Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 6

Technical Assistance for Preparation of 5 projects

in the Environment Sector.


EuropeAid/123052/D/SER/RO
Consortium C&E Consulting and Engineering GmbH
Louis Berger SAS Poyry Environment GmbH

EURO PEA N

U N IO N

P ro je c t fi n a n c e d u n d e r Is p a

Calculation
of the facilities for
surfacewater run off (rain run off)
OLD LANDFILL CALARASI
COUNTY CALARASI

TECHNICAL ASSISTANCE FOR PREPARATION OF 5 PROJECTS


IN THE ENVIRONMENT SECTOR.
EUROPEAID/123052/D/SER/RO

EuropeAid/123052/D/SER/RO
stage: December 2010-12-16

page 1 of 6

Technical Assistance for Preparation of 5 projects


in the Environment Sector.
EuropeAid/123052/D/SER/RO
Consortium C&E Consulting and Engineering GmbH
Louis Berger SAS Poyry Environment GmbH

CONTENTS

Page No.

1 Calculation basis....................................................................................................3
2 Calculation the Rain run off...................................................................................3
3 Calculation the volume of retention basin...........................................................4
3.1

Throttle outflow....................................................................................................4

3.2

Volume of Retention Basin..................................................................................4

3.3

Check the Emptying Time...................................................................................4

3.4

Compilation of the design values........................................................................4

4 Calculation of pipes and trenches for inflow and/or outflow of the basin.......5
4.1

Pipes....................................................................................................................5

4.2

Trenches..............................................................................................................5

5 Bibliography............................................................................................................6

EuropeAid/123052/D/SER/RO
stage: December 2010-12-16

page 2 of 6

Technical Assistance for Preparation of 5 projects


in the Environment Sector.
EuropeAid/123052/D/SER/RO
Consortium C&E Consulting and Engineering GmbH
Louis Berger SAS Poyry Environment GmbH

1 Calculation basis
The following assumptions and definitions were made:

Calculation the rain runoff r 15 (1) (Q r15) according to STAS 9470-73 [1]
Calculation the volume of retention basin according to ATV A-117 [2]
Return frequency of rain set with 0,2 (suitable for open basins)
Time factor for calculation r 15 (0,2) set with 1,783 [3]
Ratio Outflow / Inflow (Q out / Q in) = 0,2
Flow time to the basin (tf) set with 0 min
(This assumption increases the the reliability.)
Calculation the Design value BR according to pict. 5 and 6 of ATV A117

2 Calculation the Rain run off


according to STAS 9470-73 [1]:
region:
6
diagram:
6
rain yield factor (r15(1)):
155 l/ s*ha
peak discharge coefficient according to slope and sealing
Drainage area:
Area
A [ha]
0,90
basin-area0,20 ha
0,00 ha
Surrounding countryside
0,00 ha
Transfer Station
7,17 ha0,463,32 ha
Total

Ared [ha]

0,30
0,90

0,00 ha
0,00 ha

0,18 ha

Rain run off: Q r 15 (1,0) = r15(1,0) * A *


Q r 15 (1,0) = 155,00 l/(sxha) * 7,17 ha * 0,45
Q r 15 (1,0) = 514,1 l/s

EuropeAid/123052/D/SER/RO
stage: December 2010-12-16

page 3 of 6

Technical Assistance for Preparation of 5 projects


in the Environment Sector.
EuropeAid/123052/D/SER/RO
Consortium C&E Consulting and Engineering GmbH
Louis Berger SAS Poyry Environment GmbH

3 Calculation the volume of retention basin


3.1 Throttle outflow

= Q out / Q r 15 (0,2)
= 0,2

Q out

= 0,5* (min Qout + max Qout)

min Q out = 0
max Q out = 2 * * Q r 15(0,2)

3.2 Volume of Retention Basin


tf

=0

BR

= 750 s

according to pict. 5 and 6 of ATV A117

V [m] = (BR * Q r15(0,2))/ 1000

3.3 Check the Emptying Time


tE [h] = Vchosen / (3,6 * Q out)
Following the recommendation of the ATV 117 A should be the emptying time
maximum of 3 to 6 hours. This criterion is satisfied with the results from emptying
time.

3.4 Compilation of the design values


Retention Basin:
Inflow:
Outflow (Throttle):
Volume of basin:

Q r15 (1,0)
Q r15 (0,2)
Q out max
Q out
Q out/Q r 15(0,2)
tf
BR
V
V chosen
tE

EuropeAid/123052/D/SER/RO
stage: December 2010-12-16

[l/s]
[l/s]
[l/s]
[l/s]
[min]
[s]
[m]
[m]
[h]

514,1
916,5
366,6
183,3
0,2
0
750
687
700
1,1
page 4 of 6

Technical Assistance for Preparation of 5 projects


in the Environment Sector.
EuropeAid/123052/D/SER/RO
Consortium C&E Consulting and Engineering GmbH
Louis Berger SAS Poyry Environment GmbH

4 Calculation of pipes and trenches for inflow and/or outflow of the


basin
4.1 Pipes
Calculation according to Prandtl/Colebrook [3]
Pipe roughness kb: 1,5 mm
reach: Outflow (Throttle)
gradient I
nominal diameter (DN)
Qfull
Q
(Throttle outflow Q out max)
Q / Qfull

[%]
[mm]
[l/s]
[l/s]

1,3
500
432
366,6
0,85

4.2 Trenches
reach: Inflow
bottom width bu
slope inclination
gradient I
coefficient kst
(Manning/Strickler)
Q
(Inflow according to
Q r15 (0,2) / Outflow)
shear stress S
pavement
critical shear stress zul

EuropeAid/123052/D/SER/RO
stage: December 2010-12-16

[m]
[%]
[m 1/3 / s 1/2]

1,50
1:2
10,0
30

[l/s]

ca. 916

[N/m]

150

LMB 10/60 in 15 cm concrete


[N/m]
285

page 5 of 6

Technical Assistance for Preparation of 5 projects


in the Environment Sector.
EuropeAid/123052/D/SER/RO
Consortium C&E Consulting and Engineering GmbH
Louis Berger SAS Poyry Environment GmbH

reach: Emergency Outflow


bottom width bu
slope inclination
gradient I
coefficient kst
(Manning/Strickler)
Q
(Inflow according to
Q r15 (0,2) / Outflow)
shear stress S
pavement
critical shear stress zul

[m]
[%]
[m 1/3 / s 1/2]

0,50
1:2
5,0
30

[l/s]

ca. 916

[N/m]

100

Cp 90/250 in 20 cm gravel 16/63


[N/m]
200

reach: Emergency Outflow and Throttle Outflow


bottom width bu
[m]
0,50
slope inclination
1:2
gradient I
[%]
6,6
1/3
1/2
coefficient kst
[m / s ]
30
(Manning/Strickler)
Q
[l/s]
ca. 1.282
(Inflow according to
Q r15 (0,2) / Outflow)
[N/m]
143
shear stress S
pavement
Cp 90/250 in 20 cm gravel 16/63
[N/m]
200
critical shear stress zul

5 Bibliography
[1]

STAS 9470-73 Hidrotehnica. Ploi maxime. Intensitati, durate, frecvente

[2]

ATV-Regelwerk; Arbeitsblatt A 117 Richtlinien fr die Bemessung, die


Gestaltung und den Betrieb von Regenrckhaltebecken; 11/1977

[3]

Schneider Bautabellen; Werner Verlag

EuropeAid/123052/D/SER/RO
stage: December 2010-12-16

page 6 of 6

You might also like