLASTERING
UNDER
PROGRESS,
BLK
Constructtion
SS
BINTERNAL
work is complete
COMPLETE,DOOR
PLASTERING
S & WINDOW
COMPLETED
IN
FRAMES,INTERIOR
ALL FLATS,
S&
EXTERIORS
EXTERNAL
PLASTERED.
PLASTERING
UNDER
THE PROJECT IS
PROGRESS, BLK
COMPLETE &
C- PILLARS
SOME OF THE
CASTING OVER,
FLATS OCCUPIED
CENTERING WORK
FOR BASEMENT
SLAB UNDER
PROGRESS, BLK
D- YET TO START
December-05
September-08
08.04.04
5/28/2004
04.06.2004
venkat
THE LAYOUT
FORMATION
WORK UNDER
PROGRESS,
BOX TYPE
DRAINAGE SEEN,
SITES YET TO BE
DEMARKED
VENKAT
THIS LAYOUT
SHOULD BE IN
FULL
COMPLETION BY
SEPT.2004
Not received
5/27/2004
25 05.2004
31.01.05
RENT HOUSE
ROOF CAST.CC
BLOCK
MASONRY UPTO
R K MAKHIJA NEARING COMPLETION
3RD FLOOR, D/W
FRAMES FITTED,
CEILING
PLASTERING
G SRINIVAS
DONE,
CHANDRAN
Earth foundation
and column
footing works are
in progress
26.05.2004
G SRINIVAS
26.05.2004
G SRINIVAS
LAYOUT
FORMATION
COMPLETE, SITE
DEMARCATION
AND NUMBERING
HAS BEEN
COMPLETED,
ROADS HAVE
BEEN FORMED,
ASPHALTING TO
THE LAYOUT
BE DONE, WATER
FORMATION IS
AND
UNDER
ELECTRIFICATION
PROGRESS,
COMPLETED
WATER IS
AVAILABLE,
ELECTRIFICATION
,UGD WORK IN
PROGRESS,
R K MAKHIJA
FINISHING IN
PROGRESS,
COMPLETION
BY JULY 2004
5/29/2004
December-05
ith
9 guntas
box type
3) jayarama
drainage reddy
compound
property
wall
28.01.05
of
bearing
dressed
no R
size
225/2
K MAKHIJA
stne
and8 87/2
with measuring
ornamental1 gatre
acre 27
and
guntas
entrance
and arch
2 acres
rcc respectively
oh tank borewe
Not received
Earth work
excavation for
SOLING AND
basement floor is
METALLING WORK
completed
IN PROGRESS,
columns footing
MANHOLES,
concrete works
LAYING
17.12.04
CHANDRAN
are in progress
February-05
OF STONE WARE
PIPES FOR
SEWAGE, G I
PIPES UNDER
issued by the office of anjanapura
24.07.2004
village panchayath
VENKAT
3) e c from 01.04.91
PROGRESS
to 31.03.00 b) 29.04.04 till date
04.06.2004
VENKAT
THE PROJECT IS WELL DEVELOPED
Originals Should
be verified
before releasing
re works are completed
the Loaninside plasterig
17.05.05
Blk B Here
CHANDRAN
also all structure 7 super structure works
June-05
are completed and inside &
21.4.2003
G SRINIVAS
24.07.2004
R K MAKHIJA
Basemant Roof
level completed.
RCC COLUMN
14.05.05
FOOTINGS, SS
MAKHIJA
MASONARY, RCC PLINTH BEAM, INETRIOUS
July-05 PLASTERING IS PROGRES
31.05.05
STILL FLOORMAKHIJA
COLUMN, ROOF SLAB CAST, FFL COLUMNS
January-06
IN PROGRESS
MONEY RECEIPT
2nd
& NOC
floor TO
roof
BEslab
VERIFIED
19.03.05
completed
BEFORE
block
DISBURSAL.
CHANDRAN
work uoto 1st floor completed & also
October-05
up to 1st floor celing plastering c
S S COMPLETE,INTERIORS
20.02.2006
R&KEXTERIORS
MAKHIJA PLASTERED, FLOORING March-06
COMPLETE,FINISHING IN PROGRES
31.10.03
R k Makhija
Residential sites only/PLOTS
13.05.2004
CHANDRAN
13.05.2004
VENKAT
THE LAYOUT
WORK WAS
STARTED IN JAN
2004- AND FULLY
COMPLETION BY
JUN 2004
28.02.2003
G SRINIVAS
Not received
Fully completed
and many are
occupied.
21/07/05
R K MAKHIJA
SS COMPLETE,
INTERIORS
PLASTERED,
DOORS &
WINDOWS FRAME
FIXED.
November-05
15.3.2003
30.01.05
14.04.04
16.12.2009
08.04.2004
08.04.2004
Finishing work
going on.
ALL BLKS TOP
ROOF IS CAST, CC
BLK MASONRY
Ready
WORK for
IS
MAKHIJA
occupying
COMPLETED,
DOOR/WINDOW
FRAMES ARE
Expected date of
FIXED,
completion by Jan
ELECTRICAL
VENKAT
2005.
WATER SUPPLY
PIPES ARE LAID
INSIDE
PLASTERING
RAGHUNANDAN
COMPLETED
R K MAKHIJA
January-05
APARTMENT
VENKAT
expected date of completion dec 2003
CONSTRUCTION
WAS COMPLETED
THE
DURING 1990 AND
CONSTRCTION
OCCUPIED BY
WORK IS AT A
G SRINIVAS
RESIDENTS
GOOD PROGRESS
AND IS EXPECTED
TO BE
COMPLETED BY
VENKAT
OCT 2004
24.12.2005
BUILDING RISKCOMPLETE
MAKHIJA FINISHING OF COMMON AREAS IN PROGRESS.
Originals to be
Verified before
releasing loan.
28.02.2003
G SRINIVAS
Completed 2
years back.
29.05.2004
G SRINIVAS
ROAD MARKING
HAS COMPLETED,
WATER,
ELECTRICITY,
AND UGD TO BE
PROVIDED ,
ROADS TO BE
ASPHLTED.
All floor
22.02.05
roof slab concrete
CHANDRAN
completed inside & external plastering
July-05 works are in progress
07.10.04
CHANDRAN
07.10.04
CHANDRAN
sachidananda 2) endorsement for non acquisition issued by the bda 3) E C from 22.09.03 till date
Originals to be
verified before
Disbursement.
4/4/2003
Originals to be
verified before
Disbursement.
R K MAKHIJA
Residential Sites
only/PLOT
Not received
6/30/2003
originals to be
varified before
releasing loan.
M M C VALUER
Residential Sites
only/PLOT
Not received
07.06.2004
R K MAKHIJA
PROJECT WORK IS YET TO START.
ur village varthur hobli bangalore east talku bangalore 2) E C from 4.11.03 till date
ed by the bda 4) memorandum bearing ALN?SR?NA 38/03-04 issued by the office of deputy commissioner bangalore distr
20/02/2006
S S COMPLETE,BBM
R K MAKHIJA
COMPLETE,INTERIORS 7 EXTERIORS
February-06
PLASTERED
11.06.2004
CHANDRAN
QUALITY OF
FORMATION WBH
ROADS.DRAINAGE
STORM WATER
DRAIN,
FORMATION
WORK HAVE BEEN
COMPLETED
THE LAYOUT
FORMATION IS
COMPLETE, , ALL
SITES ARE
NUMBERED,
HAVE
COMPOUNDS
WITH GATE.
WATER,
DRAINAGE, AND
r of the builder 5) Katha extract issued by the jurisdictional revenue
authority 6)
ELECTRICITY
IS Copy of approved layout plan 1) E C from
COMPLETED,
LANDSCAPPING IS
DONE, INTERNAL
ROADS ARE OF
CONCREATE,
ROADS FORMED
PROVISION MADE
AND METALLED
FOR PARK, CLUB
COMPOUND WALL
HOUSE AND
OF BLK MASONRY
06.04 1,2,3,4,7,8,11,12,13,14,15,16,17,18
28.06.2004 & 19 G SRINIVAS
SWIMMING POOL.
ON 3 SIDES BOX
TYPE DRAINS ,
UNDERGROUND
SEWEGE LINES
09.09.2004
R K MAKHIJA
WITH MAN HOLES.
SUPERSTUCTURE
ma reddy and other in favour of B) a r ashwathanarayana reddy c)COMPLETE,
h r anusuya
d) a narasimha reddy 7) Land conversion
T FL
WALLING
IN PROGRESS,
INTERIORS
PLASTRED,
d in hrc no 781/2000 3) e c from 22.06.00 till date ( for both portions)
EXTERIORS IN
PROGRESS, DOOR
FRAMES AND
WINDOW GRILLS
6/15/2004
R K MAKHIJA
FIXED
6/20/2003
G SRINIVAS
Project is in final
stage.expected
completion by
Sept 2003
ORIGINAL VERIFICATION
12/8/2005
R K MAKHIJA
27.03.2004
R K MAKHIJA
12.06.2004
G SRINIVAS
15.06.2004
G SRINIVAS
1/9/2005
R K MAKHIJA
05.07.2004
G SRINIVAS
19.07.2004
G SRINIVAS
LAYOUT ROADS
FORMED,BOX
TYPE
DRAINS,WATER
LINES,UNDERGRO
UND SEWARAGE
LINES LAID,SOME
HOUSES & APTS
UNDER
CONSTRUCTION.
ALL THE
FF ROOF
S S CAST,
CONSTRUCTION
COMPLETE,BLOCK
WORKS ARE
MASONRY
COMPLETED
COMPLETE FOR G
AND READY FOR
+
THE LAYOUT
OCCUPATION
LAYOUT
2FLOORS,DOORS
FORMATION
IS IN
FORMATION
& WINDOW
PROGRESS,
WORK IN
FRAMES
SITE
PROGRESS,
FIXED,PLASTERIN
DEMARCATION
LAND SCAPING
G IN NUMBERING
PROGRESS.
AND
WORK IS UNDER
TO BE DONE,
COMPLETION ,
ROADS HAVE
ALL ROUND
BEEN FORMED,
COMPOUND IS
ASPLALTING TO
BEING
BE DONE, WATER
UGD, AND
ELECTRIFICATION
ARE YET TO BE
PROVIDED
December-05
December-05
f sale deed dated 03.11.58 executed in favour of sri k s nagaraja shastri 11) genealogical tree of the family of nagaraja s
19.06.2004
5/31/2003
CHANDRAN
WORK IS NOT YET COMMENCED
G SRINIVAS
Project is in final
stage and
Plumbing and
elecrical fittings
are being fitted
5/1/2006
R K MAKHIJA
12/8/2005
R K MAKHIJA
SS
BLOCK A SLAB
COMPLETE,INTERI
CENTERING WIP
ORS & EXTERIORS
FOR GFL,BLK B
PLASTERED.
ROOF CENTERED
FOR FFL,SFL
COLUMN
CENTERING IN
PROGRESS,
February-06
December-06
SECOND FLOOR
ROOF CAST,
val is in file no 439A THIRD FLOOR
ROOF IS
TO BE CAST, CC
BLK MASONRY
COMPLETEDIN
ment of land conversion fee / receipt issued by the office of cmc k r puram bangalore towards the payment of better ment
BF,GF AND FF, CC
BLK IN
PROGRESS, IN
2ND FLOOR, AND
The project is
17.06.2004
G SRINIVAS
3RD FLOOR
complete & partly
occupied.
Interiors in
progress for some
19/06/2006
R K MAKHIJA
flats.
July-06
STRUCTURE
4TH
SLAB IS OVER
COMPLETED,
, GFFLOORING
BRICK WORK
OVER FF
COMPLETED
enealogical tree of the family of sri nanjappa 4) copy of approved layout plan
UNDER
IN ALL
FLOORS,
PROGRESS,
PAINTING AND
IN
EXPECTED
TO BE
PROGRESS,
COMPLETED
BY
KITCHIN SLAB
20.07.2004
venkat
NOV 2004
/WALLS
TILES
FIXED , PLUMBING
, SANITARY AND
ELECTRICAL
CONNECTION
2) Copy of gift deed dated 20.09.72
18.06.2004
executed in favour
VARADARAJ
of r narayana shetty 3) land conversion certificate ( for all portion
COMP-LETED,
THE LAYOUT
PROJECT
FORMATION IS IN
TARGETTED FOR
PROGRESS, THE
COMPLETION IN
ROADS
EARTH
WORK
21.06.2004
G SRINIVAS
SEPT.2004
ARE TO BEFOR
EXCAVATION
ASPLATED,
COLUNN
FOOTING
ELECTRICITY
,
,SANITARY,
CC 1:4:8 WATER
FOR
09.09.2004
G SRINIVAS
ARECOLUMN
PROVIDED.
December-04
FOOTING,
MARKING OF
COLUMN
POSITION AND
6/5/2003
G SRINIVAS
Completed
REINFORCEMENT
Originals Should
OF COLUMN AND
be verified
COLUMNS
before releasing
FOOTING WORKS
the Loan
21.06.2004
CHANDRAN
ARE COMPLETED.
N/A
Originals Should
be verified
before releasing
the Loan
2/5/2006
06.07.2004
26.06.2004
R K MAKHIJA
SS
COMPLETE,INTERI
ORS & EXTERIORS
PLASTERING IN
PROGRESS,DOOR
FRAMES
FIXED.3RD FLOOR
SLAB IN
PROGRESS.3RD
FLOOR VERTICAL
DEVIATION.
November-06
VARADARAJ
ONLY PILE FOUNDATION IS COMPLETE
G SRINIVAS
FLOORING
COMPLETED IN
ALL FLATS,
PATTI/PRIMER
COMPLETED,
EXTERNAL
PAINTING DINE,
LIFT INSTALATION
WORK IN
PROGRESS,
COMPOUNF WORK
AND COMMON
AREA FLOORING
IN PROGRESS.
THE LAYOUT
FORMATION IS
UNDER
PROGRESS, ROAD
METTALING DONE,
28.06.2004
LAYOUT
VENKATFORMATION WORK UNDER PROGRESS
TO BE
ASPHALTING,
SITES ARE
DEMARCATED
0 executed in favour of sri honnappa
24.08.2004
9 doc no 2050/80-81)
G SRINIVAS
6) Tax paid
AND receipt
NUMBERED
dated for the period 03-04 ( for all portions
LAYOUT
our of the buuilder 3) Copy of approved layout plan issued by BDA 4) E C from 1.04.04 till date.
FORMATION
WORK UNDER
PROGRESS.
BOX TYPE
of land conversion fee receipt issued
29.06.2004
by the office of
VENKAT
cmc k r puram
DRAINAGE
bangaloe
SEEN
towards the payment of betterment charge
d 19.01.68 executed in favour of kempamma 4) Genealogical tree of the family of sri omer abdul latheef 5) E C in respect
ential purpose 5) Land conversion certificate 6) tax paid receipt for the period 04-057) Copy of approved layout plan issu
30.06.2004
VARADARAJ
WATER SUPPLY
LINE SEEN, RAIN
WATER
DRAINAGE,
ELECTRICTY,
PLOTS NO YET TO
BE DEMARKED,
LAYOUT SIGN
ssued by the bda 4 Copy of gpa 10.08.2004
executed by the land
VENKAT
owner in favour
BOARD
of the
DISPLYED
builder 5 Copy of genealogical tree of the fam
issued by the jurisdictional revenue authority 5) Tax paid receipt for the period 03-04 6) Copy of approved layout plan 7)
05.07.2004
12.04.04
03.07.2004
CHANDRAN
ROADS AND DRAINS ARE FORMED,
MAKHIJA
CHANDRAN
22.02.05
G SRINIVAS
18.05.05
MAKHIJA
Construction work
completed lifts to
SS complete for
be installed
stilts g & 3 floors
block walls in
progress door and
window frames
fixing in progress
TS REQUIRED
December-04
19.03.05 SS complete
MAKHIJA
interiors and exteriorsplastered flooring marble
COMPLETED
at the instance of moola toold pvt 5) Katha extract issued by the jurisdictional revenue authority 6) Tax paid recipt for th
08.07.2004
R K MAKHIJA
ALMOST COMPLETE
SANITARY,UGD,
STORM WATER
DRAIN
foundation rcc
ahalli bangalore towards the payment of betterment charges 3) endorsement
for non acquisition issued by the bda 4) Co
COMPLETED,
column ss
SITES ARE
masanry
DEMARCATED,
superstructure
NUMBERING TO
concrete
block
QUALITY
OF
BE DONE,
03.03.05
makhija
walls
February-05
FORAMATION
OF
BOREWELL DUG
LAYOUT
ELECTRICAL
SS
COMPLETE,
GENERALLY
POLES
TO BE
INTERIOUS
AND
APPEARS
ERECTED,
ROADS
EXTERIOUS
TO
BE
GOOD,
07.08.2004
G SRINIVAS
TO BE ASPHALTED
PLASTERED,
FORMATION
OF
DOOR
AND
LAYOUT
BOX
TYPE
WINDOW
FRAMES
DRAINAGE
Excavation for
FIXED.
FLOORING
SYSTEM,
UNDER
column footings 6
17/06/05
MAKHIJA
IN PROGRESS
August-05
GR
SEVERAGE
below ground
SYSTEM , WATER
level column
SUPPLY,
footing in
COMPOUND WALL
progress borewell
WORK ARE
19.03.05
R K MAKHIJA
sump tank
March-06
ALREADY
COMPLETED,
ELECTRICAL
WORK IN
HERS 4) RELEASE DEED EXECUTED
12.07.2004
BY CANARA BANK
CHANDRAN
IN FAVOUR OF NARAYANA
PROGRESSREDDY AND OTHERS 5) e c FROM 1.04.91 T
e deed
ROADS
dated
FORMED,
19.01.04
BOX
executed
TYPE DRAINS
by
29/06/05
smt MADE,
venkatamma
UNDERGROUND
R K MAKHIJA
& others in
WATER
favour
& of
SEWRAGE
p k sathya
LINES
COMPLETED
pal LAID,
( sy no
OH
51)
OVER
title TANK
deed IN
in respect
PROGRE
Advisable to
verify the
roads are formed box type drains
28.10.04
are formed to be
G SRINIVAS
metalleed and asphalted sites to be demarcated and numbered unde
orginal
documents of
title before
releasing any
loan
colums
19.07.2004
are rised up CHANDRAN
to roof slab level and centering works for roof slab work is progress
20.07.2004
VENKAT
28.06.2004
VENKAT
ED REFER FILE
13.07.2004
G SRINIVAS
13.12.04
CHANDRAN
24.08.2004
CHANDRAN
CHANDRAN
THE LAYOUT IS
FULLY DEVELOPED
WITH ALL
DRAINAGE
WORK
AMENITIES
ARE
COMPLETE,
LIKE
WATYER
ROADS UNDER
METAL
SUPPLY,
WORK O
GRLING
DRAINAGE,
UNDER
H TANK,
STREET
LIGHTSS, ALL
ROUND
COMPOUND WALL
AND ROAD WORK,
OTHER AMENITIES
LIKE CLUB
HOUSE , GYM,
SWIMMING POOL
ARE PROVIDED.
THE LAYOUT
FORMATION IS
UNDER UNDER
PROGRESS,
DRAIN WORK IS
BEING DONE,
All structural
ROADS ARE
works are
FORMED, M
STRUCTURAL
completed
WORKS ARE
finishing work in
COMPLETED,
basement works
INSIDE AND
are to be
EXTERNAL
completed
PLASTERING IS
COMPLETED,
FLOORING AND
THE APARTMENT
FINISHING WORK
BLK
TO BE TAKEN
CONSTRUCTION
WORKS ARE
COMPLETED AND
READY TO
OCCUPY
January-05
NALS
mn inTO
progress,Blk
VERIFIED AT
C&
THE
D: TIME
ss complete
OF
15/5/2006
DISBURSAL
upto 3rd floor.Blk
R K MAKHIJA
H: 1st floor in progress.Blk F:
September-07
SS complete walls in progress .G &
20-08-2005
R K MAKHIJA
20.02.05
SRINIVAS
03.10.04
G SRINIVAS
04.08.2004
R K MAKHIJA
09.12.04
MAKHIJA
18.03.05
MAKHIJA
22.07.2004
CHANDRAN
24.07.2004
01.02.05
THEThe
BUILDING
layout IS
Project in final
COMPLETE.PAINTI
formation is in
stages of
NG
& FINISHING
progress.
UGD
completion lift
IS IN
PROGRESS.
and
electrification
erected 3 falts
completed. Roads
occupies
are formed and
remaning in the
metalled.
process of
Asphalting to be
occupation
done. All round
compound wall
built. Entrance
arch is under
construction.
Metalled
roads
box types drains
ROADS FORMED
under ground
AND METTALED,
sweage lines
BOX TYPE
under ground
FORMATION
DRAINAGEOF
water lines
LAYOUT
BOX from
TYPE
borwell
3 nos oh
DRAINAGE
tankSYSTEM,
200 kl club
house
abns
MUD ROAD,
Formation of road
swimming
pool
BOUNDRY
STONES
box typer drains
FOR SITES WORK
& culverts in
ARE
progress entrance
COMPLETED,ELEC
arch under
APARTMENT
TRICAL WORKS
completion
CONSTRUCTION
UNDER GR
HAS
SEWERAGE PARK
COMMENCED,
AND PLAYWOOD
FOUNDATION
WORKS TO BE
COMPLETED,
CARRIED.
COLUMNS HAVE
COME UP,
CENTERING FOR
BASEMNET ROOF
TRO BE DONE.
