TRUCK PRODUCTION
PRACTICAL EXERCISE
Ten 22 ton/18 cy rear dump
trucks (Fig. 10.8 Performance
Chart) with low pressure tires
are available to haul a rock
dirt/gravel mixture. The wheel
loader being used has a 4.25
cy bucket.
PRACTICAL EXERCISE
The haul and return, over
poorly maintained earth, is 3
miles. It is a down hill grade
of 1.25% going to the dump
area. EVW is 36,860 lb.
Working hour efficiency is 55
minutes.
18
Bucket loads =
3.85
4.675
Bucket loads must be an integer No.
Therefore use either
3 or 4 bucket loads.
Table 4.3
2,600 lb/lcy
2,000
= 18.2 tn 22 tn ok
2,600
418
bucket
load:
lcy
= 23.4 tn 22 tn
2,000
This is a slight overload situation.
3 bucket load:
3 X 0.525 = 1.58 min
4 bucket load:
4 X 0.525 = 2.10 min
DUMP
4.25%
= 3.0% or 60 lb/tn
Gross wt. =
18.43 + 18.20 =
36.63 tn
Gross wt. =
18.43 + 23.40 =
41.83 tn
= 2,200 lb
4 bucket load Gross wt. 41.83 tn
Rimpull = 60 lb/tn X 41.83 tn
= 2,510 lb
2510
2200
= 2,030 lb
2030
= 5.143 min
3 bucket loads
Load time
+ Haul time
+ Dump time
+ Return time
1.580 min
5.143 min
2.000 min
5.143 min
Load time
+ Haul time
+ Dump time
+ Return time
2.100 min
8.183 min
2.000 min
5.143 min
13.866
Trucks required =
1.58
17.426
Trucks required =
2.10
STEP 8 PRODUCTION
3 bucket loads
The loader will control production
if we use a number of trucks (9)
greater than the balance.
PRODUCTION (LOADER) =
60 min/hr
14.025 lcy = 533 lcy/hr
1.58 min
STEP 8 PRODUCTION
4 bucket loads
The loader will control production
if we use a number of trucks (9)
greater than the balance.
PRODUCTION (LOADER) =
60 min/hr
18 lcy = 514 lcy/hr
2.10 min
STEP 9 EFFICIENCY
Working hour
efficiency is 55 min.
55 min
= 0.92
60 min
STEP 9 EFFICIENCY
Efficiency is 55 min.
STEP 8 PRODUCTION
3 bucket loads
If only 8 trucks are available the
trucks control production.
PRODUCTION (TRUCK) =
60 min/hr
14.025 lcy 8 = 485 lcy/hr
13.866 min
STEP 8 PRODUCTION
4 bucket loads
If only 8 trucks are available the
trucks control production.
PRODUCTION (TRUCK) =
60 min/hr
18 lcy 8 = 496 lcy/hr
17.426 min
STEP 9 EFFICIENCY
Efficiency is 55 min.
PRODUCTION
9 Trks
3
Buckets
490 lcy
4
Buckets
473 lcy
8 Trks
446 lcy
456 lcy
7 Trks
389 lcy
398 lcy
PRODUCTION
While matching the fleet
to the required production
is important, doing it at a
minimum $/unit of
material moved is usually
the goal.
PRODUCTION COST
As you add trucks
Cost/ ton $
0.6
0.5
0.4
0.3
0.2
0.1
0
40
80
120
160
200
Tons/ hour
240
260
Cost/ ton $
PRODUCTION COST
0.6
0.5
0.4
0.3
0.2
0.1
0
40
80
120
160
200
Tons/ hour
240
260
HAPPY HAULING