Professional Documents
Culture Documents
Building Estimate
Building Estimate
Item
No
Item
Unit
Rate
Sqm
2150.46
Sqm
41.70
Item
No
Item
Unit
Rate
Sqm
60.38
Sqm
42.27
Sqm
660.43
Sqm
70.37
Sqm
99.65
Item
No
Item
Unit
Rate
Sqm
1258.00
Fals Ceiling
Total Value of estimate (seven lacks twenty five thousand eight hundred and eight
Note:
The estimate has been framed as per the S.R. of 2010-11 A.P.W.D (Buildings).
Item
No
Item
Unit
Rate
NG WORKS
Quantity
Amount
142.00
Rs.
305,365.00
788.00
Rs.
32,860.00
Quantity
Amount
534.00
Rs.
32,243.00
312.00
Rs.
13,188.00
232.00
Rs.
153,220.00
98.00
Rs.
6,896.00
98.00
Rs.
9,766.00
Quantity
137.00
Total
Amount
Rs.
Rs.
172,346.00
725,884.00
A.P.W.D (Buildings).
Quantity
Amount
Prepared By
ESTIMATE
Name of work : Construction of Vermi Compose Shade
Name of NGO : Uttaran NGO Society
Total Value of Estimate : Rs. 114000.00
Item
No
Item
Unit
Cum
Earth/ sand filling in plinth in layers not more than 150mm thick
including necessary carriage, watering, ramming etc. complete as
directed and specified including payment of land compensation,
forest royalty, sales tax and other duties and taxes as may be
necessary.
(a) With earth or silt or sand obtained by head load with lead upto
90m and lift upto 2m
Cum
Sqm
Brick work in cement morter with 1st class brick including racking
out joints and curing complete as directed.
Cum
Item
No
Item
Unit
cum
Qtl
Sqm
Item
No
Item
a) Corner and end posts with M.S angle of size 50mmx50mmx 5mm
and length not less than 1800mm only duly slotted and bottom
torqued with two numbers as stay posts..
Unit
10
Supplying, fitting and fixing double leaf heavy duty iron gate, frame
made from 40mm x 40mm x 6mm M.S. angle and with M.S. flat of
40mm x 6mm size as per approved design.Necessary locking
arrangement for temporary closing the gate and 2nos.( minimum)
strong iron hinges of M.S bars and flat of same sizes on each leaf to
be embedded in C.C brick pillers as necessary including a red oxide
painting to all iron works as directed and specified.(Separate
payment will be made for posts).
Providing undressed wood work in roof truss, rafter, purlin, tie and
the like including hoisting and fixing in position with necessary
spikes, nails including M.S straps with bolt and nuts etc.complete
with kiricide oiling two coats to all timber members and two coats of
anticorrosive paint to M.S straps (M.S flats, angle cleats, and bolt and
nuts required for flat and angle cleats wherever used shall be
measured and paid separately)
11
Qtl
Cum
Sqm
Item
No
Item
Unit
Note:
The estimate has been framed as per the S.R. of 2013-14 A.P.W.D (Buildings).
Rate
Quantity
Amount
Rs.108.82
1.50
Rs.
163.00
Rs.105.25
3.56
Rs.
375.00
Rs. 368.71
11.88
Rs.
4,380.00
Rs. 6,045.24
4.02
Rs.
24,302.00
Rate
Quantity
Amount
Rs. 210.14
56.32
Rs.
11,835.00
Rs. 6,331.46
Rs. 1.50
Rs.
9,497.00
Rs.6,026.82
1.10
Rs.
6,630.00
Rs.656.82
26.46
Rs.
17,379.00
Rate
Quantity
Amount
Rs.6,808.23
1.05
Rs.
7,149.00
Rs.87,836.62
0.28
Rs.
24,858.00
450.45
16.56
Rs.
7,459.00
Total
Rs.
114,027.00
Say
Rs.
114,000.00
Rate
D (Buildings).
Quantity
Amount