October-05
January-05
CHANDRAN
Basement floor roof centering work is progress
CHANDRAN
Structure work uo to first floor completed
December-05
15/07/05
RCC
R KCOLUMNS,
MAKHIJA BASEMENT ROOF SLABDecember-05
IN PROGRESS
THE LAYOUT
FORMATION IS IN
PROGRESS,
ROADS
S S COMPLETE S G+3
22.12.2005
FLOORS,DOORS
R K FRAMES
MAKHIJA& MS GRILLS
FOR WINDOW
February-06
FIXED,INTERIORS & EXTERIORS P
HAVE BEEN
FORMED,
METTALING DONE,
ROADS TO BE
ASPHALTED, UGD
receipt for the period 2003-04
AND WATER LINE
COMPLETED,
SITES ARE
THE LAYOUT
DEMARCATED, TO
FORMATION IS IN
24.07.2004
G SRINIVAS
BE
NUMBERED
THE
LAYOUT
PROGRESS.
FORMATION IS IN
ELECTRICITY AND
PROGRESS, UGD
WATER SUPPLY
COMPLETED
ARE PROPOSED
IN PHASE 1 AND
13-09-2004
venkat
TO BE MADE
PHASE 2, WATER
LINE HAS BEEN
LAID, ROADS ARE
FORMED AND
24.07.2004
G SRINIVAS
METTALED, .
31.12.04
CHANDRAN
January-05
10/9/2005
R K MAKHIJA
S S COMPLETE
INTERIORS
PLASTERED.
December-05
ORIGINAL VERIFICATION
27.11.04
G SRINIVAS
30.07.2004
VENKAT
29.07.2004
CHANDRAN
02.08.2004
VENKAT
THE PROJECT IS
UNDER
CONSTRUCTION,
ASPHALTING
AND SANITARY
WORK ARE YET TO
BE COMPLETED
27.06.2008
R K MAKHIJA
THE PROJECT SI
COMPLETE AND
READY FOR
OCCUPATION
29.07.2004
CHANDRAN
ANT BE DONE
Skeleton SF roof
cast Retaining
wall in basement
in progress 4 nos
staircase cast
bore dug sump
tank
built
Structure
completed CC
block work to be
done in 4th floor
d/w frames fitted
internal
plastering
completed in gf/ff
flooring to be
done
August-05
February-05
March-08
CAN'T DOABLE
09.08.2004
ANT BE DONE
R K MAKHIJA
28.08.2004
VENKAT
01.08.2004
R K MAKHIJA
ROADS FORMED
AND METALED,
COMPOUND WALL
OF BLK MASONRY
BOREWELL IN
PROGRESS
THE
INFRASTRUCTURE
WORKS ARE STILL
UNDER
ROAD FORMED,
PROGRESS,
BOX TYPE
WORKS ARE AT A
DRAINAGES WITH
VERY SLOW PACE.
RCC
COVER, GI WATER
LINES, UNDER GR
SEWERAGE
SYSTEM.
December-04
Originals Should
be verified
before releasing
the Loan
earth work 06.08.2004
excavation worksCHANDRAN
are completed middle row column footing reinforcement works are pro
SS COMPLETE,
INTERIOR AND
EXTERIOUS
PLASTERED.
04.06.05
MAKHIJA
FLOORING LAID
June-05
22.03.05
22.04.04
24.04.04
MAKHIJA
June-05
R K MAKHIJA
Residential site only/PLOTS
VENKAT
Expected date of completion by Oct 2004
ginal verification
SS completed
02.05.05
for stilts g &R2Kupper
MAKHIJA
floor block walls in progress door
August-05
and windows frames being fix
WATER SUPPLY
SEEN, BOREWELL
POINT SELECTED,
AND YET TO BE
03.09.03
Superstructure
R complete,
K MAKHIJAfinishing in progress,completion expected oct 2003
EXECUTED, RAIN
DRAIN WATER
SEEN, LAYOUT IS
CLEARLY
09.08.2004
VENKAT
NUMBERED
ANT BE DONE
Originals Should
be verified
before releasing
the Loan
ed by Mary Matthan
ly of G V Krupanidhi.
30.05.05
09.08.2004
31.12.04
MAKHIJA
SS COMPLETE FOR
B, G & 3 UPPER
FLOORS
July-05
Basement
CHANDRAN
roof slab form work reinforcement in progress
ROAD
FORMATION,
WATER SUPPLY
ARRAGEMENTS,
Generally
CHANDRAN
culumns are rised p to basement
November-05
roof level
11.08.2004
STORM WATER
DRAIN,
FORMATION
IS IN
METTALLISED
CHANDRAN
PROGRESS.
MUD
ROAD,
DRAINAGE
HAS BEEN DONE,
ELECTRICITY ,
WATER SUPPLY ,
CHANDRAN
CONSTRUCTIONS
WORK ARE
THE PROJECT
IS INCOMPLETED
SITE
INITIAL STAGES
IDENTIFICATION
OF
NUMBER AND
DEVELOPMENT,
MARKING TO BE
MUD ROADS
VENKAT
PROPSED,
FORMED
BOREWELL IN
PROGRESS, SITES
TO BE MARKED
R K MAKHIJA
AND NUMBERED
CAN'T DOABLE
11.08.2004
R K MAKHIJA
CAN'T DOABLE
11.08.2004
R K MAKHIJA
ANT BE DONE
10.08.2004
ANT BE DONE
10.08.2004
17.08.2004
R K MAKHIJA
27.04.05
R K MAKHIJA
Finishing work in
progress
3/21/2003
G Srinivas
Layout Project
Progress-50%.
21.1.2004
R K MAKHIJA
VILLAS
May-05
13.02.2008
SS COMPLETE FOR
RK
B,MAKHIJA
G & F FL BLK WALLS IN PROGRESS,
March-08
VILLA E 13 NOT STARTED.
25-09-04
GF SLAB
SHUTTERING AND
SS COMPLETE,
REINFORCEMENT
BLOCK WALLS,
preceding 13 years acquired the 12.08.2004
property. 4, tax pad
VENKAT
receipts for the
UNDERPROGRESS
period 04-05. 5. CopyN/A
of sanction paln. 6. E c from 10
INTERNAL
PLASTERING
COMPLETE UPTO
S FL, 3RD FLR IN
Superstructure
15-09-2005
R K MAKHIJA
PROGRESS
December-05
completed for b g
& 2 upper floors
columns in
progress for 3fl
12.12.04
MAKHIJA
walls in progress
June-05
18-10-2005
08.11.2010
G SRINIVAS
R K MAKHIJA
VECON
CAN'T DOABLE
15-09-05
MAKHIJA
16.08.2004
G SRINIVAS
GF SKELECTION
ROOF CAST,
COLUMNS ARE
COMING
UP IN FF,
CENTERING IN
PROGRESS,
BOREWELL DUG,
EARTH WORK 28
STAIRCASE CAST,
RCC COLUMN
FOOTINGS RCC
PLINTH BEAM
BOREWELL WITH
PUMP SUMP TANK
1ST BLK
FOUNDATION
WORK ARE
COMPLETED,
BASEMENT FLOOR
COLUMN RAISING
WORKS
ARE
THE
LAYOUT
A BLK
60%
PROGRESS,
AND
FORMATION
2ND
BLK 2ND
UNDER
FLOOR
ROOF
PROGRESS,
SS COMPLETE,
CENTERING
WORK
ROADS AND
INTERIORS AND
ARE
PROGRESS,
DRAINS
HAVE
EXTERIORS
BEEN FORMED,
PLASTERED,
SITES ARE
ALUMINIUM
DEMARCATED, TO
WINDOWS IN
BE NUMBERED,
PROGRESS.
WATER LINES ARE
LAID,
ASPHASLTING
AND UDG TO BE
DONE
April-05
November-05
February-10
N/A
October-05
12.02.05
MAKHIJA
5/5/2006
R K MAKHIJA
07.12.2006
R K MAKHIJA
BASEMENT FLOOR
ROOF GETTING
ss COMPLETE FOR
READY FOR
STILTS GROUND
SUPERSTRUCTURE
CONCREATING.
AND
2 UPPER
COMPLETE,
FLOORS
3RD
BLOCK
WALLS
FLOOR
COLUMN 7
COMPLETE,
CENTERING
IN
DOORS AND
PROGRESS
WINDOWS
FIXED.
FLOORING
Columns footings
MARBLE AND
completed,colum
VITRIFIED
ns in progress for
KITCHEN GRANITE
Silt floor/G FL.
EXTERIORS
PAINTED LIFT
INSTALLATION IN
PROGRESS. SOME
FLATS OCCUPIED
May-05
February-07
January-07
19.08.2004
08.01.05
21.08.2004
16-08-2005
10/16/2003
Originals to be
verified before
disbursement.
PAINTING WORK
UNDER
PROGRESS,
MAGIC RAY
AND EXPECTED
100%,DIAMOND
TO100%,GOLD
BE COMPLETE
IN ANOTHER
STRIKE 2
VENKAT
MONTHS
100%,RADIANCE
100%,DAZZLE
100%,PURE
MAGIC
100%,SPARKLE
100%,LUSTURE
90%,GLITTER
70%,BRILLANCE60
%,GALAXY
GConstruction
SRINIVAS
work
in final stage of completion
February-05
30%,ZENITH
30%,ZING
30%,STAR
30%,ZEST
20%,ZEAL
CHANDRAN
1ST FLOOR ROOF SLAB IS COMPLETED,
20%,HARMONY
10%,MERIDIAN
10%,TREASURE
10%,CELEBRATIO
R K MAKHIJA
N 10%
October-06
G SRINIVAS
road formation is progressing/ PLOT
20.03.05
CHANDRAN
16.03.04
G SRINIVAS
30.12.04
G SRINIVAS
Residential Sites
only/PLOTS
Work is in
progress, only
common
facilities
2 bore wells
have
aredug
to be
been
road
providedis
formation
under progress
asphalting to be
done water
sanitary points
for each site are
provided site
demarcation done
2 houses have
been constructed
14/07/05
MAKHIJA
building is
complete,
finishing in
progress
7/1/2003
G SRINIVAS
nction Plan
August-05
7/5/2003
M M C VALUER
20.05.2004
VENKAT
WORK IS COMPLETE
Original to be
verified before
releasing.
4/10/2003
R K MAKHIJA
Finishing work
going on.
Originals to be
verified before
disbursement.
23.11.2003
G SRINIVAS
Residential Sites
only/Plots
22-10-2005
R K MAKHIJA
THE LAYOUT
WORK IS IN
PROGRESS, AND
FULLY COMPLETE.
13.11.2003
M M C VALUER
Residential Sites
only/PLOTS
04.03.04
G SRINIVAS
Residential sites
only/Plots
Originals to be
verified before
disbursement.
November-05
Original to be
verified before
disbursement.
Not received
26.04.04
G SRINIVAS
Residential Sites
only/Plots.
1/21/2003
G SRINIVAS
Residential Sites
only/Plots.
R K MAKHIJA
S S COMPLETE
FOR GFL,BLOCK
MASONARY UPTO
SIL LEVEL.
10/4/2006
March-07
Originals to be
verified before
disbursing.
Not received
Original to be
verified before
disbursement.
Not received
6/2/2002
R K MAKHIJA
2.02.05
R K MAKHIJA
Project is in initial
stage.
Earth work for
stilts floor rcc
RCC column
footings uo to
roof level
27.02.04
CHANDRAN
Residential Sites
only/PLOTS
2.12.2003
VENKAT
Residential Sites
only/PLOTS
29.01.04
CHANDRAN
Residential Sites
only/PLOTS
Originals to be
verified before
disbursement.
22.07.2004
G SRINIVAS
THE LAYOUT
FORMATION IS
COMPLETE
Originals to be
verified before
disbursement.
5/24/2000
R K MAKHIJA
Finishing work
going on.
Original to be
verified before
disbursement.
Not received
15.12.2001
30/09/04
R K MAKHIJA
December-05
Project is in initial
stage.The
earthwork
excavation and
rock cuttings is in
progress.
20% OF THE
TOTAL PROJECT
VENKAT
Expexted completion by Jan 2004
HAS BEEN
FINISHED AND IT
IS SCHEDULED
FOR COMPLETION
CHANDRAN
IN MARCH 2005
Not received
Originals to be
verified before
disbursement.
01.05.04
G SRINIVAS
FF : skeleton roof
cast. SF: roof
under progress.
CC Blcok masonry
block work yet to
start.
20.08.2004
G SRINIVAS
COLUMN WORK IN
PROGRESS
Not received
23/06/05
MAKHIJA
Originals to be
verified before
releasing loan.
09.12.04
R K MAKHIJA
The layout is dc
converted
THIS PROJECT IS
approved vide sp
100% COMPLETE
of the begur villae
& PARTLY
panchayat several
OCCUPIED
bunglows &
houses have been
constructed or
are under
construction
Originals to be
verified before
releasing loan.
3.6.2003
VENKAT
Residential Sites
only/PLOTS
July-05
June-05
Not received
Original to be
Verified before
disbursement.
03.03.05
R K MAKHIJA
25.02.2003
G SRINIVAS
29.06.2004
CHANDRAN
19.11.2009
VECON
SS rcc framed
Structure and
structure with
cement concrete
columns and
block masonry is
beams
complte.Water
electrification,san
itary and
woodwork is
under progress.
Residential Sites
PLASTERING
only/Plots
COMPLETED IN
FLOORING UNDER
PROGRESS,
PAINTING FITTING
PROGRESS.
August-05
Originals to be
verified.
Yet to be
received.
06.10.03
Original to be
verified before
disbursement.
R K MAKHIJA
Not received
Not received
Originals to be
verified before
disbursement.
Originals to be
verified before
Disbursement.
R K MAKHIJA
Finishing work
going on.
18.10.03
VENKAT
5/1/2003
VENKAT
Residential Sites
only/PLOTS
22.10.2003
G SRINIVAS
Residential Sites
only/Plots
8/14/2003
M M C VALUER
21.06.2004
VENKAT
completion
excepted on june
THE
2004
CONSTRUCTION
WORK IS FULLY
COMPLETED,
AND READY TO
OCCUPY.
Originals to be
varified before
releasing loan.
29.09.04
CHANDRAN
DEPOSIT 83000
July-05
Originals to be
varified before
releasing loan.
30.09.04
CHANDRAN
DEPOSIT 83000
July-05
FINISHING WORK
09.04.2008 DHRUVA ASSOCIATESIS IN PROGRESS
July-08
25.08.2004
CHANDRAN
31.08.2004
VENKAT
11.12.04
MAKHIJA
LAYOUT, ROAD,
DRAINAGE
FACILITIES
POWER
THE LAYOUT
HAS
SUPPLY,
ISLAID
IN
BEEN
WELL
PROGRESS
WITH
WIDE
GF AND FF INSIDE
METALLED ROADS
PLASTERING
BOX TYPE DRAINS
COMPLETED,
WATER AND
TF ROOF
SANITARY LINES
COMPLETED.
LAID SITES
MARKED AND
NUMBERED
ELECTRIC POLES
INSTALLED
January-05
14.04.2008THE PROJECT
MAKHIJA
IS COMPLETE AND MOST OF THE FLAT OCCUPIED
27.01.05
CHANDRAN
16.01.05
MAKHIJA
S S COMPLETE
FOR B,G+3
FLOORS,BLOCK
IN
ssMASONRY
WITH BLOCK
Generally
PROGRESS.
WALLS
COMPLETE
structure works
FOR B G & 3
have been
FLOORS AND
completed block
PART 4TH FLOOR
works yet to be
INTERIORS AND
commenced
EXTERIORS
PLASTERING IN
PROGRESS DOOR
AND WINDOW
FRAMES FIXED
April-06
October-05
May-05
31.08.2004
15.09.2004
26.08.2004
30.09.2005
02.04.05
13/01/2006
05.03.05
VENKAT
August-05
ASPHALTED ROAD
THE
DONE, SITE
CONSTRUCTION
MARKING WITH
WORK IS IN FULL
SITE NOS ARE
PROGRESS IN BLK
DONE,
A,
VENKAT
DRAINAGE DONE,
PLASTERING
WORK IS
COMPLETE AND
FLOORING WORK
VENKAT
YET TO START
December-04
Structural &
super structural
works are
completed
R K MAKHIJA
THE PROJECT IS COMPLETE.
September-05
finishing work
ofinside &
external
plaseteing works
CHANDRAN
are completed
June-05
R K MAKHIJA
THE PROJECT IS
COMPLETE.
MAKHIJA
December-05
of deed challans evidencing the payment of deficit stamp duty and registration fee are required for persual
30.09.04
CHANDRAN
February-05
20-08-05BUILDINGS
MAKHIJA
7 INTERIORS IS COMPLETE.FINISHING
September-05
IN PROGRESS.
works
d sale are
deed
completed & all structure
31.01.05
work are completed
CHANDRAN
& all structure works are completed
December-05
Teak wood block foundation
ALL STRUCTURE
04.10.04
IS COMPLETED
CHANDRAN
INSIDE AND EXTERNAL 3 SIDE February-05
PLASTERING HAVE BEEN COMPLETE
27/06/2006
R K MAKHIJA
THE PROJECT IS
COMPLETE .FINAL
FINISHING IN
PROGRESS.
July-05
09.08.03
VENKAT
August-04
5/7/2005
THE SITES ANDRROADS
K MAKHIJA
FORMED, BOX TYPE DRAINAGES WITH CHAPADI STONES
SS complete for
26.03.05
b gf & 3 floors MAKHIJA
interiors and exteriors plastering in progress
June-05 door and window frames
29.09.04 Metalised
VENKAT
road have been done sites marking has been done .
25-09-04
G SRINIVAS
November-04
12.04.05
CHANDRAN
Generally foundation work are in progress
ALPHA
8.03.05
RCC COLUMNS FOOTING
MAKHIJA B FL ROOF CAST COLUMNS
December-06
UP TO G FL ROOF IN PROGRESS
27.10.04
G SRINIVAS
R K MAKHIJA
centering for G/F roof in progress
September-05
3/2/2006
PLOTS LEVELLED,ROADS
R K MAKHIJA FRAMED,METALLED,SITE
September-05
MARKED & NUMBERED.
2/2/2006
SS UNDER
R K MAKHIJA
COMPLETION, WALLS MASONARY
March-06
IN PROGRESS
18/07/05
COMPOUND
R K MAKHIJA
WALL, GATE, WATER SUPPLY, ROADSCONSTRUCTION
FORMED
NOT YET STA
owner
ER LINES
in favour
TO BE of
LAID
theBOX
builder
TYPE3)DRAINS
ec
07.12.04
fromTO
28.10.99
BNE BUILD
MAKHIJA
to 19.08.04
UNDER GROUND
( in respect
SEWREAGE
of sy no 40/1)
DRAINS TO BE LAID OVER HEAD TANK
05.04.05
All most all work
CHANDRAN
are completed Blk b ground floorOctober-05
slab work is in progress
04.10.04
07.10.04
G SRINIVAS
December-04
27.04.05
CHANDRAN
Apartment const work completed
April-05
d sale deed
27/06/05
SS COMPLETEMAKHIJA
B, G, F & S FL, BLK WALLS COMPLETED
December-05
UPTO FIRST FLOOR
07.05.05
MAKHIJA
September-05
QUALITY 11/10/2004
OF CONSTRUCTION
CHANDRAN
GENERALLY APPEARS TO BE GOOD AND THERE IS GOOD PROGRESS OF
al verification
Generally
27.04.05
all structural
CHANDRAN
works are completed and inside plastering work are completed
17/01/2006
RTHE
K MAKHIJA
BUILDING IS COMPLETE,READY December-05
TO OCCUPY
STRUCTURE
12.10.04 PLASTERING
G SRINIVAS
COMPLETED FLOORING IN PROGRESS
January-05
PAINTING IN PROGRESS
ed in o s no 9967/98
BALANCE
10.09.2009
WORKS: RAGHUNANDA
FLOOR POLISH, ELECTRICAL/WATER SUPPLY
October-09
FITTING FIXING, OUTSIDE
23.03.05
9/9/2005
CHANDRAN
MAKHIJA
The project is complete finishin in progress
October-05
23.10.04
CHANDRAN
SS COMPLETE,
22/07/05 BBM R
COMPLETE,
K MAKHIJADOORS & WINDOW FRAMES
November-05
FIXED, INTERIORS PLASTERD
Originals to be
varified before
releasing loan.
30.10.04
CHANDRAN
ORIGINALS TO
BE VERIFIED
BEFORE
DISBURSAL.
24-08-2005
R K MAKHIJA
ORIGINALS TO
BE VERIFIED
BEFORE
DISBURSAL.
S
22-09-2005
S COMPLETE FOR
R KBMAKHIJA
G & 3FLOORS,BLOCK WALLS COMPLETE.INTERIOS
February-06
PLASTERED.
ORIGINALS TO
BE VERIFIED
BEFORE
DISBURSAL.
EARTH
24-08-2005
WORK FOR RCOLUMN
K MAKHIJA
FOOTINGS,RCC COLUMNS UPTO
December-06
STILT FLOOR ROOF LEVEL.
8/7/2005
October-05
PLOT LEVELED
February-07
R
BUILDING
K MAKHIJA
IS COMPLETE, FINISHING IN PROGRESS
July-05
plan covering site nos133 & 122 5. Draft copy of agreement to sell 6. draft copy of construction agreement 7 draft copy o
S 17/03/2006
S COMPLETE,INTERIORS
R K MAKHIJA
& EXTERIORS PLASTERED.FLOORING
March-06
CERAMIC IN PROGRESS.
