Download as pdf
Download as pdf
You are on page 1of 5
SNEED Broocacee ‘Our Reference: SCT/FP/QTN/2475 Date: 24" March 2013 REDCO CONSTRUCTION - ALMANA. DOHA, QATAR T: +974 44690639 +974 44162240 rusfan.ismail@redcoalmana.com, Attention : | Mr. SAMEH EL SAMADISY ~ MANAGER ~ QS DEPT Project g MMERCIAL PLAZA & CHILDREN IKATARA, Subject : 2 HOUR CEMENTITIOUS FIRE PROOFING MONOKOTE MK-6/HY & FIRE BOND Dear Sir, This has reference to your fax inquiry dated 23" March 2013 pertaining to the captioned subject. We are pleased to submit our offer as per your requirement for your kind consideration as detailed below:- This Quotation is valid only for a Project in Qatar and subject to verification. MATERIAL (1) Monokote MK-6/HY & Firebond Price. AAs per Schedules attached. The quantities are taken from the information provided by you. The final quantities should be reconfirmed by you before the agreement, (1) Monokote MK-6/HY & Firebond Price Basis This is a Supply & Fix Prices for, (1) Monokote MK-6/HY & Firebond ‘The prices quoted exclude, (1) Surface Preparation. (2) Compatible Primer. G) Sufficient Scaffoldings (Dance Floor / Requisite Type) ‘Scope of Work To supply and apply up to 120 minutes of fire rated Cementitious based coating as per UL design thickness over the compatible primer to cleaned and dried substrate in preparation to receiving the Cementitious and based coating. Tel +974 44986675, Fax +974 44644703, P.O Box 82342, Doha - Qatar Email: - info@spraycontec.com website: - www.spraycontec.com pp aaa OS qual Page 1 of 3 Chas priate CONPEED smesorcemecnt ope eee COMED renee ‘Terms & Conditions Price subject to revision upon viewing of site conditions. Spray Con Technology reserve the right to revise the offer for Quantities less than 10% of the estimate. For any extra works that has not been included in the (present) scope of work, rates will be mutually agreed and confirmed prior to commencement of the job. Escalation will be applicable in the event of Petrol hike, Dollar appreciation, acts of terrorism, revision of Customs Duties, and other Government levies/tariff during the course of application of the coating, it would be necessary to change contracted prices after mutual discussions. Al Fireproofing must be done before any MEP services, and this is the basis of our quote. Any price change based specification changed will be reverted to the General Manager or Deputy General Manager for any specification, clause or price changes to be binding on this contract. All applied materials will remain the property of Spray Con until paid for. Payments 80% of the Contract against LC of materials, at sight. 20% progressive payment (MONTHLY) payable within 1 Month, Measurements Measurements wherever applicable, will be recorded jointly for certification over the peripheral fireproofed surfaces. M/s. REDCO CONSTRUCTION - ALMANA 1. To provide temporary safe closed storage space under lock and key safe/free from rain, fire, damages, theft, arson, looting. 2. To provide electricity points where required (380/240V) at work point. 3. To provide continuous and regular supply of potable water at every level/ work point. 4. To ensure sufficient lighting / ventilation at locations of fire proofing operations. 5. To give site/area clearance prior to application of fire proofing works 6. To provide all cleaning/masking departmentally. 7. To pay idle wages based on QR 2000 per 8 hrs shift. 