Calcul Scurgeri Apa Suprafata - Calarasi - en
Calcul Scurgeri Apa Suprafata - Calarasi - en
EURO PEA N
U N IO N
P ro je c t fi n a n c e d u n d e r Is p a
Calculation
of the facilities for
surfacewater run off (rain run off)
OLD LANDFILL CALARASI
COUNTY CALARASI
EuropeAid/123052/D/SER/RO
stage: December 2010-12-16
page 1 of 6
CONTENTS
Page No.
1 Calculation basis....................................................................................................3
2 Calculation the Rain run off...................................................................................3
3 Calculation the volume of retention basin...........................................................4
3.1
Throttle outflow....................................................................................................4
3.2
3.3
3.4
4 Calculation of pipes and trenches for inflow and/or outflow of the basin.......5
4.1
Pipes....................................................................................................................5
4.2
Trenches..............................................................................................................5
5 Bibliography............................................................................................................6
EuropeAid/123052/D/SER/RO
stage: December 2010-12-16
page 2 of 6
1 Calculation basis
The following assumptions and definitions were made:
Calculation the rain runoff r 15 (1) (Q r15) according to STAS 9470-73 [1]
Calculation the volume of retention basin according to ATV A-117 [2]
Return frequency of rain set with 0,2 (suitable for open basins)
Time factor for calculation r 15 (0,2) set with 1,783 [3]
Ratio Outflow / Inflow (Q out / Q in) = 0,2
Flow time to the basin (tf) set with 0 min
(This assumption increases the the reliability.)
Calculation the Design value BR according to pict. 5 and 6 of ATV A117
Ared [ha]
0,30
0,90
0,00 ha
0,00 ha
0,18 ha
EuropeAid/123052/D/SER/RO
stage: December 2010-12-16
page 3 of 6
= Q out / Q r 15 (0,2)
= 0,2
Q out
min Q out = 0
max Q out = 2 * * Q r 15(0,2)
=0
BR
= 750 s
Q r15 (1,0)
Q r15 (0,2)
Q out max
Q out
Q out/Q r 15(0,2)
tf
BR
V
V chosen
tE
EuropeAid/123052/D/SER/RO
stage: December 2010-12-16
[l/s]
[l/s]
[l/s]
[l/s]
[min]
[s]
[m]
[m]
[h]
514,1
916,5
366,6
183,3
0,2
0
750
687
700
1,1
page 4 of 6
[%]
[mm]
[l/s]
[l/s]
1,3
500
432
366,6
0,85
4.2 Trenches
reach: Inflow
bottom width bu
slope inclination
gradient I
coefficient kst
(Manning/Strickler)
Q
(Inflow according to
Q r15 (0,2) / Outflow)
shear stress S
pavement
critical shear stress zul
EuropeAid/123052/D/SER/RO
stage: December 2010-12-16
[m]
[%]
[m 1/3 / s 1/2]
1,50
1:2
10,0
30
[l/s]
ca. 916
[N/m]
150
page 5 of 6
[m]
[%]
[m 1/3 / s 1/2]
0,50
1:2
5,0
30
[l/s]
ca. 916
[N/m]
100
5 Bibliography
[1]
[2]
[3]
EuropeAid/123052/D/SER/RO
stage: December 2010-12-16
page 6 of 6