10.12.04
FOUNDATIONSRINIVAS
AT BED LEVEL 72 PILLARS HAVE COEM
December-05
UP TO LINTEL LEVEL
04.03.05
Basement roof
CHANDRAN
slab completed and column raising
December-05
works are in progress
14.02.05
CHANDRAN
APARTMENT WORK ARE COMPLETED
March-05
07.08.2009
RAGHUNANDA
THE PROPERTY IS COMPLETED IN ALL RESPECTS
RCC
15-02-2006
FRAMED STRUCTURE
R K MAKHIJA
COMPLETE FOR B G & 3 FLOORS,PLASTERING
December-05
IN PROGRESS.
18/09/2006
DHRUVA
FINISHING WORK IS IN FINAL STAGE
November-06
skeleton
10.12.04
structure completed
SRINIVAS
cc block work completed in gf &
June-04
ff d/w frames fitted in gf & ff
Superstructure
13.11.04
complete
MAKHIJA
for all blocks concrete block walls
May-05
completed for all blocks
Plot cleard
7.12.04
levelled and
MAKHIJA
earth work completed excavation for colmns footing to commence
14-09-05
SS
MAKHIJA
complete for sites G F Fl s fl Rcc ion
October-05
progress
the land is
19.12.04
being levelled roads
MAKHIJA
are under formation work on theJune-05
box types drains was in progres
21.03.05
columns
CHANDRAN
are raised upto basement floor
September-05
slab level
CHANDRAN
Earth work excavation just commenced
1/2/04 to 30/3/04
15.12.04
CHANDRAN
First floor roof casting is in progress
July-05
3/1/2005
MAKHIJA
07.01.05
MAKHIJA
COMPLETED
SITE 23.03.2008
LEVELLED, CLEANED,
R K MAKHIJA
FENCEING ALROUND, WORK OF December-10
DEVELOPMENT NOT YET STARTED.
generally
02.05.05
all structure works
CHANDRAN
are completed internal plasteringJune-05
& flooring works are in progress
20.12.04
Superstructure
MAKHIJA
complete for b g & 3 upper floor block
April-05
walls inproress
25.12.04
INAL VERIFICATION
SS complete
MAKHIJA for b g & f fl @nd floor work in
July-05
progress
04.06.05
EARTH WORK, COLUMN
MAKHIJA FOOTING, COLUMNS UPTO BASEMENT ROOF LEVEL.
& 3 of certificate
30.12.04
generally earth
CHANDRAN
work excvation fopr column foorint
December-05
works are in progress
31.12.04
17.01.05
At present
CHANDRAN
silt floor roof beam centering works
September-05
in progress
CHANDRAN
This is old layout and nmo work is in progress
SS rcc framed06.01.05
structure concrete
MAKHIJA
block walls interiors plastered smooth and finished with plastic emu
10.01.05
Third floor roof
CHANDRAN
is completed & first floor super structure is in progress
RCC27.12.2005
S S COMPLETE PH
R KSLAB
MAKHIJA
W SHUTTERS PAINTING IN PROGRESS.BUILDING IS COMPLETE
13.01.05
21.01.05
CHANDRAN
Present stage work is in progress
July-05
The
28.01.05
work of infrastructure
MAKHIJA
development formation or road site marking is yet to start
10.02.05Rcc framed
MAKHIJA
structure complete for stilt floor roof
January-06
under casting
14/11/2005S S COMPLETE
R K MAKHIJA
FOR S G + 3 FLOORS,BLOCK WALLS
March-06
UPTO SFL.
APARTMENT CONSTRUCTION
23.01.05
IN FINAL
SRINIVAS
STAGES OF COMPLETION KITCHENMarch-05
TILES BEING FITED PAINTING IN P
24.01.05Rcc column
MAKHIJA
footing and columns 30 nos basement
September-05
rcc slab cast
S
16.08.05
S COMPLETE FOR
R KB
MAKHIJA
G & 2FLOORS,BBM COMPLETE UPTO
December-05
GFL,F FL IN PROGRESS.
Formation of 60 to 40
03.02.05
road in progressMAKHIJA
compound wall with gate marking of sites with flags borewemm 2 nos
02.02.05
Block
CHANDRAN
work uo to first floor have beenOctober-05
completed
Structural
01.02.05
work on CHANDRAN
stilt floor & ff completed raising columns
October-05
in 2nd floor is in progress
23.05.05
CHANDRAN
11/8/2005
07.02.05
earth
R K MAKHIJA
work excavation for both towers is April-07
in progress
MAKHIJA
October-05
06.02.05
EARTH EORK EXCAVATION
MAKHIJA
FOR COLUMN FOOTING MARKING
August-06IN PROGRESS
22.02.05
April-05
21/06/05
RCC COLUMN MAKHIJA
FOOTNGS, SS MASONARY. FLOORING,
COMPLETED
WHITE MOSAIC TILES
21.02.05
4/7/2005
MAKHIJA
Earth wprk excavation in progress
THIS
R KPROJECT
MAKHIJAIS COMPLETE, FINISHING INJuly-05
PROGRESS
Formation
10.03.05
of road box
MAKHIJA
type drains & culverts in progress entrance archundr completion
IGINAL VERIFICATION
Road formation
02.05.05
laying of storm
CHANDRAN
water drain laying of underground
September-05
sewer lines works are in progre
SS complete interiors24.02.05
and exteriors plastered
MAKHIJAdoor and windows frames fixed kitchen and toilet rough plaste
30.09.2005
THIS
MAKHIJA
PROJECT IS COMPLETE, FINISHING IN
junbe
PROGRESS
05
IGINAL VERIFICATION
24-09-2005
THE PROJECTMAKHIJA
IS COMPLETE. INTERIORS IN PROGRESS
September-05
FOR SOME FLATS.
23/03/2006
S SR
COMPLETE,
K MAKHIJADOOR FRAMES ,WINDOWS GRILLS
May-06FIXED.
04.03.05
SS completed
MAKHIJA
block walls door frames fixed ceilings
October-05
plastered in b fl
Formation
14.03.05 of road metalled
MAKHIJAbox types drains & culverts sites numbered and marked
29-09-2005
THE PROJECT
MAKHIJA
IS COMPLETE AND SOME OF THEAugust-05
FLATS OCCUPIED.
14.03.05
MAKHIJA
Finishing as per customer choise
May-05
BLK A: BASEMENT18.07.2008
ROOF SLAB IN PROGRESS,BLOCK
R K MAKHIJA
B & D: GROUND FLRDecember-09
COLUMNS IN PROGRESS, BLK C: YE
ORIGINAL VERIFICATION
29/10/2005
S S COMPLETE,BB
R K MAKHIJA
WALLS COMPLETE,DOOR & WINDOW
29/10/2005
FRAMES FIXED.
27.08.04
CHANDRAN
The apartment building is under cont
rcc slab uo to gf
24.05.05
completed ff roof
MAKHIJA
centring reinforcement works are
December-05
in progress block work in gf is in p
Original to be
verified before
disbursement.
G SRINIVAS
Completed and
occupied.
EARTH WORK,
4/7/2005
RCC COLUMN FOOTINGS
R K MAKHIJA
AND CILUMNS FOR STILT FLOOR,
May-06
CENTERING IN PROGRESS FO
13.04.05
CHANDRAN
Construction work are completed
May-05
16.04.05
CHANDRAN
Sf roof slab concrete completed
December-05
THE ORIGINALBLK
DOCUMENTS
A: FOUNDATION
OF TILTLE
17.09.2008
COMPLETED,
BEFORE RELEASING
COLUMNS
R K MAKHIJA
IN
ANY
PROGRESS,
LOAN
BLK B & C: SS COMPLETE
April-10 UP TO GFL, FFL ROOF IN
23.04.05
CHANDRAN
December-05
28.04.05
R KEarth
MAKHIJA
work for column footings in progress
June-06
20/4/2006
SS complete
RK
for
MAKHIJA
S & GFL, BBM upto GFL. FFl roof
December-06
centering in progress.
20.04.05
Formation
R K MAKHIJA
of road box type drains & culverts
June-05
in progress
iginal
COMPLETE
to beFOR
verified
BG+
before
3 FLOORS,BBM
disbursement.
6/10/2005
COMPLETE FOR
MAKHIJA
ALL FLOORS,DOORS & WINDOWDecember-05
FRAMES FIXED,CEILINGS PLASTERE
20/02/2006
RCC FRAMED
R K MAKHIJA
STRUCTURE COMPLETE FOR S, GFebruary-06
& 4 UPPER FLOORS
IGINAL VERIFICATION
IGINAL VERIFICATION
HORIZONTAL
27.04.05
DEVATION CHANDRAN
231% BF roof slab completed GF columns
March-06
raising works are in progress
02.05.05
Earth
MAKHIJA
work excavationcoloum footings
December-06
in progress
10/11/2005
MAKHIJA
S S COMPLETE FOR STILT & G FL.
June-06
25.09.2008
01.06.05
RCC MAKHIJA
FRAMED STRUCTURE FOR B, G & 3UPPER
June-05
FLOORS
iginal to be verified
S S COMPLETE,BBM
before disbursement.
06.09.2005
COMPLETE,DOORS
R K MAKHIJA
& WINDOW FIXED,INTERIORS PLASTERED,MARBLE
December-05
FLOORING IN PR
IGINAL VERIFICATION
20.05.05
STRUCTURAL WORKS
B CHANDRAN
HAVE BEEN COMPLETED, INSIDE
October-05
PLASTERING COMPLETED
FOOTING
31.05.05
& COLUMNS
MAKHIJA
UPTO GFL SLAB LEVEL COMPLETED,June-06
CENTERING FOR SLAB WIP
15/06/05
SS COMPLETE FOR
MAKHIJA
B, G & 2 UPPER FLOORS, ROOF SLAB
February-06
FOR TFL IN PROGRESS
8/2/2006
R K MAKHIJA
S S COMPLETE FOR S G+3 FLOORS April-06
& PH.
IGINAL VERIFICATION
28.05.05
EARTH
MAKHIJA
WORK COLUMN FOOTING IN PROGRESS
May-06
ORIGINAL VERIFICATION
ORIGINAL VERIFICATION
03.11.2006
ORIGINAL VERIFICATION
IGINAL VERIFICATION
01.06.05
STILT FLOOR FOUNDATION
MAKHIJA
COMPLETE, COLUMNS, ROOF
April-06
SLAB IN PROGRESS
RCC
31.05.05
FRAMED STRUCTURE,
MAKHIJAPLINTH BEAM, COLUMNS UPTO
April-06
ROOF LEVEL, LIFT LEVEL
07.06.05
PLOT LEVELLED,
MAKHIJA CONSTRUCTION ACTIVITIESJune-06
YET TO START
15-09-2005PLOT LEVELLED.THERE
MAKHIJA
IS A BOREWELL EXISTING
December-06
IN THE SITE.
11/10/2005
RCC COLUMNS,BLOCK
R K MAKHIJA
WALLS,FLAT RCC,INTERIORSSeptember-05
& EXTERIORS PLASTERED.
11/7/2005
EARTH
R K WORK
MAKHIJA
FOR STILT FLOOR, COLUMNS June-06
IN PROGRESS
EARTH
R K MAKHIJA
WORK & COLUMN FOOTINGS IN August-06
PROGRESS.
ORIGINAL VERIFICATION
21/07/05
R K MAKHIJA
EARTH WORK IN PROGRESS
December-06
S S COMPLETE
15-09-05
FOR BASEMENT
R K FLOOR,CENTERING
MAKHIJA
& STEEL REINFORCEMENT
March-06 READY FOR CASTING RO
R K MAKHIJA
S S COMPLETE FOR STILT AND GAugust-06
FL.
AND OWNER,TITTLE DEEDS ATLEAST FOR THE PRECEDING 13 YERARS,LAND CONVERSION CERTIFICATES REQD,
FAVOUR OF BUILDER,COPY OF GPA EXECUTED & REGISTERED RECTIFICATION DEED EXECUTED REQUIRED.
iginal to be verified S
before
S COMPLETE
disbursement.
23.09.2005
FOR B G & 4 UPPER
R K MAKHIJA
FLOORS,5TH FLOOR IN PROGRESS.INTERIORS
December-05 & EXTERIORS PLAST
22.10.2008
THE
R K PROJECT
MAKHIJA IS COMPLETE, 8 FLATS ARE
August-08
OCCUPIED
ORIGINAL VERIFICATION
SR
SK
COMPLETE,TFL
MAKHIJA
IN PROGRESS,BBM December-05
IN PROGRESS.
6/10/2006
ORIGINAL VERIFICATION
13.09.2005
DHRUVA
FINISHING WORK IS IN FINAL STAGE
December-06
BASEMENT
R K MAKHIJA
ROOF SLAB,COLUMNS FOR GFL IN
June-06
PROGRESS.
R K MAKHIJA
THE WORK IS YET TO START June-07
S SR COMPLETE
K MAKHIJA FOR S,G & FFL.SFL SLAB IN
March-06
PROGRESS.
S S COMPLETE FOR
3/10/2005
S + 3FLOORS,BLOCK
R K MAKHIJA
WALLS COMPLETE FIR S +2 FLOORS,INTERNAL
December-05
PLASTERING IN PR
6/5/2006
The
R Project
K MAKHIJA
is complete and final finishingJune-06
in Progress.
SS Complete,door and
6/5/2006
window frames
R Kfixed,interior
MAKHIJA
and exteriors in progress,flooring
August-06
complete, plastering
PHASE
31/07/2006
I & II complete,Phase
R K MAKHIJAIII:SS complete,walls flooring
September-06
and painting in progress.
ds at least for
ROADS
13 years,b)
FORMED,
Copy
METALLED,
15-09-2005
of GPA dt
BOX
15/05/2002
TYPE DRAINS,
MAKHIJA
executed
STREET
by Sri.G
LIGHT,
Muniyappa
UNDER GROUND
in favour
COMPLETE
SEWAGE,
of Sri.K AVENUE
M Prasanna
TREES,
Kumar.C
COM
03.2004 To 31.03.2004
28/12/2005
R K MAKHIJA
R K MAKHIJA
15.04.05
CHANDRAN
19-10-2005
R K MAKHIJA
23/06/05
THE BUILDING IS
COMPLETE & FEW
FLATS ARE
OCCUPIED.
THE PROJECT IS
COMPLETE,
FINISHING IN
PROGRESS
SS COMPLETE
WITH BLOCK
Generally
WALLS, FLAT RCC
finishing works
ROOF, CERAMIC
are in progress
AND VITRIFING
FLOORING,
DOORS,
WINDOWS
FRAMES FIXED
July-05
July-05
June-05
December-05
MAKHIJA
BUILDING IS COMPLETE & PARTLY OCCUPIED
June-05
02.06.05
SS COMPLETED,
MAKHIJA PAINTING INPROGRESS, 3 FLATS
April-05
OCCUPIED
S S COMPLETE
2/2/2006 FOR SRGK&
MAKHIJA
2 UPPER FLOORS.BLOCK WALLSFebruary-06
COMPLETE FOR SECOND FLOOR.
28/07/2006
R K The
MAKHIJA
Project is complete.18 Flats occupied.
August-06
SOUTH
20.10.2008
BLOCK: 100% COMPLETE
R K MAKHIJA
& SOLD, NORTH BLK, CENTRAL
May-07
BLK, 100% COMPLETE & SOLD.
SS complete for b
g & 2 upper floors
3rd floor columns
centering in
3.01.05
R K MAKHIJA
progress
June-05
Plastering work is
completed.
Expected date
27.04.04
G SRINIVAS
02.06.2004
CHANDRAN
of completion by
may 2004
building is architect
12.12.04
designed of first
R K class
MAKHIJA
construction to have g on stilts and 3 upper floors to have 9 fla
BLK A- SUPER
STRUCTURE
12/8/2005
S S COMPLETE
R KFOR
MAKHIJA
B & G FL,PHASE
II BASEMENT
COLUMNS
October-06
IN PROGRESS.
COMPLETE,
FOR
BASEMENT GR
AND 3 UPPER
FLOORS,
PLASTERING AND
GINALS
e for S,G
TO
&BE
3 upper
VERIFIED
floors,Blk
BEFORE
walls
DISBURSAL.
6/9/2006
complete,interiors
R K MAKHIJA
palstered,exteriors in progress.Flooring
September-06
complete,painted.The Proj
INTERIORS AND
IEXTERIORS, BLK
B- SUPER
STRUCTURE
iginals to be verified before disbursement
12.03.05
R K MAKHIJA
COMPLETE,
December-04
CHANDRAN
COMPLETED
June-04
SS complete,walls complete
18/10/2006
door frames fixed,interiors
R K MAKHIJA plastered upto 7th floor,dado
NOVEMBER'06
work in progress.Kitchen gra
Originals to be
Verified before
releasing loan.
Not received
RCCCOLUMN
23/06/05
FOOTINGS, COLUMNS
MAKHIJA
UPTO BASEMENT ROOF LEVEL,
December-06
RCC RETAINING WALLS IN PROGR
24.12.04
CHANDRAN
January-05
SOUTH BLOCK:
THE BLOCK IS
COMPLETE AND
OCCUPIED, NORTH
SS COMPLETE,
06.12.2008
INTERNAL & EXTERNAL
R K MAKHIJA
PLASTERED,
FLOORING,
PAINTING
March-09
& FINISHING WORK IN PROG
BLOCK:
THE
BLOCK IS
COMPLETE AND
SOME FLATS
OCCUPIED,CENTR
16.01.05
Project in final
SRINIVAS
stages of completion common area
February-05
work in progress
AL BLOCK: THE
BLOCK IS
COMPLETE AND
SOME FLATS
11.05.2007
R K MAKHIJA
OCCUPIED.
May-07
R K MAKHIJA
BLK A, B, C, D, E,
& F - COMPLETE.
September-07
16.05.05
CHANDRAN
construction
works are
completed
February-05
15.04.05
CHANDRAN
ready
COMPLETED
15.04.05
CHANDRAN
03.11.2007
July-05
ALL
23/5/2006
THE BLOCKS ARE
R K COMPLETE
MAKHIJA & UTILITIES,COMMON AREA
June-06
FINISHING IN PROGRESS.
Originals to be
varified before
releasing loan.
BLOCK A
COMPLETE AND
FLATS UNDER
3/2/2006 THE PROJECT
R K MAKHIJA
IS COMPLETE & MOST OF THEDecember-05
FLATS OCCUPIED.
OCCUPATION.BLO
CK B S S
COMPLETE,INTERI
OR & EXTERIORS
13.12.2005
R K MAKHIJA
PLASTERED.
BLCOK A DEC 2005 BLOCK B MAR 2006
16/07/05THIS PROJECT
R K MAKHIJA
IS COMPLETE AND FINAL FINISHING IN PROGRESS
21/06/05
RCC COLUMNS FOOTINGS,
MAKHIJA
CENTERING IN PROGRESS FOR STILTS ROOF SLAB
03.09.2007
18.04.04
R
THE
K MAKHIJA
PROJECT IS COMPLETE, 22 FLATS OCCUPIED.
April-07
CHANDRAN
There is good progress of work
February-05
structure
G SRINIVAS
complete. Plastering and painting in progress.
Originals to be
verified before
releasing loan
file no 232a
12.10.2003
G SRINIVAS
Structure is
complete,plasteri
ng in progress,CC
Block in
progress.Expecte
d completion by
Apr 2004.
14.11.2007
R K MAKHIJA
Originals are
verified.
11/8/2005
R K MAKHIJA
Oroginals to be
varified before
disbursement.
03.09.2003
G SRINIVAS
24.03.07
R K MAKHIJA
THE PROJECT IS
SURBHI :SS
COMPLETE.
SOME
COMPLETE
UPTO
FLATS OCCUPIED
THE
BUILDING
12TH
FLOOR IS
COMPLETE.FINISH
INTERIORS
ING OF
PLASTERED
Block C & Block
INDIVIDUAL
FLATS
EXTERIORS
C1 are
IN PROGRESS.
PLASTERING
IN
completed.Block
PROGRESS
B,Flooring in
FLOORING
progress.Completi
INTERNAL/EXTERN
on expected by
AL PAINTING
Dec 2003
WORK IN
PROGRESS
SHUBHA: PROJECT
COMPLETE &
OCCUPIED
MAKHIJA
SS COMPLETE,
FINISHING IN
PROGRESS
Originals Should
be verified
before releasing
the Loan
ORIGINAL VERIFICATION
8/9/2005
November-07
August-05
June-07
October-05
22-10-2005
S S COMPLETE,BLOCK
R K MAKHIJA
WALLS UPTO IST FLOOR,DOOR October-06
& WINDOW FRAMES FIXED.
TS REQUIRED.
SUPERSTRUCTURE
30.11.2006
COMPLETE WITH
MAKHIJA
RCC COLUMNS, BEAMS SLABS BLOCK
April-07
WALLS COMPLETE IN ALL THE
TS REQUIRED.
R K MAKHIJA
S S COMPLETE FOR S G +3 FLOORS.
February-06
26/5/2006
BLK A & BSS COMPLETE
MAKHIJAFOR GFL ,FFL IN PROGRESS .BLKBLK
C TO
A-10,B-10,C-0,D-0,E-0,F-0,
H YET TO START
12.03.04
R K MAKHIJA
Residential sites
only/PLOT
Not received
Originals to be
verified.