8. Third Party Inspection if required. Mobilization We request you to consider at least 2 to 4 weeks, (for Planning; Organizing and Mobilizing trained & certified men and material), from the date of LOI and along with the Advance Payment. ‘Commencement an tion We will commence and complete the entire work entrusted within such date, as may be mutually planned discussed and agreed upon for timely completion of the building program. Kindly provide a schedule for our works. Expected/ anticipated releases. Force Majeure Clause ‘The Standard Force Majeure Clause shall govern this contract entered into. Tel +974 44986675, Fax +974 44644703, P.O Box 82342, Doha - Qatar Email: - info@spraycontec.com website: - www.spraycontec.com cal asl ok gad Page 2 of 3 (pelo fag ATTEY sue Cl SrRayconTEemoLDGY wes 420A OHTAR COMED Scie The proposal will be valid for a period of 30 days for the date of this offer and thereafter subject to our reconfirmation. ‘Trust the proposal provided with is found technically competent and financially attractive. Should clarification. have any queries kindly revert without hesitation for any necessary information and ‘Thanking you Yours truly For Spray ConTee W.L.L G.V. ROSARIO VINOTH DGM ENGINEER M 77870225 1M 33808164 gvrosario@spraveontec.com engr@spraycontec.com Copy To:- File. Enclosed: - Detail Sheet (2 pages) Tel +974 44986675, Fax +974 44644703, P.O Box 82342, Doha - Qatar Email: - info@spraycontec.com website: - www.spraycontec.com PUTT] Page 3 of 3 oe aga YET C SPRAY CON TECHNOLOGY wus Yeu: aueers fax netes Po. son: #342 DOWA-GATAR SPRAY. Ginn, Haat Comper o Cire al & omc AH kine 2owr cements re pofing on cece tata ste. sx] mentor — [roots] arena) | pelt | wo | vce | taunt | stmtteTmanes | tatu 08 T[namsmmme [aes | Om Tans 2 | unssextenes [3 | aon] as sees rom x30 3 cun-woxtaxag [3 | asses] ass [boas rom ropa + | cunasneisexee [3 | mis | 2s 095 rom S88 3 [cupasixiixer [3 | 15600] as [ons 0m s10948 <[wpasmwme [3 [ms [ans | ons [Das rom ‘18431 7 [un ciomoxior_| 3 | “16° | 209005 ‘om | ease | unions [3 | —a530 | as [00s ion rasan [ww oman [3 | “see [2s [iar os ‘Om T9145 io | ub esxasietao [3 | omas | ae [ns | os iomm ——| —st69«0s u UB 686X254X170 3 1841.89 2 hrs 138 D925 __|Monokote MK6/HY 10 mm 60139.70 12 UB 914X305X201 3 741.89 2hrs 1.29 D925 & Fire bond 10mm 24223.49 13 |_veasasers [3 [sivas [aim [101095 TO 1961.70 ia [_vesosaosxo7 [3 | osiss [ats[ | Ds io 50st 15 | wesosxcasmite [3 | W809 ai [ os rom T1982 16 | veasexueraas | 3 | san | 2 [25] Ds TO za 17] vossexanenao [3 [ra [25 | 295 095 ion 0113 is} vessexaaexios [4 [7a [a [ax 301m oreo 19 | vesseaoxvs | «| im | 2m | 2x 14 ronnes 20[ _uoxsexsoxaer [4 | 5676 | ans a9 [xr i? worse 21 | _uexsexon [4 [19575] ans a0 itm 5676 2 [_wewsaxea [4 [08 | 2s axe 36m te CONES tot bas G58 yum ob Hag TFET gage CON TECHNOLOGY wis SPRAY re STS FAK : 4644703 7.0. Bor 82342. OOHA-QATAR SN Member No. of sides | Area (m2) Aire wr | UL Design | Material Proposed Rating(Hrs) ‘Total Cost (QR) 2 3 [came | Om a9 TBEcTON ¢ [cise 2s [xr Mot MY] so 125.02 pater [a] sto [2s | 8335 TOnm 21674 by TOTAL, 12166.18 487478.59 Rate in r / M2 Note 40.07 1 Member with 120 minuts and concealed application only. 2 Fire Proofing rates are based on works commencing before any MEP services, 3 The prices quoted excludes primer and seaffoldings(Dance floor/Requisite type). Scaffoldings provided by you free of cost. 4 This work sheet/HPA design is prepared by us based on the information provided by the client/you to Spraycon.Spraycon absolve itself off any liabilities as it has based on the thickness of fireproofing(coating thickness) on the HPA design and any changes or revision of information provided ‘would/will reflect on the HPA design applied, subsequently the prices. 5 Please confirm primer compatibility before painting steel, 6 We will not achieve the cosmetic finish on surface, This is fire proofing work 7 ‘The given quote is assumed budgetry value only.If any changes in BOQ will refelect in price of materials and labour in our quotation. If any details revised or missed from this offer kindly bring it to our concern and itis subjected to change the offered quotation price also. tt eal OS gon ° SRR Sc Vinoth.t Engineer 24/03/13

You might also like