5/23/2003
G SRINIVAS
13.08.2004
CHANDRAN
ready
layout/
LAYOUT
PLOT
FORMATION
WORK IS
COMPLETED,
ALREADY SOME
BUILDINGS ARE
CONSTRUCTED
AND SOME
BUILDINGS ARE
BEING
CONSTRUCTED
14.1.2003
R K MAKHIJA
Residential Sites
only/PLOTS
23.08.03
R K MAKHIJA
6/26/2003
VENKAT
Residential Sites
only
6/26/2003
VENKAT
Residential Sites
only
6/26/2003
VENKAT
Residential Sites
only
07.08.2004
R K MAKHIJA
Residential sites
only/ PLOT
..
27.12.2003
VENKAT
Residential Sites
only/PLOTS.
Originals to be
verified.
09.09.03
R K MAKHIJA
Residential Sites
only/PLOT
09.09.03
R K MAKHIJA
Residential Sites
only/PLOT
09.09.03
R K MAKHIJA
Residential Sites
only/PLOT
09.09.03
R K MAKHIJA
Residential Sites
only/PLOT
Not received
Original to be
verified before
disbursement.
Not received
Not received
Not received
Not received
Original to be
verified before
disbursement.
Not received
At present road
formation under
ground sanitary
work are in
Ashok and N R Amaresh. Common
27.10.05
documents 1. CHANDRAN
endorsement for non-acquisition
progress
issuedJune-05
by the BDa 2. Tax paid receipt fo
Original to be
verified before
disbursement.
30.7.2003
G SRINIVAS
Residential Sites
only/PLOTS
Original to be
verified before
funding.
09.08.2004
VENKAT
Residential Sites
only/PLOT
23.08.03
R K MAKHIJA
Residential Sites
only/PLOT
R K MAKHIJA
Residential Sites
only
Originals to be
verified before
releasing.
Original Verified
by Lawyer.
27.04.2003
R K MAKHIJA
Residential Sites
only/Plots
To be verified
1/28/2003
R K MAKHIJA
Residential
sites/PLOT
FULLY
COMPLETED
02.07.2004
G SRINIVAS
PROJECT IS
COMPLETED
Not received
08.06.2004
Original to be
verified before
disbursement.
R K MAKHIJA
THE PROJECT IS
COMPLETE & 8
FLATS OCCUPIED.
VENKAT
Not received
Not received
April-06
20.05.2009
Originals to be
verified before
release.
21.1.2004
Originals to be
verified before
release.
22-10-2005
Originals Should
be verified
before releasing
the Loan
15/07/05
Superstructure
RAGHUNANDA
COMPLETED IN ALL RESPECTS
March-08
complte,interiors
RCC FRAMED
and exteriors
STRUCTURE,
plastered.plumbin
SOLID BLOCK
g sanitary and
WALLS,
R K MAKHIJA
electricals laid.
PLASTERED
SMOOTH FOR
INTERIORS WITH
ACRYLIC
SS COMPLETE,
R K MAKHIJA
EMULSION
November-05
INTERIORS &
EXTERIORS
PLASTERED,
FINISHING IN
R K MAKHIJA
PROGRESS
August-05
Originals Should
be verified
before releasing
the Loan
20/07/05
R K MAKHIJA
Originals Should
be verified
before releasing
the Loan
16.04.05
R K MAKHIJA
Not received
4/9/2006
R K MAKHIJA
4/2/2006
R K MAKHIJA
30/12/2005
R K MAKHIJA
10.11.2007
DHRUVA
6/3/2007
R K MAKHIJA
THIS PROJECT IS
SS complete for b
COMPLETE,
g & 3 fl block
FINISHING IN
walls interiors
PROGRESS
plastered fpr
SS complete
exteriors
in
S,G+3
floor.Blk
progress
wallsdoor
frames & window
complete.Doors
&
grills fixed
windows
frames
fixed .Interior &
exteriors
plastered.Marble
flooring in
progress. Kitchen
platform, dado 2
toilet dado.7
window glazed
shutter.
SS
COMPLETE,BBM
COMPLETE FOR G
& FFL,SFL BBM
S S COMPLETE
UPTO SIL LEVEL,
FOR S F +3
FLOORS.DOORS &
WINDOWS
SS COMPLETE
FRAMES FIXED
BLOCK WALLS
FOR GFL.
BLKS 1, AND
2
INTERIORS
COMPLETE
AND
EXTERIORS
OCCUPIED,
BLKS
PLASTERED
3,4DOORS
COMPLETE
&
AND OCCUPIED
WINDOW
FIXED
MARBLE
FLOORING DADO
7' KITCHEN
PLATFORM AND
SINK PAINTING &
FINISHING IN
PROGRESS
July-05
July-05
October-06
January-06
October-06
June-07
August'07
Originals to be
verified
15.11.04
21.03.05
Srinivas
NEARING
COMPLETION
September-04
CHANDARAN
All blocks
apartment const
work are
completed
May-05
Originals to be
verified before
pproved it has
disbursement.
compound wall alround
13.05.05
road wide R
formed
K MAKHIJA
metaled sites demaracated and numbered box type drains lands
Originals to be
verified before
disbursement.
Not received
Originals to be
verified before
disbursement.
Not received
Originals to be
verified before
disbursement.
Not received
22.05.04
CHANDRAN
fully completed
Not received
Originals to be
varified before
releasing loan.
10.02.05
G SRINIVAS
Villa construction
is in final stages
of completion
club house under
construction
10.02.05
SRINIVAS
28/01/2006
March-05
January-05
THE
RK
BUILDING
MAKHIJAIS COMPLETE.FINISHING February-06
IN PROGRESS.
Originals to be
varified before
releasing loan.
07.05.05
Generally stilt
CHANDRAN
flor gf slab completed & ff roof centering
December-05
is in progress
S S COMPLETE,BBM COMPLETE,INTERNAL
9/1/2006
R PLASTERING
K MAKHIJA FOR G & FFL COMPLETE,KITCHEN
February-06& TOILET ROUGH PLAST
RS/EXTERIORS
GINALS TO BE VERIFIED
PLASTERED,
BEFORE
FLOORING,
29.08.2007
DISBURSAL.
VITRIFIED,RCERAMIC,
K MAKHIJA
KITCHE: GRANITE PLATFORM,
October-07
SS SINK, 2 DADO, TOILET: CERA
SR
SK
complete
MAKHIJAfrom GFL upto S FL at different
January-07
levels.
The Project is
complete.Interior
s wood work is in
progress
in some
SS complete
for
LDER3. KHATHA FVG. Najmunnisa
25/07/2006
4. Sanction plan
R K MAKHIJA
of&the
flats.
August-06
B,G
3 floor.Blk
walls
complete,doors &
The Project is
windows framed
complete and 30
fixed.Interiors &
syed Riyaz ur Rehman (doc.No.15626/
8/4/2006
2003 - 2004
R 2)
K MAKHIJA
Khata certificate
flatsissued
occupied.
by BMP in
February-06
favour of Shri, Syed ashfaq Ahme
exteriors
plastered,flooring
Originals to be
laid,painting.Proj
verified before
ect is complete.12
disbursement.
2/9/2006
R K MAKHIJA
flats occupied.
September-06
18-08-2005
MAKHIJA
THIS PROJECT IS
COMPLETE,
FINISHING IS
PROGRESS
August-05
October-05
February-10
27.02.2003
VENKAT
14/11/2005
R K MAKHIJA
18.12.2010
RAGHUNANDA
25.2.2003
G Srinivas
CCB Masonry
completedexpecting
completion by
Aug 2003.
15/07/05
R K MAKHIJA
14.01.05
R K MAKHIJA
THIS PROJECT IS
SS completee
COMPLETE,
block walls door
FINISHING IN
main tw rest sal
PROGRESS
flush shutters
painted windows
sal frames and
glazed shutters
fixed
CHANDRAN
Apartment
construction
works are
completed
February-05
R K MAKHIJA
RCC FRAMED
STRUCTURE,BLOC
K WALLS
PLASTERED.
December-05
15.02.05
24.12.2005
SS
COMPLETE,BLOCK
WALLS,INTERIORS
& EXTERIORS
PLASTERED.flat
rcc roof
cast,doors &
ONEY RECEIPTS & NOC ISUUED TO VERIFIED BEFORE DISBURSAL.
windows
fixed.kitchen &
toilet: Dado rough
plastered.paintin
GINALS TO BE VERIFIED BEFORE DISBURSAL.
29/4/06
R K MAKHIJA
g in progress.
July-05
January-05
July-06
Block 1 commenced
08.07.03
in agu 2002 completion
R K MAKHIJA
exp oct 2003, Block 2 commenced in oct 2002, completion ex
RCC FRAMED
25-08-05
STRUCTURE,WHITE
R K MAKHIJA
MOSAIC/VITRIFIED FLOORING.THE
August-05
PROJECT IS COMPLETE & OCCUP
ON CERTIFICATE.
26.04.05
Originals to be
Verified before
releasing loan.
MAKHIJA
The project is complete finishin in progress
June-05
Not received
2/1/2006
R K MAKHIJA
SUPER
STRUCTURE IS
COMPLETE,WALLS
IN PROGRESS
June-06
02.01.07
R K MAKHIJA
COMPLETED
December-06
Generally 02.02.05
floor & ground floor
CHANDRAN
roof slab completed & first floorDecember-05
roof centering works are in progres
29-08-2005
07.10.2008
11.02.05
16.12.04
R KEARTH
MAKHIJA
WORK FOR BASEMENT IN PROGRESS.
July-06
THER
R K PROJECT
MAKHIJA IS COMPLETE, 24 FLATS ARE
March-08
OCCUPIED
Finishing work is
in progress
woodwork in
some of the flats
MAKHIJA
in progress
April-05
R K MAKHIJA
23.12.2003
VENKAT
2/22/2004
R K MAKHIJA
COMPLETED
18.04.04StructureGcompleted.
Srinivas
Flooring in progress, painting has started.
22.09.2005
R K MAKHIJA
18.05.05
CHANDRAN
COLUMNS UPTO
RCC COLUMN
ROOF LEVEL FOR
FOOTING, SS
STILT FLOOR.
MASONARY, RCC
PLINTH BEAM,
INTERIOUS
PLASTERD
SMOOTH.
R K MAKHIJA
THE BUILDING IS
COMPLETE AND
FINISHING IN
PROGRESS
R K MAKHIJA
THE BUILDING IS
COMPLETE &
OCCUPIED
27.12.2005
6/8/2005
April-05
January-06
21.05.04
Electrical
VENKAT
fittings, fixtures and painting has to be done
04.10.04
G SRINIVAS
COLUMN WORK
FOR STILT FLOOR
IN PROGRESS
June-05
MAKHIJA
RCC columns 48
nos and plinth
beam in progress
September-05
MAKHIJA
THE PROJECT IS
COMPLETE,
FINISHING IN
PROGRESS
18.12.04
16.05.05
05.12.04
R K MAKHIJA
Superstructure
complete for b g f
& s fl concrete
block walls
inprogress
June-05
28/9/2006
R K MAKHIJA
A,B, & C-COMPLETE AND OCCUPIED,
February-06
DHRUVA
COMPLETED
June-06
Foundation
29.10.2003is completed,columns
VENKAT
have been raised.Expected completion by Dec 2004
11.03.05
MAKHIJA
27.02.04
GApartment
Srinivas
consturction is yet to commence
25-09-04
27.08.2004
Finshing in progress
February-05
VENKAT
August-05
19/06/05
EARTH WORK FOR
MAKHIJA
COLUMN FOOTINGS COMMENCED,
October-06
WORK AT STAND STILL
SS COMPLETE
14/06/05
FOR B, G & 3MAKHIJA
UPPER FLOORS, INTERIOUS PLASTERD,
September-05
DOOR & WINDOW FRAMES FIXE
DHRUVA
COMPLETED
November-07
6/2/2006
R K MAKHIJA
THE BUILDING IS
COMPLETE.
March-06
SS COMPLETE FOR
S G & 3 UPPER
FLOORS.DOORS &
WINDOWS
13-12-2005
S S COMPLETE,INTERIORS
R K MAKHIJA& EXTERIORS
PLASTERED,FINISHING
January-06 IN PROGRESS.
FRAMES FIXED
.INTERIOR &
EXTERIOR
PLASTERED
.FLOORING
SS & walls complete
4/9/2006
for B,G+3 floors.interiors
R K MAKHIJA & exteriors plasered,Flooring.The
September-06
Project is complete,1 fla
COMPLETE
FINISHING OF
STILT FLOOR AND
COMMON AREA IN
Originals to be verified before release.
26/06/2006
MAKHIJA
PROGRESS.
July-06
LAYOUT
FORMATION IS
UNDER
PROGRESS,
ELECTRIFICATION
28.09.2005
THE
R KPROJECT
MAKHIJAIS COMPLETE,FINISHING IN
October-05
PROGRESS
POLES HAVE BEEN
ERECTED, WATER
TANK BUILT, UGD
WORK
26.05.2004
G SRINIVAS
COMPLETED,
19.03.2008
DHRUVA
COMPLETED
December-07
TO
IGINAL
ROOFVERIFICATION
LEVEL, G FLR ROOF CAST
13.11.2008
COLUMNS IN FIRST
R K MAKHIJA
FLR, ROOF CAST IN FIRST FLR, FROM
December-07
0 TO 20, 25,35, 40 & 50% ACT
ORIGINAL VERIFICATION
26.10.2010
VECON
17/10/2006
Superstructure
R K MAKHIJA
complete, block walls, door and
December'06
window frames fixed
S
SEND
,BLKTHE
WALLS,INTERIORS
BUILDER FOR ORIGINAL
AND EXTERIORS
15/06/2006
VERIFICATION
PLASTERED
R K MAKHIJA
. DOOR AND WINDOWS FIXED. FLOORING:
August-06CERAMIC .FINAL FINISHIN
ETED
SEND ONLY
THE BUILDER
FINAL FINISHING
FOR ORIGINAL
PENDING,
09.07.2008
VERIFICATION
BLK B,C FLOORING
DHRUVA
COMPLETED, DOORS PARTLY
September-08
COMPLETED WINDOWS NOT FITTED
10.07.2008
DHRUVA
1ST FLR SLAB IS IN PROGRESSSep-10
RK
BLK
MAKHIJA
A & B: EARTH EXCAVATION IN PROGRESS.
June-10
26/09/2006
DHRUVA
FINISHING WORK IN PROGRESS.
December-06
28.12.2006
SS COMPLETE, DHRUVA
PLASTERING, FLOORING COMPLETE, PAINTING
April-07 IN PROGRESS
24.09.2010
VECON
LINDIYA 98%, NISA 98% & KASABA
December-12
98%
AFFIDAVIT EXECUTED BY THE LAND OWNERS AND THE BUILDER TOWARDS THE PAYMENT OF SECURITY DEPOSIT LOAN DISC
20.05.2009
DEACTIVATED
DEACTIVATED
THE
RAGHUNANDA
APTS COMPLEX IS COMPLETED IN ALL RESPECTS
DEACTIVATED
DEACTIVATED
SS COMPLETED,
S S COMPLETE
2/2/2006 FOR ALL
RK
BLOCKS,
MAKHIJA
INTERIORS,EXTERIORS PLASTERED,FINISHING
March-06
IN PROGRESS
PLASTERED,
FLOORING IN
PROGRESS AT
VARIOUS STAGES
18-10-2005
R K MAKHIJA
OF COMPLETION
January-06
19/10/2006
R K MAKHIJA
THE PROJEC IS COMPLETE.
September-05
Blk A : SS
complete,
exterior
plastered, interior
in
progress.Flooring
and kitchen dado
in progress. Blk B:
SS
rify the orginal documents of title
26/12/2006
before releasing MAKHIJA
any
The loan
project is complete and partly occupied
NOV'06
complete,interior
& exterior
plastered flooring
. 10 flats
10/4/2006
R K MAKHIJA
occupied.
March-06
14/06/05
SS COMPLETEMAKHIJA
FOR B, G, FL, CENTRING READY FOR CASTING G, FL ROOF
14/06/05
SS COMPLETE
MAKHIJAFOR B, G, FFL COLUMNS UPTO
February-06
ROOF LEVEL
TE FORORIGINAL
S,G,M & 3TO
floors.Blk
BE VERIFIED
walls,Doors
2/9/2006
& window
RK
frames
MAKHIJA
fixed.Interiors & exteriors September-06
plastered,flooring and painted .The
ORIGINAL VERIFICATION
Originals to be
Verified before
releasing loan.
28.01.2006
R K MAKHIJA
16/02/2006
R K MAKHIJA
Residentila layouts/PLOTS.
10.11.2003
VENKAT
05.08.2004
R K MAKHIJA
9/11/2003
VENKAT
1/1/1900
R K MAKHIJA
06.04.2004
VENKAT
23.04.05
R K MAKHIJA
13.12.04
CHANDRAN
10.12.04
MAKHIJA
PLOT LEVELED
January-07
Residential Sites
only/PLOT
Residential Sites
only/PLOT
ROADS
LAID AND
METTALED, BOX
TYPE DRAINE ,
COMPOUND
Residential Sites
WALLS UNDER GR
only/PLOTS
SEWERAGE LINES
WITH MANHOLE
CHAMBERS ,
PLOTS MARKED
WATER LINE LAID
April-05
ORIGINALS TO
BE VERIFIED
BEFORE
DISBURSAL.
12/7/2005
R K MAKHIJA
BLK A COLUMN
FOOTINGS, SS
MASONARY
RETAINING WALL,
91 COLUMNS,
CENTERING IN
PROGRESS FOR B
FL, BLK B
COLUMNS
FOOTING, 58
COLUMNS IN
PROGRESS
24.11.04
G SRINIVAS
6/7/2006
R K MAKHIJA
5/4/2006
R K MAKHIJA
24.02.05
MAKHIJA
The township
formation is in
progress site
demarcation
completion and
numbered layout
Compound walls
leveling work in
at the entrance
progress roads
.box type drains
have been formed
made, water and
COMPOUND WALL
sewage line,roads
AT THE
metaling in
ENTRANCE.BOX
progress.Street
TYPE DRAINS
lights poles fixed.
MADE, WATER &
SEWAGE LINE
LAID ROADS
VK layout is a
METALING IN
large wxpanse of
PROGRESS.
land comprising
of 37 sites of
various
dimesnsiond of
Phase 1 2 3
Not received
Residential Sites
only
09.12.2005
R K MAKHIJA
Formation of road
box type drains &
culverts in
progress
ORIGINAL
VERIFIED BY
ASM
8/2/2003
G SRINIVAS
Original to be
verified before
releasing.
19/11/2005
R K MAKHIJA
Original to be
verified before
releasing.
Original to be
verified before
releasing.
FORMATION OF
ROADS,BOX TYPE
DRAINS&
CULVERTS IN
PROGRESS.
May-07
September-06
September-06
November-05
Not received
09.07.2004
G SRINIVAS
THE TOWNSHIP
FORMATION IS IN
PROGRESS,
LAYOUT LEVELING
AND
DEMARCATION
COMPLETED,
DRAIN WORK IN
PROGRESS,
PROJECT
EXPECTED TO BE
COMPLETE BY
DEC2004
THE BUILDING,3.
SUPERSTRUCTURE
ENCUMBRANCE
COMPLEE,
24.05.2007
CERTIFICATE
BLOCKFROM:
WALLS,
R K MAKHIJA
a.10.03.1998
DOOR FRAMES
TO 31.03.2005,
AND WINDOW
b. GRILLS
15.04.2006
August-07
FIXED.
TILL
INTERIOR
DATE
PLASTERING
rify
URE,
the
BBM
orginal
WALLS,
documents
INT/EXT of
PLASTERED,
title
06.09.2008
beforeDOORS
releasing
&RWINDOW
K
any
MAKHIJA
loanFRAMES FIXED. VITRIFIEDSeptember-08
& MARBLE FLOORING IN PROGRESS,
15.02.2008
DHRUVA
6 FLOORASSOCIATE
SLAB AND AVG 2 FLR MASONARY
November-09
COMPLETED
SUPERSTRUCTURE,
09.02.2008
WALLS, INTERIORS
R K MAKHIJA
AND EXTERIORS PLASTERED, FLOORING
June-08
AND PAINTING IN PROG
08.08.2008
NO 96/3,
DHRUVA
DODDATHAGURU,
ASSOCIATE
ELECTRONIC CITY, HOSUR
March-09
RD, B'LORE
11.03.2008
DHRUVA
B/W PLASTERING
ASSOCIATEIN PROGRESS, 11 SLAB
November-09
COMPLETED
06.02.2009
RAGHUNANDA
PROJECT IS TARGETED FOR COMPLETION
June-09
31.07.2008
THE PROJECT
R K MAKHIJA
IS COMPLETE, COMMON AREAS,
November-08
LIFT IN PROGRESS.
23.07.2008
DG SET, CLUB HOUSE,
R K MAKHIJA
INDOOR GAMES, SWIMMING POOL,
December-09
GYM, STEAM, SAUNA.
25.07.2010
SS COMPLETE,
06.09.2008
DOOR & WINDOW
R K MAKHIJA
FRAMES FIXED, INTERIORS PLASTERED,
December-08
EXTERIORS IN PROGRES
SS COMPLETE,
06.09.2008
DOOR & WINDOW
R K MAKHIJA
FRAMES FIXED, INTERIORS PLASTERED,
December-08
EXTERIORS IN PROGRES
rify
E UPTO
the orginal
2ND FLR,
documents
GFL BLK MASONRY
of title
10.08.2008
before
IN W/P
releasing
40%,RBLK
K
any
MAKHIJA
Bloan
YET TO START 0%, BLK C 10%December-09
, BLK D SS COMPLETE, BLK MASON
10.09.2008FOUNDATION
R K MAKHIJA
COMPETE, GFL ROOF SHUTTERING
August-09
IN PROGRESS
19.09.2008
R
THE
K MAKHIJA
PROJECT IS COMPLETE, FLAT OCCUPIED
September-08
5 NO
rify
MPLET,
the DOOR
orginal&documents
WINDOW FRAMES
of title
22.09.2008
before
FIXED, releasing
INTERIORS
RK
any
MAKHIJA
& EXTERIORS
loan
PLASTERED, EXTERIORS
December-08
PAINTED, VITRIFIED FLOORING
rify
RCC
the
FRAMED
orginalSTRUCTURE
documents WITH
of title
25.10.2008
FOOTINGS,
before releasing
PLINTH
RK
any
BEAM
MAKHIJA
loan
& COLUMNS IN PROGRESS FOR
February-10
STILTS FLOOR FOR BLOCK 1,2 &
rify
STURUCTUR
the orginal
COMPLETED
documents
BLOCK
of title
WORK
29.01.10
before
UNDER
releasing
PROGRESS
any
VECON
loan
PAINTING, 50%, ROW HOUSES FEW
May-10
UNITS FOUNDATIO COMPLET
25.09.2008
DHRUVA ASSOCIATE
FINISHING IS IN FINAL STAGE
September-08
15.10.2008
DHRUVA ASSOCIATE
FLOORING IS IN PROGRESS
December-08
15.10.2008
DHRUVA ASSOCIATE
FINISHING IS IN PROGRESS
29.10.2008
DHRUVA ASSOCIATE
FINISHING WORK IN IN FINALSTAGE
23.10.2008
DHRUVA ASSOCIATE
FINISHING WORK IN IN FINALSTAGE
SS COMPLETE, BBM,16.10.2008
INTERNAL PLASTERING
R K MAKHIJA
COMPLETE, EXTERNAL PLASTERING
March-09
UPTO 9TH FLR, FLOORING UP
ANTILA-1: SUPERSTRUCTURE,
17.10.2008
BB WALLS COMPLTE,
R K MAKHIJA
ANTILA-3 FOUNDATION IN PROGRESS,
October-08
ANTILA-6 GENERAL EXCAVA
11.05.2009
RAGHUNANDA
BLK A, B, C & D: 100%, BLKS: E, F, G, H July-09
& I : 96%
NDER
rify the
PROGRESS
orginal documents
IN 4TH FLR,
ofBLK
title
07.01.2009
B:
before
3RD FLR,
releasing
ROOF
RAGHUNANDA
any
IS CAST,
loan CC BLK MASONY IS DONEDecember-09
UPTO 1ST FLR, IS UNDER PROGRES
14.11.2008
BLK A:STRUCTURE
DHRUVA ASSOCIATE
COMPLETE 50%, BLK B: 2 SLAB
September-09
COMPLETED 35%
rify
ER INITIAL
the orginal
STAGE
documents
OF FORMATION
of title
29.03.2010
RD
before
FORMATION
releasing
RAGHUNANDA
WORK
any loan
IS UNDER PROGRESS. MOCK September-11
UP VILLA CONSTRUCTION WORK HAS
23.10.2008
DHRUVA ASSOCIATE
FOUNDATION IS IN PROGRESS
08.11.2008
DHRUVA ASSOCIATE
100%
24.12.2008
DHRUVA ASSOCIATE
FINISHING IS IN PROGRESS
28.01.2009
RAGHUNANDA
BLKS A, B, & D 40%, C 35%,August-09
22.04.2009
RAGHUNANDA
BLK GLORIA: 100%, BLKS OPERA & SONATA:
June-09
96%
11.09.2009
THE
RAGHUNANDA
APTS COMPLEX WAS COMPLETED DURING 2008
BLK I (TOWERS
08.10.2009
A, B, C & D)RAGHUNANDA
TOP ROOF IS CAST, CC BLK MASONRY WORK IS COMPLETED DOOR/ WIND
17.11.2009
RAGHUNANDA
THE PROJECT IS COMPLETED IN ALL RESPECTS
29.12.2009
VECON
UNDER
19.12.2009
FINAL FINISHING
VECON
STAGE, PAITING PLUMBLING, ELECTRICAL WORKS IN PROGRESS.
BLKS A 20%,15.02.10
B 22, C 24%, DRAGHUNANDA
20%, E 18%, F 16%, G 86%, H 87% I 80%, J, K, L & M 82%, N 36%, P, 1 &
25.5.2010
VECON
25.05.10
VECON
08.05.2010
GROUND 28.05.2010
LEVELLING & FORMATION
VECONWORK 100% COMPLETED, UNDER GROUND DRAINAGE WORKS 1
28.05.2010
VECON
0%
VILLA UNDER
22.10.2010
COMPILATION STAGE,
VECON10 VILLAS FOUNDATION COMPLETE, GROUND FLR, COLUM RAIS
14.09.2010
VECON
13.08.2010
VECON
BLKS A1 TO A8 65%
03.11.2006
2ND FLOOR ROOFVECON
SLAB IN COMPLETED, BLK WORK GROUND
February-11
FLR IN PROGRESS
CONSTRU
PROGRESS %
90%
APPRAISED
RATE PER SQ.FT
COMMENTS
SPECIAL
COMMENTS
Block 1 & 2,
BLK 1 AND 2Rs.1670/- Block
80%, BLK 33 and 4 is Rs.
40%, BLK 4- 15%
1735/-
90%
Rs. 1600/SFT
60%
RS 1050/SFT
65%
RS 1900/-
80%
RS.1400/- SFT
100%
100%
Approved
100%
RS 650SFT
50%
70%
5%
1300/-
80%
Rs. 2400/SFT
90%
100%
RS 2000/SFT
25%
RS. 2200/SFT
50%
10%
90%
Rs 1900 sft
100%
RS 1500 sft
85%
consists of B+GF+3UF
1250/- per sqft.BESCOM Rs.50000/- Car park Rs.75000/Rate pe swft includes car
park,BWSSB,
BESCOM and KGST.
Rate per sq.ft includes car park,
BWSSB and BESCOM deposits,
90%
70%
astering in progress.
100%
Rs 550 sft
100%
70%
RS 375 SFT
50%
Rs 1550 sft
85%
consists of
single block and
tot. 24 flats
YET TO COMMENCE
Rs.250 to350/- Per sqft
Rs 550 sft
100%
80%
RS 2500/- SFT
100%
70%
15%
80%
2000/-PER SQFT
30%
55%
consists of 54 sites
80%
100%
95%
Project is completed.
1%
100%
RS 2100/-PER
SQT
100%
RS 1850/-PER SFT
5%
45%
70%
85%
70%
RS 3000/- SFT
90%
50%
90%
Rs 1150 sft
5%
95%
RS 800/- SFT
MAIN GATE,ARCH,COMPOUND
WALL,BOX TYPE DRAINS WITH
CONCRETE SALB OVER,ROADS
FORMED & METALLED.
100%
100%
Rs.1700/SFT
100%
BLKS:20%
EAST, NORTH & SOUTH 50%, BLK WEST 80%
100%
BLCOK C
100%,BLOCK D
100%,BLOCK G
98%
RS 2150/- PER
SFT
Rs 1100 sft
25%
1100/- TO 1200/-
15%
45%
Rs.1900/-sft
consists of
single block tot.
16 flats
Approved
80%
Rs 300 sft
5%
RS 1500/SFT TO
1600/SFT
30%
100%
100%
RS 450/SFT
90%
RS 350/SFT TO
400/SFT
40%
RS 350/SFT TO
400/SFT
RS 1250/SFT
40%
100%
Approved
Rs 450 sft
Approved
Rs 750
Approved
Approved
100%
Rs 450 sft
100%
RS 2000 SFT
consists of 627
sites
85%
Approved
Rs 450 sft
car park is rs.150000, BWSSB,
KPTCL and Statutory deposits
150000/-
50%
100%
rs 2500 sft
30%
consists of 80 sites
10%
RS RS 300/SFT
TO
325/SFT
90%
100%
Rs 1000 sft
35%
0%
100%
Rs 2200 sft
5%
0%
100%
RS 2100/- SFT
100%
Rs 1650 sft
70%
20%
90%
40%
90%
Rs.900/SFT
45%
Rs 670 sft
80%
Rs 1500 sft
95%
75%
100%
Rs 1500 sft
Approved
B, C, D, E, F, G, H, I, J, K, L, M,
NO
N,Rs.
11/3,
O, 3000/P&
SM
Q 1%
RD, DASARAHALLI VLG, YESHWANTHPURA
CAR
HOBLI,
PARK B'LORE
150000
40%
95%
Rs 1600 sft
10%
Rs 1250 sft
10%
Rs.1640/-
80%
Rs.1100/sft
Rate includes
consists
all costs
of 36 flats
except
2&3B/R
regn.cost
2B/R fkats are 20 nos. and 3B/R flats are
Rs 675 sft
Approved
5%
75%
30 lakhs
RS 1400/SFT
50%
50%
80%
95%
Rs 2000 sft
95%
RS 1750/SFT
40%
100%
Approved
Approved
85%
95%
Rs. 1500/sft
Approved
Phase
Phase 2
1 10%
Rs. 1200/-. Phase 2 Rs.1400/- per sq.ft
100%
RS 600 SFT
100%
RS 575/SFT
70%
Rs. 1800/SFT
60%
90%
65%
Rs.1500/-
30%
RS 2400/SFT
90%
75%
100%
60%
NA
Covered Car Park Rs.1,25,000/and Open Car Park Rs.60,000/Rate per sq.ft excluded deposit
towards electricity
and water/drainage connection.
Closed car parking sold at Rs. 1
Rs. Rs. 1800/- per sq.ft
Lakh each
Rs 1850 sft
RS 400/SFT
Rate per Sqft excludes registration
PHASE 1 IRIS
BLOCK A TO C
100%,ORCHID
Rs.300/- per
BLOCK D TO F
Sqft
100%,TULIP
BLOCK G
20%,BLOCK H
60%,BLOCK I & J
80%
RS 2500/- TO 2700/- SFT
CAR PARK Rs. 150,000/-
Approved
BLOCK A 70%,
BLCOK B 70%,
BLOCK C 70%
AND BLOCK D
70%
RS. 2700/- TO RS.3200
Rs.2000/- per
sq.ft
90%
15%
Rs. 1700/SFT
100%
RS 1900/-SFT
60%
RS 300/SFT TO 325/SFT
95%
55%
Rs 1330 sft
92%
Rs 1650 sft
Approved
100%
1650/- sft
90%
3%
Ph 1 - 100%
PH2 - 90%
Rs 1450 sft
Rs 1400 sft
rs 1400/sft
Approved
Approved
80%
100%
RS 250/SFT TO 300/SFT
100%
Approved
85%
RS 1825/SFT
100%
Rs 1550 sft
95%
1200/-per Sqft.
0%
Rs 1650 sft
50%
95%
RS 1055/SFT
80%
Rs 500 sft
100%
RS 1800/ sft
95%
Rs 1800/ sft
100%
car park175000/-
100%
50%
RS 1450 SFT
80%
Rs.300/- To Rs.350/-
300/SFT
100%
sites only/PLOT
10%
Approved
80%
RS 400/SFT TO 450/SFT
60%
95%
25%
100%
RS 1600/SFT
RS 1450/- SFT
excluding depositstowrds
electricity and water connection
car parking 75000/-
consists of
GF+FF+SF tot.
15 flats
90%
60%
Rs 650 sft
100%
RS 2000/ SFT
80%
RS 1500/SFT
100%
Rs.1825/- per
sq.ft
BLOCK A 90%
BLOCK B 70%
Rs 1800 sft
100%
Rs. 2500/-
RS 1450/SFT
60%
CAR PARK
150000
90%
60%
Rs 250/sft
to 300/sft
RS 350/SFT
50%
RS 280/SFT TO
320/SFT
Approved
90%
1900/SFT
50%
Rs 1750/- to 1850/-/sft
5%
RsCar
2700
parking
sft
rs 2.00 lakh Deposit rs 100 per bwssb & bescom
100%
Rs 300/sft to400/sft
60%
RS 250/SFT TO
RS
300/SFT.
80%
1300/SFT
100%
375/SFT INCLUSIVE OF ALL AMENITIES
40%
RS 475/SFT TO 500/SFT
RS 550/SFT
53%
RS 1950/SFT
10%
Approved
CAR PARKING
consitsRS
of 125000/a basement for car park GF+UF to have 80 flats of 3
RS 300/SFT
80%
Rs.1400/SFT INCLUDING CAR PARK.
20%
Rs.2500/SFT
consists of
single block of 6
flats
30%
Rs 1400 sft
95%
RS 1800/- SFT
10%
RS 1040/SFT
80%
RS 325/SFT
Rs 350
60%
sft 5% extra for corner and premium sites
100%
Approved
80%
Rs 1750 sft
85%
100%
Rs 1250 sft
10%
Rs.1735/- per
sq.ft
90%
Rs. 2300/- TO
2400
60%
100%
2000 TO 2100/SFT
65%
1750/SFT
90%
RS 2100/- SFT
consists of
BF+GF+3floors
75%
Rs 1300 sft
80%
Rs 1200 sft
50%
RS 600/SFT TO
700/SFT
100%
65%
Approved
Car parking
Rs 1550
1 lakh
sft Deposit Rs 10,000 & 7500 sales tax 4% Registration extra
40%
RS 1500
90%
RS 1600 SFT
450/SFT
1200/SFT
95%
RS 2200/- SFT
50%
RS 220/SFT
Approved
100%
RS 400/SFT TO 450/SFT.
RS 300/SFT
imha reddy 7) Land conversion certificate in respect of sy no 104/1 & 104/3 8) Sale deed dated 1.1.96 executed by gowr
70%
95%
1400/SFT
RATE IS EXCLUSIVE
75%
OF KPTCL
500/-SFT
& BWSSB & MAINTENANCE DEPOSITS,SALES TAX ON CONSTRUCTION & CAR PARK @ 4%
100%
75%
RS 1200/SFT TO
1300/SFT
RS 1600
OPEN
SFT
CAR PARK 80,000/- & CLOSED CAR PARK 100000/RATE PER SFT EXCLUDING
DEPOSITS
TOWARDS ELECTRICITY AND
RS 1000/SFT TO 1250/SFT
WATER SUPPLY
40%
RS 200/SFT TO RS 250/SFT
85%
95%
RS 2000/- SFT
CAR PARKING 100000/RS 1850 /- FOR
NON POOL,RS
1950/-FOR POOL
BLOCK A 15%,B FACING RS 2100
18%,C 8%
FOR DUPLEX
SALES TAX ON CONSTRUCTION & CAR PARK @4%.
100%
RS 2300/- SFT
55%
RS 1500/SFT
90%
80%
100%
10%
RS 325/SFT
Rate per sqft excluding the deposit
RATE PER SFT INCLUDING THE
towords electricity and water
COST OF UNDEVIDED SHARE
1400/- per Sqft. supply. Car parking is Rs.75000/OF THE LAND AND RS 32000/- FOR
CAR PARKING, BWSSB /KPTCL
DEPOSITS AND SALES TAX ,
REGISTRATION CHARGES EXTRA AS
RS 1600/SFT
PER ACTUAL
consists of
Gf+3UF tot. 7
nos.
60%
RS 1900/- SFT
RS 1200/SFT
90%
RS 1500/SFT TO 1600/SFT
RS 300/SFT TO RS 350/SFT
70%
RS 400/SFT
RS 325/SFT TO 350/SFT
abdul latheef 5) E C in respect of sy no 21/1 1) noc for non acquisition issued by the bda 2) E C from 12.05.04 till date
py of approved layout plan issued by tehbda 8) E C from 01.05.04 till date depicting the sale transaction of following sale
RS 350/SFT TO 400/SFT
60%
RS 350/SFT
Rs 350 sft
25%
RS 225/SFT
100%
Rs 1450 sft
50%
RS/-2000/SFT
Rs. 2650/-Sft
100%
Rs 1600 sft
CAR PARKING
150000
50%
RS 1500/- SFT
90%
RS 2700/-sft
100%
Rs. 2250/-sft
thority 6) Tax paid recipt for the period 03-04 7) Copy of approved layout plan 8) E C from 22.11.02 till date
90%
RS 1800/SFT
uisition issued by the bda 4) Copy of sanction plan for the building issued by teh office of cmc bommanahalli bangaloe 5)
90%
Rs 1850
car
sftparking 125000 sales @ 4% registration @ 10%
40%
RS 225/SFT TO 250/SFT
85%
Rs 1950 sft
2%
Rs 2350 sft
70%
RS 250/SFT TO 275/SFT
100%
Rs 650 sft
60%
RS 500 SFT
CAR PARKING RS 100000/-,
SCOOTER PARKING RS 25000/-,
DEPOSIT LIKE BWSSB AND KEB IS
RS 50000/-
15%
RS 1500/SFT
40%
RS 400/SFT TO 425/SFT
RS 475/SFT TO 500/SFT
Approved
40%
RS 250/SFT TO 300/SFT
90%
Rs 1300 sft
75%
RS 1100/SFT
1300/SFT
consists of
B+GF+2UF Tot.
36 flats
95%
RS 1500/SFT
100%
1600 sft
70%
RS.225/-PER SFT
Approved
RS 450/SFT
80%
Rs 800 sft
Rs 450 sft
30%
20%
RS 125/SFT TO 145/SFT
RS 1300/SFT TO
RS
CAR 14000/SFT
PARKING RS 75000/-, DEPOSTS TOWARDS
CONSISTS
ELE. AND
OF WATER
SINGLECHARGES
BLOCK Tot. 12 flats
Exculding
15%deposits towards
RS 1100/SFT
ele. And water/drainage connection.
Consists
Car parking
of GF+FF+SF
deposits tot.
and14
regist.
no.s Is extraa
88%
Deposit kebRs
water
1450
rssft
1,00,000 Car parking rs 1,00,000 registration extra sales tax Extra
85%
Rs 1250 sft
15%
Rs 1900/ sft
80%
RS 1750/- SFT
Approved
50%
RS 400/SFT TO 450/SFT
50%
RS 300/SFT TO 350/SFT
95%
Rs 1800 sft
75%
RS 2000 SFT
40%
Rs 1400 sft
70%
Rs 1500 sft
RS 1600/SFT
40%
RS 1300/SFT
RS 280/SFT
100%
70%
RS 1100/SFT
425/SFT
80%
RS 350/SFT
RS 350/SFT
10%
RS 1150/SFT
90%
RS 2600/SFT
55%
RS 1000/SFT
70%
Rs 1600 sft
60%
consists of
A+B+C+D
blocks Tot. 32
flats
60%
60%
90%
7%
5%
Rs 1500 sft
RS 300/SFT
Rs 2800 sft
RS 325/SFT
10%
RS 1100/SFT
30%
RS 525/SFT
RS 1675/SFT TO 2000/SFT
40%
RS 1250/SFT
RS 1250/SFT
consists of
B+GF+3UF tot.
24 flats
consiting of
basement , G/F,
3 floors
consists ofB,
G/f,3U/F
100%
RS 862/SFT TO 1179/SFT
95%
Rs 1600 sft
Villas 1,8,24100%,3,2,27,2895%,4,5,12,14,1
.
5,16,19,29-85%
and
7,6,9,13,17,18,2
0,21,22,23,25,2
6-80%
RS.5000/-
25 -27 Lakhs.
100%
25% depositsRS
like
1450/SFT
BWSSB&BESCOM are at Rs. 100000/- SFT.
consists
The carofpark
1 block,
is Rs.12
100000
aprts.
85%
RS 2400 SFT
90%
Rs. 2000/SFT
Extra taxes 4% Car parking 1,25,000 registration 10%
30%
RS 1250/SFT
80%
RS 2400 SFT
60%
5800/- TO 6000/-
20%
add deposits
1150/sft
of ele &water car parking 1.35
Consists
lakh deposite
of 2 blocks
. Rs. B+GF+3UF
90per Sq. ft.
Tot. 72 flats
90%
RS 1900 SFT
50%
RS 400/SFT
8%
RS.1500/-SFT
20%
RS 1500/SFT
50%
Rs 2000 sft
10%
90%
Carparking 125,000
RS.2750/-
90%
RS 1100/SFT
95%
Rs 1400 sft
25%
RS 1500/SFT
ists of B+GF+&3 UF
Rs 2100/SFT
CONSIST OF 20
BLOCKS
56%
40%
75%
RS 600 SFT
70%
Rs.700/- to
Rs.750/- per Sft
Approved
Approved
90%
RS 600 SFT
95%
Rs 2300 sft
100%
100%
rs.1300/-
100%
RS 1600/SFT
80%
90%
100%
RS 1000/SFT
Approved
40%
80%
85%
80%
BLOCK 1
50%,BLOCK 2
25%,BLOCK 3
10%.
RS 2200/- SFT
Approved
7.50%
Rs 1500 sft
100%
100%
RS 850/SFT
Approved
1200/-per Sqft.
55%
65%
40%
Rs. 1300/- To
1500/- per sq.ft
15%
RS 1800/SFT
100%
Rs 1400/ sft
Rs 900 to 950
sft
15%
consists of
single block 12
flats GF+SF+TF
Tot. 12 flats
consists single
block 6 flats
Approved
Approved
Approved
Rs 1300 sft
including
statutory
deposit
50%
100%
RS 400/SFT TO
425/SFT
85%
3500/- TO 3800/-
Approved
Rs.200sft
Approved
40%
75%
RS 1250/SFT
100%
30%
30%
1900/-
95%
RS.2250/-
30%
RS 550/SFT
60%
RS 2600/SFT
100%
70%
RS 1800 SFT
30%
Rs 1300 sft
75%
Rs 1600 sft
Car parking rs
consists
1,00,000
of Basement GF+ #UF tot. 9 flats per floor.
RS 1350/SFT
100%
RS 900/SFT
70%
RS 1430/SFT
100%
RS 2000 SFT
80%
Rs 1350 sft
100%
RS 1700/- SFT
Rs 2200 sft
60%1250/-SFT,1380/-SFT&1440/-SFT
CARPARKING 1.25 LAKH
95%
RS 2100/-SALES
SFT TAX ON CONSTRUCTION & CAR PARK @ 4%
e
ng
wood
Rs 1.25
40%lakh
teakdeposit
wood 10%
Rs 60,000
sandalkptcl
wood&0%
bwssb land & dev ( included in flat value )
95%
RS 2000/- SFT
ABOVE60%
1500/-SFT
CARPARKINF 1.00LAKH
95%
Rs 2400/- sft
90%
Rs 550 sft
75%
90%
Rs 500/SFT
75%
Rs 1400 sft
85%
Rs 2400 sft
40%
500/-SFT
80%
100%
RS 2000/- SFT
consists of GF+FF+SF&TF
10%
Rs 2000 sft
deposit 75000
30%
1700/- SFT
900 3 to 5 2950 6 to
5%8 3000 9 to 11 3050 12 to 14 3100
car
15parking
to 21 3150
1,50,000
22 and 23 3500
40%
RS.350/-SFT
95%
RS 450 SFT
100%
RS 1800 SFT
20%
Rs 1400 sft
55%
Rs 1550 sft
80%
Rs 1550 sft
35%
Rs 1300
Carsft
parkign Rs 60,000 deposit Rs 50000 sales tax 4%
100%
90%
RS 2300/- SFT
Rs 1450
Car parking
sft
rs 1,00,000 deposit 75,000 bwssb 30 to 35000
30%
800/-SFT
85%
RS 1500
55
RS 1590
90%
Rs 1400 sft
80%
RS 1650 SFT
SALE TAX ON CONSTRUCTION & CAR PARK @ 4%.
50%
Rs.2100/SFT
75%
Rs 1450 sft
30%
1500/-
80%
consists of B+GF+3UF
RS 1700GENERATOR
PER SFT
KEB WATER AND CAR PARKING Rs 2,20,000
65%
Rs. 1500/SFT
60%
Rs 1900 sft
100%
RS 1800/- SFT
80%
65%
98%
100%
Rs
CAR
1250
PARKING
sft
1,00,000 KPTCL DEPOSIT 65000 BWSSB RS 20,000
95%
RS 1800 SFT
70%
RS 500 SFT
60%
RS 1600 SFT
75%
Rs 1900/ sft
15%
RS 1650
Car
SFT
parking rs 1.00lakh Deposits Rs
consists
80,000offor
GF+FF+SF+TF
kptcl
tot. 47 flats
1%
RS 5250 SFT
80%
RS 2200 SFT
10%
RS 2300 SFT
90%
uction agreement 7 draft copy of the proposed sale deed 8. e c from 31.08.04 till date
100%
RS 2100/- SFT
5%
Rs 1750 sft
15%
Rs 875 to 900DEPOSIT
sft
KEB RS 50,000 CAR PARKING 35000
90%
Car parking
Rs 1500 Rs
sft1,00000 deposit Rs 75000 sales tax 4% registration extra
100%
100%
RS 2600/- sft
95%
Rs 3000/-SFT
CARPARKING 100000/-
100%
Rs.2700/-sft
60%
Rs 1400 sft
70%
Rs 1550 sft
70%
Rs350
95%
RS 3000/- SFT
Rs 550 sft
15%
Rs 1600 sft
Consists of BF+GF+_2UF
2%
Rs 2800 sft
Deposit 100000
25%
Rs 2150Car
sft parking extra sales tax 4% registration
consists
extra
if GF+3UF tot. 8 flats.
70%
Rs 1250 sft
80%
Rs 250 sft
Rs 575 sft
100%
Rs 1700 sft
100%
RS 2700/- sft
30%
Rs 2200 sft
2.00 lakh
90%
Rs 3250
Car parking
sft
Rs 1,50,000 deposit Rs 100 ( bwssb & kptcl)
65%
Rs 2000 sft
10%
Rs 1500 sft
45%
Rs 1500 sft
5%
1,800/SFT
50%
Rs 500 sft
5%
Rs 1600 sft
Car parking Rs 1,00,000 Deposit rs 75 per sft
10%
Rs 1450 sft
Rs 350 sft
100%
Rs 1500 sft
30%
Rs 1300
Carsft
parking 75,000 deposit rs 25,000sales
bwssb
tax
Rsextra
25,000
regestration extra
90%
Rs 2100 sft
98%
RS 1850/-SFT
50%
650/-
70%
DepositRs
keb
1400
Rs 100000
sft
car parking rs 100000 sales tax extra registration extra
Rs 300 sft
12%
Rs 1400 sft
10%
Rs 1500 sft
45%
Rs 1975 sft
50%
Rs 1500
Car parking
sft
Rs 1,00,000 sales tax 4% registration Extra
75%
Rs 1900 sft
95%
RS 1300 SFT
15%
Rs 1400 sft
45%
RS 2250 SFT
10%
40%
30%
Rs 450 sft
Rs 1500 Deposit
sft
keb water Rs 75 Car parking Rs 1,00,000
Car parking
Rs 1250
rs 1,00,000
sft
deposit rs 130 per sft sales tax extra registration extra
70%
Rs 1450 sft
deposit 50000
3%
RS 2600 SFT
Deposit
40%keb water Rs
etc1250
Rs extra
sft Closed car parking Rs 1,00,000 per sft Registration extra sales tax 4%
5%
Rs 1400 sft
80%
Rs 1700 sft
80%
Rs 650 sft
100%
Rs 2,500/- sft
Rs
5%17 lakh for 2brd Rs 24 lakh for 3 brd
95%
Rs. 1800/SFT
25%
Rs 300 sft
Rs 550 sft
1%
Rs.6000/-
80%
Rs 1750 sft
100%
RS 1850 SFT
75%
Rs 1700 sft
95%
Rs 2500 sft
85%
RS 2000/- SFT
Tulip-Orchid-Iris-Asther-70% Pine-80%
Rs.3300/-SFT
75%
Rs 1500 sft
5%
Rs 1800 sft
Rs 650 sft
100%
Rs 2100 sft
85%
Rs 2100 sft
75%
RS 2200 SFT
Rs 1550 sft
100%
15%
Rs. 2000/-
95%
Rs 1500 sft
35%
Rs 1400 sft
deposit 1 lakh
10%
Rs 1400 sft
2%
Rs 2000 sft
30%
Rs 2100 sqft
90%
Rs 2600 sft
Rs 450 sft
85%
RS 1850/-SFT
100%
RS 2200/- SFT
deposit 50000
2%
Rs 3000 sft
100%
Rs 2900sft
15%
Rs 1500 sft
5%
Rs 2500 sft
15%
RS 2300 SFT
25%
RS/-1300 SFT
100%
Rs. 3200/-
80%
Rs. 1400/SFT
80%
RS. 2700/SFT
60%
10%
Rs. 1750/SFT
0%
Rs. 1,450/SFT
82%
RS 2100/- SFT
Rs.2500/SFT
1%
INCLUDING STATURY DEPOSITS
CAR PARK Rs.1,25,000/-
20%
2000/SFT
10%
RS. 1900/SFT
1%
Rs.2300/SFT
0%
RS. 1900/SFT
100%
RS 1600/-SFT
5%
Rs. 1700/SFT
5%
RS 2300 SFT
12%
RS.2750/-SFT
25%
RS. 1550/SFT
100%
5%
Rs. 2300/SFT
15%
Rs 2000 sft
20%
RS 1800/- SFT
CERTIFICATES REQD,
TED REQUIRED.
90%
RS 3200/- SFT
100%
Rs. 7500/-
40%
RS 2100/- SFT
95%
RS 3400/- SFT
95%
RS 3000/-SFT
CAR PARKING RS 200000 & INTERIORS 225000
85%
0%
40%
Rs 2000 sft
70%
RS 1650/- SFT
12%
RS 2150/- SFT
95%
Carparking 100,000
100%
80%
Rs 3000/-sft
Carparking 150,000
95%
50%
Rs 2350/- SFT
80%
PH-1 G1-5 100%,
PH-1 J1-5 100%,
PH-2S1-10 100%
PHASE 3 Y1-8
90%.
Rs 1400 sft
Approved
Rs 2700/- sft
Approved
100%
Rs.3250/-SFT
CAR Parking-200,000.
100%
Rs 1450 /sft
Approved
Approved
Approved
100%
RS 1900/- SFT
Approved
100%
Rs 1750 sft
consists of 36 flats
95%
Rs 1300 sft
95%
100%
Rs.1550/-sft
100%
Rs 2000/ sft
95%
Approved
100%
RS 2400/- SFT
Approved
100%
RS.2800/- SFT
Approved
100%
Rs 2600 sft
ks
THnorth,
100%,central,
NORTH and
100%
south.
AND CENTRAL
Tpt.
RS.3000/144 flats
100%
SFT
60%
Rs 1000 sft
25%
RS 2500
RS 2100 sft
100%
Rs 3600/- sft
95%
Rs 1800 sft
Approved
100%
Rs 1400 sft
Approved
100%
90%
Rs.2700/-
5%
Rs 1900 sft
80%
Rs 1800 sft
90%
95%
Rs 1500 sft
100%
Rs 2500 sft
Approved
Approved
100%
Rs 1850 sft
100%
Rs 1700 sft
80%
Rs 1700 sft
98%
RS 1600/- SFT
100%
RS 2700/- SFT
98%
5%
Rs 3500/ sft
consists of
GF+#uF Tot. 36
flats
Approved
Approved
Rs. 2,650/SFT
consists of
single block of
36 flats
CONSISTS OF
SINGLE BLOCKS
BLOCK A , B &
SALES
C- 100%
TAX RS.
ON 3000/CONSTRUCTION & CAR PARK @4% Registration @ 10% car park 200000
15%
Rs 1750
Deposit
sft 100 sft car parking Rs 75000 Sales tax Rs 4%
Approved
60%
100%
Rs.3750/- SQFT
100%
Rs 2700 sft
80%
rs.1500/- per
sqft
SURABHI-85%
SHUBHA-100
95%
Rs 3100 sft
Rs 2200 sft
Approved
CAR PARKING-200000/-
consists of
B+GF+12 Floors
Tot. 140 flats
consists of
B+GF+3UF Tot.
40 flats
25%
RS.2400 SFT
60%
100%
RS. 2700/SFT
80%
RS 2000/- SFT
BLK A-10,B-10,C-0,D-0,E-0,F-0,G-0,H-0
RS-2000/- SQFT
100%
Rs.600/- per
sq.ft
Approved
Approved
100%
Approved
Approved
RS 1100/SFT
Rs.1000/- per
sqft
100%
Approved
Approved
Approved
Approved
Approved
Approved
Approved
100%
Rs.525/- to
Rs.625/-
100%
Approved
100%
Approved
100%
Approved
100%
Approved
10%
Rs 1250 sft
Approved
80%
RS 1000/SFT
Road formation is
complete,electrical poles have
been erected,wires being drawn
and compound wall has been
constructed.
Approved
Approved
Approved
Approved
50%
RS 2500 SFT
100%
100%
RS 2000/SFT
RS 2600/- sft
RS 3000/SFT
NICHOLL
PROPERTIES
CAR PARKING
17500/-
Approved
75%
BLOCK I
100%,BLOCK II
100% BLOCK III
95%,BLOCK IV
95%
Approved
RS 3000/ SFT
Approved
95%
Rs 1700/ sft
Approved
98%
Rs. 1750/SFT
Approved
95%
Rs 2000 sft
consists of 12 units
65%
RS 3200 SFT
4-100%,COMPLETE, BLKS-1,2-100%
RS.2500/COMPLETE.
SFT
Approved
Block 90%
overall 85%
Rs 2000
95%
Rs 2800
Approved
Approved
Approved
Approved
Approved
Approved
100%
OPEN CAR
RS.3100/PARKING
TO 3200/1,00,000 & CLOSED CAR PARKING 1,50,000 AND DOUBLE 250000/-
Rs 750 sft95%
and cost of construction on turn key Rs 1200 sft
100%
Rs 2500 sft
Approved
Approved
Approved
20%
Rs 1650 sft
95%
RS 2300/- SFT
100%
25%
RS 1800/- SFT
100%
RS 3000/- SFT
Approved
100%
RS 2300/- SFT
Approved
100%
RS 2800 SFT
Approved
100%
Rs 1950 sft
Approved
lavender -100%,
BLK 2-92%
RS 2100 SFT
Rs.3450/- TO 3550/-
73%
Approved
60%
100%
RS 1800/ SFT
Approved
95%
RS 1500SFT
Approved
95%
Rs 1550 sft
100%
RS 2400 SFT
Approved
80%
RS 2200/- SFT
Approved
75%
100%
Rs 1850 sft
95%
Rs 1600 sft
Approved
Approved
PART 1
95%,PART 2
95%,PART 3 80%
PART 4 80%.
Rs 2250 sft
Approved
100%
Rs 1500 sft
Approved
60%
Rs 550 sft
RS.3000/- SFT
consists of 2
blocks A &B of
60 flats in
GF+FF+SF+TF.
20%
Rs 1350 sft
2%
RS 2150 SFT
100%
RS 3500/- SFT
95%
Rs 1900
95%
Rs 1800 sft
70%
Rs 2400 sft
100%
100%
Approved
100%
Rs.1000 sft
100%
Rs 1400 sft
10%
RS 1900 SFT
100%
Rs 1500 sft
Approved
95%
RS 2200/- SFT
Approved
100%
Rs.1500/SFT
Approved
Approved
95%
Rs. 1250/-
<5%
1400/-PER SFT
10%
Rs 1950 sft
95%
Rs.1500/SFT
CAR PARKINGRS.75000/-
consists of B+GF+and 3 UF
50%
Rs 1400 sft
BLK A 100% B
100%, AND
BLK C-100%
Rs 2750 sft
100%
Rs 3000/-sft
15%
95%
Rs 1650 sft
0%
100%
Approved
consists of 40
flats
Approved
RS 2300/SFT
RS 1750/SFT
0%
Rs. 1,500/-
75%
100%
RS.4200
100%
RS 2100/- SFT
100%
RS.2500/- SFT
92%
RS 2200 SFT
100%
RS 2400/- SFT
95%
Rs 2400/ sft
60%
RS 250/SFT TO
RS
300/SFT
Approved
D RATE RS 2400/-SFT
0-50%
LAND
VILLA
RS 2000/RATE 2000/-SFT.DAHILA
SFT VILLA RS 1750/LAND
SFTRATE RS 4800/- SFT VILLA RATE 3500/- SFT,LILY LAND RATE RS 6
OVERALL 42%
Rs.3300/- TO Rs. 3500/-
70%
90%
RS 2000/-
CARPARKING-100,000
3%
Rs.3200/-
95%
Rs.2300/-SFT
CAR PARKING-150000
85%
Rs.3500/-SFT
CAR PARKING-200,000
90%
RS.2500/-SFT
CARPARKING-200,000
90%
Rs.3500/-SFT
90%
98%
Rs.3500/- TO 3900/-
F SECURITY DEPOSIT LOAN DISCHARGE CERTIFICATE ISSUED BY VIJAYA BANK ENCUMBRANCE CERIFICATE FROM 27.11.200
CAR PARKINGconsists
1,50,000/of GF+FF+SF+TF tot. 46 flats incul 2&3 B/R
100%
Rs.2500/-
100%
Rs.3200/-
BLK A 100%,BLK
B 98%
RS 2300 SFT
20%
Rs. 2000/SFT
25%
Rs.2000/SFT
Approved
90%
Rs 1600 sft
100%
RS 2400/- SFT
0%
RS 1850/- SFT
RS 1500/- SFT
Approved
reqular rs
925/sft and
corner rs
1025/sft
Approved
reqular rs
925/sft and
corner rs
1025/sft
Approved
100%
65%
40%
RS 850/SFT
Nil
RS 190/SFT TO
200/SFT
1200 sft Rs
1100 sft 2400
sft Rs 1100
4000 sft Rs
1300
RS 1,350 PER
SFT
Rs 800 sft 10%
extra for cornet
sites
Approved
consists of
B+GF+&3UFTot.
24 flats
BLK A 10%, B
5%, C 2%
Rs. 2000/SFT
Rs 450
80%
sft 5% extra for premium & corner sites
80%
RS 1200/- SFT
70%
1200/-SFT
100%
Rs 500
60%
1200/SFT
100%
RS.500/-SFT
Approved
Approved
Approved
BMRDA
APPROVED
LAYOUT
RS 350/SFT TO
400/SFT
30%
PHASE I A, C 100%
RS.2300/-
BLK A, B, C, - 55%
2BHK & 3BHK 2900/-
45%
75%
RS.3600/-SFT
100%
90%
96%
Rs.4200/- to 4300/-
25%
Rs.2600/- Sft
90%
Rs.2500/-
0%
96%
100%
RS. 2900/-
85%
Rs.3150/- TO Rs. 3250/CAR PARKING AREA Rs. 150000/- PER OPEN CAR AREA, Rs. 200000/- PER CLO
A BLK 80%
Rs. 2750/-
A BLK 80%
Rs. 2750/-
20%
Rs. 2200/-sft
100%
Rs. 4000/-
90%
Rs. 3200/-
kptcl,
2 VILLAS:
bwssb,
80%,
maintenace
& 8 VILLAS:
deposits,
10 TO
Rs.80%
service
3500/- tax & vat on construction+car park as per tariff structure, registaration @ 10%
90%
Rs. 2750/-
20%
Rs. 2750/-
100%
Rs. 8000/-
80%
Rs. 3100/-
95%
Rs.2100/-
95%
Rs.3000/-
80%
Rs.
RATE
3250/IS INCLUSIVE OF KPTCL,BWSSB, MAINENANCE
CAR
DEPOSITS
PARK 150000
90%
Rs.
RATE
3500/IS INCLUSIVE OF KPTCL,BWSSB, MAINENANCE
CAR
DEPOSITS
PARK 150000
95%
Rs. 2250/-
95%
Rs. 2250/-
80%
Rs. 2600
98%
Rs.2400/-
5%
10%
Rs. 9250/-
100%
2500/-
95%
2300/-
90%
Rs. 3200/-
97%
100%
2500/- TO 2600/-
80%
0%
2300/-
100%
90%
Rs.1700/- TO Rs.1800/-
88%
Rs.2500/- TO 2600/-
95%
42%
20%
70%
Rs.1800/- TO Rs.1900/-
98%
Rs 2700/- TO 2900/-
55
0%
0%
5%
Rs. 4750/-
100%
65%
50%
RS.2400/- TO 2550/-
DSA
CONTACT
NUMBER
CONTACT
PERSON
9845595944
MANJUNATH
5359693/535093
4
VIJAY KIRAN
984551607
MOHAN
01.11.2004
15.12.2004
OBST
Complete
Complete
01.12.2004
15.12.2004
COMPLETE
COMPLETE
PLAN
SNCTIONED BY
BANK
COMPLETE
OBST
07.1.05
LS
25/10/05
9448075194
JANARTHANA RAO
25633234
PRAMILA
COMPLETE
OBST
29/09/05
9/1/2004
OBST
2/10/2005
OBST
COMPLETED
completed
COMPLETE
BANK
28.01.05
CMC Bangalore
9448002872
GURUPRASAD
BMP
27.04.05
COMPLETE
17.04.2006
BDA
1/1/2004
N/A
RK 200000
17/07/2006
consists of 54 sites
20/2/04
07.05.05
9448282680/81/86
RAJESH
N/A
N/A
15.06.05
COMPLETE
19.04.05
20-11-05
9343785084
SOHAN SHETTY
COMPLETE
COMPLETE
02.01.05
N/A
30/12/2006
18.03.05
CMC Mahadevapura
11/1/2006
9845228595
PIYOSH BALDOTA
BDA
COMPLETE
COMPLETE
9342247578
BANK
2/1/2006
LS
2.03.05
DEEPAK
CMC
10/10/2003
CMC
2121025/7
SHIV KUMAR
31/10/03
24/7/06
9945607444
satish kumar
CMC
ls
23.02.05
SCB
06.11.2004
COMPLETE
COMPLETE
CMC
OBST
OBST
05.11.2004
COMPLETE
31856008,
36832142
CHANDRASHEKA
R
BDA
29.05.04
31856008,
36832142
CHANDRASHEKA
R
CMC
28.02.05
31856008,
36832142
CHANDRASHEKA
R
CMC
31856008,
36832142
CHANDRASHEKA
R
31856008,
36832142
CHANDRASHEKA
R
31856008,
36832142
CHANDRASHEKA
R
8/12/2005
pv
01.03.05
BMRDA
s of 80 sites
4.02.05
completed
25/7/03
BDA
8/9/2004
COMPLETE
Grama Panchayath
s. With 12 flats
pv
completed
BMP
bank
25-11-05
bank
completed
9844020369
VINIT GOYAL
KING 150000
Grama Panchayath
9845122133
Praveen Reddy
9845187170
rg
12.07.05
15.05.05
SUMANTH
bank
complete
KING 250000
RK 150000
9740012436
ARUN
1/12/2005
BDA
27.03.05
Comm. CMC
07.05.05
LEGAL N/A
COMPLETE
OBST
10.05.05
COMPLETE
completed
COMPLETE
OBST
COMPLETE
COMPLETE
4/10/2005
28.04.05
9847760402
adiga
05.01.05
25/9/04
completed
2/5/2006
56697000
moses
27/10/05
12/2/2006
01.01.05
21.04.05
15.04.05
9845680613/25284755 hemanth
27.03.2006
NELSON
9845154718
SATHYAPAL
6711172/984402
3523
RAHAMAN S A
6711172/984402
3523
RAHAMAN S A
02.05.05
20.04.05
COMPLETE
COMPLETE
09.12.2004
completed
COMPLETE
18.08.05
BANK
9845232459
COMPLETE
22/01/2006
9845059053
ameen
BMRDA APPROVED
COMPLETE
COMPLETE
20.12.05
COMPLETE
28.03.05
Commi BMP
LS
11/1/2005
Grama Panchayath
COMPLETED
03.05.05
19.07.05
COMPLETE
BDA
06.01.05
4.04.05
completed
9341874173
28.11.2004
COMPLETE
LS
5/2/2006
12.11.2004
02.01.05
9845528862
RAMA
984412441/41676464
MARIA
31.04.05
COMPLETE
LS
COMPLETE
17.03.05
21/4/2003
14.08.05
31.08.05
CMC bangalore
N/A
19.06.05
17.05.2006
11.03.05
COMPLETE
9342599770
VENKATESH S
OBST
21/10/05
9341216798
KSHAVA
BMP
completed
14/7/2004
BMP
9880564360
VENKATARAMAN
COMPLETE
24.03.2006
9448282680
MUTHU
COMPLETE
06.03.05
OBST
stration extra
30.04.05
22.05.05
LS
07.1.05
LS
07.1.04
18/05/2006
COMPLETE
dated 1.1.96 executed by gowramma and others in favour of a rama reddy and a r ashwathanarayana reddy in respect o
COMPLETE
1/12/2005
hittigere thimmaiah and other in favour of p anasuya 13) copy of sale deed dated 28.08.74 14) copy of sale deed dated 3
5/4/2006
26494221
12/11/2005 26494221/9886892575
mber 6) genealogical tree of the family of meddali fee / receipt issued by the
28/10/2006
09.12.2004
COMPLETE
21/9/2004
3/8/2006
9880413625
SHARAVAN KUMAR REDDY
24.11.2004
ale transaction of following sale deeds a) dated 17.05.04 ( doc no 4038/2004-05) b Dated 18.05.04 (doc 4036/2004-05 re
UCS
10.11.2004
12.03.05
3/10/2004
bank
N/A
completed
18.08.05
9900170864
19.06.05
RAVI
24-12-05
9845541999
ANIL/ SRINIVAS
1/11/2006
9945251869
Rajashekar Reddy
9448492385
RAMANA REDDY
3.06.05
PV
07.11.2004
AMBIKA
13/09/05
19.06.05
KRISHNA RAJ
9845106838
KRISHNA RAJ
9845101555
RUPESH
completed
OBST
9845007366
28.01.05
19/10/04
CMC Mahadevapura
13.03.05
OBST
10.11.2004
RVFC
15/5/2006
9448379950
NAGESH
20-11-05
bank
9844356179
SHASHIDHAR
20.05.05
03.01.05
09.03.05
18.06.05
Gram Panchath
15/10/04
24/10/04
N/A
01.05.05
16.07.05
15/10/05
9844008226
PRAFUL REDDY
22-03-2006
9844008226
PRAFUL REDDY
31.03.05
10/12/2005
of 35 flats in b+GF+SF+&TF
22.03.05
9845000371
PRADHAN
CMC
27.02.05
FO
6/11/2004
OBST
04.09.05
3/11/2004
22.06.05
CMC Byarayanapura
9844099266
VIJAY
2.07.05
09.11.2004
OBST
30.08.05
OBST
09.11.2004
ucs
31.03.05
Village Panch.
Grma panchayath
COMPLETE
27.07.05
SUPRA
12.11.2004
15-12-05 9341980413/57602476
30.05.05
BMP
KUMAR
Director of BMP
k of 12 flats in GF+SF+TF
12.11.2004
CMC
18-01-2006
9880076776/9035961632
RAMANA REDDY
BF+GF+3floors
14.11.2004
15-12-05
CMC Mahadevapuram
9341980366
RAVINDRA CHANDRA REDDY
27.12.04
CMC K R PURAM
24.11.2004
BMP
12.05.05
8/9/2006
9448367329
jagadish/Murthy
07.03.2006
9342228466
MURTHY
CMC
B+GF+&3 UF
s of 36 units
19.11.2004
SUPRA
08.04.05
21.11.2004
CMC
16-11-05
N/A
16/1/04
N/A
20.06.05
BDA
30.03.05
COMPLETED
COMPLETE
COMPLETE
COMPLETE
MR KARUNAKAR
3544073/984426 REDDY/RAMANA
4677
REDDY
COMPLETE
9886081706
AYESHA
10/7/2006
9886681840
DINESH REDDY
Panchayat Approval
01.09.2004
5353700
MR GANESH.B
02.05.05
COMPLETE
COMPLETE
30/01/05
1/8/2004
BMP
20.11.2004
BMP
RG
23/09/05
OBST
09.03.05
OBST
3.06.05
COMPLETE
28567058
COMPLETE
30.12.04
BMP
30.12.04
BMP
OF 200 SITES
28/8/04
CMC
1.12.2004
11.03.05
28.12.05
16.04.05
9845139902
VENKAT
1.12.2004
COMPLETE
26.11.2004
30-12-05
9845006469
VIJAY
9845124455
RAVINDRA REDDY
02.07.05
13.04.2006
5.06.05
30.12.04
20-11-05
9845166466
31/04/2006
9448018375
04.01.05
27/10/2006
26.04.05
bank
23.02.05
ANAND KUMAR
deputy commissioner BMP
OBST
COMPLETED
bank
11.11.04
9845027476
26.06.05
29.12.04
25-12-04
CMC
OBST
COMPLETE
51269621
MAHALAKSHMI
Appr. No. avil Valuvator says not legible
12.07.05
PV
of 131 sites
RG
27-12-04
BMP
8.06.05
Comm. BDA
27-12-04
BMRDA
27.01.05
COMPLETE
N/A
01.01.05
CMC Mahadevapura
09.08.05
26.06.05
28.05.05
9448067945
RAMACHANDRA
BANK
3/5/2006
22103131
BANK
2/5/2006
22103131/22103132
18/10/05
22222689
AA
07.03.05
05.07.05
04.01.05
OBST
07.01.05
RG
07.1.05
27.07.05
RAJANNA
COMM BDA
RAJANNA
L P NO. 18/04/05 APP BY NA
PV
10/11/2005
9342540479
LAXMI REDDY
27/09/05
9245071628
SUNDER SINGH
07.08.05
LS
11.01.05
UCS
13.03.05
UCS
20.08.05
RG
27.07.05
COMPLETE
BMP
BMP
9448581950
NANDA GOPAL
LS
12.01.05
OBST
11.07.05
OBST
18.01.05
UCS
23.06.05
9/12/2005
9845947472
RG
11.03.05
SUPRA
23.01.05
9845049409
OBST
22/10/05
9448369940
NATARAJ
umesh
commissioner CMC bommanahalli
OBST
30.01.05
OBST
24-11-05
9243406051
OBST
22-12-05
9243406051
SATISH
OBST
24-11-05
9243406051
SATISH
Bank
LS
BMP
COMPLETE9243136838/9341726123
04.08.05
COMPLETE
BMP
BMP
OBST
10.03.05
CMC BOMMANAHALLI
4.07.05
ation extra
14.05.05
AREA Rs.150000/-
OBST
6/11/2005
9845099336
MANJUNATH
OBST
complete
9845099336
MANJUNATH REDDY
OBST
18/12/2006 9845099336/26689730
MR MANJUNATH
OBST
21/05/2007
10.03.05
bank
13.11.04
CMC
of 144 sites
25.06.05
BMRDA
14-12-05
19.03.05
obst
06.03.05
21.06.05
CMC Bommanahalli
15.03.05
BMP
13.03.05
06.03.05
complewted
8/5/2006
9448085190
SOHAN SETTY
9900506544/40453453
14.06.05
02.08.05
RG
20.03.05
LS
21.03.05
OBST
25.03.05
LS
04.09.05
CMC Bommanahalli
9448002872
GURUPRASAD
29.03.05
30.03.05
Comm BDA
31.03.05
COMPLETED
regestration extra
istration extra
10.04.05
07.04.05
27.03.2006
21.04.05
28.04.05
9448496964
ANIL REDDY
10.05.05
16.04.05
20.04.05
21.04.05
14/02/2006
9343748014
BALARAM REDDY
9448289070
B R SRINIVAS
23.04.05
24.04.05
16-11-05
CMC
03.05.05
rg
02.05.05
istration extra
23.05.05
14.06.05
11/11/2005
07.05.05
06.05.05
30.08.05
22484330/22484331RAMAKRISHNA
22.05.05
completed
21-05-05
OBST
completed
9880061970
SURESH
rk rs 1,60,000
10.06.05
02.08.05
19.05.05
BDA
9845732301
SAMRAT
9845050599
SUKESH
24.05.05
30-12-05
24-12-05
23/06/2006
BDA
23.05.07
04.06.05
LS
08.06.2007
18.06.05
14.06.05
9849165065
CHANDRA SHEKAR
29-12-05
14.06.05
21.06.05
29/01/2006
9342516065
RAM MOHAN
9341093836
RAMACHANDRA
27.11.04
DEPOSITS 100,000/-
24.08.05
COMPLETE
08.08.05
AMBIKA
4/10/2005
13.07.05
16.07.05
CMC
RK 225000
0 bwssb 10000
9741301885
KESHAV
20/7/2006
9341217141
Srinivas reddy
8/9/2006
9342540479
lakshmi reddy
20-11-05
9845049468
SURESH
20/05/2006
9844016750
MURALI KRISHNA
23.07.05
28.07.05
20.07.05
k dep Rs 1 lakh
04.08.05
OBST
27.07.05
02.08.05
10/2/2006
26494919, 2649004
12.08.2005
9845666166
VENKATARAMANA REDDY
06.09.2005
9343755575
SRINIVAS
20.08.08
31.08.05
15/09/05
9845052860
JAYRAM
8/5/2006
9845204262
SRIDHAR REDDY
9945323275
PRASANTHI
9448462288
RAVI KUMAR
28.08.05
PV
8/2/2006
01.09.05
23591203
SURESH KUMAR
9341227810
SHRAVAN KUMAR
31.08.05
LS
OBST
COMPLETE
9448311246
PRATHAP
OBST
11/10/2005
9448109211
PHALGUN
OBST
27-11-05
9886470084
RESHMA
BMP
OBST
04.11.2005
9845952911
RAHIM
OBST
8/10/2005
9845054218
RAVI KUMAR
OBST
COMPLETE
65992934
G S KUSHA KUMAR
9844028369
MUNSHI
OBST
OBST
21/10/05
26785493
15-12-05
9342542627
SANTHOSH
25.04.2006
9945099999
SUBRAMANI
RK 500000
9342555122
LOAN SHOP
30-11-05
9448017885
22/06/2006
9845032242
IMRAN PASHA
SANTHOSH KUMAR
OBST
OBST
6/12/2006
9880307385 & 9880900000
13-12-05
OBST
9886656089
MAHENDAR REDDY
9632177999
CHAKRAVARTHY
OBST
25/04/2006
9880084810
SWARDA RASAM
OBST
10/1/2006
9886198555
MURALI KRISHNA
3/1/2006
9448271381
NAGARAJ
1/1/2006
9880028499
SAMEER/AYESHA
8/9/2006
9845230909
8/9/2006
9886685349
Chaitanya
9880766994
Khan
NG Rs.200000/-
8/9/2006
10.06.05
OBST
31/11/2006
9341245393
NATRAJ
BDA
14/05/2007
9845582675
DINESH
CMC
COMPLETE
9845541765
BOPANNA
COMPLETE
s of 36 flats
COMPLETE
15.07.05
RVFC
19-01-2006 51145050/51245500
23/09/05
9343780566
ABDUL
NAGESH
BDA Bangalore
bank
obst
BANK
obst
02.09.05
26557299, 26654665
2/5/2006
9343780566
complete
9845006860
CMC
NAGESH
Commissioner bommanahalli CMC
SELVA KUMAR
Dy. Commissioner BMP
7/11/2006 9341979756/28530963
COMPLETE
BANK
9341220117
9845032328
3.04.05
CMC
CHANDRA Asst.
SHEKAR
director town planning BMP
CMC bommanahalli
5 psft sales 4%
LS
12.03.05
BMP
12/11/2005 9880022488/57657766
COMPLETED
9880999942
MAHESH F
12.06.05
bank
BDA
COMPLETED
6545781/655890
1/9844023128
SHAH SANJAY
JAIN
COMPLETE
6545781/655890
1/9844023128
SHAH SANJAY
JAIN
22/9/06
9844305949
HARI KRISHNA
23/09/05
9845036663
CHANDRA
SHEKAR
9245582675
DINESH
N/A
NA
24.03.05
30.12.05
16.04.05
16.08.05
9845032328
cmc
03.02.2008
9880788852/53
16.08.05
15.07.05
15.07.05
COMPLETE
9880788868
COMPLETE
26634176/77/78
BANK
13-02-06
9880216779
AA
COMPLETE
25296699
RAMESH
BMP
BMP
NA
21/09/05
obst
25293399
9880216781
04.07.05
MANJUNATH
NA
BMP
completed -phase-2-22/02/2007
BDA
24.06.07
Comm. BDA
8/12/2005
BDA
obst
22-01-2006
30.02.2006
9845961614/ OFFICE 26491564
PRABHU/RAJESH
9845069601
RAJA SHEKAR
OBST
30.03.2006
9448459459
SHIVAKANTH
OBST
29/9/2006
9980400444/5
SHIVAKUMAR
COMPLETE
9844015982/527
0902/3/4/fax5288411
VIKAS
9844015982/527
0902/3/4/fax5288412
VIKAS
9844015982/527
0902/3/4/fax5288413
VIKAS
9844015982/527
0902/3/4/fax5288414
VIKAS
9844015982/527
0902/3/4/fax5288415
VIKAS
9844015982/527
0902/3/4/fax5288416
VIKAS
9844015982/527
0902/3/4/fax5288417
VIKAS
9844015982/527
0902/3/4/fax5288418
VIKAS
9844015982/527
0902/3/4/fax5288419
VIKAS
9844015982/527
0902/3/4/fax5288420
VIKAS
9844015982/527
0902/3/4/fax5288421
COMPLETE
COMPLETE
COMPLETE
9844015982/527
0902/3/4/fax5288422
COMPLETE
9844015982/527
0902/3/4/fax5288423
VIKAS
COMPLETE
9844015982/527
0902/3/4/fax5288424
VIKAS
VILLAGE PANCHAYAT
COMPLETE
9844015982/527
0902/3/4/fax5288425
VIKAS
VILLAGE PANCHAYAT
COMPLETE
9844015982/527
0902/3/4/fax5288426
VIKAS
9844015982/527
0902/3/4/fax5288427
VIKAS
9844015982/527
0902/3/4/fax5288428
VIKAS
9844015982/527
0902/3/4/fax5288429
VIKAS
9844015982/527
0902/3/4/fax5288430
VIKAS
9844015982/527
0902/3/4/fax5288431
VIKAS
9844015982/527
0902/3/4/fax5288432
VIKAS
9844015982/527
0902/3/4/fax5288433
VIKAS
13/11/04
CMC
UCS
08.11.04
19/02/2006
COMPLETE
9243103036
SHIV KUMAR
CMC
2286868/228691
G.A.
3/2286911
Ravish/NANDINI
2286868/228691
G.A.
3/2286912
Ravish/NANDINI
COMPLETE
9844065005
RAVISH
2286868/228691
G.A.
3/2286914
Ravish/NANDINI
BMP
15.07.05
22867474
RAGHU
9886416666
WILSON
RG
22-01-2006
OBST
COMPLETE
OBST
COMPLETE
of 12 units
16.04.05
4/11/2006
4/5/2006 9845048311/9845508777
HARI & PRATAP
30-03-2006
9845508777
6/6/2007
9845508777
15.02.05
5483580/548328
6
Captain White
21.06.05
13.08.05
BDA
BDA
BDA
BDA
COMPLETE
DOUBLE 250000/-
22256325
10.05.05
bank
10.05.05
BMP
BANK
COMPLETE
26631955
07.08.05
LS
LS
9/4/2006
29.11.2007
9844020369
vineth goel
9844020369
VINEET GOEL
9844020369
VINEET
12/7/20069844020369/9341094299 VINEET
25/11/2006
OBST
OBST
9342320029
MANJUNATH
30.03.2006
BMP
2/11/2006
COMPLETE
9886600971
14/02/2006
2229962
SUNIL HINDUJA
22229962/98802
16029
GOPALA
KRISHNA
2229962
bank
COMPLETE
BANK
14.04.05
SUNIL HINDUJA
15.05.05
24.03.2006
OBST
29/7/06
25288923
VASANTHI
COMPLETE
9844058779
RADHAKRISHNA
2990455/299045
6
C Prasad
26.07.05
bank
2/4/2006
2990455/299045
6
C Prasad
COMPLETED
31828613
KESHAV
31.03.05
31828613
KESHAV
2/11/2006
9886209875/576
32571
RAVI
29-11-05
9845075892
NARAYAN REDDY
27-06-2007
9845075892
RAVI RAJ
CMC Bommanahalli
20.05.05
11.05.05
16.03.05
21.03.2006
COMPLETE
9886045635
VASUDEVA REDDY
PRABHAKAR
REDDY
B+GF+and 3 UF
PRABHAKAR
REDDY
COMPLETE
PRABHAKAR
REDDY
PRABHAKAR
REDDY
COMPLETE
9845064435
obst
PRABHAKAR
REDDY
PRABHAKAR
REDDY
18.05.05
27.03.2006
ISSUED BY BMP
9845494007
PRASAD
bank
04.01.05
18.03.05
Commi. BMP
05.03.05
28/12/2006
9845494332
SRINIVAS
28/12/2006
9341221246
BHADRACHALAM
3320485/332904
0/9886178101
DINESH
3320485/332904
0/9886178101
DINESH
3320485/332904
0/9886178101
DINESH
3320485/332904
0/9886178101
DINESH
27.11.2004
3320485/332904
0/9886178101
DINESH
16/09/05
9845848108
HARISH
14/09/05
9845848108,
23320485
11.05.2007
9448497470
11.06.05
OBST
RAMA DEVI.
BDA
CMC Mahadevapura
BMP
6/5/2006
OBST
obst
5/11/2006
9343795408
PRAKASH
13-02-06
9844126326
NARAYANA REDDY
complete
23446027/23441594
NAGARAJ
Commissioner CMC bytarayanapura
26/10/2006
23322009/23420532/9845466778
OBST
28.12.05
9845466778
18/06/2007
9880079668
27-12-05
RAJAGOPAL
9342121819
PURUSHOTHAM
15/10/2006
9845452525
8/11/200625259825,MO:9945179444 FRANKE
RK 250000
9916919160
KUMAR
9945603864
UMESH
16/05/2007
9448855806
VINODH
13/12/06
9865050859
26/12/2006
9845025675
KING 200000
KING 150000
BDA
9343498940
SANTOSH
OBST
2/5/2006
25567333
18-01-2006
9844012225/361
1913/6595174
NARAYAN
DAS/VARSHA
CMC
COMPLETE
9845000076
MURTHY
CMC Hoody
OBST
COMPLETE
9845273832
PHALGUN
BMP
supra
2/4/2006
9845445499
STALIN
BDA
14/09/04
14/09/05
CMC Bommanahalli
19.07.05
OBST
complete
9448073568
BANK
28.04.2006
9448073568
KRISHNA KUMAR
COMPLETE
5588415/16/17/1
8/9844128311
ALLEM
CMC
BDA
05.11.04
COMPLETE
23.07.05
RG
13.03.05
LS
02.03.05
9845039370
CMC
PV
12/10/2005
9845083641
MANJUNATH
24.02.05
7/11/2006
51193293
BMRDA
5/7/2006
9341908008
BMRDA/BDA
compeleted
6586862/7
SAINATH/ARIF
6586862/1
SAINATH/ARIF
6586862/2
SAINATH/ARIF
6586862/3
SAINATH/ARIF
51193293
SAINATH/ARIF
Village Panchayath Appro
COMPLETED
BDA
6586862/5
SAINATH/ARIF
6586862/6
SAINATH/ARIF
6586862/7
SAINATH/ARIF
40174000
JAGAN
9880733669
9880822585/ 25092033,25594380
ANANTHA SWAMY
15.05.2008
9243453766
BDA
RK 150000
OBST
22450288
GIRISH
RK 150000
9902294503
RAJENDRA
RK 175000
9900118818
DIWAKAR
g area 200000/-
26536550
PAPANNA
9243111239/9243400000
PREM KUMAR
KING 200000
KING 200000
KING 200000
9980143283
VINAYAK
9880594092/26545122
CHANDRASHEKAR
9844949850
OKEN SINGH
AZAR
RK 150000
9989715067
KRISHNAMURTHY
RK 150000
9945539899
SRIDHAR RAJU
BMP
99001133599
MAHESH KUMAR
RK 100000
99001133599
MAHESH KUMAR
RK 200000
9845091760
VENUGOPAL
RK 175000
RK 150000
RK 150000
RK 300000
9741498069
NISHANTH
RK 150000
9880716405
PREMRAJ
9342642643
MALLIKARJUN
RK 150000
9880923735
SAMUEL
RK 125000
RK 150000
9845221029
RAMAMURTHY
RK 150000
9880034066
DEVARAJ
RK 150000
9342567897
VENKATESHWARLU
RK 150000
9342567897
VENKATESHWARLU
96611800630
JYOTHISH
96611800630
JYOTHISH
RK 200000
9945031249
ANAND
RK 150000
9342511028
MARIA
RK 150000
9900928889
SOMASHEKHAR
RK 125000/-
9880019651
MAHALAKSHMI
RK 500000/-
64559955
JAGADEESH
RK 400000
25594003
RAJA
9845177773
MUNLIA
OBST
RK 150000
9980018066/ 9886746049
BHANU KISHORE N
RK 200000
32471009
REDDY
RK 200000
9845020513
DASARATH
RK 200000
9341311505
BHUVANA
42133177/9379335408
P REDDY
9686197004
HARSHA
9008111099
ARVIND
968656452
PADMANABHAN
9902271599
HEMA
9535067107
FRANKEN
9880425394
PARNJEET
9686193731
MADHU
44103534
UMESH
9880953242
9886812457
ASHOK AGARWAL
9945230041
ANIL KUMAR
9980238258
BASAWARAJ
9731988330
HARISH
9900135112
RAJESHKAR
9845144347
SELVAM
VERIFICATION
OF DATA ENTRY
AND
DOCUMENTS
TYPE
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
APTS
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
nchayath Appro
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
NA FILE
SENT TO CROWN
APTS
SENT TO CROWN
SENT TO CROWN
APTS
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
DONE
LAYOUT
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
DONE
APRTS.
SENT TO CROWN
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
Sites
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
nchayath Appro
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
nchayath Appro
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
DONE
LAYOUT
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
DONE
APTS
SENT TO CROWN
DONE
Sites
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
DONE
APT
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
DONE
Aprts.
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
DONE
LAYOUT
SENT TO CROWN
DONE
LAYOUT
SENT TO CROWN
DONE
LAYOUT
Done
Sites
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
appt
Done
Sites
SENT TO CROWN
Done
Sites
SENT TO CROWN
SENT TO CROWN
Done
Sites
SENT TO CROWN
SENT TO CROWN
DONE
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
DONE
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
APTS
Done
Sites
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
nchayath Appro
SENT TO CROWN
OT AVAILABLE
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
Done
Aprts.
Done
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
DONE
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
DONE
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
APTS
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
SENT TO CROWN
DONE
APT
APTS
APTS
APRTS
APRTS
nchayath Appro
APPROVED
APTS
NOT RECIVED
Done
Aprts
nchayath Appro
Done
Aprts.
Aprts.
Done
Aprts.
nchayath Appro
Done
Aprts.
Aprts.
APRTS
nchayath Appro
available in file
Done
DONE
Done
Aprts.
Done
Aprts.
DONE
APTS
Done
Aprts.
nchayath Appro
APRTS
availabie in file
nchayath Appro
DONE
wathanarayana reddy in respect of sy no 104/3 9) Sale deed dated 01.01.96 executed by gowramma and others in favour o
nchayath Appro
.74 14) copy of sale deed dated 3.11.55 executed by sampangi rama shastri in favour of k n seshadri and another 15) La
Done
Aprts.
Done
Aprts.
nchayath Appro
Done
Sites
Done
Aprts.
Done
nchayath Appro
DONE
DONE
Aprts.
nchayath Appro
Done
Sites
Done
Aprts.
Done
Aprts.
APTS
DONE
DONE
APTS
nchayath Appro
Done
Aprts.
Done
Aprts.
Done
Aprts.
SENT TO CROWN
SENT TO CROWN
Done
Aprts.
Done
Aprts.
DONE
Aprts.
Village Panch.
panchayath
Done
Aprts.
done
Aprts.
Done
Aprts.
Done
Aprts.
Done
Aprts.
Done
Aprts.
DONE
APRTS
Done
Aprts.
Done
Aprts.
Done
Sites
DONE
DONE
APTS
nchayath Appro
DONE
LAYOUT
DONE
LAYOUT
ot available
nchayath Appro
Done
Aprts.
Done
Aprts.
APTS
DONE
APTS
DONE
APTS
DONE
APTS
Done
Aprts.
Done
Aprts.
DONE
SITES
Done
Aprts.
LAYOUT
Done
Sites
Done
Aprts.
Done
Aprts.
done
Aprts.
Done
Sites
Done
Aprts.
Done
Aprts.
DONE
APTS
DONE
APTS
APTS
Done
Aprts.
Done
Aprts.
APRTS
DONE
APRT.
Done
Aprts.
Aprts.
Aprts.
Aprts.
Done
Aprts.
Done
Aprts.
Done
Aprts.
DONE
Aprts.
DONE
APRT.
APTS
APTS
DONE
APTS
Done
Aprts.
Done
Aprts.
aprts
Done
Aprts.
Done
Aprts.
APPT
arasabhe bommanahalli
APTS
APTS
APTS
VILLA
APTS
APTS
APTS.
APTS
APTS.
APTS
APTS
APTS
APTS
APTS
WN PLANNING
PLANNING, BMP
APTS
APTS
APRTS.
APRTS.
Done
Aprts.
DONE
APTS
Done
Aprts.
Done
Aprts.
Done
done
DONE
APTS
Done
aprts.
DONE
APTS
DONE
Done
Aprts.
done
Aprts.
DONE
APTS
DONE
Aprts.
DONE
Aprts.
Done
Aprts.
Done
Aprts.
Done
APRT
DONE
APTS
DONE
APT
DONE
APTS
DONE
APTS
APTS
DONE
APTS
DONE
APTS
Done
APRTS.
Done
Aprts.
DONE
APTS
DONE
Aprts.
DONE
Aprts.
Done
APRTS.
DONE
DONE
APT
DONE
APT
Done
Aprts.
DONE
APTS
APTS
available in file
DONE
APTS
DONE
DONE
DONE
DONE
DONE
DONE
DONE
PLOT
available in file
DONE
DONE
DONE
Done
Sites
nchayath Appro
DONE
DONE
AVAILABLE IN FILE
AVAILABLE IN FILE
DONE
APTS
Done
Aprts.
DONE
APTS
DONE
DONE
APTS
Done
Aprts.
Done
Aprts.
Done
Aprts.
DONE
APTS
DONE
APTS
DONE
APTS
DONE
APTS
DONE
APTS
DONE
APTS
DONE
APTS
DONE
APTS
OT RECEIVED
DONE
Done
APTS
OT RECEIVED
DONE
DONE
APT
DONE
APRTS
DONE
APRTS
DONE
Aprts.
Done
Aprts.
Done
Aprts.
Done
APTS
AVAILABLE IN FILE
DONE
DONE
APRTS
DONE
APRTS
DONE
APT
DONE
APT
Done
Aprts.
APRTS.
APRTS.
available in file
DONE
ARTS
DONE
APTS
DONE
APTS
DONE
APT
Done
DONE
APT
Done
Aprts.
DONE
APTS
Done
Aprts.
Done
Aprts.
DONE
Aprts.
APTS
DONE
APT
APTS
Done
APTS
DONE
APTS
DONE
APTS
DONE
APTS
Aprts.
DONE
APTS
VILLAS
21.05.2007
Done
Aprts.
21.05.2007
DONE
APTS
21.05.2007
Done
Aprts.
21.05.2007
21.05.2007
DONE
APTS
21.05.2007
DONE
APTS
21.05.2007
21.05.2007
21.05.2007
21.05.2007
21.05.2007
R R NAGAR
APRTS.
21.05.2007
DONE
APRTS
21.05.2007
Done
LAYOUT
21.05.2007
DONE
LAYOUT
21.05.2007
21.05.2007
21.05.2007
21.05.2007
21.05.2007
Done
LAYOUT
21.05.2007
Done
Aprts.
21.05.2007
21.05.2007
21.05.2007
21.05.2007
21.05.2007
21.05.2007
21.05.2007
21.05.2007
DONE
LAYOUT
DONE
21.05.2007
21.05.2007
21.05.2007
21.05.2007
VILLAS
21.05.2007
DONE
APTS
21.05.2007
DONE
LAYOUT
21.05.2007
21.05.2007
21.05.2007
21.05.2007
gowramma and others in favour of a rama reddy and sri a r ashwathganarayana reddy 10) partition deed dated 12.03.78
k n seshadri and another 15) Land conversion certificate 16) Endorsement for non acquisition issued by teh BMRDA?BD
0) partition deed dated 12.03.78 executed amongst sri balappa reddy and others 11) agreement to entered in to betwee
uisition issued by teh BMRDA?BDA 17) katha extract / demand register issued by the jurisdictional revenue authority 18)
reement to entered in to between the land owner and the purchaser 12) GPA executed by the land owner in favour of th
isdictional revenue authority 18) tax paid receipt for the period 03-04 /04-05 19) Copy of approved layout plan 20) E C fro
by the land owner in favour of the builder 13 Copy of approved layout plan
KRISTAL OLIVINE
1029KLVN
1034MAGM
SPRINGFIELDS
APPARTMANT COMPLEX.
PHASE 3
1036SPFI
1037GOHA
SUN SPURGE
1037SPRG
GOLDEN STAR
1037STAR
GOLDEN GABLES
1039GOGA
NOTTING HILLS
1039NTHL
1039SRSP
1039SRSP
CANOPY SUNSPREE
1042SNSP
SALARPURIA SILVER
WOODS
1060SLWD
1064RYGD
SUN CITY
1068SNCT
ANAGHA PERIDOT
1074ANPE
MAHAVEER CITADEL
1076CITA
MAHAVEER CORONET
1076CRNT
MAHAVEER GARDENIA
1076GRDN
MAHAVEER SPRINGS
1076MASP
MAHAVEER PALACE
1076PALC
MAHAVEER PALMS
Not Approved
MAHAVEER RICH
Not Approved
MAHAVEER HERMITAGE
Not Approved
MAHAVEER WILLOW
1076MAWI
MAHAVEER WILTON
Not Approved
KNIGHTS BRIDGE
1080KNBR
KNIGHTS BRIDGE
1080KNBR
WINDSOR AMBIKA
1088AMBK
WINDSOR MEENAKSHI
1088MNKS
WINDSOR CLASSIC
1088WDCL
DSR DIVINE
1092DSDI
1092SPBE
STERLING EAST
1098EAST
STERLING TERRACES
1098TRAC
STERLING TERRACES
PHASE II
1098STR2
ALPINE REGENCY
H M TAMBORINE APARTMENTS
1106TANE
ARDENDALE
1196MMAR
Not Approved
HM TAMBOURINE
1106TANE
REGENCY ALANDON
1111aldn
REGENCY MAGNUM
1111REGY
1113HAVI
DUO TOWN
1117DUTO
DUO TOWN 1
1117DUTO
PARIWAR SHANBHOG
1146PASH
PARIWAR PETALS
1146PTLS
1147grfs
Not Approved
HIMAGIRI CASTLE
Not Approved
INDUS SIGNATURE
1148sign
VINYAS ARUNODHAYA
1149VIAR
VINAY HARMONY
1151VNHY
1151VNVK
SMR CASTLE
Not required
Not Approved
Not Approved
Not Approved
Not Approved
Not Approved
Not Approved
Not Approved
1151VIGA
SMR ENDEAOUR
Not Approved
KEERTHI REVERIA-1
1154KRRV
KEERTHI RIVERA - II
1154KRRV
KEERTHI ROYALE
1154KRIR
1157SLED
SKYLINE AMOGH
1158SKAG
SKYLINE SOLSTICE
1158SKSO
ROCK HOMES
1159HMES
ROCK PARADISE
1159RKPD
KRISHNA DWELLINGTON
1162KRDW
PYRAMID PLANET
1167PYPL
1168BESU
MONALISA
1169VAMO
R M V CLUSTER 2
1171RMVC
1173DILA
AKSHAYA LAYOUT
1176AKSH
AKME HARMONY
1177AKHA
BINDU ARPAN
1180ARPN
BINDU ANMOL
1180BIAN
PRAKRUTHI MEADOWS
1184MDWS
SAI JYOTHI
2110SAIJ
CELESTIAL GREENS-Ph 1
& Ph 2
1002CLGR
ROYAL PALMS
Not required
TRINITY MEADOWS
1002TRMD
ADMIRALTY AVENUE
1002ADAV
ADMIRALTY SQUARE
1002ADSQ
1002MLLH
ARISTOCART
1002ARST
ROYAL HERITAGE
Not required
ADMIRALTY MANOR
Not required
TEMPLE TREES
1002TTFB
WILSON MANOR
1002WLMR
Not required
ADMIRALTY SQUARE
1002ADSQ
GOPALAN PUSHPANJALI
Not Approved
GOPALAN GARDENIA
Not Approved
ROYAL ESTATE
1002RLES
GOPALAN JEWELS
1002GPJW
GOPALAN GRANDEUR
1002GOGR
GOPALAN BRINDAVAN
1002GOBR
CASA GOPALAN
1002CAGO
1003GRNW
WHISPERING WINDS
Not Approved
PRESTIGE SHANTHINIKETAN
1003SHNT
1003PCSR
PRESTIGE ST JOHN
WOODS
1003STJW
WHISTLING PALMS
1003WHPL
Not Approved
GREEN WOODS
1003GRNW
1003CRNC
PRESTIGE LANGLEIGH
1003LANG
ELGIN
1003ELGN
ACROPOLIS
1003ACRP
DORCHESTERS
1003DORC
LAKE VISTA
Not Approved
Not required
GLEN MORGAN
Not required
PRESTIGE LEE
PROMENADE
Not Approved
PRESTIGE CEDARS
Not Approved
1003FRSN
Not Approved
Not Approved
PRESTIGE SERENITY
Not Approved
PRESTIGE ST.JOHNS
WOOD PHASE 11
Not Approved
PRESTIGE WINSTON
Not Approved
Not Approved
PRESTIGE WELLINGTON
PARK
1003WLTG
PRESTIGE ASTER
Not Approved
1003KGTN
BRIGADE LAVELLE
Not required
BRIGADE ENTERPRISES
Not Approved
BRIGADE JACARANDA
Not required
BRIGADE CLASSIC
1005CLSC
1005HLLV
KOMARLA BRIGADE
RESIDENCY
1005KUMR
BRIGADE MAYFAIR
Not Approved
BRIGADE LEGACY
Not Approved
BRIGADE HARMONY
Not Approved
BRIGADE GATEWAY
1005GTVY
BRIGADE METROPOLIS
1005MTLS
BRIGADE PARAMOUNT
1005PART
BRIGADE COURTYARD
1005BGCO
Not Approved
BRIGADE PETUNIA
Not Approved
PALM MEDOWS
1007PLMD
ADARSH RESIDENCY
1007RESI
1007ADPA
Not Approved
Not Approved
ADARSH CRYSTAL
Not Approved
ADARSH RHYTHM
Not Approved
ADARSH GULMOHAR
Not Approved
DUO RHYTHM
1007PLMD
NANDI GARDENS
1008GRDN
NANDI PARK
1008PARK
NANDI PARK
Not Approved
FREE BIRD
Not Approved
SOBHA OPAL
Not Approved
SOBHA WINDFALL
1009WNDF
SOBHA ZIRCON
Not Approved
1009SEP2
SOBHA CORAL
1009CRAL
SOBHA JADE
1009JADE
SOBHA SAPPHIRE
Not required
SOBHA AQUAMARINE
Not Approved
SOBHA ONYX
Not Approved
1009SBMF
SOBHA ORCHID
1009SRCD
SOBHA IRIS
1009IRIS
SOBHA MAGNOLIA
1009SBMG
SOBHA DREAMS
Not Approved
SOBHA DAFFODIL
1009SDDF
SOBHA DAHLIA
Not Approved
SOBHA CHRYSANTHEMUM
1009SDCH
Not Approved
1009SOSL
SOBHA PETUNIA
1009PETU
SOBHA LAVENDER
Not Approved
1009SDAL
Not Approved
SOBHA AMETHYST
1009AMTH
SOBHA ADAMUS
Not Approved
1009DFLR
SOBHA SAFFRON
Not Approved
SOBHA CINNAMON
1009CINM
Not Approved
SOBHA CLASSIC
Not Approved
SOBHA GARRIOSN
Not Approved
TOWNS END
Not required
1010TRND
ZED COLLECTIVE
APARTMENTS
T-ZED HOMES
1010TZHN
1011STCT
Not Approved
PURVA FAIRMONT
APARTMENT
1013FRMT
PURVA PARK
1013PRVP
PURVA HEIGHTS
Not required
PURVA GRACES
Not required
PURVA PAVILLION
1013PALN
PURVA PARKRIDGE
1013PUPK
PURVA FOUNTAIN
SQUARE
1013FSQR
PURVA CARNATION
Not Approved
PURVA BELMONT
1013FSQR
PURVA VANTAGE
Not Approved
PURVA VENEZIA
1013PUVE
FREE BIRD
1014FRBR
SCARLET BEGONIAS
Not Approved
Not Approved
HOME-2
Not Approved
GOOD EARTH
Not required
LIFE IS BEAUTIFUL
Not required
TIMES APARTMENT
Not Approved
TIME
Not Approved
Not Approved
WILLOW HERBS
Not Approved
GREEN SLEEVES
1014GRSL
1014WNYM
MEENAKSHI CLASSIC
1017MCLS
GOLDEN GREENS
Not Approved
MEENAKSHI RESIDENCY
1017MEEN
RAJARAJESHWARI NIVAS
1017RJNV
RAJA PRAKRUTHI
1017RJPK
MEENAKSHI MANOR
Not required
RAJA GARDENIA
Not Approved
RAJA HELIX
1017HELX
RAJA ARISTOS
Not Approved
RAJA IRIS
Not Approved
RAJA SANNIDHI
1017RASN
SRIRAM PROPERTIES
Not Approved
SHRIRAM SHANKARI
APARTMANTS
Not Approved
1018SAMD
SRIRAM SPANDANA
1018SPDN
SHRIRAM ADITHYA
1018SPAD
SHRIRAM SYMPHONYE
1018SYMP
SHRIRAM SHREYAS
1018SHSR
SHRIRAM SAHANA
Not Approved
SHRIRAM SHRISTI
Not Approved
SHRIRAM SURABHI
Not Approved
RENAISANCE PROSPERO
Not Approved
PALASHA
1019PLSH
RENAISANCE REGALIA
Not Approved
RENAISANCE TRANQUIL.
Not Approved
RENAISSANCE AURA
Not Approved
RENAISANCE NEST
Not required
RENAISANCE SURYA
1019SRYA
RENAISSANCE KRISHNA
Not Approved
RENAISSANCE JAGRUTHI
1019JAGR
RENAISSANCE JAGRUTHI
phase 2
Not Approved
RENAISSANCE AERO
Not Approved
RENAISSANCE VERONA
Not Approved
RENAISSANCE PARK 1
Not Approved
RENAISSANCE PARK 3
Not Approved
RENAISSANCE TERRA
1019RNTA
RENAISSANCE EXOTICA
1019EXTK
RENAISSANCE TEMPLE
BELLS
1019RHTB
RENAISSANCE JAGRITI
APARTMENTS
Not Approved
RENAISSANCE SRINIVAS
Not Approved
RENAISSANCE HVV
VALLEY
1019HVRS
RENAISSANCE RAINBOW
Not Approved
MANTRI LAKEVIEW.
Not Approved
Not required
MANTRI RESIDENCY
Not Approved
MANTHRI RESIDENCY
Not Approved
MANTRI ELEGANCE
1021ELGN
MANTRI ELITE
1021ELIT
MANTRI CLASSIC
1021CLSC
MANTRI PRIDE
Not Approved
MANTRI RHYTHAM
Not Approved
MANTRI AQUATICA
Not Approved
MANTRI ALTIUS
Not Approved
MANTRI TERRACE
Not Approved
MANTHRI ENCLAVE-2
Not Approved
MANTRI GREENS
Not Approved
MANTRI SPLENDOR
1021MSLR
MANTRI ESPANA
1021MAEP
MANTRI TRANQUIL
1021MATR
MANTRI ROYALE
Not Approved
KRISTAL SUNSTONE
Not Approved
KRISTAL TOPAZ
1029TOPZ
KRISTAL GALENA
Not Approved
KRISTAL TIARA
Not Approved
KRISTAL OPAL
Not required
KRISTAL RUBY
APPARTMANTS
Not Approved
KRYSTAL HALITE 1
1029HLT1
KRYSTAL HALITE 2
1029HLT2
KRYSTAL BROOKITE
1029BRKT
KRISTAL JADE
1029JADE
KRISTAL SELENITE
Not Approved
Not Approved